GL-GLOBE/ GT-MH 17 September 2014
E2E Materials HandlingFulfilment
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
2/83
GL-GLOBE/ GT-MH 7 September 2014 2
Agenda
MH Key DecisionsMH Process Decomposition
MH Roles
E2E Materials Handling Fulfilment
MH High Level Change Impacts
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
3/83
GL-GLOBE/ GT-MH 37 September 2014
MH Key Decisions
Key Decision
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
4/83
GL-GLOBE/ GT-MH 7 September 2014 4
Key Decisions - Content
1. Full Batch Traceability2. Pallet Handling
3. Inbound Delivery
4. Radio Frequency
5. IM-WM Key Design Principles
6. Interfaces to External Warehouses
7. Transportation
8. Out of Scope for V1.5
9. Process Control Integration Principles
Key Decision
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
5/83
GL-GLOBE/ GT-MH 7 September 2014 5
1. Key Decision - Full Batch Traceability
Batch Management will be activated for:
All - Finished (FERT), Semi Finished (HALB), Raw Materials (ROH)
Partially - Packaging Materials (ZPCK) e.g. glue, shrink-wrap etc.
GLOBE standard for unique batch numbers
DS070-Batch Number for Finished Goods
DS071-Batch Number for Raw and Packaging Material
Traceability requirements apply to Nestl operations
as well as co-packer and co- manufacturing
System based traceability - with Full Compliance to Nestl QualitySystem (NQS)
Key Decision
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
6/83
GL-GLOBE/ GT-MH 7 September 2014 6
Customers
Other Factories
Traceability Requirement (NQS)
Key Decision
Manufacturer
Factory
Relevant processingand quality records
Consignmentidentified bysupplier's lot codeor Nestl designatedlot codes
Supplier Consumerunit
Upstream Traceability
Downstream Traceability
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
7/83GL-GLOBE/ GT-MH 7 September 2014 7
Traceability
Traceability need to record the use of materialBatch Management of all materials to identify the material used
In Manufacture: appropriate application of the process orderconcept to the degree of traceability required
In Distribution (sales): traceability to customer through batch intransfer order
Traceability is a given requirement. What needs to be assessedis the degree of traceability
EXTERNAL (minimum requirement)Limitation is the physical identification of the product (code). Unlesstime stamped there is no benefit to have exact timing. Information isFull Production batch code and recall would be by batch code (max1 day)
INTERNALProcess control before release. In the event of a deviation, theability to find the cause and the product effected by the deviation
Production control (time based)
Business Decision based on cost effort and risk
Key Decision
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
8/83GL-GLOBE/ GT-MH 7 September 2014 8
2. Key Decision - Pallet Handling
SAP Handling Unit Management (HUM)not be used. SAPStorage Unit Management be used instead (as in version 1.0)
Storage unit (SU) managed, and SU labeled according to the DS078-Identification of Handling Units
All inventoried, palletized materials (Finished Goods, Semi-Finished,Raw and Packaging materials)
Nestl best practice: all internal movement between Nestl sites(factory to DC, DC to DC) handled with homogenous pallets(samematerial, same batch)This requires production to produce/declare homogenous pallets
Pallet labels for mixed pallets / storage units shipped to customers inscope
Management of Handling Materials (pallets, crates, boxes, wire baskets, roll-
containers and containers) out of scope. However, the full functionality forreturnable containers (e.g. in terms of tracking the returnable containersoutside of Nestl premises) will be subject to scope and solution providedby Greenwich on direct delivery
Tote Bin management NOT in scope. The content of tote bins can bestorage unit managed. The management of the physical tote binsthemselves has to be done off-line
Key Decision
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
9/83GL-GLOBE/ GT-MH 7 September 2014 9
Label example
Key Decision
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
10/83GL-GLOBE/ GT-MH 7 September 2014 10
3. Key Decision - Inbound Delivery
SAP Inbound Delivery functionality will not be used in templateversion 1.5 due to a gap in SAP relating to QM inspection lots.This is because inbound delivery cannot be created when QM isactive in a plant. This decision applies to both factories andDC's.
All incoming receipts of materials will be performed via postinggoods receipt against a purchase order directly into SAP withouthaving to go through the SAP Inbound Delivery process.
Best Practice is to receive goods based on a dispatch advice(ASN-Advanced Shipping Notification) EDI message (EANCOMDESADV messaging standard) sent by the external supplier orthe sending plant. For interplant / intercompany / intermarketdeliveries, this is a mandatory requirement, supported bytemplate with Discrepancy Management of ASN's.
Key Decision
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
11/83GL-GLOBE/ GT-MH 7 September 2014 11
4. Key Decision - Radio Frequency
Automated Data Capture is incorporated intoTemplate designthis covers both Radio Frequency(RF) & Key Board scanning functionality
It is highly desirable that each implementation market
adopts, wherever practical, scanning and/or RFtechnology to support the increased requirementsplaced on markets by Template
This key decision addresses process requirementsand not the hardware requirements
Design incorporates near real time data capture &capture at source recommended
Key Decision
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
12/83GL-GLOBE/ GT-MH 7 September 2014 12
5. Key Decision - IM-WM Principles
SAP WM forms the integral MH solution for:
Distribution Centers / Regional Distribution Centers
Factories and / or Production Facilities
SAP IM without WM solution is only envisaged inexceptional cases e.g. interfaced to a 3rdparty WMS
Key Decision
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
13/83GL-GLOBE/ GT-MH 7 September 2014 13
6. Key Decision - Interface to External WM
'Generic' interface plug-in to 3rdparty warehousesand external systems will be supported based on fullEAN compliance and EDIFACT standards.
First choice for WMS should be GT solution unlessmarket has must have functionality that is notsupported by GT
Use of interface for 3rdparty WMS in case ofoutsourced operations
Key Decision
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
14/83
GL-GLOBE/ GT-MH 7 September 2014 14
Interface plug-in messages
Master Data MaintenanceMaterial Master changes
Inbound Process
Receipt Advice (RECADV)
Receipt Advice (Cust. Returns)
Receipt Advice (Process Order)
Outbound Process
Delivery release (SHPORD)
Dispatch advice (DESADV)
Goods issue to Production
(YINVRPT500)
Stock Adjustments (YINVRPTxxx)Local Quality Adjustment
Product Transformation
Manage Quality (Not MH)
Central Quality ch. (YINVRPT900)
Local Quality ch. (YINVRPT100)
Periodic Reporting
Stock Reconciliation (YMCHBDIF)
Others
Purchase Order (ORDERS)
Key Decision
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
15/83
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
16/83
GL-GLOBE/ GT-MH 7 September 2014 16
7. Key Decision - Transportation
Transportation execution provided by GT V1.5 islimited to:
Manual grouping of deliveries into national loads
Split order or order line
Load planning
Additional Route Planning and scheduling functionality forDirect Delivery
Complete transport process decomposition is out of
scope for GT V1.5
Key Decision
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
17/83
GL-GLOBE/ GT-MH 7 September 2014 17
8. Key Decision - Out of Scope for V1.5
The following topics are out of scope for GT V1.5:Warehouse planning
storage optimization, planning activities and resources
Dock & Yard management
Shop floor integration
Integration to warehouse mechanical handling AS/RSAutomatic Storage / Retrieval System
Management of pallets and interfaces to pallet managementsolutions
Full Tote Bin Management solution including status
Key Decision
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
18/83
GL-GLOBE/ GT-MH 7 September 2014 18
Key Decision 9 (MH / Mfg & Agreed with CT-Eng)Process Control Integration Principles
SAP implementation projects identify a need for integratingInformation flows and transaction execution between SAP and shopfloor process control systems
The implementation of process control integration with SAP mustadhere to the key design principles laid out in the document
These design Principles include:
Requirement to view all attributes of materials (raw, packaging, semi-finished work in progress and finished goods)in terms of quality, quantity,batch, physical location within a SAP warehouse
Establishing the integration points between systems by establishing theresponsibility for transactional processing(i.e.. Quality status changes must occur in SAP)
Frequency of messaging - incorporating 'near real time' requirements
that recognise the integrated nature of the Template solution, and thebusiness requirements
Data consistency must be maintained between SAP and externalsystems (e.g. common use of master data, organizational structures)
Messaging standards, together with the proposed message streamsthat will be supported.
(For full details of the standards refer to the document)
Key Decision
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
19/83
GL-GLOBE/ GT-MH 197 September 2014
Process Decomposition
Pl.
Res.Inb. Outb.
Stock
Mgt
Int. Sto
Mov.
Level 2 to 5
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
20/83
GL-GLOBE/ GT-MH 7 September 2014 20
Master Data
Process DecompositionLevel 2 and 3 - Content
- Standard- ProductionDeclaration
- Returns
- Expenseditems
- Capex - TradeAssets
Plan
ResourcesInbound Outbound
Stock
Management
Internal
Stock
Movements
Pl.
Res.Inb. Outb.
Stock
Mgt
Int. Sto
Mov.
Level 2
- General, Putaway- Retrieval
- Picking AreaReplenishment
- Production Staging
- Cross - Docking
- Vehicle Direct
Delivery
- Standard- ProductionConsumption
- SupplierReturns
- Trade Assets
- Product Transformation
- Stock Adjustment- Inventory Counting
- Logistical Status Change
- PlanResources
- Master Data
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
21/83
GL-GLOBE/ GT-MH 217 September 2014
L3 - Inbound
Master Data
Plan
ResourcesInbound Outbound
Stock
Management
Internal
Stock
Movements
Pl.
Res.Inb. Outb.
Stock
Mgt
Int. Sto
Mov.
Inbound
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
22/83
GL-GLOBE/ GT-MH 7 September 2014 22
L3 - InboundVariants
Pl.
Res.Inb. Outb.
Stock
Mgt
Int. Sto
Mov.
Inbound
Standard Inbound Process Inbound Production Declaration
Inbound Returns
Inbound Expensed items
Inbound CAPEX - Trade Assets
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
23/83
GL-GLOBE/ GT-MH 7 September 2014 23
Discrepancy
Management
Unload /
Palletize
Post GoodsReceipt
Print or
Reprint Labels
Administrative
Control
Quality
Pre-check
Assign Resources
for unloading
Goods Arrive
L3 - Standard Inbound ProcessDecomposition
Pl.
Res.Inb. Outb.
Stock
Mgt
Int. Sto
Mov.
Inbound
Manual process, normally a pre-planned activity
driven by Purchase Order release
Administrative step to match Purchase Orders againstdocumentation and information for loads arriving on site
Quality check conducted before a formal goodsreceipt is performed in the system
Unload arriving goods and prepare them(pack/palletize) for storage in the warehouse
Allocation of resources before physicalmovement of goods takes place
Printing new, or reprinting missing/unusable, palletlabels for received palletized goods
Posting the receipt of goods into the inventorysystem
Managing discrepancy arising during inter-Nestl
transfers
WMIM
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
24/83
GL-GLOBE/ GT-MH 7 September 2014 24
Materials
Handling
Pl.
Res.Inb. Outb.
Stock
Mgt
Int. Sto
Mov.
Inbound
Refer to
plan
Resources
Purchase
Order or
ASN
Refer to
Procure to
Pay (ES)
Goods
Arrive
Administrative
Control
Goods
to be
receiv
ed?
Quality Pre-
Check
Goods
to be
receiv
ed?
Assign
Resources for
unloading
Unload /
Palletize
Post Goods
Receipt
Labellin
g
require
d?
Proof of
Delivery
(ASN)
Refer to QM
Execute Inspection
for Goods Receipt
of Inbound Material
(ES)
Refer to
Internal
Stock
Movements
Print orReprint
Label
Discrepancyreport
Refer to QM Execute
Inspection Prior to
Goods Receipt (ES)
Yes
No
Yes
No
Yes
No
Delivery
confirmation
(e.g. EDI)
to supplier
*POD
L3 - Standard Inbound ProcessProcess Flow
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
25/83
GL-GLOBE/ GT-MH 7 September 2014 25
Materials
Handling
Refer to
Production
Execution(ES)
Refer to QM
Sampling /
Inspection Lot(ES)
Goods
produced
Inspection
Lot
Customer development front end to perform GR data
capture, print labels and post goods receipt
Post Goods
Receipt
Labellin
g
require
d?
Print or
reprintLabels
Goods Receipt
Document
Refer to
Internal
Stock
Movements
Yes
No
L3 - Inbound Production DeclarationProcess Flow
Pl.
Res.Inb. Outb.
Stock
Mgt
Int. Sto
Mov.
Inbound
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
26/83
GL-GLOBE/ GT-MH 7 September 2014 26
MaterialsHandling
Refer to
Procure to
Pay (ES)
Refer to
Plan
Resources
Refer to
Procure to
Pay
Refer to
Customer
Services
Inbound
Notification or
PO
Goods
Arrive
Administrative
Control
Goodsto be
received
?
Quality Pre-
check
Assign
Resources for
unloading
UnloadPost Goods
Receipt
Proof of
Delivery End
Goodsto be
received
?
L3 - Inbound Expensed itemsProcess Flow
No No
Yes
Yes
Pl.
Res.Inb. Outb.
Stock
Mgt
Int. Sto
Mov.
Inbound
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
27/83
GL-GLOBE/ GT-MH 7 September 2014 27
Materials
Handling
L3 - Inbound CAPEX - Trade AssetsProcess Flow
Pl.
Res.Inb. Outb.
Stock
Mgt
Int. Sto
Mov.
Inbound
Administrative
Control
Goods
Arrive
Refer to
Plan
Resource
Inbound Vendor
Shipping Document
or PO
Goods
to be
received
?
Refer to
Procure to
Pay
Refer to
Customer
Services
Refer to
Internal
StockMovement
Refer to
Returns &
Refusals
Refer to
Asset
Creation
Refer to
Procure to
Pay (ES)
Proof of
Delivery
Unload
Perform
Quality
Check
Post Goods
Receipt
(inventory IM
blocked)
Assign
Resources
for
unloading
Goods
to be
received
?
Asset
Tagging
required
?
QC
Check
OK?
Post Goods
Receipt (WM
released fixed
asset)
Print or
Reprint Label
(local)
Maintain Trade Asset
Equipment Record
End
No
Yes
No
No
Yes
Yes
YesNo
Maintain Trade Asset
Equipment Record
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
28/83
GL-GLOBE/ GT-MH 287 September 2014
L3 - Outbound
Master Data
Plan
ResourcesInbound Outbound
Stock
Management
Internal
Stock
Movements
Pl.
Res.Inb. Outb.
Stock
Mgt
Int. Sto
Mov.
Outbound
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
29/83
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
30/83
GL-GLOBE/ GT-MH 7 September 2014 30
Proof of DeliveryProcessing
Load
Goods Issue
Ship
Staging
L3 - Standard Outbound ProcessDecomposition
Goods are assembled, labelled and sequenced forloading
Goods are physically loaded into vehicles ready to beshipped
Removal from stock is confirmed in the system andshipping documents printed / sent electronically
Proof of Delivery (POD) isreceived and processed
Truck is authorized to leave site, alldocuments have been issued
Pl.
Res.Inb. Outb.
Stock
Mgt
Int. Sto
Mov.
Outbound
IM
WM
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
31/83
GL-GLOBE/ GT-MH 7 September 2014 31
L3 - Standard Outbound ProcessVariants
The Standard Outbound Process covers the common rules and
requirements, applicable for all Outbound processes
Plan
ResourcesInbound Standard Outbound Process
Stock
Management
InternalStock
Movements
Outbound Production Consumption
Outbound Supplier Returns
Outbound Trade Assets
Other Outboundvariants requireseparate processdecompositions tocover specific cases
Pl.
Res.Inb. Outb.
Stock
Mgt
Int. Sto
Mov.
Outbound
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
32/83
GL-GLOBE/ GT-MH 7 September 2014 32
Materials
Handling
Goods Moved
(based on
outbound delivery)
ASN
(Dispatch
Advice)
Goods
issued
Goods
shipped
Goods
shipped
POD not
OK
Refer to InternalStock Movements
Retrieval
Refer to
Billing (ES)End
Refer to
Billing (ES)
Refer to Receive
Claims, Returns
and Refusals (ES)
Ship (Truck
leaves site)
ASN
Require
d?
Invoic
e with
Goods
?
Was
there
Pre-
invoice?
POD
OK?
Proof of
Delivery
Processing
Goods
IssueStaging Load
Yes
No No
No
Yes Yes
No
Yes
L3 - Standard Outbound ProcessProcess Flow
Pl.
Res.Inb. Outb.
Stock
Mgt
Int. Sto
Mov.
Outbound
This process does not apply for Direct delivery outbound processes since SAPoutbound is performed after Customer deliveries
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
33/83
GL-GLOBE/ GT-MH 7 September 2014 33
Materials
Handling
Customer development front end to perform GI data
capture for SU managed materials
Refer to
Produce
Goods (ES)
Goods
moved
Goods
Issued
Goods
Issue
Refer to Internal
Stock Movement
Production Staging
L3 - Outbound Production ConsumptionProcess Flow
Pl.
Res.Inb. Outb.
Stock
Mgt
Int. Sto
Mov.
Outbound
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
34/83
GL-GLOBE/ GT-MH 7 September 2014 34
Materials
Handling
Staging
Refer to Internal
Stock Movement
Retrieval
Goods
moved
ASN
Require
d?
Refer to Manage
Claims &
Returns (ES)
ASN
(Dispatch
Advice)
Materials
Returned to
Supplier
LoadShip (Truck
leaves site)
Goods
Issue
L3 - Outbound Supplier ReturnsProcess Flow
Pl.
Res.Inb. Outb.
Stock
Mgt
Int. Sto
Mov.
Outbound
No
Yes
St k
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
35/83
GL-GLOBE/ GT-MH 7 September 2014 35
Materials
Handling
L3 - Outbound Trade AssetsProcess Flow
Pl.
Res.Inb. Outb.
Stock
Mgt
Int. Sto
Mov.
Outbound
Good IssueStaging
Refer To
Customer Service
Enter Order (TradeAsset)
Outbound
Delivery
PODOK?
Load Ship (Truckleaves site)
PODProcessing
Refer to
Internal
StockMovement
Refer to Receive
Claims, Returns
and Refusals (ES)
POD not
OK
Goods
shipped
Maintain
Trade
Equipment
Records
End
No
Yes
St k
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
36/83
GL-GLOBE/ GT-MH 367 September 2014
L3 - Internal Stock Movements
Master Data
Plan
ResourcesInbound Outbound
Stock
Management
Internal
Stock
Movements
Pl.
Res.Inb. Outb.
Stock
Mgt
Int. Sto
Mov.
Internal Stock Movement
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
37/83
GL-GLOBE/ GT-MH 7 September 2014 37
L3 - Internal Stock Movements (ISM)Content
Overview ISM General, Putaway & Crossdocking
ISM General, Putaway
ISM Cross - Docking
ISM Retrieval
ISM Picking Area Replenishment
ISM Production Staging
ISM Vehicle Direct Delivery
Stock
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
38/83
GL-GLOBE/ GT-MH 7 September 2014 38
Storage Area
Rack Storage
Block Storage
L3 - Internal Stock Movement (ISM)Overview
Outbound To
customer
Returns
to supplier
PSA
ProductionSupply
Area
Production
Shipping
Area
Case
Picking
Receiving
Area
Inbound from
supplier
Customer
returns
Internal
Cross-Dock
Put
away
Replen-
ishment
Retrieval
Staging
Inboundfrom
Production
Production Consumption
Pl.
Res.Inb. Outb.
Stock
Mgt
Int. Sto
Mov.
Internal Stock Movement
Stock
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
39/83
GL-GLOBE/ GT-MH 7 September 2014 39
Materials
Handling
Create Internal
Movement
Instruction
Start
Request for
putaway
movement
EndMovement Slip
(putaway slip)
Goods
Moved
Assign
Resources
Perform
Movement
L3 - ISM General, PutawayProcess Flow
Pl.
Res.Inb. Outb.
Stock
Mgt
Int. Sto
Mov.
Internal Stock Movement
SStock
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
40/83
GL-GLOBE/ GT-MH 7 September 2014 40
Materials
Handling
Create
Replenishment
Instruction
Assign
Resources
Start
Request for
replenishment
Perform
Movement
Replenishment
List
Goods Moved to Case
Picking area End
Outbound
Deliveries to be
prepared
L3 -ISM Picking Area ReplenishmentProcess Flow
Pl.
Res.Inb. Outb.
Stock
Mgt
Int. Sto
Mov.
Internal Stock Movement
L3 ISM P d ti St iStock
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
41/83
GL-GLOBE/ GT-MH 7 September 2014 41
Materials
Handling
Create ProductionStaging Instruction
AssignResources
Released
Process
order(s)
Start
End
Stock level in
the PSA
Movement
Slip
Goods Moved to
the PSA
PerformMovement
L3 - ISM Production StagingProcess Flow
Pl.
Res.Inb. Outb.
Stock
Mgt
Int. Sto
Mov.
Internal Stock Movement
Stock
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
42/83
GL-GLOBE/ GT-MH 427 September 2014
L3 - Stock Management
Master Data
Plan
ResourcesInbound Outbound
Stock
Management
Internal
Stock
Movements
Pl.
Res.Inb. Outb.
Mgt
Int. Sto
Mov.
Product Transformation
L3 St k M tStock
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
43/83
GL-GLOBE/ GT-MH 7 September 2014 43
L3 - Stock ManagementContent
Pl.
Res.Inb. Outb.
Mgt
Int. Sto
Mov.
Product Transformation
Product Transformation
Stock Adjustment
Inventory Counting
Logistical Status Change
L3 P d t T f tiStock
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
44/83
GL-GLOBE/ GT-MH 7 September 2014 44
Materials
Handling
L3 - Product TransformationProcess Flow
Perform System
Transformation
Refer to
Plan
Resources
Move
require
d?
Refer to
Internal
Stock
Movements
Refer to Internal
Stock Movements
Manufacturing PT
Product
Transformation
Requirement
Stock
Updated
Use
PP-PI
?
Move
require
d?
Physical
Manipulatio
n required?
Select stock to be
transformed
Decide where to perform
transformation
Perform Physical
Transformation
Print
Labels *
End
Pl.
Res.Inb. Outb.
Mgt
Int. Sto
Mov.
Product Transformation
Yes
No
Yes
No No
Yes
Yes
No
* Print Labels may not be necessary with small label
Ex. Coffee Downgrading
L3 St k Adj t tStock
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
45/83
GL-GLOBE/ GT-MH 7 September 2014 45
Materials
Handling
Perform
Stock
Adjustment
Refer to
Plan
Resources
Request for
Stock
Adjustment
Relabe
l?
Start
End
Stock
Updated
Print or
Reprint
Label
Yes
No
L3 - Stock AdjustmentProcess Flow
Pl.
Res.Inb. Outb.
Mgt
Int. Sto
Mov.
Stock Adjustment
L3 I t C tiStock
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
46/83
GL-GLOBE/ GT-MH 7 September 2014 46
Materials
Handling
Generate
Inventory
Document
Assign
Resources
Refer to
Plan
Resources
Request for
Inventory count,
planned or ad hoc
Recou
nt?
Start
End
Enter
Count
Results
Analyze
Inventory
Results
Count
sheets
Validate Results
& Clear
Differences
Generate
Inventory
Recount
Count
sheets
Adjusted
Inventory
Includes physical counting
as well system update
L3 - Inventory CountingProcess Flow
Pl.
Res.Inb. Outb.
Mgt
Int. Sto
Mov.
Inventory Counting
Yes
No
L3 L i ti l St t ChStock
M t
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
47/83
GL-GLOBE/ GT-MH 7 September 2014 47
Materials
Handling
L3 - Logistical Status ChangeProcess Flow
Perform Logistical
Status Change
Refer toPlan
Resources
Request for
Logistical Status
Change
(Un)hol
d
storage
bin?
Logistical Status
Change Effected
(Un)hold
Storage
unit?
End
Yes
No
Yes
No
Pl.
Res.Inb. Outb.
Mgt
Int. Sto
Mov.
Logistical Status Change
Stock
M t
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
48/83
GL-GLOBE/ GT-MH 487 September 2014
L3 - Plan Resources
Master Data
Plan
ResourcesInbound Outbound
Stock
Management
Internal
Stock
Movements
Pl.
Res.Inb. Outb.
Mgt
Int. Sto
Mov.
Plan Resources
L3 Plan Resources Process
Stock
Mgt
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
49/83
GL-GLOBE/ GT-MH 7 September 2014 49
Materials
Handling
Analyze Input,
Scenarios andAvailabilities
Receive Inputs(Requirements)
Refer to
Customer Service,
P2P, QM,
Manufacturing,Transport
Activity and
Movement Plan
Outboun
d
delivery
group/split
required
?
Refer to
MH Inbound
& Outbound
Refer to
Inbound,
Outbound,
Internal Stock
Movements,
Stock Management
Schedule
Resourcesand Activities
Group/Split
OutboundDeliveries
L3 - Plan Resources ProcessProcess Flow
Pl.
Res.Inb. Outb.
Mgt
Int. Sto
Mov.
Plan Resources
Yes
No
Master Data Stock
Mgt
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
50/83
GL-GLOBE/ GT-MH 507 September 2014
L3 - Master Data
Master Data
Plan
ResourcesInbound Outbound
Stock
Management
Internal
Stock
Movements
Master Data
Pl.
Res.Inb. Outb.
Mgt
Int. Sto
Mov.
L3 Master DataMaster Data Stock
Mgt
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
51/83
GL-GLOBE/ GT-MH 7 September 2014 51
L3 - Master DataObjectives
Main purpose is to ensure the correctness andconsistency of all master data information within thesystem for reliable business transactions
To achieve that, master data relevant to inventorycontrol and warehouse management has to becreated and maintained
Material master information relevant to Warehouse
Warehouse storage bin definitions
Material staging to productionBatch search strategies (for retrieval)
Shipping output conditions
Master Data
Pl.
Res.Inb. Outb.
Mgt
Int. Sto
Mov.
L3 Master DataMaster Data Stock
Mgt
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
52/83
GL-GLOBE/ GT-MH 7 September 2014 52
MaterialsHandling
Create and Maintain
Master Data
Requirement to
Create or
Maintain Master
Data
Start
End
Master Data
Created or
Maintained
L3 - Master DataProcess Flow
Master Data
Pl.
Res.Inb. Outb.
Mgt
Int. Sto
Mov.
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
53/83
GL-GLOBE/ GT-MH 537 September 2014
MH End User Roles
End User Roles
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
54/83
GL-GLOBE/ GT-MH 547 September 2014
Terminology
Changes from V1.0 to V1.5
Jobs
MH End User Roles
End User Roles
Overview
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
55/83
GL-GLOBE/ GT-MH 7 September 2014 55
OverviewTerminology
Transaction
Roles
Includes a logical grouping of transactions and tasksperformed in SAP and other GLOBE Applications
Determines the access / security a user is allocated
Defined globally then copied to create market roles
Jobs
General employee classification of tasks, functions, etc.
A Job is an aggregate of one or more roles
Defined in a global catalog in SAP HR
Position
A particular occurrence of this job in a particularorganization unit
Defined locally in SAP HR
200+
14
~30,000
14
Changes from V 1 0 to V 1 5
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
56/83
GL-GLOBE/ GT-MH 7 September 2014 56
Changes from V.1.0 to V.1.5
Version 1.0
Material Handling Display
Warehouse Worker
Warehouse Clerk
Warehouse Manager
Version 1.5
MH-0374 Material Handling Display
MH-0406 Stock Movement Confirmation
MH-0404 Stock Goods Issue & Receipt
MH-0410 Manufacturing MH Execution
MH-0407 Inventory Counting
MH-0411 Stock Push DispatchMH-0403 Stock Movement Creation &
Confirmation
MH-0405 Stock Management
MH-0536 Stock Adjustment
MH-0402 Clear IM Inventory Differences
MH-0408 Warehouse Master Data Clerk
MH-0386 Load Planner
MH-0387 Load Planning Customizer
MH-0412 Warehouse InterfaceAdministration
End User Roles
Materials Handling Jobs
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
57/83
GL-GLOBE/ GT-MH 7 September 2014 57
Materials Handling Jobs
Distribution Group Manager
Distribution Manager
Transport Manager
Warehouse Supervisor
Transport Supervisor
Warehouse ControllerTransport Controller
Warehouse Specialist
Transport Specialist
Stock Controller
Distribution Administrative AssistantWarehouse Operator
Distribution / Warehouse Assistant
Transport Driver
Other Jobs
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
58/83
GL-GLOBE/ GT-MH 7 September 2014 58
Other Jobs
Audit ManagerMH-0374 Material Handling Display (optional)
AuditorMH-0374 Material Handling Display (optional)
Manufacturing SupervisorMH-0374 Material Handling Display (optional)
MH-0410 Manufacturing MH Execution (optional)
Production OperatorMH-0374 Material Handling Display (optional)11
MH-0410 Manufacturing MH Execution
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
59/83
GL-GLOBE/ GT-MH 597 September 2014
Materials Handling Fulfilment
Process Purpose and Applicability
Process Flow
ScenariosProcess Business Rules
MH End to End
Process Purpose & Applicability
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
60/83
GL-GLOBE/ GT-MH 7 September 2014 60
Process Purpose & ApplicabilityWhy this new E2E in V 1.5 ?
Other E2E: focus on integration
MH E2E: focus on pure WM functionality
Movements within the warehouse
Concurrent execution of tasksPutaway algorithms for different storage types
Replenishment algorithms - case picking areaorganization
Retrieval algorithms for different storage types
RF usability
Exception management
MH End to End
Process Purpose & Applicability
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
61/83
GL-GLOBE/ GT-MH 7 September 2014 61
Process Purpose & ApplicabilityScenarios
The two E2E-scenarios describe the processes morespecific to
Distribution center
Factory warehouse
Factory warehouse scenario:Integrated in Planning to Produce Standard E2E
MH End to End
Process Purpose & Applicability
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
62/83
GL-GLOBE/ GT-MH 7 September 2014 62
Process Purpose & ApplicabilityDescription of the End-to-End Process
Starts with the receiving of goods into a warehouse: receipts from suppliers or other Nestl companies
returns from customers
inbound from production
It describes all possible movements of goods inside awarehouse (including inventory counting)
Ends with the goods issue
to customers
to suppliers (for returns)
to production (consumption of raw and packaging material)
MH End to End
Process Purpose & Applicability
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
63/83
GL-GLOBE/ GT-MH 7 September 2014 63
Process Purpose & ApplicabilityKey Decisions
1. Full Batch Traceability2. Pallet Handling (Storage Unit management, not
HUM-Handling Storage Management)
3. Inbound Delivery Process (through Purchase Orderinstead of inbound delivery)
4. RF-Radio Frequency Functionality
5. Inventory vs. Warehouse Management - MaterialsHandling Key Design Principles (use WM)
MH End to End
Process Purpose & Applicability
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
64/83
GL-GLOBE/ GT-MH 7 September 2014 64
Process Purpose & ApplicabilityAssumptions
The triggers are already created (creation not part ofE2E)
The materials involved are defined for the respectivewarehouses
MH End to End
Process Purpose & Applicability
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
65/83
GL-GLOBE/ GT-MH 7 September 2014 65
Process Purpose & ApplicabilityTriggers
Inbound TriggersPurchase order
Return Delivery (inbound from customers)
Process Order (ready for production declaration)
Outbound Triggers:
Outbound Delivery Standard
Purchase Order (Returns to suppliers)
Process Order (ready for release)
Inventory Counting Trigger:
Need for Inventory Counting
MH End to End
Process Flow
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
66/83
GL-GLOBE/ GT-MH 7 September 2014 66
Process FlowOverview
Factory
QualityInspection
StockAdjustments
InternalStockMovements
Outbound
Outbound toManufacturing
Inbound
Inbound from
Production
DC
QualityInspection
StockAdj.
InternalMoves
= SAP WarehouseManagement includingRadio frequency (RF)
OutboundInbound
Customer
Customer
Production
Supplier Supplier
Customer returns
Supplier returns Supplier returns
Customer returns
MH End to End
Process Flow
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
67/83
GL-GLOBE/ GT-MH 7 September 2014 67
Process FlowInternal Stock Movements
Storage Area
Rack Storage
Block Storage
Outbound To
customer
Returns
to supplier
PSA
Production
Supply
Area
Production
Shipping
Area
Case
Picking
Receiving
Area
Inbound from
supplier
Customer
returns
Internal
Cross-Dock
Put
away
Replen-
ishment
Retrieval
Staging
Inboundfrom
Production
Production Consumption
MH End to End
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
68/83
Scenario 1 Distribution Center
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
69/83
GL-GLOBE/ GT-MH 7 September 2014 69
Scenario 1 Distribution CenterProcess flow
E2E Planning to Produce StandardPurchase Order / ASN (supplier or factory)
Inbound Standard
Internal Stock Movement (ISM) Putaway
Product TransformationReplenishment of picking face
Outbound Delivery Standard
ISM Retrieval (crossdock)
Outbound Standard (goods issue)
E2E Order to Cash Standard
MH End to End
Scenario 1 Distribution Center
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
70/83
GL-GLOBE/ GT-MH 7 September 2014 70
S CIndividual steps (1 / 2)
Inbound of Finish Goods from factory (including early shipment)and supplier (e.g. trade goods)
Putaway
Product transformation
using MH transactions (no Process Order)
using Process Order Replenishment of fixed bin picking face
batch execution
dynamic execution
Retrieval
pallet case
each
2-step picking
MH End to End
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
71/83
Scenario 2 Factory Warehouse
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
72/83
GL-GLOBE/ GT-MH 7 September 2014 72
E2E Planning to Produce Standard
Purchase Order (converted from purchase requisition)
Inbound Standard
Internal Stock Movement (ISM) Putaway
Process Order (ready for release)Release Process Order for Production
ISM Production Staging
Outbound Production Consumption
Process Order (ready for production declaration)
Inbound Production Declaration
Internal Stock Movement (ISM) Putaway
MH End to End
yProcess flow
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
73/83
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
74/83
Process Business Rules (1 / 2)
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
75/83
GL-GLOBE/ GT-MH 7 September 2014 75
( )
SAP-WM and storage unit (SU) management is used
Each SU is labeled and identified with its SSCC
Radio Frequency (RF) is used wherever possible
When there is a problem with the early ship stock, the
producing factory is responsible to change the"Inspection End Date" in the inspection lot and the"Available From" date in the batch record for the stockin Quality Inspection. Quality management uses theinspection end date, the available from date is used
by APO for planning
MH End to End
Process Business Rules (2 / 2)
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
76/83
GL-GLOBE/ GT-MH 7 September 2014 76
( )
Only selected personnel will be given authorization tomake a status change on "Quality Inspection" and"Blocked" stock
Ability to view the status and details of inspection lotsmust be available at all times
All movements of stock must be documented andhave full traceability
MH End to End
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
77/83
GL-GLOBE/ GT-MH 777 September 2014
MH High Level Change Impacts
Change Impact
Key Changes, Benefits and Implications
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
78/83
GL-GLOBE/ GT-MH 7 September 2014 78
y g
Materials Handling will introduce 4-7 key changes tothe way we manage our business:
Pallet labeling for all non bulk
materialsThis means
Adherence to Pallet labeling
standard for Raw Material, Packing
Material, Semi Finished Product and
Finished Products.
System Based Batch Traceability This meansRaw Materials, Packing Materials,
Semi Finished Products & Finished
Products includes Co-packers and
Sub contractors Per NQS policy.
Change in skill set of employees This meansEmpowerment to shop floor
Real time data capture at source This means
Traceability of stock on corporate
level,Stock accuracy
Less errors and corrections
Reduced stock levels
Change Impact
Key Changes, Benefits and Implications
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
79/83
GL-GLOBE/ GT-MH 7 September 2014 79
Materials Handling will introduce 4-7 key changes tothe way we manage our business:
This means
Fully integrated solution for MH This meansStrong reliance on master data
integrity clearer definition of MH
corporate view on inventory
Warehouse Management (WM)
organizes work in the warehouse
System control at a local level
Better organized warehouses
More time for management
System Stock Rotation This means
FEFO
Better Customer Service
Capacity increase
Cost reduction
Change Impact
What else will change?
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
80/83
GL-GLOBE/ GT-MH 7 September 2014 80
Responsibility / Accountability Changes
Warehouse Clerk creates internal movementinstruction but the system advises which pallet andwhere to place it. By exception the worker can chose
different locations
Outbound deliveries are created by- Customer Service for dispatch to customers
- DSP for Planned dispatch to other Nestl sites- MH when load planning or push dispatch is used
Change Impact
What else will change?
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
81/83
GL-GLOBE/ GT-MH 7 September 2014 81
Workload Shift and Communication
More interaction between Warehouse, QM, Planningand Procure to Pay
Efficiency of Out/In bound process will improve i.e.more accurate, improved visibility of vendor
performance.
The quality monitoring of arriving goods is sharedbetween Warehouse and Quality personnel.
Traceability will be assured
Change to SU-managed Warehouse will mean aninitial increase in workload
Change Impact
What else will change?
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
82/83
GL-GLOBE/ GT-MH 7 September 2014 82
New Ways of Working / Skills Requirements
Knowledge of QM data capture procedures,Resource planning and Analysis
Knowledge of impacts of goods receipt toWarehouse, inventory and stock valuation
Experience with using bar code scanners and RFequipment
To adopt best practice, to exchange information(ASN, proof of delivery, etc.) with business partners
using EDICapability to carry out error search and correction of
wrong WM postings
Change Impact
MH - Key Benefits
-
8/10/2019 239003122-SCM-E2E-Materials-Handling-Fulfilment.pdf
83/83
Greater Efficiency Inbound and Outbound (ASN, RF)
Traceability
Stock Accuracy
Real Time movement visibility
Guidance for the UserDecision Making Capability
Change Impact