Presented by: Presented by: Presented by: Presented by: MthokozisiMthokozisiMthokozisiMthokozisi MlotshwaMlotshwaMlotshwaMlotshwa
IntroductionIntroduction
Large consumers consume >40% of water supplied in some SA Metro’sLarge consumers consume >40% of water supplied in some SA Metro’s
Large consumers generally pay for their water consumptionLarge consumers generally pay for their water consumption
It is imperative that this water is accurately metered and billedIt is imperative that this water is accurately metered and billed
Photograph of Consol Glass in EMMPhotograph of Consol Glass in EMM
Large Water UserLarge Water User Un-metered Fire ConnectionsUn-metered Fire Connections
Un-metered Fire ConnectionsUn-metered Fire Connections
Un-metered
Supply Point
2014/08/27
2
Standard Design for Consumer Meter InstallationsStandard Design for Consumer Meter Installations
Adopt a Meter TypeAdopt a Meter Type
Combination Hybrid Magnetic Flow
Revise Policy on Unmetered ConnectionsRevise Policy on Unmetered Connections
Consolidate InternallyConsolidate Internally Develop a Workflow MethodologyDevelop a Workflow Methodology
2014/08/27
3
ImplementationImplementation Zero Pressure TestZero Pressure Test
Search for Buried ConnectionsSearch for Buried Connections Search for Buried ConnectionsSearch for Buried Connections
Capture Details of Each ConnectionCapture Details of Each Connection Shutdown ReportShutdown Report
2014/08/27
4
Design Supply ConsolidationDesign Supply Consolidation ConstructionConstruction
Completion Report – New Meter DetailsCompletion Report – New Meter Details
Completion Report – Removed Meter DetailsCompletion Report – Removed Meter Details
Update Municipal Billing SystemUpdate Municipal Billing System
2014/08/27
5
Courtesy VisitCourtesy Visit
Monitoring Metered ConsumptionMonitoring Metered Consumption
BenefitsBenefits
Improved metering
Reduction of consumer meters
Reduction Commercial Losses
Reduction in Physical Losses – leak identification and repair
Improved Relationship between Municipality and Large Consumers
Sustainable Job Creation
Improved metering
Reduction of consumer meters
Reduction Commercial Losses
Reduction in Physical Losses – leak identification and repair
Improved Relationship between Municipality and Large Consumers
Sustainable Job Creation
2014/08/27
6
Metered Consumption Increase 150 ConsumersMetered Consumption Increase 150 Consumers
EMM Top 500 Project PaybackEMM Top 500 Project Payback
Increase in metered consumption = 3 399m3 / day
= 1 240 635m3 / annum
@ R12.50/Kℓ = R15.5 Million / annum
Increase in Sewer charge = R 3.9 Million / annum
Increased revenue = R 19.4 Million / annum
Project cost = R15.8 Million
Project Payback Period < 12 Months
Increase in metered consumption = 3 399m3 / day
= 1 240 635m3 / annum
@ R12.50/Kℓ = R15.5 Million / annum
Increase in Sewer charge = R 3.9 Million / annum
Increased revenue = R 19.4 Million / annum
Project cost = R15.8 Million
Project Payback Period < 12 Months
Wadeville Project 423 PropertiesWadeville Project 423 Properties
Increase of 16%Increase of 16%
R8 400 000 / yearR8 400 000 / year
Wadeville Project PaybackWadeville Project Payback
Implementation Cost: R19 750 000
Increase in Revenue: R8 400 000 / year
Payback Period: < 2.5 Years
Implementation Cost: R19 750 000
Increase in Revenue: R8 400 000 / year
Payback Period: < 2.5 Years
Leakage was found to be 24 m3/hr. This represents
almost 600 m3/day or more than 200000 m3 per
annum with a cost to EMM of over R1 mil/annum. The
leak is estimated to have run for over 3 years with a
total water loss of 600 000 m3. This water was not
reflected on the billing system.
2014/08/27
7
Saving = 210Mℓ/year
Leakage was found to be 24 m3/hr. This represents
almost 600 m3/day or more than 200000 m3 per
annum with a cost to EMM of over R1 mil/annum. The
leak is estimated to have run for over 3 years with a
total water loss of 600 000 m3. This water was not
reflected on the billing system.
Before
Key Success FactorsKey Success Factors
Improve Metering and billing of industrial consumers.
Consolidate multiple supplies to single supplies.
Large consumers monitor consumption profile through permanent logging.
Improve revenue to Municipality
Identify and repair onsite leakage
Improve Metering and billing of industrial consumers.
Consolidate multiple supplies to single supplies.
Large consumers monitor consumption profile through permanent logging.
Improve revenue to Municipality
Identify and repair onsite leakage
- QUESTIONS -- QUESTIONS - - Thank You -- Thank You -