2019 Construcon Program PennDOT Engineering District 1 SERVING CRAWFORD, ERIE, FOREST, MERCER, VENANGO, AND WARREN COUNTIES Tom Wolf, Governor Leslie S. Richards, Secretary of Transportaon James A. Foringer, P.E., District Execuve

Upload: others

Post on 07-Sep-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

2019 Construction Program

PennDOT Engineering District 1

SERVING CRAWFORD, ERIE, FOREST, MERCER, VENANGO, AND WARREN COUNTIES

Tom Wolf, Governor

Leslie S. Richards, Secretary of Transportation

James A. Foringer, P.E., District Executive

Page 2: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

2

Contact Information

PennDOT Engineering District 1 255 Elm Street

PO Box 398 Oil City, PA 16301

(814) 678-7085

Business Hours: 8:00 AM — 4:30 PM Monday — Friday

PennDOT’s Engineering District 1 is responsible for the state-maintained transportation network in this region.

This includes 3,689 miles of roadway and 2,064 bridges in the six-county area.

Page 3: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

3

Overall 2019 Construction Program

• Projected 2019 Program: $125.44M

• 2018 Program: $92.84M

Page 4: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

4

District 1 2019 Construction Program

Thank you for your interest in the Pennsylvania Department of Transportation District 1 Construction Program for 2019.

This publication is intended to provide a general overview of projects that currently are under construction, and those scheduled to be awarded or begin construction in 2019.

The 2019 Construction Book is divided into seven sections: one representing projects spanning the entire district or multiple counties and one representing each of the six counties in the district.

Award dates, expected completion dates, project descriptions, project locations, costs, and maintenance of traffic are listed. The listed estimated cost for a project is for the construction phase only.

County maps have also been included for reference.

Please keep this book on hand throughout the upcoming construction season.

Note: All information is correct as of the distribution date of this booklet. However, all dates and costs are estimated and, therefore, are subject to change.

Page 5: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

5

Districtwide & Multi-County

Projects

Page 6: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

6

Carryover Projects—Districtwide

Map ID: Districtwide Districtwide

Title: Districtwide Guiderail 1-17-GR1 Districtwide Guiderail 1-17-GR2

SR (Section): N/A N/A

MPMS ID: 107876 107878

Project Type: Safety Project Safety Project

Contractor: Penn Line Service, Inc. Green Acres Contracting Co., Inc.

Contract cost: $1,856,208 $1,221,894

PennDOT

Contact: Tim F. Scott Tim F. Scott

Project

Description:

This project includes the repair and replacement of guiderail on various state routes in various municipalities in Erie, Forest and Warren counties.

This project includes the repair and replacement of guiderail on various state routes in various municipalities in Mercer and Venango counties.

Maintenance of

Traffic:

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

Estimated

Completion: Summer 2019 Summer 2019

Page 7: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

7

2019 Projects—Districtwide

Map ID: Districtwide Multiple Counties

Title: 2019-2020 Highway Lighting D1 Northwest 2019 AWPM

SR (Section): N/A N/A

MPMS ID: 112506 106576

Project Type: Safety Project Safety Project

Estimated Cost: $650,000 $160,000

PennDOT

Contact: Ronald Johnson Diana Craft

Project

Description:

This project includes the repair and replacement of highway lighting throughout District 1 in 2019 and 2020.

This project includes installing, repairing and replacing reflective pavement markings on various state routes and in various municipalities in Crawford, Forest, Venango and Warren counties in 2019.

Maintenance of

Traffic:

A minimum of one lane of traffic will be maintained during installation or replacement of the markers.

Daylight traffic control only.

Access to drives will be maintained.

A minimum of one lane of traffic will be maintained during installation or replacement of the markers.

Daylight traffic control only.

Access to drives will be maintained.

Open for Bid: 2/21/2019 2/28/2019

Estimated

Completion: December 2020 Fall 2019

Page 8: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

8

Crawford County

Projects

Page 9: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

9

Page 10: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

10

Carryover Projects—Crawford

Map ID: 6 7 21

Title: SR 1007: Bidley Crns Brdg PA 27 over Oil Creek Trib Big "I" Roundabout

SR (Section): 1007 (B03) 27 (B04) 6 (S01)

MPMS ID: 505 74605 106367

Project Type: Bridge Project Bridge Project Safety Project

Contractor: Shingledecker's Welding, Inc Horizon Construction Group, Inc. S. E. T., Inc.

Contract cost: $669,527 $623,719 $6,126,811

PennDOT

Contact: Peter G. Valentino Peter G. Valentino Chad J. Tarr

Project

Description:

This project includes the replacement of the State Route 1007 (Brown Hill Road) Bidley Corners Bridge over Federal Run in Athens Township, Crawford County. The bridge is 44 feet in length.

This project includes the replacement of the State Route 27 (West Central Avenue) Bridge over the Oil Creek Tributary in Oil Creek Township, Crawford County. Existing structure is being replaced with a box culvert. The bridge is 19 feet in length.

This project includes safety improvements to the intersection of US Routes 6/322 (Conneaut Lake Road) with US 19 and PA 98 (Perry Highway) in Vernon Township, Crawford County.

Work involves the construction of a roundabout along with minor roadway alignment and profile changes, appropriate signing and pavement markings.

Maintenance of

Traffic:

A detour will be required during construction.

Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com.

A detour will be required during construction.

Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com.

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

Estimated

Completion: June 2019 Fall 2019 Fall 2020

Page 11: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

11

2019 Projects—Crawford

Map ID: 1 2 3

Title: SR 4008 over Conneaut Ck PA 198 Bridge ov Cuss Trib SR 198 Bridge Seg. 260

SR (Section): 4008 (B03) 198 (B09) 198 (B02)

MPMS ID: 78857 90030 105842

Project Type: Bridge Project Bridge Project Bridge Project

Estimated Cost: $800,000 $180,000 See project 90030

PennDOT

Contact: Matthew Antrilli Kenneth Sanoski Kenneth Sanoski

Project

Description:

This project includes the rehabilitation of the State Route 4008 (Fisher Road) Bridge over Conneaut Creek in Spring Township, Crawford County. The project also includes stream bank restoration. The bridge is 115 feet in length.

This project includes the replacement of the State Route 198 (Foster Road) Bridge over the Cussewago Creek Tributary in Summerhill Township, Crawford County.

The bridge is 12 feet in length and will be replaced with a box culvert.

Project is being contractually combined with project 105842. This is the lead project.

Allison Park Contractors, Inc. will be the contractor for this project.

This project includes the replacement of the State Route 198 (Foster Road) Bridge in Summerhill Township, Crawford County.

The bridge is 13 feet in length and will be replaced with a box culvert.

Project is being contractually combined with project 90030.

Maintenance of

Traffic:

A detour will be required during construction.

Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com.

A detour will be required during construction.

Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com.

A detour will be required during construction.

Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com.

Open for Bid: 4/25/2019 Project has been awarded Project has been awarded

Estimated

Completion: Fall 2019 Summer 2019 Summer 2019

Page 12: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

12

2019 Projects—Crawford

Map ID: 4 5 8

Title: US 6 Br over French Ck SR 1037: Federal Run Brdg SR 1003/Woodcock Ck Trib

SR (Section): 6 (B18) 1037 (B02) 1003 (B00)

MPMS ID: 57940 57974 93169

Project Type: Bridge Project Bridge Project Bridge Project

Estimated Cost: $5,000,000 $800,000 $1,600,000

PennDOT

Contact: Mark Nicholson Stephen Schettler Kenneth Sanoski

Project

Description:

This project includes the replacement along with a detour of the US Route 6 (Main Street) Bridge over French Creek in the Borough of Cambridge Springs, Crawford County. The bridge is 203 feet in length.

This project includes the replacement of the State Route 1037 (Little Cooley Road) Porters Road Bridge over Little Federal Run in Bloomfield Township, Crawford County.

The bridge is 23 feet in length.

This project includes the restoration/rehabilitation of the State Route 1003 (Shutz Road) Bridge over Woodcock Creek Tributary in Woodcock Township, Crawford County.

The bridge is 273 feet in length.

Maintenance of

Traffic:

A detour will be required during construction.

Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com.

A detour will be required during construction.

Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com.

A detour will be required during construction.

Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com.

Open for Bid: 8/8/2019 3/28/2019 12/5/2019

Estimated

Completion: Fall 2020 Fall 2020 Fall 2020

Page 13: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

13

2019 Projects—Crawford

Map ID: 9 10 11

Title: 2019 Crawford & Forest Shotcrete Group S 322 Br/Crooked Ck Trib US 322: Pymatuning Res Br

SR (Section): 2016 (B14) 322 (B00) 322 (B03)

MPMS ID: 106580 78683 374

Project Type: Bridge Project Bridge Project Bridge Project

Estimated Cost: $360,000 $645,000 $1,000,000

PennDOT

Contact: Kenneth Sanoski Matthew Antrilli Matthew Antrilli

Project

Description:

This project includes the application of shotcrete to the insides of metal culvert pipes/bridges to prolong their life. Various locations are included on state routes throughout Crawford, Forest, and Warren counties in 2019.

This project includes the replacement of the US Route 322 (28th Division Highway) Bridge over the Crooked Creek Tributary in West Fallowfield Township, Crawford County.

The bridge is 14 feet in length.

This project includes the replacement of the US Route 322 (28th Division Highway) Bridge over Pymatuning Reservoir Tributary in West Shenango Township, Crawford County.

The bridge is 21 feet in length.

Maintenance of

Traffic:

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

A detour will be required during construction.

Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com.

Temporary single-lane half-width construction.

Traffic will be controlled with temporary traffic lights.

Access to drives will be maintained.

Open for Bid: 12/5/2019 6/20/2019 3/14/2019

Estimated

Completion: Fall 2020 Fall 2019 Fall 2019

Page 14: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

14

2019 Projects—Crawford

Map ID: 12 13 14

Title: Crawford Group 192 - Lead Crawford Group 192 - 2 Crawford Group 191

SR (Section): 6 (192) 886 (192) 77 (191)

MPMS ID: 98875 98818 99653

Project Type: Group Project Group Project Group Project

Estimated Cost: $1,659,000 $750,000 $2,914,750 (actual)

PennDOT

Contact: Ronald Johnson Ronald Johnson Ronald Johnson

Project

Description:

This project includes 1.08 miles of resurfacing/restoration (betterment) on State Route 6 from Venango Avenue to the Cambridge Springs Borough line with an at grade railroad crossing (DOT #262872M) with the Western New York and Pennsylvania Railroad LLC in the Borough of Cambridge Springs. Work involves mill and overlay, and ADA curb ramps. Project is being contractually combined with project 98818. This is the lead project.

This project includes .64 miles of resurfacing/restoration (betterment) on State Route 886 (Main Street) from Cambridge Springs to State Route 6 with an at grade railroad crossing with Western New York and Pennsylvania Railroad LLC (DOT # 262873U) in the Borough of Cambridge Springs and Cambridge Township.

Work involves a mill and overlay, and ADA curb ramps.

Project is being contractually combined with project 98875.

This project includes 9.93 miles of resurfacing on State Route 77 from State Route 1033 to State Route 8 in Athens, Bloomfield and Richmond Townships, Crawford County.

Russell Standard Corporation will be the contractor for this project.

Maintenance of

Traffic:

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

Open for Bid: 2/28/2019 2/28/2019 Project has been awarded

Estimated

Completion: Fall 2019 Fall 2019 Fall 2019

Page 15: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

15

2019 Projects—Crawford

Map ID: 15 16 17

Title: Crawford Co. SR 2034, SR 2039 & SR 2040 SR 2035: PA 27 to Devour Rd Spring Road ovr Carr Run Trib

SR (Section): 2034 (01M) 2035 (01M) XX (L00)

MPMS ID: 98950 98956 534

Project Type: Highway Project Highway Project Local Project

Estimated Cost: $1,500,000 $2,420,000 $1,000,000

PennDOT

Contact: Matthew Hetrick Matthew Hetrick Thomas Alcorn

Project

Description:

This project includes 1.20 miles of resurfacing/restoration (betterment) on State Route 2034 and State Route 2040 (Spring Street) from State Route 102 to State Route 2037 in the City of Meadville and Vernon Township, Crawford County. The project also includes State Route 2039 from State Route 102 to State Route 4009. Work involves a mill and overlay and ADA curb ramps.

This project includes 2.18 miles of resurfacing/restoration (betterment) on State Route 2035 (Williamson Road/Popular Street/Liberty Street) from State Route 27 (North Street) to just past Devour Road in the City of Meadville and West Mead Township, Crawford County.

Work involves a mill and overlay, ADA curb ramps, drainage, new pavement markings.

This project includes the replacement of the East Spring Road (Township Road 466) Bridge over Carr Run in Spring Township.

This local bridge is 36 feet in length and is owned by Spring Township.

Maintenance of

Traffic:

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

A detour will be put in place during the construction.

Check our website for detailed information: www.penndot.gov/District1

Open for Bid: 11/7/2019 12/5/2019 8/22/2019

Estimated

Completion: Fall 2021 Fall 2020 Fall 2020

Page 16: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

16

2019 Projects—Crawford

Map ID: 18 Citywide 19

Title: Wallace Ave Bridge/Linesville Ck City of Meadville Local Fed Aid Routes Porter St Ped Bridge

SR (Section): Local bridge project Local roadway project Local bridge project

MPMS ID: 527 110948 108096

Project Type: Local Project Local Project Local Project

Estimated Cost: $600,000 $1,343,818 $219,940

PennDOT

Contact: Thomas Alcorn Christine Boyer-Krantz Lyndsie DeVito

Project

Description:

This project includes the replacement, rehabilitation, or removal of the Wallace Avenue (Township Road 346) Bridge over Linesville Creek in Conneaut Township. This local bridge is 33 feet in length and is owned by Conneaut Township, Crawford County.

This project includes the milling and overlay and pavement marking replacement on the following Federal Aid Routes owned by the City of Meadville, Crawford County:

• Grove Street • South Main • Leslie Road • Diamond Street • Allegheny Street • Water Street • Terrace Street • North Main Street • State Street • Mercer Street • Limber Street

This project includes rehabilitation of the pedestrian footbridge and installation of interpretive panels.

Rehabilitation includes replacement of deteriorated sections of decking along with removal and replacement of support structure and bracing.

Maintenance of

Traffic:

A detour will be put in place during the construction.

Check our website for detailed information: www.penndot.gov/District1

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

This is a pedestrian bridge only.

Traffic will not be impacted by the construction.

Open for Bid: 9/26/2019 4/25/2019 12/5/2019

Estimated

Completion: Fall 2020 Fall 2020 Fall 2020

Page 17: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

17

2019 Projects—Crawford

Map ID: 20

Title: Cambridge Springs RR Corridor

SR (Section): 1016 (R14)

MPMS ID: 106283

Project Type: Safety Project

Estimated Cost: $1,600,000

PennDOT

Contact: Jeanette Uhl

Project

Description:

This project includes safety improvements to various RR crossings along the Cambridge Springs corridor in Cambridge Springs Borough in Crawford County. Improvements include new warning lights, gates, signs, and surface improvements. Crossing locations: • Bolard Avenue in Cambridge Springs

Borough new devices only • State Route 1025 in Cambridge Springs

Borough new devices only • US Route 6 in Cambridge Springs

Borough new devices with surface • State Route 86 in Cambridge Springs

Borough new devices with surface • State Route 408 in Cambridge Springs

Borough new devices with surface

Maintenance of

Traffic:

Detours will be developed and implemented by the railroad.

Open for Bid: N/A

Estimated

Completion: Winter 2019

Page 18: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

18

Erie County

Projects

Page 19: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

19

Page 20: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

20

Carryover Projects—Erie

Map ID: 8 16 17

Title: US 20 Bridge over Elk Creek Bayfront Pkwy Microsurface PA 5: Wayne St to Franklin Ave

SR (Section): 20 (B09) 4034 (A14) 5 (24M)

MPMS ID: 1271 110858 109748

Project Type: Bridge Project Highway Project Highway Project

Contractor: MEKIS Construction Corporation Russell Standard Corporation Joseph McCormick Construction Co., Inc.

Contract cost: $6,648,314 $2,016,875 $1,789,663

PennDOT Delavar Mizban John A. Murcavage John A. Murcavage

Project

Description:

This project includes the rehabilitation of the US Route 20 (Ridge Road) Bridge over Elk Creek in Girard Township and the Borough of Girard, Erie County. Work involves superstructure replacement and substructure spall repair. The bridge is 624 feet in length.

This project includes the replacement of the ultra thin pavement course from Greengarden to Sassafras on State Route 4034 in the City of Erie. It will also include concrete patching, ADA compliant curb ramps, guiderail, signs and new pavement markings.

This project includes 1.60 miles of resurfacing (2" mill, fill and base repair) on State Route 5 (12th Street/Lake Road) from State Route 290 (East Side Access) to Franklin Avenue with railroad coordination with CSX Transportation and one signal rebuild with possible audible pushbuttons at Downing Avenue in the City of Erie.

Maintenance of

Traffic:

Overnight detour will be in place for this project during demolition and portions of construction.

Check our website for detailed information: www.penndot.gov/District1

.

A minimum of one lane of traffic will be maintained using flaggers.

Some night work will be performed during construction on this project.

Access to drives will be maintained.

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

Estimated

Completion: Summer 2020 Early Summer 2020 Summer 2021

Page 21: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

21

Carryover Projects—Erie

Map ID: 18 19 20

Title: SR 4012: Intrchng Rd Impr I-79: MP 178 - 182.5, Preservation I-79 MM 168.5 -178

SR (Section): 4012 (A00) 79 (A22) 79 (A24)

MPMS ID: 95558 106298 109775

Project Type: Highway Project Highway Project Highway Project

Contractor: Swank Construction Company, LLC Russell Standard Corporation Russell Standard Corporation

Contract cost: $20,997,746 $5,958,810 $6,178,500

PennDOT

Contact: Chad J. Tarr Steven J. Novak Steven J. Novak

Project

Description:

This project includes 2.17 miles of reconstruction on State Route 4012 (Interchange Road) from Old Zuck Road to Zimmerly Road and PA 699 from Zimmerly Road to US 19 (Peach Street) in Millcreek Township, Erie County. Work involves widening the road and the existing Zimmerly Road Bridge over Walnut Creek, which is 166 feet in length; rehabilitating the Zimmerly Road Bridge over Interstate 79, which is 243 feet in length; and adding left turn lanes to the Interstate 79 ramps.

This project includes 9.83 miles of milling and resurfacing on Interstate 79 (Raymond P Shafer Highway) from milepost 178 to milepost 182.5 in Millcreek and Summit Townships and the City of Erie. This project will contain bituminous milling and resurfacing a four-lane road way with Stone Matrix Asphalt Mix WMA 24' width, concrete pavement patching, concrete shoulders, asphaltic plug dams, drainage, guiderail, signs and pavement markings.

This project includes removing and replacing Ultrathin Friction Course to extend the service life of the concrete until it requires a structural overlay.

Maintenance of

Traffic:

State Route 4012 will be open at all times. Short-term duration closures of some side streets may last up to several weeks. Overnight closures of the interstate ramps may be needed. Check our website for detailed information: www.penndot.gov/District1. Access to drives will be maintained.

A minimum of one lane of traffic will be maintained.

Daylight traffic control only.

Access to ramps will be maintained.

A minimum of one lane of traffic will be maintained.

Daylight traffic control only.

Access to ramps will be maintained.

Estimated

Completion: Fall 2019 Fall 2019 Fall 2019

Page 22: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

22

Carryover Projects—Erie

Map ID: 21 25 28

Title: SR 19: 38th St to 26th St McBride Viaduct PA 290/Buffalo Road Int

SR (Section): 19 (15M) Local bridge project 290 (A08)

MPMS ID: 98333 58232 104463

Project Type: Highway Project Local Project Safety Project

Contractor: Mayer Brothers Construction Company, Inc. Swank Construction Company, LLC Joseph McCormick Construction Co., Inc.

Contract cost: $1,414,610 $1,446,028 $3,328,520

PennDOT

Contact: Holly R. Sidman Holly R. Sidman Holly R. Sidman

Project

Description:

This project includes 1.65 miles of highway restoration on State Route 19 (Peach Street) from 38th Street to 26th Street in the City of Erie. Work involves milling and overlay, drainage improvements, and ADA ramp improvements where needed.

This project is for the removal of the McBride Viaduct-East Avenue Bridge over the CSX Railroad in the City of Erie. This local bridge is 1,170 feet in length and is owned by the City of Erie. The project will include provisions to update the existing sidewalk along the north side of East 12th Street and ADA updates to the East Avenue and East Side Access intersection with East 12th Street.

This project includes the construction of Superpave Asphalt Mixture designs for a new ramp, traffic signals, drainage, sidewalk and other miscellaneous construction.

From approximately 450 feet west of the intersection with the ramp to State Route 20 to approximately 0.5 mile east of the intersection with State Route 5.

Maintenance of

Traffic:

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

Vehicular traffic will continue to use the East Side Access Highway and East 12th Street.

A detour will be required during construction.

Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com.

Estimated

Completion: Fall 2019 Summer 2019 Fall 2023

Page 23: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

23

Carryover Projects—Erie

Map ID: 29 30 31

Title: 38th Street VA Signal N Waterford Improvements US 6N and SR 98 Intersection

SR (Section): 4016 (00S) 19 (S03) 3006 (S01)

MPMS ID: 107539 91394 109857

Project Type: Safety Project Safety Project Safety Project

Contractor: Power Contracting Co. Russell Standard Corporation Perram Electric, Inc.

Contract cost: $439,467 $4,744,744 $200,080

PennDOT

Contact: Tim F. Scott Robert G. Cole Steven J. Novak

Project

Description:

This project includes a new intersection and new signal for the VA hospital located on State Route 4016 (38th Street) in the City of Erie.

This project includes .44 miles of safety improvements on US Route 19 (Waterford Pike) from the northern intersection of US Route 19 and State Route 197 (Waterford Street) in the Borough of Waterford and Waterford Township, Erie County. Work involves reconstruction and realignment of the intersection to include the addition of turning lanes and a new traffic signal. The intersection of State Route 197 and Circuit Street will also be widened to include turning lanes.

This project will include the full rebuild of the signalized intersection of US 6N and State Route 198 in Elk Creek Township, Erie County.

Rebuild will include improvements including 12" LED signal heads, reflectorized back plates, tunnel visors, improved visibility through proper indexing on mast arms, enhanced detection, and improved timings.

Maintenance of

Traffic:

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

Estimated

Completion: Summer 2019 Fall 2019 Summer 2019

Page 24: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

24

Carryover Projects—Erie

Map ID: Countywide

Title: Erie Countywide Crack Sealing

SR (Section): XX (XXX)

MPMS ID: 110846

Project Type: Highway Project

Contractor: Annseal of Pa, Inc.

Contract cost: $271,203

PennDOT John A. Murcavage Lynn Herrmann

Project

Description:

This project consists of crack sealing various state routes in various municipalities in Erie County.

Maintenance of

Traffic:

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

Estimated

Completion: Spring 2019

Page 25: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

25

2019 Projects—Erie

Map ID: 1 2 3

Title: Huntley Road/I-90 SR 3006 Bridge over I-90 Erie 2019 Bridge Shotcrete Group

SR (Section): 3102 (B00) 3006 (B04) 2006 (B04)

MPMS ID: 82924 97183 106443

Project Type: Bridge Project Bridge Project Bridge Project

Estimated Cost: $3,150,000 $531,000 $350,000

PennDOT

Contact: Kenneth Sanoski Kenneth Sanoski Kenneth Sanoski

Project

Description:

This project includes the replacement/restoration of the State Route 3102 (Huntley Road) Bridge over Interstate 90 (American Veterans Memorial Highway) in Springfield Township, Erie County. The bridge is 185 feet in length. Project is being contractually combined with project 102031.

This project includes the preservation of the State Route 3006 / US 6N Bridge over Interstate 90 (American Veterans Memorial Highway) in Springfield Township, Erie County.

Work involves applying a waterproof membrane and overlay.

The bridge is 155 feet in length.

Project is being contractually combined with project 102031.

This project includes the application of shotcrete to the insides of metal culvert pipes/bridges to prolong their life.

Various locations are included on state routes throughout Erie County.

Maintenance of

Traffic:

A detour will be required during construction.

Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com.

A detour will be required during construction.

Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com.

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

Open for Bid: 3/14/2019 3/14/2019 9/12/2019

Estimated

Completion: Fall 2020 Fall 2020 Fall 2020

Page 26: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

26

2019 Projects—Erie

Map ID: 4 5 6

Title: SR 4032 Brdg/4 Mile Creek US 19 over Trout Run SR 2008/French Ck Trib

SR (Section): 4032 (B02) 19 (B02) 2008 (DFB)

MPMS ID: 97128 600 940

Project Type: Bridge Project Bridge Project Bridge Project

Estimated Cost: $1,000,000 $1,600,000 $200,000

PennDOT

Contact: Robert Bell Robert Bell Matthew Antrilli

Project

Description:

This project includes the restoration/rehabilitation of the State Route 4032 (Main Street) Bridge over Four Mile Creek in Lawrence Park Township, Erie County. The bridge is 35 feet in length.

This project includes the replacement of the US Route 19 (Waterford Pike) Bridge over Trout Run in Waterford Township, Erie County.

The bridge is 82 feet in length.

This project includes a Department Force bridge replacement of the State Route 2008 (Stone Quarry Road T-301) Bridge over French Creek Tributary in LeBoeuf Township, Erie County.

The bridge is 26 feet in length and will be a superstructure replacement with precast channel beams.

The project will also include streambed paving.

Maintenance of

Traffic:

A vehicle detour will be put in place during the construction.

Pedestrian access will be maintained during construction.

Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com.

A detour will be required during construction.

Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com.

A detour will be required during construction.

Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com.

Open for Bid: 8/8/2019 9/12/2019 N/A

Estimated

Completion: Summer 2020 Summer 2020 Fall 2019

Page 27: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

27

2019 Projects—Erie

Map ID: 7 9 10

Title: SR 2006 over French Creek Erie Group 291-2 Erie Group 291 Lead

SR (Section): 2006 (B01) 3018 (291) 832 (291)

MPMS ID: 88462 107750 99713

Project Type: Bridge Project Group Project Group Project

Estimated Cost: $2,000,000 See project 99713 $5,668,584 (actual bid)

PennDOT

Contact: Matthew Antrilli Ronald Johnson Ronald Johnson

Project

Description:

This project includes the rehabilitation of the State Route 2006 (Wattsburg Road) Bridge over French Creek in Waterford Township, Erie County. The bridge is 418 feet in length.

This project includes 3.8 miles of resurfacing on State Route 3018 in Girard Township, Erie County.

Project is being contractually combined with

project 99713 and 89217.

This project includes 3.88 miles of resurfacing on State Route 832 (Sterrettania Road) from Interstate 90 (American Veterans Memorial Highway) to Grubb Road in Millcreek and McKean Townships, Erie County.

Project is being contractually combined with project 107750 and 89217. This is the lead project.

Mayer Brothers Construction Company, Inc. will be the contractor for this project.

Maintenance of

Traffic:

A detour will be required during construction.

Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com.

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

Open for Bid: 5/23/2019 Project has been awarded Project has been awarded

Estimated

Completion: Fall 2019 Fall 2019 Fall 2019

Page 28: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

28

2019 Projects—Erie

Map ID: 11 12 13

Title: Erie Group 291 I-90: MP 0 to 3.5 Reconstruct I-86 Eastbound Preservation

SR (Section): 4016 (291) 90 (A29) 86 (A02)

MPMS ID: 89217 102031 81441

Project Type: Group Project Highway Project Highway Project

Estimated Cost: See project 99713 $39,346,000 $7,501,653

PennDOT

Contact: Ronald Johnson Rodney Fasenmyer Rodney Fasenmyer

Project

Description:

This project includes 5.70 miles of restoration on State Route 4016 (West 38th Street) from Asbury Road to State Route 19 (Peach Street) in Millcreek Township and the City of Erie. Work involves milling and resurfacing. Project is being contractually combined with

project 99713 and 107750.

This project includes the replacement of State Route 3012 (Huntley Rd) Bridge along with guiderail updates and signing updates on Interstate 90 (American Veterans Memorial Highway) from the Ohio/Pennsylvania line to the maintenance crossover east of US Route 6N in Springfield Township, Erie County.

Project is being contractually combined with projects 82924 and 97183. This is the lead project.

This project includes seven miles of preservation on I-86 (Hopkins-Bowser Highway) from milepost 1 to milepost 7 in Greenfield Township, Erie County.

Work includes mill and overlay on the eastbound lanes only.

The westbound lanes are concrete pavement and will have joint cleaning and sealing as well as minor patching completed.

This project also includes the preservation of seven bridge structures.

Project is being contractually combined with projects 109997. This is the lead project.

Maintenance of

Traffic:

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

A minimum of one lane of traffic will be maintained in each direction during construction.

A minimum of one lane of traffic will be maintained in each direction during construction.

Open for Bid: Project has been awarded 3/14/2019 4/11/2019

Estimated

Completion: Fall 2019 Fall 2020 Fall 2019

Page 29: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

29

2019 Projects—Erie

Map ID: 14 26 NA

Title: US 20: Cumberland Rd to Davison Rd Peach St. Safety & Mobility Imp. City of Erie Local Federal Aid Routes 2019-

2020

SR (Section): 20 (17M) 19 (S04) XX (XXX)

MPMS ID: 99015 107348 108

Project Type: Highway Project Safety Project Local Project

Estimated Cost: $3,940,000 $1,100,000 $170,000

PennDOT

Contact: Rodney Fasenmyer Christine Boyer-Krantz Christine Boyer-Krantz

Project

Description:

This project includes 4.82 miles of resurfacing/restoration (betterment) on US Route 20 (Buffalo Road) from Water Street to Walbridge Road in the Borough of Wesleyville and Harborcreek Township, Erie County.

This project includes the design and construction of a sidewalk on the east side of US Route 19 (Peach Street ) from State Route 699 (Edinboro Road ) to State Route 4026 (Kuntz Road ) and along the south side of Kuntz Road for approximately 760 feet to Jodie Lane in Millcreek Township, Erie County. Also included is the retiming and coordination of four signals along Peach Street between Edinboro Road to Millcreek Square Road.

This project includes milling and overlay only on Zimmerman Road from 33rd Street to 38th Street in the City of Erie, Erie County.

The City of Erie will be performing the pavement markings.

This project is on a local federal aid route.

Maintenance of

Traffic:

A minimum of one lane of traffic will be maintained in each direction during construction.

Access to drives will be maintained.

A detour will be required during construction.

Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com.

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

Open for Bid: 12/5/2019 12/5/2019 2/14/2019

Estimated

Completion: Fall 2021 Fall 2019 Fall 2019

Page 30: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

30

2019 Projects—Erie

Map ID: 22 23 24

Title: Huntley Road RR Crossing Caughey Road ADA Ramps Little Italy Sidewalk Recon Ph 2

SR (Section): NA NA NA

MPMS ID: 111147 106865 108024

Project Type: Local Project Local Project Local Project

Estimated Cost: $350,000 $465,000 $175,745

PennDOT

Contact: Jeanette Uhl Michael Hunkele Lyndsie DeVito

Project

Description:

This project is single crossing involving upgrades to pavement, signs, and lights. The project is located on Huntley Road at grade crossing with Bessemer & Lake Erie Railroad Company in Springfield Township, Erie County.

This project includes the construction of sidewalks and ADA compliant curb ramps along Caughey Road from US Route 20 (Ridge Road) to State Route 832 (Sterrettania Road) in Millcreek Township, Erie County.

This project includes cement concrete sidewalk and curb removal and reconstruction with associated streetscaping (landscaping and trees) on 18th Street in the city of Erie, Erie County.

This fourth and final phase would complete both sides from Sassafras Street to Liberty Street. The area has Elm Street status.

Maintenance of

Traffic:

A detour will be developed and implemented by the railroad.

Traffic should not be impacted from by this project.

Traffic should not be impacted from by this project.

Open for Bid: 10/10/2019 4/11/2019 4/25/2019

Estimated

Completion: Fall 2020 Fall 2020 Fall 2019

Page 31: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

31

2019 Projects—Erie

Map ID: 27 Countywide

Title: I-86 High Speed Ramp to I-90 Erie 2019 AWPM

SR (Section): 8170 (S01) XX (XXX)

MPMS ID: 109997 106441

Project Type: Safety Project Safety Project

Estimated Cost: $200,000 $164,000

PennDOT

Contact: Greg Maser Diana Craft

Project

Description:

This project entails improvements to the Interstate 86 westbound ramp onto Interstate 90. Improvements include sequential flashing chevrons, advance warning signage, pavement legends, and additional delineation relative to horizontal alignment.

Project is being contractually combined with project 81441.

This project includes installing, repairing, and replacing reflective pavement markings on various state routes in various municipalities in Erie County.

Maintenance of

Traffic:

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

A minimum of one lane of traffic will be maintained during installation or replacement of the markers.

Daylight traffic control only.

Access to drives will be maintained.

Open for Bid: 4/11/2019 2/28/2019

Estimated

Completion: Fall 2019 Fall 2019

Page 32: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

32

Forest County

Projects

Page 33: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

33

Page 34: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

34

Carryover Projects—Forest

Map ID: 3 4

Title: US 62: PA 36-Tionesta Boro PA 666 Retaining Wall #2

SR (Section): 62 (09M) 666 (WA2)

MPMS ID: 99086 97041

Project Type: Highway Project Safety Project

Contractor: IA Construction Corporation Francis J. Palo, Inc.

Contract cost: $3,058,778 $497,041

PennDOT

Contact: William P. Hanson Matt Blasting

Project

Description:

This project includes resurfacing/restoration of:

• 1.47 miles on US Route 62 (Oil City Road/Elm Street) from State Route 36 Tionesta Township and the Borough of Tionesta, Forest County.

• 3.5 miles State Route 36 (Colonel Drake Highway) from approximately 0.2 miles north from the intersection with State Route 3006 (Buell's Corner Road) north to the intersection with US Route 62.

This project includes a 0.15 mile safety improvement/slide correction on State Route 666 (David Zeisburger Highway) 0.2 mile south of the Warren/Forest county line in Howe Township, Forest County. Work involves a geotechnical reinforced soil slope.

Maintenance of

Traffic:

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

A minimum of one lane of traffic will be maintained using temporary traffic signals.

Access to drives will be maintained.

Estimated

Completion: Fall 2019 Summer 2019

Page 35: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

35

2019 Projects—Forest

Map ID: 1 2

Title: 2019 Crawford & Forest Shotcrete Group Forest Group 391

SR (Section): 2016 (B14) 2002 (391)

MPMS ID: 106580 111009

Project Type: Bridge Project Group Project

Estimated Cost: $450,000 $918,009 (actual)

PennDOT

Contact: Kenneth Sanoski Ronald Johnson

Project

Description:

This project includes the application of shotcrete to the insides of metal culvert pipes/bridges to prolong their life. Various locations are included on state routes throughout Crawford, Forest, and Warren counties in 2019.

This project includes 2.75 miles of resurfacing on State Route 2002 in Forest County from State Route 2022 to State Route 36 in Barnett Township.

Glen O. Hawbaker, Inc. will be the contractor for this project.

Maintenance of

Traffic:

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

Open for Bid: 12/5/2019 Project has been awarded

Estimated

Completion: Fall 2020 Fall 2019

Page 36: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

36

Mercer County

Projects

Page 37: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

37

Page 38: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

38

Carryover Projects—Mercer

Map ID: 3 7 8

Title: SR 173: Sandy Creek Brdg SR 318 Brdg/Lil Nesh Ck PA 760 Bridge over Bobby Run

SR (Section): 173 (B08) 318 (B04) 760 (B00)

MPMS ID: 58069 1817 73494

Project Type: Bridge Project Bridge Project Bridge Project

Contractor: C.H. & D. Enterprises Inc. Shingledecker's Welding, Inc. C.H. & D. Enterprises Inc.

Contract cost: $725,791 $520,000 $471,719

PennDOT

Contact: Kenneth T. Engstrom Renaldo Jannetti Nikita M. Tsikouris

Project

Description:

This project includes the rehabilitation of the State Route 173 (Main Street) Bridge over Sandy Creek in the Borough of Sandy Creek, Mercer County. The bridge is 169 feet in length.

This project includes the bridge rehabilitation and superstructure replacement of the State Route 318 (Middlesex-Mercer Road) Bridge over Little Neshannock Creek in East Lackawannock Township, Mercer County. The bridge is 50 feet in length.

This project includes the replacement of the State Route 760 (Broadway Avenue) Bridge over the Shenango River Tributary in the City of Hermitage, Mercer County.

The bridge is 22 feet in length.

Maintenance of

Traffic:

No detour will be necessary during construction.

Traffic will be managed by temporary traffic signals.

A detour will be required during construction. Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com.

Temporary single-lane half-width construction.

Traffic will be controlled with temporary traffic lights.

Access to drives will be maintained.

Estimated

Completion: Fall 2019 Fall 2019 Fall 2019

Page 39: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

39

Carryover Projects—Mercer

Map ID: 10 11 12

Title: I-80: SR 19 - SR 2007, Preservation SR 208: Lake Rd to West Main St State St: Forker - PA 18

SR (Section): 80 (A12) 208 (08M) 3008 (A02)

MPMS ID: 87637 108944 102554

Project Type: Highway Project Highway Project Highway Project

Contractor: Lindy Paving, Inc. Glenn O. Hawbaker, Inc. Kirila Contractors, Inc.

Contract cost: $7,314,740 $1,280,207 $4,019,600

PennDOT Blaise A. Bucha Douglas Villmer Nikita M. Tsikouris

Project

Description:

This project includes 27.3 miles of resurfacing and concrete patching on Interstate 80 (Z H Confair Highway) from the Ohio state Line to State Route 2007 (Springfield Church Road) at Milepost 21 in Shenango, East Lackawannock, and Findley townships, Mercer County. Work involves milling and inlay SMA, and concrete patches.

This project includes 0.81 miles of resurfacing on State Route 208 from Lake Rd to State Route 58 (West Main St) in Pine Township and the Borough of Grove City, Mercer County. This project also includes the replacement of twin pipes with a box culvert East of Lake Rd.

This project includes restoration along State Route 3008 (State Street) from Forker Boulevard to State Route 18 in the City of Hermitage, Mercer County.

Work involves paving, sidewalks, curbing, drainage improvements, intersection improvements, and pedestrian accommodations.

Maintenance of

Traffic:

A minimum of one lane of traffic will be maintained.

Night lane closures are possible, but not planned at this time.

All ramps will remain open .

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

A minimum of one lane of traffic will be open.

Daylight traffic control only.

Access to drives will be maintained.

Estimated

Completion: Summer 2019 Fall 2019 Fall 2019

Page 40: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

40

Carryover Projects—Mercer

Map ID: 14 18 20

Title: South Diamond St. Streetscape Sharon Neighborhood Revitalization Phase 1 SR 3008: State St Stscp

SR (Section): 58 (STU) 3021 (MML) 3008 (A00)

MPMS ID: 106754 108108 96362

Project Type: Local Project Local Project Local Project

Contractor: M and B Services, LLC Kirila Contractors, Inc. Kirila Contractors, Inc.

Contract cost: $371,471 $511,270 $5,269,000

PennDOT John L. Sebesta John L. Sebesta Nikita M. Tsikouris

Project

Description:

This project includes streetscape improvements on State Route 58 (S. Diamond Street) between State Route 19 (Erie Street) and Pitt Street in the Borough of Mercer. Work will include new sidewalks, landscaping, decorative lighting, curb including ADA compliant ramps, handrail as prescribed and pavement markings.

This project includes the milling and repaving of various streets in the City of Sharon, Mercer County including: McDowell, Boyd, 1/2 Richmond, Fairfield, Lillian, Dougherty, State Route 3021 (Forker Blvd.), Alcoma, Bentley, Buhl, Partridge (from Forker to Bentley) and portions of Tamplin, Hall, Thornton, and Pearl. Sidewalks will also be removed and replaced as necessary in accordance with ADA regulations and ADA compliant curb ramps installed where required.

This project includes 0.68 miles of restoration on State Route 3008 and State Route 518 (State Street) from Forker Boulevard to Oakland Avenue in the City of Sharon, Mercer County.

Work involves resurfacing, ADA curb ramps, crosswalks, medians, signage, signal timing modifications, landscaping, and furnishings.

Maintenance of

Traffic:

A minimum of one lane of traffic will be maintained using flaggers.

Some nighttime work may be performed during the construction.

Access to drives will be maintained.

A minimum of one lane of traffic will be maintained using flaggers.

Some nighttime work may be performed during the construction.

Access to drives will be maintained.

A detour will be required during construction. Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com.

Estimated

Completion: Spring 2019 Spring 2019 Fall 2019

Page 41: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

41

Carryover Projects—Mercer

Map ID: 22 23

Title: SR 18 & SR 518 Intersection (Bobby's

Corner)

PA 718 Retaining Wall

SR (Section): 18 (S03) 718 (WAL)

MPMS ID: 106765 97046

Project Type: Safety Project Safety Project

Contractor: M and B Services, LLC Carmen Paliotta Contracting Inc.

Contract cost: $470,387 $484,444

PennDOT

Contact: Walter J. Mezzara Renaldo Jannetti

Project

Description:

This project will include safety improvements at the intersection of State Route 18 and State Route 518 (Bobby's Corner) and Longview Rd. in the City of Hermitage, Mercer County. These improvements will include ADA compliant curb ramps along with a complete signal upgrade which encompasses new poles and a left turn phase.

This project includes construction of a new retaining wall on State Route 718 (Water Avenue) in the City of Sharon, Mercer County.

Maintenance of

Traffic:

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

A detour will be required during construction. Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com.

Estimated

Completion: Summer 2019 Summer 2019

Page 42: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

42

2019 Projects—Mercer

Map ID: 1 2 4

Title: PA 58 Bridge/Faherty Run SR 1001 Brdg/Lil Shen Riv Fredonia Rd Br over I-79

SR (Section): 58 (B10) 1001 (B01) 1004 (B01)

MPMS ID: 97307 78923 88481

Project Type: Bridge Project Bridge Project Bridge Project

Estimated Cost: $380,000 $725,000 $800,000

PennDOT

Contact: Robert Bell Kenneth Sanoski Kenneth Sanoski

Project

Description:

This project includes the restoration/rehabilitation of the State Route 58 (Liberty Street) Kinsman Road Bridge over Faherty Run in Greene Township, Mercer County. The bridge is 25 feet in length.

This project includes replacing the existing superstructure with a new P/S spread box beam superstructure on the State Route 1001 (Fredonia Road) Bridge over the Little Shenango River in Perry Township, Mercer County.

The bridge is 75 feet in length.

This project includes the rehabilitation/restoration of the State Route 1004 (Fredonia Road) Stoneboro Bridge over Interstate 79 (Raymond P Shafer Highway) in Lake Township, Mercer County.

The bridge is 228 feet in length.

Maintenance of

Traffic:

A detour will be required during construction.

Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com.

A detour will be required during construction.

Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com.

A detour will be required during construction.

Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com.

Open for Bid: 4/11/2019 2/28/2019 11/7/2019

Estimated

Completion: Summer 2019 Fall 2019 Summer 2020

Page 43: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

43

2019 Projects—Mercer

Map ID: 5 6 9

Title: SR 2007: Mill Ck Brdg PA 158 Bridge/Brandy Run Mercer Group 491

SR (Section): 2007 (B01) 158 (B03) 173 (491)

MPMS ID: 58082 1687 100019

Project Type: Bridge Project Bridge Project Group Project

Estimated Cost: $250,000 $250,000 $2,699,953 (actual)

PennDOT

Contact: Robert Bell Robert Bell Ronald Johnson

Project

Description:

This project includes the Department Force bridge replacement of the State Route 2007 (Springfield Church Road) Bridge over Mill Creek in Findley Township, Mercer County. The bridge is 22 feet in length and will be replaced with a box culvert.

This project includes the Department Force bridge replacement on the State Route 158 (Mercer Road) Bridge over Brandy Run in the Borough of Mercer and East Lackawannock Township, Mercer County.

The bridge is 21 feet in length and will be replaced with a box culvert.

This project includes 5.23 miles of resurfacing on State Route 173 (Main Street/Mercer Street) from Lake Street to Gordon Road in Sandy Lake and Mill Creek Townships and the Boroughs of New Lebanon and Sandy Lake in Mercer County.

Sharon Paving and Construction Co. will be the contractor for this project.

Maintenance of

Traffic:

A detour will be required during construction.

Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com.

A detour will be required during construction.

Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com.

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

Open for Bid: 10/10/2019 11/7/2019 Project has been awarded

Estimated

Completion: Summer 2020 Summer 2020 Fall 2019

Page 44: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

44

2019 Projects—Mercer

Map ID: 13 15 Countywide

Title: Alan Avenue Sidewalk Project Sharpsville Road & MML Improvements Mercer 2019 AWPM

SR (Section): NA NA NA

MPMS ID: 111434 111087 106572

Project Type: Local Project Local Project Safety Project

Estimated Cost: $994,600 $432,700 $100,000

PennDOT

Contact: Lyndsie DeVito Lyndsie DeVito Diana Craft

Project

Description:

This project includes construction of an ADA accessible sidewalk along Alan Avenue in the Borough of Greenville, Mercer County. These enhancements will greatly improve safety and provide a safe pedestrian connection from Thiel College to the nearby borough park.

This project is the reconstruction of West High Street and North Sixth streets in the Borough of Sharpeville, Mercer County.

Work will include directional signage, sidewalk reconstruction/restoration, pedestrian and ADA access, and upgrades to the catch basin inlet grates to bicycle and wheelchair safe grates.

This project includes installing, repairing and replacing reflective pavement markers on various state routes and in various municipalities in Mercer county in 2019.

Maintenance of

Traffic:

A minimum of one lane of traffic will be maintained during construction.

Daylight traffic control only.

Access to drives will be maintained.

A minimum of one lane of traffic will be maintained during construction.

Daylight traffic control only.

Access to drives will be maintained.

A minimum of one lane of traffic will be maintained during installation or replacement of the markers.

Daylight traffic control only.

Access to drives will be maintained.

Open for Bid: 12/5/2019 4/11/2019 2/28/2019

Estimated

Completion: Fall 2020 Fall 2020 Fall 2019

Page 45: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

45

2019 Projects—Mercer

Map ID: 17 19 21

Title: Hermitage Bikeway Project Sharon Neighborhood Revitalization Ph 2 US 62/State St Intersection

SR (Section): NA NA 62 (S01)

MPMS ID: 111163 111071 105775

Project Type: Local Project Local Project Safety Project

Estimated Cost: $538,181 $1,067,255 $3,200,000

PennDOT

Contact: Lyndsie DeVito Lyndsie DeVito Christine Boyer-Krantz

Project

Description:

This project will widen each lane of both Thorton Ave. & Forker Blvd. with the addition of five-foot bike lanes in the City of Hermitage, Mercer County. Work will also include the realignment of the intersection from its current configuration of a "Y" to a "T"

This project includes the milling and repaving of various streets in the City of Sharon, Mercer County.

Deteriorated sidewalks and curb ramps will be removed and replaced with ADA compliant ramps.

This project is an intersection safety improvement at US 62 and State Street in the City of Hermitage, Mercer County

Work will include the construction of a roundabout with ADA ramps and crosswalks, and landscaping.

Maintenance of

Traffic:

A minimum of one lane of traffic will be maintained during construction.

Daylight traffic control only.

Access to drives will be maintained.

A minimum of one lane of traffic will be maintained during construction.

Daylight traffic control only.

Access to drives will be maintained.

A minimum of one lane of traffic will be maintained using flaggers during minor work in 2019. Daylight traffic control only. Access to drives will be maintained.

A detour using a temporary roadway during construction will be put in place from April to September 2020.

Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com.

Open for Bid: 12/5/2019 12/5/2019 6/6/2019

Estimated

Completion: Fall 2020 Winter 2020 Winter 2020

Page 46: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

46

Venango County

Projects

Page 47: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

47

Page 48: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

48

Carryover Projects—Venango

Map ID: 7 16

Title: SR 308 Brdg over I-80 Franklin 13th Street RR Crossing

SR (Section): 308 (B00) 322 (R01)

MPMS ID: 2233 107915

Project Type: Bridge Project Safety Project

Contractor: Thornbury, Inc. Glenn O. Hawbaker, Inc.

Contract cost: $2,504,834 $872,564

PennDOT

Contact: Blaise A. Bucha Douglas Villmer

Project

Description:

This project includes the preservation of three bridges crossing over Interstate 80 in Venango County:

• State Route 308 (Clintonville Road/Butler Street) Bridge in Clinton Township. The bridge is 231 feet in length. MPMS ID 2233.

• State Route 3007 (Rockdale Road) Bridge in Scrubgrass Township. The bridge is 296 feet in length. MPMS ID 97395.

• State Route 3009 (Stone Church Road) Bridge in Scrubgrass Township. The bridge is 221 feet in length. MPMS ID 97398.

This project includes raising the grade of the railroad crossing to eliminate flooding at the intersection of US 322 and the Western New York Pennsylvania (WNYP) crossing in the City of Franklin, Venango County. The project will also include various drainage items and intersection upgrades with new traffic signals.

Maintenance of

Traffic:

A detour will be required during construction.

Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com.

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

Estimated

Completion: Fall 2019 Summer 2019

Page 49: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

49

2019 Projects—Venango

Map ID: 1 2 3

Title: 2019 Venango & Warren Shotcrete Group SR 62 Br over Conrail R.R. & Allegheny River PA 38 Bridge Grp

SR (Section): 322 (B06) 62 (B09) 38 (B06)

MPMS ID: 110409 88509 97367

Project Type: Bridge Project Bridge Project Bridge Project

Estimated Cost: $425,000 See project 97367 on page 49 $1,389,861 (actual)

PennDOT Contact: Kenneth Sanoski Robert Bell Robert Bell

Project

Description:

This project includes the application of shotcrete to the insides of metal culvert pipes/bridges to prolong their life. Various locations are included on state routes throughout Forest, Venango & Warren Counties in 2019.

This project includes the preservation of the US Route 62 (Petroleum Street) Bridge over the Allegheny River in Oil City, Venango County.

Preservation activities include sealing the parapets and sidewalks.

Project is being contractually combined with projects 97367, 58253, 97383 and 97372.

This project includes preservation activities on the following:

• State Route 38 (Fifth Street) Emlenton Street Bridge in the Borough of Emlenton. The bridge is 672 feet in length.

• State Route 322 (13th Street) Bridge over in Franklin. The bridge is 489 feet in length.

Project is being contractually combined with projects 88509, 58253, 97383 and 97372. This is the lead project.

MEKIS Construction Corporation will be the contractor for this project.

Maintenance of

Traffic:

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

Open for Bid: 2/28/2019 Project has been awarded Project has been awarded

Estimated

Completion: Fall 2019 Summer 2019 Summer 2019

Page 50: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

50

2019 Projects—Venango

Map ID: 4 5 6

Title: 8th St Br/Allegheny River SR 3013/T-380, Sandy Ck SR 3008 Bridge/Allegheny River

SR (Section): 322 (B08) 3013 (B08) 3008 (B02)

MPMS ID: 58253 97383 97372

Project Type: Bridge Project Bridge Project Bridge Project

Estimated Cost: See project 97367 on page 49 See project 97367 on page 49 See project 97367 on page 49

PennDOT

Contact: Robert Bell Robert Bell Robert Bell

Project

Description:

This project includes the preservation of the US Route 322 (28th Division Highway) Eighth Street Bridge over the Allegheny River in the City of Franklin and Cranberry Township, Venango County.

Work includes milling and repaving after waterproof membrane placement, encasing some piers, sealing the parapets, and replacing the strip seal dam.

The bridge is 922 feet in length.

Project is being contractually combined with projects 97367, 88509, 97383 and 97372.

This project includes the preservation of the State Route 3013 (Old Route 8 Road) Pecan Hill Bridge over Township Road 380 in Sandycreek and Victory townships, Venango County.

Work will include sealing the parapets and an epoxy overlay on the deck.

The bridge is 441 feet in length.

Project is being contractually combined with projects 97367, 58253, 88509 and 97372.

This project includes the preservation of the State Route 3008 (Kennerdell Road) Bridge over the Allegheny River in Clinton Township, Venango County.

Work involves an epoxy wearing surface, sealing the parapets, and replacing the rubber in the strip seal dams.

The bridge is 740 feet in length.

Project is being contractually combined with projects 97367, 58253, 97383 and 88509.

Maintenance of

Traffic:

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

Open for Bid: Project has been awarded Project has been awarded Project has been awarded

Estimated

Completion: Summer 2019 Summer 2019 Summer 2019

Page 51: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

51

2019 Projects—Venango

Map ID: 9 10 11

Title: Venango Group 592 Venango Group 591 Atlantic Ave.

SR (Section): 8 (592) 257 (591) 4004 (01M)

MPMS ID: 110840 100155 109152

Project Type: Group Project Group Project Highway Project

Estimated Cost: $1,280,000 $2,696,778 $760,000

PennDOT

Contact: Ronald Johnson Ronald Johnson Matthew Hetrick

Project

Description:

Resurfacing and drainage on 5.57 miles of State Route 8 from Venango/Butler County Line to Georgetown Road in Irwin Township and the Borough of Barkeyville, Venango County.

This project includes 4.07 miles of resurfacing on State Route 257 (Salina Road) from US Route 322 to Innis Street and 1.96 miles on US Route 322 from State Route 257 to Egypt Corners in Cranberry Township, Venango County.

IA Construction Corporation will be the contractor for this project.

This project contains 1.37 miles of restoration (betterment) on SR 4004 (Atlantic Avenue) starting from the intersection of US Route 322 (Grant Street) headed East to the intersection US Route 322 (North 13th Street), Venango County.

Maintenance of

Traffic:

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

Open for Bid: 3/28/2019 Project has been awarded 5/23/2019

Estimated

Completion: Fall 2020 Fall 2019 Fall 2020

Page 52: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

52

2019 Projects—Venango

Map ID: 12 Citywide 15

Title: I-80 MM27 to MM34 City of Oil City Local Fed Aid Routes Franklin Mid-block Traffic and Ped Signal

SR (Section): 80 (A11) NA 62 (RLE)

MPMS ID: 109821 110952 111015

Project Type: Highway Project Local Project Safety Project

Estimated Cost: $3,500,000 $306,321 $78,237

PennDOT

Contact: Brian Bowen Christine Boyer-Krantz Lyndsie DeVito

Project

Description:

Micro surface overlay on Interstate 80 (Z H Confair Highway) from the Mercer/Venango line at milepost 27.6(Mercer/Venango county line) to Exit 35 at milepost 34.5 (Exit 35) in the Boroughs of Barkeyville and Clintonville and Irwin and Clinton Townships, Venango County.

This project includes the milling, overlay and pavement marking replacement on Siverly Avenue (federal aid route) owned by the City of Oil City, Venango County.

This project is the replacement/upgrade of the mid-block crossing traffic and pedestrian signals US 62 & US 322 in between US 322 (16th Street) and West Park Street in the City of Franklin, Venango County.

The signal needs replaced because deterioration of the northern pole's base caused the structure to fall. The signal is not currently functioning and needs replaced.

The City of Franklin is handling the contracting and timing of this project.

Maintenance of

Traffic:

A minimum of one lane of traffic eastbound and westbound will be maintained during construction.

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

A minimum of one lane of traffic will be maintained.

Daylight traffic control only.

Access to drives will be maintained.

Open for Bid: 12/5/2019 4/25/2019 Project will be locally contracted. Municipality

will control the timing of the project.

Estimated

Completion: Fall 2020 Fall 2019 Summer 2019

Page 53: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

53

Warren County

Projects

Page 54: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

54

Page 55: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

55

Carryover Projects—Warren

Map ID: 12 13 15

Title: US 6: Sheffield to McKean Co PA 27: Hosmer Rn Rd - PA 426 Northwest Slide/Wall Group

SR (Section): 6 (A09) 27 (03M) 62 (GRP)

MPMS ID: 100318 97920 96361

Project Type: Highway Project Highway Project Safety Project

Contractor: Glenn O. Hawbaker, Inc. Bob Cummins Construction Company Glenn O. Hawbaker, Inc.

Contract cost: $3,442,932 $3,978,919 $13,389,062

PennDOT

Contact: Will Tissue Theodore C. Wilson William P. Hanson

Project

Description:

This project includes resurfacing 4.0 miles on State Route 6 from Sheffield to the McKean County line in Sheffield Township, Warren County. The project also includes resurfacing on State Route 1006 and State Route 6006 in the City of Warren, Warren County.

This project includes 1.32 miles of resurfacing (betterment) on State Route 27 from Hosmer Run Road to State Route 426 in Pittsfield Township, Warren County. This project also includes MPMS 57185: the replacement of the superstructure of the State Route 27 (Grand Street) Bridge over the Buffalo and Pittsburgh Railroad in Pittsfield Township, Warren County. The bridge is 174 feet long.

This project includes repairs to landslides on State Route 62 in Hickory Township in Forest County and Watson and Limestone townships, Warren County.

Work involves repairing the landslides to maintain the integrity of the roadway by various means, including geosynthetic reinforced soil slopes and soldier pile retaining walls.

Maintenance of

Traffic:

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

A minimum of one lane of traffic will be maintained using flaggers and temporary signals.

Access to drives will be maintained.

Estimated

Completion: Summer 2019 Fall 2019 Spring 2021

Page 56: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

56

2019 Projects—Warren

Map ID: 1 2 3

Title: 2019 Venango & Warren Shotcrete Group PA 426 Br/Brokenstraw Ck. 2019 Crawford & Forest Shotcrete Group

SR (Section): 322 (B06) 426 (B02) 2016 (B14)

MPMS ID: 110409 2523 106580

Project Type: Bridge Project Bridge Project Bridge Project

Estimated Cost: $425,000 $1,000,000 $450,000

PennDOT

Contact: Kenneth Sanoski Robert Bell Kenneth Sanoski

Project

Description:

This project includes the application of shotcrete to the insides of metal culvert pipes/bridges to prolong their life. Various locations are included on state routes throughout Forest, Venango & Warren Counties in 2019.

This project includes the restoration/rehabilitation of the State Route 426 Bridge over Brokenstraw Creek in Columbus Township, Warren County.

The bridge is 162 feet in length.

This project includes the application of shotcrete to the insides of metal culvert pipes/bridges to prolong their life.

Various locations are included on state routes throughout Crawford, Forest and Warren counties in 2019.

Maintenance of

Traffic:

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

A detour will be required during construction.

Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com.

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

Open for Bid: 2/28/2019 11/7/2019 12/5/2019

Estimated

Completion: Fall 2019 Spring 2020 Fall 2020

Page 57: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

57

2019 Projects—Warren

Map ID: 4 5 6

Title: 2019 Warren Shotcrete Group PA 27 over Browns Run Browns Run Road Bridge

SR (Section): 59 (B09) 27 (B03) 2010 (B00)

MPMS ID: 110411 74612 2545

Project Type: Bridge Project Bridge Project Bridge Project

Estimated Cost: $425,000 $160,000 $1,241,000

PennDOT

Contact: Kenneth Sanoski Matthew Antrilli Michael Hunkele

Project

Description:

This project includes the application of shotcrete to the insides of metal culvert pipes/bridges to prolong their life. Various locations are included on state routes throughout Warren County in 2019.

This project includes the Department Force bridge replacement of the State Route 27 (North Main Street) bridge over Browns Run in Brokenstraw Township, Warren County.

The bridge is 19 feet in length and will be replaced with a box culvert.

This project includes the replacement of the State Route 2010 (Brown Run Road) Bridge over Browns Run in Mead Township, Warren County.

The bridge is 38 feet in length.

Maintenance of

Traffic:

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

A detour will be required during construction.

Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com.

Traffic will be maintained using a temporary roadway with automated traffic signals.

Open for Bid: 4/11/2019 12/5/2019 3/14/2019

Estimated

Completion: Fall 2019 Summer 2020 Fall 2019

Page 58: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

58

2019 Projects—Warren

Map ID: 7 8 9

Title: US 6 Bridge over Ludlow St SR 3002: McGraw Road Br over Pine Creek Warren Group 691

SR (Section): 6 (B21) 3002 (B02) 957 (691)

MPMS ID: 57180 2530 111010

Project Type: Bridge Project Bridge Project Group Project

Estimated Cost: $800,000 $150,000 $4,163,335 (actual)

PennDOT

Contact: Robert Bell Matthew Antrilli Ronald Johnson

Project

Description:

This project includes the rehabilitation of US Route 6 (Warren Bypass) Bridge over State Route 62 (Ludlow Street) in the City of Warren, Warren County. The bridge is 166 feet in length.

This project includes the Department Force bridge replacement of the State Route 3002 (McGraw Road) bridge over Pine Creek in Southwest Township and Warren County.

The bridge is 21 feet in length and will be replaced with pre-cast channel beams and set back abutments.

This project includes 6.07 miles of resurfacing on State Route 957 from the Erie County line to Lottsville in Columbus and Freehold Townships, Warren County.

IA Construction Corporation will be the contractor for this project.

Maintenance of

Traffic:

A minimum of one lane of traffic eastbound and westbound will be maintained during construction.

A detour will be required during construction.

Check our website for detailed information: www.penndot.gov/District1 or www.511PA.com.

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

Open for Bid: 3/28/2019 N/A Project has been awarded

Estimated

Completion: Summer 2019 Fall 2019 Fall 2019

Page 59: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

59

2019 Projects—Warren

Map ID: 14 11

Title: SR 3017 Wall US 62: Market Street Ext

SR (Section): 3017 (WAL) 62 (21M)

MPMS ID: 97049 100320

Project Type: Safety Project Highway Project

Estimated Cost: $600,000 $6,600,000

PennDOT

Contact: Matthew Hetrick Rodney Fasenmyer

Project

Description:

This safety improvement project includes a 0.08 mile slide correction on State Route 3017 (York Hill Road) in Brokenstraw Township, Warren County.

Work involves a soldier pile retaining wall.

This project includes 6.69 miles of resurfacing on US 62 (Market Street Extension) from Penn Avenue to Hatch Run Road with railroad coordination in the City of Warren and Conewango Township, Warren County.

The project also includes the resurfacing of 5.54 miles on State Route 1017 (Market Street).

Maintenance of

Traffic:

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

A minimum of one lane of traffic will be maintained using flaggers.

Daylight traffic control only.

Access to drives will be maintained.

Open for Bid: 8/22/2019 4/25/2019

Estimated

Completion: Fall 2020 Fall 2020

Page 60: 2019 Construction Program...Project Type: Safety Project Safety Project Estimated Cost: $650,000 $160,000 PennDOT Contact: Ronald Johnson Diana Craft Project Description: This project

60

For more information, contact our Community Relations Coordinator

Jill Harry 255 Elm Street

Oil City, PA 16301 Phone: (814) 678-5035 Email: [email protected]

Find us online at www.PennDOT.gov/District1

Follow us on Twitter @511PAErie

For road conditions and information Visit www.511pa.com