25 mw solar pv plant. introduction incorporated to devote all the efforts, knowledge,...

8
25 MW SOLAR PV PLANT

Upload: henry-ferguson

Post on 21-Dec-2015

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: 25 MW SOLAR PV PLANT. Introduction  Incorporated to devote all the efforts, knowledge, infrastructure and related market provisions to develop large

25 MW SOLAR PV PLANT

Page 2: 25 MW SOLAR PV PLANT. Introduction  Incorporated to devote all the efforts, knowledge, infrastructure and related market provisions to develop large

Introduction

Incorporated to devote all the efforts, knowledge, infrastructure and related market provisions to develop large scale solar photovoltaic power projects to meet ever rising energy demand of the society.

We provide support for entire lifecycle of the project.

Strong network of experienced technical associates.

Page 3: 25 MW SOLAR PV PLANT. Introduction  Incorporated to devote all the efforts, knowledge, infrastructure and related market provisions to develop large

Solar Potential

Approximately 300 sunny days.

The daily average solar energy incident over India varies from 4 to 7 kWh/m2 with about 1,500–2,000 sunshine hours per year

Even with efficiency as low as 10%, Solar Energy can fulfill complete energy demand expected by 2015.

Page 4: 25 MW SOLAR PV PLANT. Introduction  Incorporated to devote all the efforts, knowledge, infrastructure and related market provisions to develop large

At Bhamer village, Dhule district, Maharashtra1st phase of 25 MW started.

100 MW Solar Park

Page 5: 25 MW SOLAR PV PLANT. Introduction  Incorporated to devote all the efforts, knowledge, infrastructure and related market provisions to develop large

Block diagram

Page 6: 25 MW SOLAR PV PLANT. Introduction  Incorporated to devote all the efforts, knowledge, infrastructure and related market provisions to develop large

Sample Tehcnicals

For 1 MW Solar PV Project Solar Panels: 4000 nos. Solar Inverters: 2 nos. Support structures: 900 nos. Electrical wiring: 5400 meters LT Panel: 1 nos. HT Panel: 1 nos. Transformer: 1 nos.

Page 7: 25 MW SOLAR PV PLANT. Introduction  Incorporated to devote all the efforts, knowledge, infrastructure and related market provisions to develop large

Benefits of Solar Project

Eco-friendly energy. 80% depreciation per year 10 years of Income tax holiday Best option for tax planning. This project will be registered for Gold

Standard, which will recognize project at International platforms.

Local employment generation

Page 8: 25 MW SOLAR PV PLANT. Introduction  Incorporated to devote all the efforts, knowledge, infrastructure and related market provisions to develop large

Why us?

Completion of technical design. All legal permissions obtained. Land finalisation completed. Completely ready road and water facilities. Ready to use transmission infrastructure. Nearby substation. We offer flexible investment options which

enables investors to gain benefits as per their requirements and capacity.