Banglalink 3G Mega Project Quality Assurance Department.Huawei Technologies (BD) Ltd.Document V1.0THE QUALITY REPORT FOR NEW INDOOR BTS SITEDocument Ref: V1.0ALL RIGHT RESERVEDHUAWEI TECHNOLOGIES (BD) LIMITED Document Name :Banglalink 3G Mega Project Document Version. & No.:V.1.1/08-12-2013Prepared By :Mohammad Ariful HoqueID No.:00703077Cell No.:+8801730070661Designation:DQMNameIDDepartmentDesignationCell NumberOrganization Mohammad Ariful Hoque00703077QMDDQM+8801730070661Huawei Md. Jahidul IslamNetwork DeploymentQC Engineer+8801924400382Banglalink GSM Md. SultanNetwork DeploymentSr. Asst. Quality Manager+8801924400193Banglalink GSMDocument review informationALL RIGHT RESERVEDHUAWEI TECHNOLOGIES (BD) LIMITED2Document Sign off InformationNameIDDesignationCell NumberOrganizationSignature Md Abu Hasnat Shahriar00723205BSS Coordinator+8801678010734Huawei Mohammad Iftakhar Hossain Khan00708431BSS Team Leader+8801730061065Huawei Huawei Rafiqul Hassan88918PM+8801944668806Huawei Mohammad Ariful Hoque00703077DQM+8801730070661Huawei Hisamul Nasir00725535DPD+8801819413095Huawei Wanglu (Ryan)00208602DPD+8801911312601Huawei Liuzongyi (Joey)00135280PD+8801730037501Huawei Md. Jahidul IslamQC Engineer+8801924400382Banglalink Md. SultanSr. Asst. Quality Manager+8801924400193Banglalink HOD of Network DeploymentBanglalink Banglalink BanglalinkALL RIGHT RESERVEDHUAWEI TECHNOLOGIES (BD) LIMITEDQuality Management Department ofHardware Quality 20 Keys Report of Banglalink 3G Mega ProjectSITE INFORMATIONSite NameDHK_X3517Site IDDHK_X3517Site AddressLichu Bagan, Johar Sahar, DhakaCluster No.MOS DateOBI Date02-03-2014Installation Start Date06-03-2014Installation Finish Date06-03-2014Power On Date06-03-2014Internal QAT Date06-03-2014PAT Date06-03-2014SUBCONTRACTORS INFORMATIONSP NameRTCLSupervisor NameMahmud HasanMobile Number01730727330Address19/1 kalabagan, dhakaE-mail [email protected] AGENTS INFORMATIONOperator's NameEngineers NameMobile NumberAddressE-mail ALL RIGHT RESERVEDHUAWEI TECHNOLOGIES (BD) LIMITED

SITE ID : DHK_X3517SITE NAME : DHK_X3517New equipment fixation picture as per quality standardALL RIGHT RESERVEDHUAWEI TECHNOLOGIES (BD) LIMITED

SITE NAME : DHK_X3517SITE ID: DHK_X3517New equipment installation picture as per quality standardALL RIGHT RESERVEDHUAWEI TECHNOLOGIES (BD) LIMITED

SITE NAME : DHK_X3517SITE ID: DHK_X3517New equipment installation picture as per quality standardALL RIGHT RESERVEDHUAWEI TECHNOLOGIES (BD) LIMITED

SITE NAME : DHK_X3517SITE ID : DHK_X3517The new equipment installation picture as per quality standardALL RIGHT RESERVEDHUAWEI TECHNOLOGIES (BD) LIMITED

SITE NAME : SITE ID : DHK_X3517The new equipment fixation picture as per quality standardN/AALL RIGHT RESERVEDHUAWEI TECHNOLOGIES (BD) LIMITED

SITE NAME : SITE ID : DHK_X3517The BTS rack must be firmly fixed on its base and base bolt should be tighten 45 N-m by using torque wrench N/AALL RIGHT RESERVEDHUAWEI TECHNOLOGIES (BD) LIMITED

SITE NAME : DHK_X3517SITE ID : DHK_X3517RF cable connector making procedure picture as per quality standardALL RIGHT RESERVEDHUAWEI TECHNOLOGIES (BD) LIMITED

SITE NAME: DHK_X3517SITE ID : DHK_X3517RF cable connector making procedure picture as per quality standardALL RIGHT RESERVEDHUAWEI TECHNOLOGIES (BD) LIMITED

SITE NAME : DHK_X3517SITE ID : DHK_X3517The Jumper cable connected with GRFU & Feeder should be proper tighten (25 N-m) after checking VSWRALL RIGHT RESERVEDHUAWEI TECHNOLOGIES (BD) LIMITED

SITE NAME : DHK_X3517SITE ID: DHK_X3517Jumper cable latching should be quality standard, no Cell mismatches for GRFU connection or Cross-feeder should be checked outALL RIGHT RESERVEDHUAWEI TECHNOLOGIES (BD) LIMITED

SITE NAME : DHK_X3517SITE ID : All the cable connection to rectifier inside and all cable latching as per quality standard with marking .N/AALL RIGHT RESERVEDHUAWEI TECHNOLOGIES (BD) LIMITED

SITE NAME DHK_X3517SITE ID : BTS door open and MDB full view pictureN/AALL RIGHT RESERVEDHUAWEI TECHNOLOGIES (BD) LIMITED

SITE NAME: DHK_X3517SITE ID : The PGND , PCM and CPRI cable latching and marking as per quality standardN/AALL RIGHT RESERVEDHUAWEI TECHNOLOGIES (BD) LIMITED17SITE NAME :SITE ID : The picture of Node-B DCDU power cable and RRU power, CPRI cable latching and MarkingN/AN/AALL RIGHT RESERVEDHUAWEI TECHNOLOGIES (BD) LIMITED18

SITE NAME :SITE ID : DHK_X3517The picture of grounding bus barN/AALL RIGHT RESERVEDHUAWEI TECHNOLOGIES (BD) LIMITED19

SITE NAME : DHK_X3517SITE ID : The picture of feeder cable bending as per quality standardN/AALL RIGHT RESERVEDHUAWEI TECHNOLOGIES (BD) LIMITEDSITE NAME :SITE ID : The print Screen of Alarm log file , how many Alarm works this site

ALL RIGHT RESERVEDHUAWEI TECHNOLOGIES (BD) LIMITED21Thanks For Your Attention!For any query please feel free to ask me anytime