  • SPECTRUM

    Client: M/s NAVIN FLUORINE INTERNATIONAL LTD

    BRINE CHILLER ( -30 OC)

    (SCREWED TYPE, WATER COOLED)

    MANUFACTURING PLANT NO.2 AT DEWAS

    TECHNICAL SPECIFICATION

  • TECHNICAL SPECIFICATION

    BRINE CHILLER PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D06 PAGE NO . PAGE1 OF 16

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Chiller

    systems\21113 M-00-D06 URS CHILLER ( -30 C ) - R0.docx Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    REVISION HISTORY

    REVISION EFFECTIVE DATE REASON FOR REVISION 00 02-01-2014 FIRST ISSUE

  • TECHNICAL SPECIFICATION

    BRINE CHILLER PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D06 PAGE NO . PAGE2 OF 16

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Chiller

    systems\21113 M-00-D06 URS CHILLER ( -30 C ) - R0.docx Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    TABLE OF CONTENTS

    1.0 APPROVAL SIGNATURES 3 2.0 OVERVIEW 4 3.0 INSPECTION, TESTING AND DISPATCH 5 4.0 DRAWINGS & DOCUMENTS 5 5.0 PACKING 6 6.0 SPARES 7 7.0 DATASHEET 7

  • TECHNICAL SPECIFICATION

    BRINE CHILLER PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D06 PAGE NO . PAGE3 OF 16

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Chiller

    systems\21113 M-00-D06 URS CHILLER ( -30 C ) - R0.docx Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    1.0 APPROVAL SIGNATURES

    This document is prepared by the SPCPL team for the project of NAVIN FLUORINE INTERNATIONAL LIMITED, DEWAS under the authority of their Project Manager. Hence this document before being effective shall be approved by the QA team of NAVIN FLUORINE INTERNATIONAL LIMITED, DEWAS, and authorized by the appropriate Project Authority.

    SPCPL

    Name Designation Signature Date

    Prepared By Rajesh Yerawar Sr.Executive - Mechanical

    Checked By Akhilesh Verma Manager - Mechanical

    Approved By Sanjay Katkade GM-Engineering

    CLIENT

    Name Designation Signature Date

    Approved By

    Authorized By

  • TECHNICAL SPECIFICATION

    BRINE CHILLER PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D06 PAGE NO . PAGE4 OF 16

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Chiller

    systems\21113 M-00-D06 URS CHILLER ( -30 C ) - R0.docx Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    2.0 OVERVIEW

    2.1 Project introduction Navin Flourine International Limited has envisioned setting up an Manufacturing plant No.2 facility at Dewas along with the necessary utilities. Nearest railway station : DEWAS Nearest airport : INDORE Ambient conditions:

    Summer ( DB / WB / % RH) 41.1 C / 25 C / 28 % Monsoon ( DB / WB / % RH) 32.2 C / 27.8 C / 70 % Winter ( DB / WB / % RH) 10 C / 7.2 C / 65 %

    2.2 PROJECT STANDARD

    Chiller units shall comply with all the requirements of the latest editions of the applicable international/ national codes and standards as far as they are equal to or more stringent than these specifications.

    Units shall conform to the following standards/ codes of the latest edition.

    i. Chiller performance shall be rated in accordance with AHRI standard 550/590. ii. Equipment fabrication and installation shall be in compliance with safety code for

    mechanical refrigeration ASHRAE 15 iii. Condenser shall include ASME U stamp and nameplate certifying compliance with

    ASME section VIII, Division 1 1998 code for unfired pressure vessels. iv. Chiller shall be designed and constructed to meet UL & CSA requirements. v. ASME standard B 31.5 1995 Refrigeration Piping. vi. National Electric code. vii. Electric motor as per IS 325 : 1996 viii. Earthing acceptance as per standard code IS3043. ix. Mechanical vibration, balance quality requirement as per Grade G1 specified in ISO

    1940/1.

  • TECHNICAL SPECIFICATION

    BRINE CHILLER PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D06 PAGE NO . PAGE5 OF 16

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Chiller

    systems\21113 M-00-D06 URS CHILLER ( -30 C ) - R0.docx Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    3.0 INSPECTION, TESTING AND DISPATCH

    The Chiller will be subjected to inspection at manufacturers works in the presence of purchaser/consultant. During inspection following routine tests shall be carried out:

    Visual inspection for workmanship and verification with respect to specifications. Mechanical operation of valves etc. Functional test for control circuits. Tightness of screwed/bolted connections

    The vendor shall supply to purchaser 3 sets of the certificates of Internal routine tests.

    4.0 DRAWINGS & DOCUMENTS Vendor to submit following Drawing & Documents at various stages.

    4.1 Drawings (3 Sets) - GA Drawings, Engineering Drawings (For approval, Approved, As built, As installed) - Electrical Circuit Diagrams - System schematics

    4.2 Manuals and Procedures (3 Sets) - Operation and Maintenance manuals - Specialized procedures, if applicable (such as Calibration, Cleaning, etc.) - Specifications and sources of some important materials, if applicable (such as lubricants,

    cleaning agents, etc.) 4.3 Lists (3 Sets)

    - Equipment and Instrument list with component descriptions - Electrical component parts list with descriptions - Spare parts list with appropriate identification nos., if any - Change parts list with appropriate identification nos., if any

    4.4 Factory Acceptance Test Certificates (3 Sets) - Detailed list of modifications after contract &/or in final approved design - Material specifications and test certificates - Instrument Calibration certificates - Functional/ Factory acceptance certificates (such as weld inspection, passivation, pressure/

    vacuum holds, etc.) - Warranty certificates

  • TECHNICAL SPECIFICATION

    BRINE CHILLER PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D06 PAGE NO . PAGE6 OF 16

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Chiller

    systems\21113 M-00-D06 URS CHILLER ( -30 C ) - R0.docx Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    - Surface finish test reports - Food grade material certificate

    4.5 Site Acceptance Test (3 Sets) - Operational Qualification Protocol

    5.0 PACKING

    Equipment shall be dispatched to site packed in full wooden case (Sea Worthy). It shall be wrapped in polythene sheets before putting in cases and it shall be ensured that damage to the equipment does not occur during handling/transportation. Lifting hooks shall be provided for unloading at site.

  • TECHNICAL SPECIFICATION

    BRINE CHILLER PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D06 PAGE NO . PAGE7 OF 16

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Chiller

    systems\21113 M-00-D06 URS CHILLER ( -30 C ) - R0.docx Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    6.0 SPARES

    Commissioning Spares - The vendors shall include in the quoted price sufficient quantities of commissioning spares required for erection and commissioning of the equipment. These shall include such items as Bolts and other miscellaneous parts. Essential Spares - The vendor shall supply spares required for two years trouble free operation & furnish list of spare considered with offer.

    7.0 DATASHEET

    DESIGN PARAMETERS REQUIRED SPECIFICATIONS GENERAL ( For complete Chiller Unit) Type Water Cooled Brine Chiller Unit

    Manufacture / Model Vendor to Specify

    Tag Number CHB-102

  • TECHNICAL SPECIFICATION

    BRINE CHILLER PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D06 PAGE NO . PAGE8 OF 16

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Chiller

    systems\21113 M-00-D06 URS CHILLER ( -30 C ) - R0.docx Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    DESIGN PARAMETERS REQUIRED SPECIFICATIONS

    Quantity (Nos.) 1 Nos. Actual capacity at design conditions 50 TR

    Chilled Brine Temperature Inlet / Outlet -30C / -25C

    Cooling Water Temperature Inlet / Outlet 32C / 37C

    Operating & Shipping Wt. (Kg) Vendor to Specify Noise Level NMT 80 db (A) at 1m distance from unit Evaporator type Vendor to Specify

    Overall Dimensions L x W x H Vendor to Specify

    Minimum Clearance Required. Vendor to Specify

    Refrigerant. R22

    Main Incomer rating. Vendor to Specify

    Microprocessor Required

    Location Indoor Recommended Brine solution & flow (Methanol + water / Cacl / MEG ) MEG ( % To be defined by vendor)

    COMPRESSOR

    Model Vendor to Specify

    Type Screw type

    Quantity Nos. per chiller Vendor to Specify

    Type of Compressor Single / multistage

    Type of drive Belt (Vendor to Confirm) MOC-Compressor Cast Iron

    MOC-Shaft Vendor to Specify

    Capacity control To be provided ( details by vendor)

  • TECHNICAL SPECIFICATION

    BRINE CHILLER PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D06 PAGE NO . PAGE9 OF 16

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Chiller

    systems\21113 M-00-D06 URS CHILLER ( -30 C ) - R0.docx Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    DESIGN PARAMETERS REQUIRED SPECIFICATIONS

    Type of lubricant Vendor to Specify

    Type of Refrigerant R22

    Charge of Refrigerant (Kg) Vendor to Specify Saturated suction pressure (kg/ cm) Vendor to Specify Saturated discharge pressure (kg / cm) Vendor to Specify Design pressure (kg/ cm) Vendor to Specify Design temperature (C) Vendor to Specify Operating weight ( kg) Vendor to Specify Speed Vendor to Specify IKW consumed at 100% / 75% / 50 % / 25 % capacity Vendor to Specify Operating TR at 100% / 75% / 50 % / 25 % capacity Vendor to Specify IKW /TR at constant condenser temperature 100% / 75% / 50 % / 25 % capacity Vendor to Specify

    Oil Separator and Lubrication Required

    Type of oil separator Vendor to Specify

    Lubrication pump Automatic reversible type gear pump

    RPM Vendor to Specify

    BHP Vendor to Specify

    First lot of oil Vendor to Specify

    First lot of refrigerant and inert gas Vendor to Specify

    Cooling water requirement Vendor to Specify

    Refrigerant charging and removal arrangement with necessary valve

    Vendor to Specify

    Minimum continuous operating load and power consumption. Vendor to Specify

    MOTOR / STARTER

  • TECHNICAL SPECIFICATION

    BRINE CHILLER PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D06 PAGE NO . PAGE10 OF 16

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Chiller

    systems\21113 M-00-D06 URS CHILLER ( -30 C ) - R0.docx Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    DESIGN PARAMETERS REQUIRED SPECIFICATIONS

    Manufacture- Model Vendor to Specify

    Type Squirrel cage, two pole, induction type & air cooled

    Quantity (Nos.) per chiller Vendor to Specify Type of power supply 415 V/ 50 Hz / 3 phase + Neutral Type of enclosure Vendor to Specify

    Type of protection Vendor to Specify

    Class of Insulation F with temperature rise limited to class B

    Efficiency Vendor to Specify

    Type of starter Vendor to Specify

    Type of Bearings Vendor to Specify

    Speed (rpm) Vendor to Specify Frame size (mm) Vendor to Specify Electrical continuous power (KW) Vendor to Specify Starting current ( A ) Vendor to Specify Continuous current ( A ) Vendor to Specify Operating weight ( Kg) Vendor to Specify Connected load Vendor to Specify

    Controlling VFD

    EVAPORATOR

    Manufacture Model Vendor to Specify

    Construction Shell & Tube

    Type Flooded tubes without joints or U bends. Quantity (Nos.) per chiller Vendor to Specify No of passes ( Nos) Vendor to Specify Nominal capacity (NTR) Vendor to Specify

  • TECHNICAL SPECIFICATION

    BRINE CHILLER PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D06 PAGE NO . PAGE11 OF 16

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Chiller

    systems\21113 M-00-D06 URS CHILLER ( -30 C ) - R0.docx Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    DESIGN PARAMETERS REQUIRED SPECIFICATIONS

    Shell outlet diameter (mm) Vendor to Specify Overall length (mm) Vendor to Specify Number of tubes (Nos.) Vendor to Specify Tube outer dia. (mm)/ Tube material / Length of Tubes) Vendor to Specify Number of Refrigerant circuit (Nos.) Min. 2 Circuits (Vendor to Specify) Operating charge (Kg) Vendor to Specify Design Chilled brine inlet temperature (C) -25 C Design Chilled brine outlet temperature (C) -30 C Brine Pressure drop (mmw) Vendor to Specify Brine flow Rate (m/ hr) Vendor to Specify Face area of tubes for heat transfer (cm ) Vendor to Specify Design fouling factor Vendor to Specify

    Shell Material IS 2062 (Vendor to Confirm) Tube Material Copper (Vendor to Confirm) Shell Design Pressure (kg/ cm) Vendor to Specify Tube Design Pressure (kg/ cm) Vendor to Specify Shell Thickness Vendor to Specify

    Tube Thickness 22 gauge

    Insulation Material Vendor to Specify

    Thickness of Insulation Vendor to Specify

    Insulation cladding Vendor to Specify

    Insulation area Entire evaporator

    Operating weight ( kg ) Vendor to Specify Shipping weight ( kg) Vendor to Specify

  • TECHNICAL SPECIFICATION

    BRINE CHILLER PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D06 PAGE NO . PAGE12 OF 16

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Chiller

    systems\21113 M-00-D06 URS CHILLER ( -30 C ) - R0.docx Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    DESIGN PARAMETERS REQUIRED SPECIFICATIONS Purge connection To be provided Safety valve & fixing arrangement To be provided Isolation valve for compressor maintenance To be provided Chilled brine flow switch & fixing arrangement

    To be provided

    Chilled brine drain nozzle with valve To be provided Chilled brine inlet nozzle To be provided Purge connection To be provided Chilled brine outlet nozzle To be provided Chilled brine vent with valve To be provided

    CONDENSER ( WATER COOLED ) Manufacture Model Vendor to Specify

    Type Shell & Tube type

    Quantity ( Nos.) per chiller Vendor to Specify Nominal Capacity (NTR) Vendor to Specify Number of passes (Nos.) Vendor to Specify Shell outer diameter ( mm) Vendor to Specify Overall length ( mm ) Vendor to Specify Cooling water inlet temperature (C ) 32 C Cooling water outlet temperature (C ) 36 C Water flow rate (m/ hr) Vendor to Specify Maximum storage capacity of refrigerant (kg) Vendor to Specify Fouling Factor Vendor to Specify

    Drain Connection (mm) Vendor to Specify Number of tubes ( Nos. ) x length Vendor to Specify Pressure drop (mmw)- water side Vendor to Specify

  • TECHNICAL SPECIFICATION

    BRINE CHILLER PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D06 PAGE NO . PAGE13 OF 16

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Chiller

    systems\21113 M-00-D06 URS CHILLER ( -30 C ) - R0.docx Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    DESIGN PARAMETERS REQUIRED SPECIFICATIONS

    Shell Material IS 2062 (Vendor to Confirm) Tube Material Vendor to Specify

    Shell Design Pressure (kg/ cm) Vendor to Specify Tube Design Pressure (kg/ cm) Vendor to Specify Shell Thickness Vendor to Specify

    Tube Thickness 22 gauge Purge connection To be provided Safety valve & fixing arrangement To be provided Fusible plug & fixing arrangement To be provided Isolation valve for compressor maintenance To be provided Cooling water flow switch & fixing arrangement

    To be provided

    Cooling water drain nozzle with valve To be provided Cooling water inlet nozzle To be provided Cooling water outlet nozzle To be provided Cooling water vent with valve To be provided

    REFRIGERANT CIRCUIT

    MOC The inter connected refrigerant piping shall be heavy duty, seamless copper tubes with weld able socket type fittings of forged steel construction with reference code ASME B 31.3

    Refrigerant circuit components shall include hot gas muffler, high side pressure switch, low side pressure switch liquid line shut-off valves, suction and discharge shut-off valves, filter drier, moisture indicating sight glass, thermostatic expansion valve (Exv), solenoid valve and complete operating charge of refrigerant and compressor oil.

    To be provided

    Temperature drop in Hot gas line, Liquid line & Suction line

    Vendor to specify

    Insulation for Hot gas line Hot insulation to be provided

    Insulation for Liquid line Cold insulation to be provided

  • TECHNICAL SPECIFICATION

    BRINE CHILLER PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D06 PAGE NO . PAGE14 OF 16

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Chiller

    systems\21113 M-00-D06 URS CHILLER ( -30 C ) - R0.docx Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    DESIGN PARAMETERS REQUIRED SPECIFICATIONS Liquid lines shall provide a float type-metering valve to maintain the proper level of refrigerant in the evaporator under both full and part load operating conditions for improving part load efficiency.

    To be provided

    ACCESSORIES AND COMPONENTS

    Flow Switch Required Victaulic Coupling at Condenser and Evaporator Inlet and Outlet Required

    Anti Vibration Pad Required

    Pressure gauges with isolation cocks Required

    Thermowell Required

    Electrical details Vendor to specify

    Control details Vendor to specify

    Control cabling within skid Required

    Purge connection To be provided Safety valve & fixing arrangement To be provided Fusible plug & fixing arrangement To be provided Isolation valve for compressor maintenance To be provided Cooling water flow switch & fixing arrangement To be provided Cooling water drain nozzle with valve To be provided Cooling water inlet nozzle To be provided Cooling water outlet nozzle To be provided Cooling water vent with valve To be provided

    SAFETY INTERLOCKS / PROTECTION

    Loss of refrigerant charge protection To be provided

    Low water flow detection To be provided

    Low chilled brine temperature protection To be provided

  • TECHNICAL SPECIFICATION

    BRINE CHILLER PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D06 PAGE NO . PAGE15 OF 16

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Chiller

    systems\21113 M-00-D06 URS CHILLER ( -30 C ) - R0.docx Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    DESIGN PARAMETERS REQUIRED SPECIFICATIONS

    Low control voltage protection To be provided

    High hot gas pressure trip To be provided

    Low suction gas pressure trip To be provided

    Relay preventing reverse operation To be provided

    Single phase protection To be provided

    Low oil pressure protection To be provided

    Electric overload protection To be provided POWER CUM CONTROL PANEL Components Microprocessor

    Power and control circuit terminal blocks ON/OFF control switch Replaceable solid-state relay panel Diagnostic display panel on unit Audio visual alarm

    Functions Automatic unloading Pump out at beginning and end of every circuit cycle Capacity control based on leaving chilled water temperature and rate of change of return water temperature

    Capacity control based on leaving chilled water temperature and rate of change of return water temperature interlocks / Safety Protection Temperature indication

    Pressure indication

    Fault indication Alarm (Audio Visual both)

    Display Required, details by vendor MOC Powder coated CRCA sheet Mounting On skid

    DIMENSION & WEIGHT REQUIRED SPECIFICATION Operating / Shipping weight Vendor to specify

    Dimensions (L x W x H) Vendor to specify

  • TECHNICAL SPECIFICATION

    BRINE CHILLER PROJECT NO 21113 REVISION NO 00

    DOCUMENT NO M-00-D06 PAGE NO . PAGE16 OF 16

    File Location

    Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\REVISED\Chiller

    systems\21113 M-00-D06 URS CHILLER ( -30 C ) - R0.docx Format No: SOP/ENG/005/02 Rev. 00 01/01/2013

    DESIGN PARAMETERS REQUIRED SPECIFICATIONS OTHERS

    1. Refrigerant piping with all accessories To be provided

    2. Power cabling within skid To be provided

    3. Control cabling within skid To be provided

    4. Installation & onsite training To be provided

    5.Installation & onsite training To be provided

    6.Motor with screw alinment frame & belt guard in case of belt drive

    To be provided

    7.Power cum control panel To be provided