DIESEL/ GASOLINEFUEL STORAGE
ELEV 1
F.F.Elev. 755.50
1'-0" 83'-0" 1'-0" 17'-2"
3'-0" 81'-0" 3'-0" 17'-2"
1'-0
"58'-6
1 2"
2'-0
"57'-0
1 2"
1'-0
"
3'-0
"
1'-0
"40'-0
"
3'-0
"38'-0
"3'-0
"
1'-0
"
2'-0
"3'-4
"2'-0
"1'-9
1 2"2'-0
"7'-1
1"
3'-6"2'-0" 14'-912"1'-212"2'-0"14'-912"2'-0"1'-212"2'-0"14'-912"2'-0"1'-212"2'-0"14'-912"2'-814"1'-634"12"
9'-1
1"
9'-4"
FOOTING NOTES
1) SET CONCRETE FOOTINGS 48" (MIN.) BELOW SCHEDULED FINISHED GRADE.2) SET CONCRETE FOOTINGS ON UNDISTURBED SOIL OF ADEQUATE BEARING.3) SET SCHEDULED REINFORCING (RE-BAR) AS INDICATED. RE-BAR SHALL
HAVE THREE (3) INCHES OF CONCRETE COVER IN ANY DIRECTION.4) RE-BAR PRIOR TO POUR SHALL BE SUSPENDED FROM FORMWORK,
SETTING OF RE-BAR ON BLOCK OR STONE IS UNACCEPTABLE.5) 'SIMPSON' POST ANCHORS, AS SCHEDULED, MAY BE WET-SET.
CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE PROPER LOCATIONAND ORIENTATION OF ALL POST ANCHORS.
2
3
102'-2"
6" 9'-4" 9'-4" 9'-4" 9'-4" 9'-4" 9'-4" 9'-4" 9'-4" 8'-7" 8'-7" 6"
60'-6
1 2"
6"
9'-1
1"
9'-1
1"
9'-1
1"
9'-1
1"
9'-1
1"
6"
1'-6"
AA103
A
1
B
2
A1 A2 A3 C1 C2 E1 E2 G1 H1 J1
C D E F G H J K L M
A1 A2 A3 C1 C2 E1 E2 G1 H1 J1
5A
3
4
5
6
7
1
2
5A
3
4
5
6
7
A B C D E F G H J K L M
AA103
1
3'-1112"
1'-1112"12"
3'-0
"
4
BTM.FTG.EL.=753.00
BTM.FTG.EL.=753.00
BTM.FTG.EL.=753.00
BTM.FTG.EL.=753.00
BTM.FTG.EL.=753.00
BTM.FTG.EL.=753.00
BTM.FTG.EL.=752.50
BTM.FTG.EL.=752.50
BTM.FTG.EL.=755.00* TOP.FTG.EL.=756.00
BTM.FTG.EL.=VARIES (755.00 - 751.00)*
*TOP.FTG.EL.=755.00 *TOP.FTG.EL.=754.00 *TOP.FTG.EL.=753.00 *TOP.FTG.EL.=752.00
*BTM.FTG.EL.=751.00
BTM
.FTG
.EL.
=755.0
0*
TOP.
FTG
.EL.
=756.0
0
BTM
.FTG
.EL.
=VARIE
S (755.0
0 -
753.0
0)
*
*TO
P.FT
G.E
L.=
756.0
0*
TOP.
FTG
.EL.
=755.0
0*
TOP.
FTG
.EL.
=754.0
0
*BTM
.FTG
.EL.
= 7
53.0
0
ELEV 4
ELEV
2
ELEV
3
5B 5B
TOP OF CONC. WALLEL = 762.00
TOP OF CONC. WALLEL = 762.00
TOP OF CONC. WALLEL = 762.00
TOP OF CONC. WALLEL = 762.00
1
1
OPEN STORAGEF.F.Elev. 757.00
NOTE:ORIENTATION OF 'SIMPSON' POST BASES AS SHOWNTHIS DETAIL IS SAME AS FOOTINGS PLAN, THIS SHEET.
ORIENTATION OFVERTICAL LEGS
ORIENTATION'A'
ORIENTATION'B'
'SIMPSON' #CB66 POST BASE(TYPICAL ALL POSTS)
FINISH GRADE VARIES
60" x 12"DP.CONCRETE FOOTING(N.T.S.)
6" CONCRETE SLAB W/#4 BARS @ 12"O.C. EACHWAY AND FIBER REINFORCING
6 MIL VAPOR BARRIER
12" R.O.B. SUB-BASECOMPACTED TO 95%STANDARD PROCTOR
12" REINFORCEDCONC. FROST WALL
TRANSITION
VARIE
S
#5 DOWELS @ 12"O.C.
(4) #5 BARS (CONT.)
#5 BARS @ 12"O.C.
#5 BARS @ 12"O.C. (VERT.)
#5 BARS @ 12"O.C. (HORIZ.)
3" MIN. COVER
TOP OF CONCRETE WALLEL =762.00)
7
2'-0
"
1'-0
"1'-0
"
A2 A3
2'-8"
1'-0" 8" 1'-0"
32" x 24" REINFORCED CONCRETE FOOTINGNOTE:-PROVIDE 3" (MIN.) COVER FOR ALL STEELREINFORCEMENT-BOTTOM OF FOOTING ELEVATION(BTM.FTG.EL.) = 753.00
'SIMPSON' #CB66POST BASE (TYP.)
#4 BARS @12"O.C. EACH WAY
C1 C2
E1
G1 H1
K
4A 5
6 7
2'-0"
1'-0" 1'-0"
2'-0
"
1'-0
"1'-0
"
24" x 24" REINFORCED CONCRETE FOOTINGNOTE:-PROVIDE 3" (MIN.) COVER FOR ALL STEELREINFORCEMENT-BOTTOM OF FOOTING ELEVATION (BTM.FTG.EL.)VARIES; SEE FOOTING PLAN, THIS SHEET
'SIMPSON' #CB66POST BASE (TYP.)
#4 BARS @12"O.C. EACH WAY
E2
7
2'-0
"
1'-0
"1
'-0"
J1 K
3'-6"
1'-0" 1'-6" 1'-0"
42" x 24" REINFORCED CONCRETE FOOTINGNOTE:-PROVIDE 3" (MIN.) COVER FOR ALL STEELREINFORCEMENT-BOTTOM OF FOOTING ELEVATION(BTM.FTG.EL.) = 752.50
'SIMPSON' #CB66POST BASE (TYP.)
#4 BARS @12"O.C. EACH WAY
FOUNDATION PLANSCALE: 3/16"=1'-0"
IT IS
A V
IOLA
TION
OF
THE
NEW
YO
RK S
TATE
ED
UCA
TION
LA
W A
ND
THE
CO
MM
ISSI
ON
ER'S
REG
ULA
TION
S FO
R A
NY
PERS
ON
, UN
LESS
AC
TING
UN
DER
THE
DIR
ECTIO
N O
F A
LIC
ENSE
D A
RCHI
TEC
T, E
NG
INEE
R O
R LA
ND
SUR
VEY
OR,
TO
ALT
ER A
N IT
EM IN
AN
Y W
AY.
IF A
N IT
EM B
EARI
NG
THE
SEA
L O
F A
N A
RCHI
TEC
T, E
NG
INEE
R O
R SU
RVEY
OR
IS A
LTER
ED, T
HE A
LTER
ING
PA
RTY
SHA
LL A
FFIX
TO
THE
ITEM
THE
IR S
EAL
AN
D T
HE N
OTA
TION
"ALT
ERED
BY"
FO
LLO
WED
BY
THEI
R SI
GN
ATU
RE A
ND
THE
DA
TE O
F SU
CH
ALT
ERA
TION
, AN
D A
SPE
CIF
IC D
ESC
RIPT
ION
OF
THE
ALT
ERA
TION
.
DATE DRAWN CHECKED
SCALE
SHEET TITLE
PROJECT NUMBER
DRAWING NUMBER
15111
5/24/19
STO
RAG
E BU
ILD
ING
FOR
THE
TOW
N O
F N
ORT
H EA
ST H
IGHW
AY
DEP
ART
MEN
TN
YS R
OUT
E 22
NO
RTH
EAST
D
UTC
HESS
CO
UNTY
N
EW Y
ORK
Dra
win
g N
ame:
S:\
Proj
ects
\Nor
th E
ast_
T\Hw
y Fa
cilit
y\D
Des
ign\
AC
AD
\Stru
ct\A
rch_
Bid
Set
.dw
gD
ate
last
acc
esse
d: 6
/28/
2019
10:
54 A
MD
ate
last
plo
tted
: 6/2
8/20
19 1
0:55
AM
Plot
ted
By:
Tim
Gle
ason
REV
ISIO
NS
DES
CRI
PTIO
NBY
DA
TEN
O. 1
6/28
/19
TJG
RJJ
DET
AIL
1 R
EVIS
ED
TJG RJJ
AS NOTED
FOOTING PLAN& DETAILS
A 100
9 ELKS LANEPOUGHKEEPSIE, NEW YORK 12601
TEL (845) 454-3411FAX (845) 473-1962
A / 1
POSTDESIGNATION
ANCHORORIENTATION
A
A / 2
A / 3
A / 4
A / 5
A / 6
A / 7
A1 / 7
B / 1
C / 1
C1 / 7
B
B
B
B
B
A
A
A
A
A
C2 / 7 A
D / 1 A
E / 1 A
E1 / 7 A
F / 1 A
G1 / 7
AG / 1
A
H / 1 A
H1 / 7 A
J1 / 7
AJ / 1
A
K / 1 A
K / 2 B
K / 3
K / 4 B
K / 5 B
K / 6 B
K / 7 A
POST ANCHOR ORIENTATION SCHEDULE6SCALE: N.T.S.
A2 / 7 A
A3 / 7 A
E2 / 7 A
B
L / 1 A
A
M / 1 A
A
FOOTING DETAIL1SCALE: N.T.S.
FOOTING DETAIL2SCALE: N.T.S.
FOOTING DETAIL3SCALE: N.T.S.
FOOTING DETAIL4SCALE: N.T.S.
K / 5B B
L / 5A
M / 5A
1
DIESEL/ GASOLINEFUEL STORAGE
ELEV 1
F.F.Elev. 755.50
AA103
6" REINFORCED CONCRETE SLABW/ #4 BARS @ 12" O.C.AND FIBER REINFORCEMENT
PROVIDE 12" EXPANSION FILLER AROUND
TIMBER POSTS PRIOR TO SLAB POUR
PROVIDE 12" EXPANSION FILLER
AT EDGE OF SLAB (TYPICAL)
A
1
B
2
A1 A2 A3 C1 C2 E1 E2 G1 H1 J1
C D E F G H J K L M
A1 A2 A3 C1 C2 E1 E2 G1 H1 J1
5A
3
4
5
6
7
1
2
5A
3
4
5
6
7
A B C D E F G H J K L M
AA103
PROVIDE 12" EXPANSION FILLER
AT EDGE OF SLAB (TYPICAL)
PROVIDE 12" EXPANSION FILLER
AT EDGE OF SLAB (TYPICAL)
ELEV 4
ELEV
2
ELEV
3
7 8
C.J.
S.C
.
C.J.
C.J.
C.J.
C.J.
C.J.
C.J.
C.J.
S.C
.S.C
.
S.C
.S.C
.S.C
.
S.C
.S.C
.S.C
.
5B 5B
1'-0
1 2"
83'-0"1112"
82'-11"
58'-51 2"
41
'-0"
18
'-6"
1'-012"
17'-112"
39'-1
1"
4'-6
"
5'-0"
4" CONC.PAD
5'-0
"
4'-6"
4" CONC.PAD
6" REINFORCED CONCRETE SLABW/ #4 BARS @ 12" O.C.AND FIBER REINFORCEMENT
6" REINFORCED CONCRETE SLABW/ #4 BARS @ 12" O.C.AND FIBER REINFORCEMENT
6" REINFORCED CONCRETE SLABW/ #4 BARS @ 12" O.C.AND FIBER REINFORCEMENT
CONCRETE APRONSEE DETAIL 7, THIS SHEET
OPEN STORAGEF.F.Elev. 757.00
6" x 6" TIMBER POST BEYOND
2'-0
"
1'-0"
6"
EXPANSION FILLER WRAP AT TIMBER POSTS (TYP.)
6"x6" TIMBER POST w/ 'SIMPSON' CB66 POST ANCHOR(NOT SHOWN) SET ON REINFORCED CONCRETE FOOTING
1'-0
"
4'-0
"
SEE FOOTING PLAN
2'-0
"
1'-4"
#4 DOWELS @ 24"O.C.30"
18"
TYP. SLAB EDGEBETWEEN POSTS
TYP. SLAB EDGE AT POSTS
6" x 6" TIMBER POSTS (TYPICAL)
6" CONCRETE SLAB w/ #4 BARS @ 12"" O.C. EACH WAY #4 BARCONTINUOUS#4 BAR
CONTINUOUS
6 MIL VAPOR BARRIER
12" COMPACTED GRADED GRAVEL
(2) #4 BARS (CONTINUOUS; 3" MIN. COVER)
REINFORCED CONCRETE FOOTINGSEE DETAILS SHEET A100
#5 @ 16"O.C.
#3 @ 12"O.C.
3'-0"
6"
FINISH GRADE
CONCRETE APRONSLOPE 1/8" PER FOOT
6x6 P.T. POST BEYOND
CONCRETE APRONSEE DETAIL 7
6"Ø CONC. FILLEDSTEEL BOLLARD
SUBGRADE COMPACTED TO 95%MODIFIED PROCTOR
12" GRADED GRAVEL COMPACTEDTO 95% MODIFIED PROCTOR
'SIKADUR 51' SEALER ALONGCONTROL JOINTS
6 MIL VAPOR BARRIER
'SIKADUR 51' SEALER ALONGCONTROL JOINTS
SUBGRADE COMPACTED TO 95%MODIFIED PROCTOR
12" GRADED GRAVEL COMPACTEDTO 95% MODIFIED PROCTOR
PRE-FABRICATED METAL CONTROLJOINTS WITH REMOVABLE PLASTICCAPS. PROVIDE #4 SMOOTHDOWELS (24" LONG) AT 24" O.C.
6" CONCRETE SLAB W/ #4 BARS @ 12"O.C.EACH WAY AND FIBER REINFORCEMENT
'SIKADUR 51' SEALER ALONGCONTROL JOINTS
POWER FLOAT FINISH
PROVIDE TWO (2) COATS SEALER WITH SILICASAND ANTI-SLIP
6 MIL VAPOR BARRIER
2" DEEP SAW-CUT WITH'SIKADUR 51' SEALER
POWER FLOAT FINISH
PROVIDE TWO (2) COATS SEALER WITH SILICASAND ANTI-SLIP
SUBGRADE COMPACTED TO 95%MODIFIED PROCTOR
12" GRADED GRAVEL COMPACTEDTO 95% MODIFIED PROCTOR
6 MIL VAPOR BARRIER
6" CONCRETE SLAB W/ #4 BARS @ 12"O.C.EACH WAY AND FIBER REINFORCEMENT
3'-9
"
CONCRETE SLAB PLANSCALE: 3/16"=1'-0"
IT IS
A V
IOLA
TION
OF
THE
NEW
YO
RK S
TATE
ED
UCA
TION
LA
W A
ND
THE
CO
MM
ISSI
ON
ER'S
REG
ULA
TION
S FO
R A
NY
PERS
ON
, UN
LESS
AC
TING
UN
DER
THE
DIR
ECTIO
N O
F A
LIC
ENSE
D A
RCHI
TEC
T, E
NG
INEE
R O
R LA
ND
SUR
VEY
OR,
TO
ALT
ER A
N IT
EM IN
AN
Y W
AY.
IF A
N IT
EM B
EARI
NG
THE
SEA
L O
F A
N A
RCHI
TEC
T, E
NG
INEE
R O
R SU
RVEY
OR
IS A
LTER
ED, T
HE A
LTER
ING
PA
RTY
SHA
LL A
FFIX
TO
THE
ITEM
THE
IR S
EAL
AN
D T
HE N
OTA
TION
"ALT
ERED
BY"
FO
LLO
WED
BY
THEI
R SI
GN
ATU
RE A
ND
THE
DA
TE O
F SU
CH
ALT
ERA
TION
, AN
D A
SPE
CIF
IC D
ESC
RIPT
ION
OF
THE
ALT
ERA
TION
.
Dra
win
g N
ame:
S:\
Proj
ects
\Nor
th E
ast_
T\Hw
y Fa
cilit
y\D
Des
ign\
AC
AD
\Stru
ct\A
rch_
Bid
Set
.dw
gD
ate
last
acc
esse
d: 6
/28/
2019
10:
54 A
MD
ate
last
plo
tted
: 6/2
8/20
19 1
0:55
AM
Plot
ted
By:
Tim
Gle
ason
REV
ISIO
NS
DES
CRI
PTIO
NBY
DA
TEN
O. 1
6/28
/19
TJG
RJJ
CO
NC
. APR
ON
TJG RJJ
AS NOTED
ADD ALTERNATECONCRETE SLABPLAN & DETAILS
A 101
9 ELKS LANEPOUGHKEEPSIE, NEW YORK 12601
TEL (845) 454-3411FAX (845) 473-1962
SLAB DETAIL7SCALE: 1"=1'-0"
SLAB DETAIL8SCALE: 1"=1'-0"
CONTROL JOINT DETAIL9SCALE: 1 1/2"=1'-0"
SAW-CUT JOINT DETAIL10SCALE: 1 1/2"=1'-0"
DATE DRAWN CHECKED
SCALE
SHEET TITLE
PROJECT NUMBER
DRAWING NUMBER
15111
5/24/19
STO
RAG
E BU
ILD
ING
FOR
THE
TOW
N O
F N
ORT
H EA
ST H
IGHW
AY
DEP
ART
MEN
TN
YS R
OUT
E 22
NO
RTH
EAST
D
UTC
HESS
CO
UNTY
N
EW Y
ORK
1
1