34 point list of griha - green buildings
DESCRIPTION
Griha for Green BuildingsTRANSCRIPT
S No
CRITERIA 1a
b
CRITERIA 2
a
b
c
d
e
CRITERIA 6
a
b
c
CRITERIA 7
a
b
c
CRITERIA 8
a
b
CRITERIA 9
a
CRITERIA 15
a
b
c
CRITERIA 16
a
b
CRITERIA 20a
CRITERIA 21
a
bcd
CRITERIA 22
a
CRITERIA 23
CRITERIA 24
CRITERIA 28
CRITERIA 29
a
b
CRITERIA 30
a
CRITERIA 32
a
CRITERIA 33
a
b
CRITERIA 34a
b
c
d
Description
Site selectionSite in conformity to DP/Master plan/UDPFI
Site within 0.5 KM radius of existing bus stop commuter rail,light rail,metrostation,brownfield site
Preserve & protect during construction/compensatory depositery forestation
proper timing of construction with respective rain & confine const. with pre designated areasstaging+spill prevent ,erosion+sedimentation control
Top soil preserve
Preserve existing veg. or replant ratio 1:3
Trees replanted 25% excess than minimum required
Enhance outdoor lighting system efficiency
Lumonious efficiency of 100% of outdoor lamps meets required
Automatic control of 100% outdoor light
Min. 25% of total no OR 15 % of total connected load whichever
higher to be soar powered
Plan utilise efficiently & Optimize on site circulation efficiency
Minimisation & consoliation of transportation / service corridoorsshading of pedestrain road
Use of aggregate utility corridors
Consolidation of utility corridors along previously disturbed areas or along new roads
Provide at least, minimum level of sanitation /safty facilities for construction workersSafty during construction,NBC norms complying Constructional practisesStorage,stacking & handlingSafty in construction of element of building
Health & sanitation facilities
Reduce air pollution during construction
Air pollution preventive measures (stage const. & clear veg.only from areas where work has to begin min.3m high hoarding aroundperimeter of building vegetation/mulch areas where vehicles donot ply:Vehicle circulation paths coverrd/hard paved : water spraying:cover dusty loads on vehicles with impervious sheeting etc
Utilisation of flyash in building structure
Minimum 15% replacement of portland cement with flyash by weight of cement used in struct. Concrete
Addition points if more than 30%Minimum 40% usages of fly ash by volume of material for 100% loadbearing & non load bearing walls
Certify minimum 30% replacement of OPC with flyash by weight of cement used in plaster/masonry mortar
Reduce volum , weight & time of construction by adopting efficienttechnology for eg.precast system, ready mix concrete ,and so onStructural application -use of low energy mat/efficient tech min. 5% reduction in embodied energy for 100%struct. System.
Non structural application use of low energy mat/efficient tech (such as infill wall system) min, 5% reduction in embodied energy, for 100%infill wall system , meeting equivalenty strength req.
Waste water treatmentTreated water should meet the disposal/reuse application stadards
Water recycle & reuse ( including rainwater)
Annual water reuse of 25%
Annual water reuse of 50%Annual water reuse of 75%Recharge of surplus rainwater into aquifer
Reduction in waste during construction
Segregation of inert and hazardous wastes AND recycling and safe
disposal of segregated wastes
Efficient waste Provision of multi- coloured bins for waste segregation at source
Storage and disposal of wastesProvision of space for hygenic storage of segregated waste
Water quality confirming to IS standereds
Accepatable outdoor & indoor noise levels
Outdoor noise levels within acceptable limits as set in CPCB envirnmentalStadards- noise Indoor noise levels are within accepatable limits as set in NBC 2005
Tobacco & smoke control
By HVAC/architectural consultant certifying that all
Company policy for ban/ prohabitation of smoking within bldg premises OR signed templet
Energy Audit & validation
Energy system & water & waste management systems of building performing
as predicted & match the info provided at the time of award of provisionalGriha rating ( Mandatory & no points)
Operations & maintanance protocol for electrical and mechanical equipmentProvision of meters for monitaring bldgs energy and water consumption
Provision for core facility/service group responsible for O & M of building system after installation ( and inclusion of req.clauses in contract docs)
INNOVATIONEnvironmental education
Company Policy on green supply chain
Integrated pest maneagement
Life cycle coasting
Required
Site plan showing site & surrounding areas 1upto 2Km radius.
Certificate from Architect for construction 1stage completed as per planningRequired sedimentation tank at lowest point 1of phase IProper stock of top soil ,Maximum Quantity of top soil 1required to shif at safe place for fertility
As per our record only 1 mango tree preserve & available 1
Landscape plan showing plantation 25% in excess than 1min . Required
Luminous efficiency of each type of lamp used in outdoor 1
manufacturer details of lamp,ballast,luminaries & 1placement of automatic switchDemarcatesolar lighting system for outdoor lighting in 1
Total Points
layout & give the detail of same.
A narrative along with supporting drawing to prove 1that road lengths & building footprint are minimised & that all pedestrain roads have permanent shadingSite plan - section of aggregate utility coridor with utility line 1
Site plan -all services along with pedestrain & vehicular paths 1
Provision of safe drinking water & sanitation stystem to worker 1
2
Provide supporting documents 1
Provide supporting documents 2
Provide supporting documents 2
RMC 2
Low energy material 2
Type of treatment system ,Drawing with Quantum of treated water, periodical quality checking 2of sample, sludge dispose & reuse
1harvesting & being use of diffrant application, landscape
1
112
1
Dual water system, calculation sheet representing the total quantity of water treated
Narrative indicating the quantum of waste generated during construction activity, & storage
of storage facility .
Photographs 1
Photographs 1
2Quality report before & after treatment
Report certificate for local & munciple authority for munciple water.
Quality checking frequency & sampling plan for potable water
2
building
1
supportive documents verified & sign by responsible authority
smoking area0
facility for segregated inert & hazardous waste before recycle & disposal, photograph of lacation
Water flow diagram giving the complete collection ,treatment ,& distrubution of different application
Specification details indicating capacity & component of the treatment plant along with drawing
Sound audit report in spacified format ,noise level at site & outdoor at diffrant location inside the
Company policy for ban/prohibition on smoking within building premises , if applicable with the
On architectural drawing demostrating smoking zone on the building periphery separated from non
Drawing & document showing location of energy & water meter 1
1
1
authority 1
environment issues in the owner
Proof of company policy on green supply chain 1
1
1
47
Provide proof of the company policy for promotion of envirnmental awareness with supportive documents
Building Brocher, CD information leaf let small vidio documentary used to creat awarness towards
Photographs of demostarting the innovative strategies incorporated in building
Possible Remark
1
1
1
1
1
1
1 Costing of lamp
1 Costing of lamp
Possible with Cost
Not possible
Required drawing from landscape architect
1
1use for that with PO.
Required calculation of concrete quantity &
2use for that with PO.
2
Required calculation of concrete quantity &
2
laid down by competent authority
Conducted by organisation recognised by a
compenent authority it should follow procedure
1
1
15 3