2600_singh

Upload: idiazg

Post on 08-Aug-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/22/2019 2600_Singh

    1/22

    4th

    June 2013 Intergraph Confidential

    REPLACE GREY BOX WITH THECONFERENCE LOGO. EDIT THIS INTHE MASTER > SLIDE MASTERUNDER THE INSERT MENU.INSERT JPEG, PNG 24, BMP or WMP.

    04.09.13: EDIT OR DELETE THIS IN THE

    MASTER > SLIDE MASTER UNDER THEINSERT MENU.

    Nuclear Certification (NQA) of CAESAR IIMandeep Singh (Author, Presenter)

    Richard Ay, Kathleen Byle (Contributors)

    IntergraphVersion Date: 04.09.13

  • 8/22/2019 2600_Singh

    2/22

    4th

    June 2013 Intergraph Confidential

    Agenda

    1. Introduction and use of CAESAR II in the power Industry

    2. Addressing the Requirements of the Nuclear Market

    ASME NQA-1

    US 10 CFR Part 50 App. B,

    US 10 CFR Part 21

    3. CAESAR IIs approach to NQA-1 Qualification (CGD, Design Control and

    Test Control)

    4. CAESAR II interfaces and a Case Study

    5. Q&A

  • 8/22/2019 2600_Singh

    3/22

    4th

    June 2013 Intergraph Confidential

    What is CAESAR II - an Industry Standard

    One of the first commercial, PC-based, pipe

    stress design and analysis program, andgrowing ever since 1984

    Most comprehensive range of capabilities both static and dynamic analysis

    Extensive component/system modeling

    capabilities can address most pipingsituations

    Stress evaluation in accordance with 30+international piping codes which promotes itsuse in over 80 countries

    Known for its technical superiority, flexibility,ease of use, and innovation

    Interfaces to design, S3D, CADWorx, PDS

    Pedigree that is vital in the nuclear industry.3

  • 8/22/2019 2600_Singh

    4/22

    4th

    June 2013 Intergraph Confidential

    REPLACE GREY BOX WITH THECONFERENCE LOGO. EDIT THIS INTHE MASTER > SLIDE MASTERUNDER THE INSERT MENU.INSERT JPEG, PNG 24, BMP or WMP.

    04.09.13: EDIT OR DELETE THIS IN THE

    MASTER > SLIDE MASTER UNDER THEINSERT MENU.

    CAESAR II NuclearAddressing the Nuclear Market Needs

  • 8/22/2019 2600_Singh

    5/22

    4th

    June 2013 Intergraph Confidential

    CAESAR II NQA-1 Program Overview

    Program Compliant with applicable Requirements of ASME NQA-1 2008/2009

    ASME NQA-1

    Commercial Grade Dedication (CGD) completed

    Internal Document Control and Record Center Established

    10 CFR Part 50 Appendix B Program Error Reporting in place

    Accessible to customers via SharePoint login

    10 CFR Part 21 Procedure Approved

    10 CFR Part 21 Compliance officer on site

    On-staff: Kathleen Byle, NQA lead auditor and contributing author to recent

    edition of ASME NQA-1 std. with CGD guidance

  • 8/22/2019 2600_Singh

    6/22

    4th

    June 2013Intergraph Confidential

    REPLACE GREY BOX WITH THECONFERENCE LOGO. EDIT THIS INTHE MASTER > SLIDE MASTERUNDER THE INSERT MENU.INSERT JPEG, PNG 24, BMP or WMP.

    04.09.13: EDIT OR DELETE THIS IN THEMASTER > SLIDE MASTER UNDER THEINSERT MENU.

    CAESAR II Approach to NQA-1 QualificationCGD

    Design ControlTest Control

  • 8/22/2019 2600_Singh

    7/22

    4th

    June 2013Intergraph Confidential

    Commercial Grade Dedication (CGD)

    CGD to bring legacy CAESAR II development (pre-2011) up to NQA

    standard.

    Approaches used from ASME NQA-1 2012 edition to perform CGD:

    Method 1: Inspections, tests, or analyses performed after delivery Detailed Technical verification by alternate calculation (Mathcad)

    Comparison to published benchmarks (NRC benchmarks)

    Tests developed are added to the existing test suite to be run every release.

    Provides adequate, repeatable and documented test coverage of software.

    Method 4: Acceptable supplier/item performance record Reliability demonstrated by successful track record (in use since 1984 and de-

    facto std. in commercial applications)

  • 8/22/2019 2600_Singh

    8/22

    4th

    June 2013Intergraph Confidential

    CGD CAESAR II Effort Numerical Focus

    Covered byNQA program

    for newdevelopmentsince 2011

    Focus ofCGD&

    Part 21Problemreporting

  • 8/22/2019 2600_Singh

    9/22

    4th

    June 2013Intergraph Confidential

    Pipe Codes NQA Qualified via CGD

    Industry Category

    Locale Pipe Code Power Process Pipeline Offshore Nuclear FRP

    USA

    ASME B31.1 XASME B31.3 XASME B31.4 & B31.4 Chapter IX X XASME B31.5 XASME B31.8 & Chapter VIII X XASME B31.9 XASME B31.11 XASME SECT III CLASS 2 XASME SECT III CLASS 3 XU.S. Navy 505 XANSI B31.1 1967 XGPTC/Z380 X

    Germany FBDR XCanada Z662 & Z662 Chapter 11 X X

    Netherlands Stoomwezen XSweden Swedish Method 1 & 2 X

    UKBS-806 XUKOOA XBS-7159 XIGE/TD/12

    X

    PD 8010 Part 1 & 2 X X

    France CODETI X XRCC-M C XRCC-M D X

    Japan JPI XHPGSL X

    Norway TBK 5-6 XDnV X

    International EN-13480 X XISO-14692 X 9

  • 8/22/2019 2600_Singh

    10/22

    4th

    June 2013Intergraph Confidential

    Full Scope of Commercial Grade Dedication at this time

    Static Solver Dynamic Solver

    Piping Codes Implementation ASME B31.1 & ASME B31.3 ASME NC & ASME ND RCCM C & RCCM D

    Configuration Options Add F/A in Stresses

    Include Insulation in Hydrotest Add Torsion in SL Stresses All Cases Corroded Allow Users SIF on Bends Base Hoop Stress On Use PD/4t Welding Contour Tees B31.3 Sec319.2.3c B31.3 Sustained SIF Multiplier

    Include Pressure Stiffening on Bends B31.3 Appendix P B31.3 Code Case 178 No RFT/WLT in Reduced Fitting SIFs Use WRC329 Ignore B31.1/B31.3 Wc Factor Thermal Bowing Delta Temperature Liberal Stress Allowable

    Details of Technical CII Features

    Targeted by CGD

    These critical functions mapped

    to test cases and qualif ied usingalternate calculations.

  • 8/22/2019 2600_Singh

    11/22

    4th

    June 2013Intergraph Confidential

    CGD Verification sample

    Also available for purchase

  • 8/22/2019 2600_Singh

    12/22

    4

    th

    June 2013Intergraph Confidential

    Design Control: Mapping Requirements to Tests

    All development follows Intergraph CAESAR II NQA Program

    Requirement and Design Control Process Feature Described

    Acceptance Criteria Defined

    Tests Planned (Unit and Acceptance)

    Multiple level of reviews (Technical, Quality, Management)

    Traceability of Software Development Life-Cycle Design plan to source code to testing

    Internal source code comments trace back to design,

    Test Cases trace back to feature

    Designs and implementation reviewed on acceptance criteria.

  • 8/22/2019 2600_Singh

    13/22

    4th June 2013 Intergraph Confidential

    Input Verification Feature in CAESAR II Nuclear

    Input can be verified via a text file.

    Enables the nuclear user to provide recordsfor Design Control.

    No Dependence on GUI

  • 8/22/2019 2600_Singh

    14/22

    4th June 2013 Intergraph Confidential

    Test Control Map Functionality of CAESAR II

    Being an Analysis software, numerical correctness is paramount.

    Functionality of the software is complete for CGD and numerical content

    Testing:

    550+ automated tests for numerical accuracy

    Additional 400+ tests for user interface and workflow

    Test coverage metrics used to manage release plans

    Continuous improvements

    more Automated tests, targeted testing and wider coverage

    Complete automated builds, from build to installation to testing

    Following Agile development with short incremental development cycles,more intermediate builds & automated testing - to catch issues early

  • 8/22/2019 2600_Singh

    15/22

    4th June 2013 Intergraph Confidential

    Tracking Released Software issues

    Intergraph support standard practice

    User feedback channeled directly into development processes User notifications regarding related status updates issued throughout development

    Software release criteria based on issue review and prioritization

    Intergraph PPM defect priority guidelines

    P1 - Vital P2 - Crucial

    P3 - High

    P4 - Normal

    Enhanced support for CAESAR II Nuclear customers US 10 CFR Part 50 Appendix B error reporting available via a SharePoint portal

    US 10 CFR Part 21 (NRC reporting) also in place

  • 8/22/2019 2600_Singh

    16/22

    4th June 2013 Intergraph Confidential

    REPLACE GREY BOX WITH THECONFERENCE LOGO. EDIT THIS INTHE MASTER > SLIDE MASTERUNDER THE INSERT MENU.INSERT JPEG, PNG 24, BMP or WMP.

    04.09.13: EDIT OR DELETE THIS IN THEMASTER > SLIDE MASTER UNDER THEINSERT MENU.

    CAESAR II InterfacesUsing CII in the Nuclear Industry

    interfaces and Case Study

  • 8/22/2019 2600_Singh

    17/22

    4th June 2013 Intergraph Confidential

    Smart 3D - CAESAR II Interface

    1. Enhanced & interactive Smart 3D-CAESAR II interface2. Results exported back to SPR/Smart 3D

    The new Smart 3D-CAESAR II interface will greatly reduce

    our modeling work load and allow a smooth data transfer from

    the design to the engineering environment

    Mustafa mercik, Pipe stress analyst. Linde AG

    Smart 3DCAESAR II

    SP Review or Smart 3D

  • 8/22/2019 2600_Singh

    18/22

    4th June 2013 Intergraph Confidential

    Reduce errors by getting design context in CAESAR II

    Engineer

    Reduces time and error in modeling Get design context to make intelligent changes

    within stress model

    Designer

    Easy view of changes made by engineer within thedesign model

    Support and Structural engineers

    Get loads from piping with location in easy to reviewformat (SPR or S3D)

    Quality Assurance*

    Compare design and stress model to ensure changecompliance

  • 8/22/2019 2600_Singh

    19/22

    4th June 2013 Intergraph Confidential

    Some CAESAR II Interfaces to support your workflow

    CAD interfaces

    Smart 3D, CADWorx, PDS, CADPIPE and PCF

    Hydraulic interfaces AFT, PIPENET, LIQT, Pipeplus, FlowMaster

    CAESAR II Neutral file text file interface many 3rd parties

    CAESAR II Access MDB file Smart 3D, Lisega (support design), .

    CAESAR II FEA interface coming very soon

    more.

  • 8/22/2019 2600_Singh

    20/22

    4th June 2013 Intergraph Confidential

    Drivers of Success Runners-up, CAU 2012

    GENPRO Engenharia S.A., Brazil

    Designed and Built a Nuclear Research Reactor plant in Brazil (800 lines ofnuclear classes 2,3 and non-nuclear piping) with CAESAR II

    CAESAR II benefits for GENPRO

    Performed seismic analysis of piping using spectrum specified at multiple levels

    Eliminated snubbers which eliminated maintenance costs

    Verified equipment nozzles to meet requirements

  • 8/22/2019 2600_Singh

    21/22

    4th June 2013 Intergraph Confidential

    CAESAR II Nuclear Release Candidate Q3 2013

    Developed to ASME NQA-1 Std. subject to 10 CFR Part

    50 App. B & 10 CFR Part 21 Commercial grade dedication to bring legacy

    development (1984-now) to NQA-1 Std.

    Internal audits provide continuous quality evaluation &improvement

    New text file for input verification

    550+ automated and 400+ manual tests Updated V&V Manual with software for users to

    benchmark their installation

    Premium technical direct support from Intergraph

    Support for audits conducted on behalf of CAESAR IINuclear customers.

    Option to purchase CAESAR II Commercial GradeDedication (CGD) Verification Guide

    NQA - a Standard of Quality focusing on

    preventing defects before release

    21

    Ready to address user

    needs in Nuclear industry

  • 8/22/2019 2600_Singh

    22/22

    4th June 2013 Intergraph Confidential04.09.13: EDIT OR DELETE THIS IN THEMASTER > SLIDE MASTER UNDER THEINSERT MENU.

    Thank You!

    Questions?