2015 business plan - gwinnett county

46
2015 Business Plan September 2014

Upload: others

Post on 26-Dec-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2015 Business Plan - Gwinnett County

2015 Business Plan

September 2014

Page 2: 2015 Business Plan - Gwinnett County

Mission

To Provide Superior Water Services at an Excellent Value

Page 3: 2015 Business Plan - Gwinnett County

To Provide Superior Water Services at an Excellent Value

Highly Performing

Staff

Well Maintained

Assets Financial

Sustainability

Page 4: 2015 Business Plan - Gwinnett County

To Provide Superior Water Services at an Excellent Value

Highly Performing

Staff

Well Maintained

Assets Financial

Sustainability

Page 5: 2015 Business Plan - Gwinnett County

Highly Performing Staff

• 77 New Hires • 44 Promotions • 580 Positions Total

Culture Shift

Continuous Improvement

Realigned Organization

Page 6: 2015 Business Plan - Gwinnett County

Highly Performing Staff Realigned Organization

Outside Hire

Realigned Position

DirectorWater Resources

Ron Siebenheiner.

Assistant to DirectorDebbie Boyd

Operations Support ServicesDeputy Director

J C Lan

Operations Tech SupportDivision Director

Denise Funk

Modeling and Asset Management ServicesDivision Director

Vacant

Engineering and ConstructionDivision Director

Don Joffe

Premitting and Regulatory ComplianceSection Manager

Kevin Farrell

Treatment FacilitiesDeputy Director

Jeff Boss

Water Rec Operations ManagerSection Manager

Eric Hancock

Water Prod Operations ManagerSection Manager

Vacant

Maintenance ManagerSection ManagerPierce Freeman

RCM ManagerSection Manager

Clinton Davis

Field ServicesDeputy Director

Rebecca Shelton

Corrective MaintenanceSection Manager

Howard Buck

Preventive MaintenanceSection Manager

Steve Sheets

Contracts/SupportSection ManagerCharlie Roberts

Material ManagerSection Manager

Greg Gaines

Assistant Director

Tyler Richards

Financial ServicesSection Manager

Vacant

Training and OutreachSection ManagerJerimiah McClary

Customer ServicesCustomer Service Manager

Alisha Voutas

Project Controls/ContractsDivision Director

Rich Schoeck

Page 7: 2015 Business Plan - Gwinnett County

Highly Performing Staff Integrating Stormwater

Stormwater Engineering Engineering

Pipe Inspection Pipe Inspection

Regulatory/MS4 Permits Regulatory/NPDES Permits

Field Crews Field Crews

Field Investigation Field Investigation

GIS/Billing GIS

Water & Sewer

Page 8: 2015 Business Plan - Gwinnett County

Highly Performing Staff Integrating Stormwater

Stormwater Engineering Engineering

Pipe Inspection Pipe Inspection

Regulatory/MS4 Permits Regulatory/NPDES Permits

Field Crews Field Crews

Field Investigation Field Investigation

GIS/Billing GIS

Water & Sewer

Page 9: 2015 Business Plan - Gwinnett County

Highly Performing Staff Challenge – Diversity of Skillsets

Field Trades Associates Customer Service Reps

Engineers

Pump Stations Mechanics Construction Inspectors

Maintenance Techs

Admin Assistants Electrician Meter Repair

Leak Detectors Warehouse technicians Operators Trades Technicians Financial Analyst

Page 10: 2015 Business Plan - Gwinnett County

Highly Performing

Staff

Training for Core Competency and

Career Development

Safety Training Recruitment

Highly Performing Staff Training and Recruitment

Page 11: 2015 Business Plan - Gwinnett County

Highly Performing Staff Progress to Date

Training and Career Development New Training and Outreach Section Manager hired

Training needs survey initially complete

Training and certifications tracking software

implemented Specific job skills requirements being identified

Page 12: 2015 Business Plan - Gwinnett County

Highly Performing Staff Progress to Date

Recruitment Key position recruitment

14 summer interns hired (706 applicants)

2 Co-op students hired for fall 2014 temporarily in

intern positions

Page 13: 2015 Business Plan - Gwinnett County

Highly Performing Staff Next: Improved Safety Program

Explosive Gases • Methane • Oxygen

Toxic Gases • Ozone • Carbon Monoxide • Hydrogen Sulfide • Chlorine

Hazardous chemicals

• Lime • Ferric Chloride • Sodium Hypochlorite

Hazardous Environments

• Confined space • Heights • Trenches • Heavy Equipment • Roadways • Electrical Equipment • Microbiological Hazards • UV exposure

Page 14: 2015 Business Plan - Gwinnett County

Highly Performing Staff Resource Needs

2015 Budget Decision Packages 1 Safety Section Manager position 4 new Co-op positions

Increased 2015 Training Budget

Page 15: 2015 Business Plan - Gwinnett County

To Provide Superior Water Services at an Excellent Value

Highly Performing

Staff

Well Maintained

Assets Financial

Sustainability

Page 16: 2015 Business Plan - Gwinnett County

Well Maintained Assets

• 3 Water Reclamation Facilities • 2 Water Treatment Facilities • 221 Sewage Pump Stations • 8,036 miles of Water, Sewer and Stormwater Pipe

$9 Billion Asset Replacement Value

Page 17: 2015 Business Plan - Gwinnett County

Well Maintained Assets Goals and Achievements

1. Move from Reactive to Proactive Maintenance PM now a priority – 33% increase in PM work orders Predictive Maintenance program being developed

2. Implement Best Practices across Maintenance and Operations Centralized management Improved warehouse practices Training of planners and warehouse staff Root cause analyses of critical equipment failures

Page 18: 2015 Business Plan - Gwinnett County

Well Maintained Assets Goals and Achievements

3. Improve Utilization of our Assets – both

Staff and Equipment Centralized management of O&M – decrease in

backlog work orders of 22%

4. Ensure the right assets are installed, in the right place, in the right way Centralized management of inspections Revising equipment and pipe specifications

Page 19: 2015 Business Plan - Gwinnett County

Well Maintained Assets Budget Impacts

Increased professional services to

develop maintenance programs

Increased CIP at facilities to improve equipment rehab and replacement

Page 20: 2015 Business Plan - Gwinnett County

To Provide Superior Water Services at an Excellent Value

Highly Performing

Staff

Well Maintained

Assets Financial

Sustainability

Page 21: 2015 Business Plan - Gwinnett County

Long-Term Financial Plan

Financial Sustainability for Gwinnett County Water Resources

Financial Sustainability

Page 22: 2015 Business Plan - Gwinnett County

Financial Sustainability 2015 Budget

W&S Service Fees 94%

Stormwater Fees >99%

W&S Revenue $317.5 Million

Stormwater Revenue $31.3 Million

Page 23: 2015 Business Plan - Gwinnett County

Financial Sustainability W&S 2015 Budget

Operating Expenses $111.5 M

Debt Service

$100.4 M

Transfer to R&E (Capital)

$84.2 M

Page 24: 2015 Business Plan - Gwinnett County

Financial Sustainability W&S 2015 Operating Budget

Category $ %

Operating Budget

Personnel Services $38.2 M 34.3%

Utilities $15.6 M 14.0%

Professional Services $13.9 M 12.5%

Industrial R&M $11.4 M 10.2%

Chemicals $8.9 M 8.0%

Other $23.5 M 21.0%

Operating Expense $111.5 M

Page 25: 2015 Business Plan - Gwinnett County

Financial Sustainability Increasing Efficiency

Utilities and Chemicals annual costs $24.5 M • Power generation from biogas at Hill WRC • FOG and High Strength Waste Receiving Station • Nutrient Recovery – $200,000 O&M Savings • Optimize polymer chemical addition

$700,000 per year cost saving

Page 26: 2015 Business Plan - Gwinnett County

Financial Sustainability W&S 2015 Capital Budget

Source of Funds 2015 2016 2017 2018 2019 2020 Total

2015-2020

Internal Funding $ 84.18 $ 104.91 $117.06 $ 108.77 $ 103.98 $ 101.98 $ 620.88

Use of Funds

Wastewater Treatment $ 19.50 $ 42.00 $ 63.00 $ 55.00 $ 51.00 $ 48.00 $ 278.50

Wastewater Collection $ 19.55 $ 21.75 $ 20.05 $ 20.05 $ 19.55 $ 19.55 $ 120.50

Water Distribution $ 15.30 $ 16.30 $ 16.30 $ 16.30 $ 16.50 $ 17.50 $ 98.20

Water Treatment $ 19.00 $ 14.00 $ 10.00 $ 10.00 $ 10.00 $ 10.00 $ 73.00

System Development $ 7.19 $ 6.28 $ 5.79 $ 5.04 $ 5.05 $ 5.05 $ 34.40

Equipment/building/tech support $ 3.54 $ 4.38 $ 1.72 $ 2.18 $ 1.68 $ 1.68 $ 15.18

Utility Relocates $ 0.10 $ 0.20 $ 0.20 $ 0.20 $ 0.20 $ 0.20 $ 1.10

Total Use $ 84.18 $ 104.91 $117.06 $ 108.77 $ 103.98 $ 101.98 $ 620.88

Page 27: 2015 Business Plan - Gwinnett County

Financial Sustainability W&S 2015 – 2020 CIP Budget

$0

$50

$100

$150

$200

$250

$300

WaterReclamation

CollectionSystem

DistributionSystem

WaterProduction

SystemDevelopment

Other

$620.88 Million Total

Milli

ons

$

Page 28: 2015 Business Plan - Gwinnett County

Financial Sustainability Stormwater 2015 Budget

* In thousands

Operating Expense

$9.6M

Debt Service $0.4M

Transfer to R&E (Capital)

$20.4M

Page 29: 2015 Business Plan - Gwinnett County

Category $ %

Operating Budget

Personnel Services $5.4M 56.3%

Professional Services $1.6M 16.7%

Other $2.6M 27.0%

Operating Expense

$9.6M

Financial Sustainability Stormwater Operating Budget

Page 30: 2015 Business Plan - Gwinnett County

Financial Sustainability Stormwater 2015 Capital Budget

Source of Funds 2015 2016 2017 2018 2019 2020 Total

2015-2020

Internal Funding $ 20.36 $ 20.68 $ 21.80 $ 21.85 $ 21.60 $ 21.50 $ 127.79

Use of Funds

Stormwater Draining Improvements $ 20.01 $ 20.33 $ 21.45 $ 21.50 $ 21.25 $ 21.15 $ 125.69

Natural Resources Watershed (Dams) $ 0.15 $ 0.15 $ 0.15 $ 0.15 $ 0.15 $ 0.15 $ 0.90

Admin/contingency $ 0.10 $ 0.10 $ 0.10 $ 0.10 $ 0.10 $ 0.10 $ 0.60

DWR Data Management $ 0.10 $ 0.10 $ 0.10 $ 0.10 $ 0.10 $ 0.10 $ 0.60

Total Use $ 20.36 $ 20.68 $ 21.80 $ 21.85 $ 21.60 $ 21.50 $ 127.79

Page 31: 2015 Business Plan - Gwinnett County

Financial Sustainability Long-Term Financial Plan

Revenue

Operating Costs Debt Service Capital Needs

Page 32: 2015 Business Plan - Gwinnett County

$0

$50

$100

$150

$200

$250

$300

$350

$400

2010 2012 2014 2016 2018 2020 2022 2024 2026 2028 2030

Annu

al W

&S

Rev

enue

, Mill

ion

$ Financial Sustainability

W&S Revenue Over Time – Projected

Last approved rate increase in 2015 (Total 5%) After 2015 assumes 2% increase in revenue

every other year due to growth

Page 33: 2015 Business Plan - Gwinnett County

$0

$20

$40

$60

$80

$100

$120

$140

2010 2012 2014 2016 2018 2020 2022 2024 2026 2028 2030

Annu

al W

&S

Ope

ratin

g C

osts

, Mill

ion

$ Financial Sustainability

W&S Operating Costs Over Time – Projected

1.5% Increase/year

Page 34: 2015 Business Plan - Gwinnett County

Financial Sustainability W&S Debt Service Over Time

$0

$20

$40

$60

$80

$100

$120

2010 2012 2014 2016 2018 2020 2022 2024 2026 2028 2030

Annu

al W

&S

Deb

t Ser

vice

, M

illio

n $

Page 35: 2015 Business Plan - Gwinnett County

Financial Sustainability Funds Available for CIP – Projected

$0

$50

$100

$150

$200

$250

$300

$350

$400

2010 2012 2014 2016 2018 2020 2022 2024 2026 2028 2030

Annu

al W

&S

Rev

enue

, Mill

ion

$

Debt ServiceOperating CostRevenue

Funds Available for CIP

Page 36: 2015 Business Plan - Gwinnett County

$0

$50

$100

$150

$200

$250

$300

2010 2012 2014 2016 2018 2020 2022 2024 2026 2028 2030

Annu

al C

IP F

unds

Ava

ilabl

e, M

illio

n $

Financial Sustainability Funds Available for CIP – Projected

Page 37: 2015 Business Plan - Gwinnett County

$0

$50

$100

$150

$200

$250

$300

2010 2012 2014 2016 2018 2020 2022 2024 2026 2028 2030

Annu

al C

IP F

unds

Ava

ilabl

e, M

illio

n $

Funds Available for CIP

CIP Budget

Future CIP Needs

?

Financial Sustainability Funds Available for CIP – Projected

Page 38: 2015 Business Plan - Gwinnett County

Financial Sustainability Gravity Sewer Pipe Installed Each Decade, Miles

Page 39: 2015 Business Plan - Gwinnett County

Financial Sustainability Gravity Sewer Pipe Replacement Needs through 2030

Cum

ulat

ive

Cos

t, $M

$- $10 $20 $30 $40 $50 $60 $70 $80 $90 $100

02468

101214161820

2015 2020 2025 2030

5.8 M Annual R&R

Fund Surplus

Shortfall

Current Annual Funding

Page 40: 2015 Business Plan - Gwinnett County

$-

$50

$100

$150

$200

$250

$300

$350

02468

101214161820

2015 2020 2025 2030 2035 2040

Surplus

Shortfall

40

Financial Sustainability Gravity Sewer Pipes Replacement Needs through 2040

Cum

ulat

ive

Cos

t, $M

R&R Fund

Page 41: 2015 Business Plan - Gwinnett County

Financial Sustainability Long-Term Infrastructure R&R Needs

Gravity Sewer System Distribution System

Projected R&R Needs Complete

? Water Reclamation Facilities ? Water Treatment Facilities ? Sewage Pump Stations ? Sanitary Sewer Force mains ? Water Booster Stations and Tanks

Developing Projected R&R Needs

Page 42: 2015 Business Plan - Gwinnett County

$0

$50

$100

$150

$200

$250

$300

2010 2012 2014 2016 2018 2020 2022 2024 2026 2028 2030

Annu

al C

IP F

unds

Ava

ilabl

e, M

illio

n $

Funds Available for CIP

CIP Budget

Future CIP Needs

Financial Sustainability Funds Available for CIP – Projected

Page 43: 2015 Business Plan - Gwinnett County

$0

$10

$20

$30

$40

$50

$60

Pipe R&R Program

Mill

ions

Current Annual Funding

Financial Sustainability Annual Stormwater Pipes Replacement Needs through 2030

Shortfall

Annual Funding Needs

Page 44: 2015 Business Plan - Gwinnett County

Financial Sustainability 2015 Initiative

Long-Term Financial Plan for DWR • Operating Budget Needs • Capital Plan Needs • Capital Needs Management Strategy • Long-term R&R Funding Strategy • Reserve Funding Plan • Investment Strategy • Rates to Support Needs

Page 45: 2015 Business Plan - Gwinnett County

To Provide Superior Water Services at an Excellent Value

Highly Performing

Staff

Well Maintained

Assets Financial

Sustainability

Page 46: 2015 Business Plan - Gwinnett County

Questions?