3.6. traffic control signal design (civil)...presentation of drawings for the installation or...
TRANSCRIPT
CADD Manual UNCONTROLLED WHEN COPIED
3.6. Traffic Control Signal Design (Civil)
3.6.1. Approval Sheet
TITLE: Traffic Control Signal Design (CIVIL)
VERSION NUMBER: 3
REVISION NUMBER: 1
APPROVED BY: SIGNED: David Reid DATED: 30th April 2004
MANAGER PROJECT DESIGN SERVICES
© 2005 Roads & Traffic Authority
For further information, contact: CADD Policy Officer
RTA CADD Advisory Group Telephone: (02) 8837 0522
June 2005 Version 3.2 OTP-TP-001.1 3.6-1
CADD Manual UNCONTROLLED WHEN COPIED
3.6.2. Table of Contents
3.6. Traffic Control Signal Design (Civil) .......................................................3.6-1
3.6.1. Approval Sheet......................................................................................................................................................... 3.6-1 3.6.2. Table of Contents................................................................................................................................................... 3.6-2 3.6.3. Overview...................................................................................................................................................................... 3.6-3
3.6.3.1. Scope ......................................................................................................................................................................................3.6-3 3.6.3.2. Objective...............................................................................................................................................................................3.6-3
3.6.4. Drawings....................................................................................................................................................................... 3.6-4 3.6.4.1. General ..................................................................................................................................................................................3.6-4
3.6.4.1.1. Component Drawings..........................................................................................................................................3.6-4 3.6.4.1.2. Drawing Media .........................................................................................................................................................3.6-4 3.6.4.1.3. Plan Border.................................................................................................................................................................3.6-4 3.6.4.1.4. Drawing Approval...................................................................................................................................................3.6-4 3.6.4.1.5. Reference Documents..........................................................................................................................................3.6-5
3.6.4.2. Specification for Drawings ...........................................................................................................................................3.6-5 3.6.4.2.1. Plan Size........................................................................................................................................................................3.6-5 3.6.4.2.2. Scales..............................................................................................................................................................................3.6-5 3.6.4.2.3. Font and Line Styles...............................................................................................................................................3.6-5 3.6.4.2.4. Additional Sheets ....................................................................................................................................................3.6-5 3.6.4.2.5. TCS, Sheet and Issue Numbers.......................................................................................................................3.6-5 3.6.4.2.6. Symbols (Cells).........................................................................................................................................................3.6-5
3.6.5. Functional Grouping of Information ............................................................................................................ 3.6-6 3.6.5.1. Composition of Components ...................................................................................................................................3.6-6
3.6.5.1.1. Design Layout ...........................................................................................................................................................3.6-6 3.6.5.1.2. Detailed Road Design For Channelisation And Associated Civil Work ...................................3.6-6
3.6.5.2. Composition of Groupings .........................................................................................................................................3.6-6 3.6.5.2.1. Border Level (Layer)..............................................................................................................................................3.6-6 3.6.5.2.2. Base Level (Layer)...................................................................................................................................................3.6-6 3.6.5.2.3. Post Level (Layer) ...................................................................................................................................................3.6-7 3.6.5.2.4. Ancillary Level (Layer) ..........................................................................................................................................3.6-7 3.6.5.2.5. Hatching Level (Layer) .........................................................................................................................................3.6-7 3.6.5.2.6. Unmodified Base Level (Layer)........................................................................................................................3.6-8
3.6.6. Appendix A Standard RTA TCS Border................................................................................................. 3.6-9 3.6.7. Appendix B Standard TCS Design Drawing .......................................................................................3.6-11 3.6.8. Appendix C Standard TCS Level Details..............................................................................................3.6-13
June 2005 Version 3.2 OTP-TP-001.1 3.6-2
CADD Manual UNCONTROLLED WHEN COPIED
3.6.3. Overview
3.6.3.1. Scope
This document sets out the RTA’s requirements for the organisation of CADD data and the presentation of drawings for the installation or modification of Traffic Control Signals.
3.6.3.2. Objective
The objective of this guideline is to provide drawings of TRAFFIC CONTROL SIGNAL sites in a format that can be read by the RTA and electronically stored.
It defines the way in which data is to be organised and how it is to be presented.
June 2005 Version 3.2 OTP-TP-001.1 3.6-3
CADD Manual UNCONTROLLED WHEN COPIED
3.6.4. Drawings
3.6.4.1. General
3.6.4.1.1. Component Drawings
Designs for installation or reconstruction of Traffic Control Signals sites will require at least three component drawings as follows:
• DESIGN LAYOUT
• CABLE INSTALLATION (Contact Manager Traffic Solutions, Parramatta).
• CABLE CONNECTION CHART (Contact Manager Traffic Solutions, Parramatta).
NOTE: Some sites may require additional drawings dealing with:
• DUCT LAYOUT (Contact Manager Traffic Solutions, Parramatta).
• DETAILED ROAD DESIGN FOR CHANNELISATION AND ASSOCIATED CIVIL WORK (see Section 3.5 of this Manual - Road Design).
NOTE: The Design Brief will specify when these drawings are required.
3.6.4.1.2. Drawing Media
Both hard and electronic copies of the specified drawings are to be supplied. The Design Brief will specify the number of hard copies required. Electronic copies are to be delivered in accordance with Section 2.1 of this Manual - CADD Data Exchange Policy.
3.6.4.1.3. Plan Border
Plan borders are to be in accordance with Australian Standard AS1100, or as supplied by the RTA. Refer to 3.6.6 Appendix A – Standard RTA TCS Border, which gives examples of standard A1 borders, which are supplied by the RTA.
Details such as the project name, design/reviewed/recommendation/approval signatures, plan registration number, file number, amendment block, sheet number and total number of sheets, should be shown. The title block may be altered to include the consultant's name.
3.6.4.1.4. Drawing Approval
The approval of the drawings is subject to local regional requirements and should include a report and site photos.
June 2005 Version 3.2 OTP-TP-001.1 3.6-4
CADD Manual UNCONTROLLED WHEN COPIED
3.6.4.1.5. Reference Documents
The primary reference documents are:
TRAFFIC SIGNAL PRACTICE – DESIGN RTA 1992
TRAFFIC SIGNAL DESIGN STANDARDS (RTA-TC-189) RTA 1994
SPECIFICATION SI/TCS/8 INSTALLATION AND RECONSTRUCTION OF TRAFFIC LIGHT SIGNALS
3.6.4.2. Specification for Drawings
3.6.4.2.1. Plan Size
Generally, the RTA prefers its standard presentation sheet for Traffic Control Signals to be A1 format. Other sizes should only be used if requested by client. All plain paper sheets must conform to ISO guidelines - however, concept design may conform to “A0” for height, and width may vary.
3.6.4.2.2. Scales
The drawings shall be prepared in metres as the unit of measurement and plotted at a scale of 1:200.
3.6.4.2.3. Font and Line Styles
Refer to Section 2.1 of this Manual - CADD Data Exchange Standards.
3.6.4.2.4. Additional Sheets
Where all data cannot be contained to a single sheet then additional sheets may be added, such sheets should have the next consecutive available sheet number.
3.6.4.2.5. TCS, Sheet and Issue Numbers
The issue of TCS numbers is controlled by the Traffic Management Centre (TMC) (or their delegates) and is registered on the TMC VAX computer.
Sheet numbers are issued consecutively from the RTA CARMS plan registering system the sheet number is available from regional offices.
Minor changes to the drawing may be authorised by the raising of an issue number only; major changes will require the raising of a new sheet and issue number and re-approval of that sheet by the RTA regional office.
3.6.4.2.6. Symbols (Cells)
Refer to RTA CADD Cell Library.
June 2005 Version 3.2 OTP-TP-001.1 3.6-5
CADD Manual UNCONTROLLED WHEN COPIED
3.6.5. Functional Grouping of Information
3.6.5.1. Composition of Components
3.6.5.1.1. Design Layout
This drawing will comprise the following Levels:
• Border
• Base
• Posts
• Ancillary detail
3.6.5.1.2. Detailed Road Design For Channelisation And Associated Civil Work
If the Design Brief requires a detailed road design for channelisation and associated civil work the drawing, refer to Section 3.5 of this Manual - ROAD DESIGN.
3.6.5.2. Composition of Groupings
3.6.5.2.1. Border Level (Layer)
Border template Completed details as called for by the template.
3.6.5.2.2. Base Level (Layer)
This is to show the site at the time when the signals are commissioned. Detailed Reference: Traffic Signal Practice – DESIGN.
The detailed survey and design (if relevant) Utilities both over head and underground Drainage pits and grates, gutter crossings Awnings and clearances as required Trees and other likely sight obstructions Existing bus stops and street furniture (shelters, seats, gardens etc) Main Road Nos and street names, “To and From” Date in Service Property boundaries where signal hardware is to be placed adjacent to private property Approach grades on each approach.
The consolidation of these details may require other levels created by a design package to be combined into one Level.
June 2005 Version 3.2 OTP-TP-001.1 3.6-6
CADD Manual UNCONTROLLED WHEN COPIED
3.6.5.2.3. Post Level (Layer)
This is to show those design elements that will form the basis of the Cable Installation sheet Detailed Reference: Traffic Signal Practice – DESIGN.
Posts types including vertical lengths and / or outreach Post locations * Post number assigned to each post Detector location, width and identifying number Electric supply point Controller location. * If the post location dimension, conflicts with other displayed information an insert- POST LOCATION DIAGRAM could be considered
3.6.5.2.4. Ancillary Level (Layer)
This group shows the additional information necessary for the “DESIGN LAYOUT” which is not shown in the preceding Levels.
• Detailed Reference: Traffic Signal Practice – DESIGN. Interim Guide To Signs And Markings. Regulatory Signs.
• Lantern displays
• Lantern labels
• Lantern monitoring
• Push buttons
• Push button labels
• Detector names
• Detector location (L, C, R etc)
• Regulatory sign posts.
• All longitudinal and transverse line markings including chevrons, arrows, painted medians/islands and logos
• All schedules and specification charts
• Co-ordinate information schedules for kerb adjustments, post positions, where appropriate. ie new sites where post footings, ducts etc will be installed prior to kerbing, pavement etc.
• Movement diagrams
• All notes
3.6.5.2.5. Hatching Level (Layer)
This group contains all hatching that forms part of the “DESIGN LAYOUT”(generally turned off following the completion of the WAE issue).
June 2005 Version 3.2 OTP-TP-001.1 3.6-7
CADD Manual UNCONTROLLED WHEN COPIED
3.6.5.2.6. Unmodified Base Level (Layer)
This level is optional.
This level is a copy of the BASE LEVEL before any modifications, i.e. removal of parts of the BASE LEVEL to clearly display information in other groups, which together form the DESIGN LAYOUT.
Its purpose is to provide the BASE LEVEL that is used in other Component Drawings, obviously if the original BASE LEVEL is not modified, it is not required.
June 2005 Version 3.2 OTP-TP-001.1 3.6-8
CADD Manual UNCONTROLLED WHEN COPIED
3.6.6. Appendix A Standard RTA TCS Border
June 2005 Version 3.2 OTP-TP-001.1 3.6-9
00
00
.00
0.V
V.0
00
0DO NOT AMEND MANUALLY
DRAWN BY CADD
A
OR
IGIN
AL
IS
SU
E
APPROVED
RTA ACCEPTANCE
RECOMMENDED
DESIGN PREPARED BY
ACCEPTED
TRAFFIC SIGNALS AT
SYDNEY0000.000.VV.0000
SYDNEY COUNCIL AREA
MAJOR ROAD (M.R. 000) AND MINOR STREET
07/07/2005 16:21:49 PM...\Standard Border TCS NEW.dgn
PUBLIC UTILITY LEGEND REFERENCE PLANS
SYMBOLS/ABBS. VD003-6
STD POSIT VD001-5
DET SCHED EXP VD018-10
PRES. DETECT VC005-17
SSG DIS. SEQ. VD018-8
SURVEYOR :
DATE : N/A
N/A
TELECOM PILLAR
TELEPHONE BOX
STAY POLE
POWER POLE
ELECT LIGHT POLE
TELECOM PIT
SEWER MANHOLE
GAS VALVE
STOP VALVE
HYDRANTCO-ORDS N:
300 000
6 000 000
DESIGNED
CHECKED
SITE CHECKED
RECOMMENDED
U.B.D. Ref. Map 138 F4 DESIGN APPROVAL
................................
POSITION ................................
DATE ................................
................................
POSITION ................................
DATE ................................
................................
POSITION ................................
DATE ................................
....................................................
....................................................
ROADS AND TRAFFIC AUTHORITY OF NSW
DESIGN LAYOUT TCS No 0000
EXISTING PROPOSED
SCALE
FILE
REGN.
REGION:
10(1:200)
505ISSUE
SHEET
SUPERSEDES
SHEET/ISSUE -
C COPYRIGHT ROADS AND TRAFFIC AUTHORITY OF NSW
B
1
000 TS 000
M.G.A. E:
SYDNEY CADD FILE: VV0000_1B.dgn
PROJECT DESIGN
OPERATIONS & SERVICES
DATE IN SERVICE : 08/07/57
CADD Manual UNCONTROLLED WHEN COPIED
3.6.7. Appendix B Standard TCS Design Drawing
June 2005 Version 3.2 OTP-TP-001.1 3.6-11
SPECIMEN O
NLYNOTE: Colour denotespen line thickness.
: Text colour denotesheight (mm) unless
stipulated with an *
2.0 *
COLOURS DENOTE
LINE THICKNESS
AND
TEXT HEIGHT
A
OR
IGIN
AL
IS
SU
E
00
00
.00
0.V
V.0
00
0DO NOT AMEND MANUALLY
DRAWN BY CADD
07/07/2005 16:21:51 PM...\New_ VV_0000_001_Ex1.dgn
PUBLIC UTILITY LEGEND REFERENCE PLANS
SYMBOLS/ABBS. VD003-6
STD POSIT VD001-5
DET SCHED EXP VD018-10
PRES. DETECT VC005-17
SSG DIS. SEQ. VD018-8
SURVEYOR :
DATE : N/A
N/A
TELECOM PILLAR
TELEPHONE BOX
STAY POLE
POWER POLE
ELECT LIGHT POLE
TELECOM PIT
SEWER MANHOLE
GAS VALVE
STOP VALVE
HYDRANTCO-ORDS N: 6 000 000
DESIGNED
CHECKED
SITE CHECKED
RECOMMENDED
U.B.D. Ref. Map 138 F4 DESIGN APPROVAL
APPROVED
RTA ACCEPTANCE
RECOMMENDED
................................
POSITION ................................
DATE ................................
................................
POSITION ................................
DATE ................................
................................
POSITION ................................
DATE ................................
....................................................
....................................................
DESIGN PREPARED BY
ACCEPTED
TRAFFIC SIGNALS AT
SYDNEY
10(1:200)
505ISSUE
SHEET
SUPERSEDES
SHEET/ISSUE -
C COPYRIGHT ROADS AND TRAFFIC AUTHORITY OF NSW
0000.000.VV.0000
M.G.A. E:
SYDNEY COUNCIL AREA
MAJOR ROAD (M.R. 000) AND MINOR STREET
ROADS AND TRAFFIC AUTHORITY OF NSW
0000
000 TS 000
SYDNEY VV0000_1B.dgn
DESIGN LAYOUT TCS No
REGION:
SCALE
FILE
REGN.
CADD FILE:
PROPOSEDEXISTING
1
B
DATE IN SERVICE : 08/07/57
- Red 3.0 / 3.5
- Green 5.0
- Cyan 7.0
- Black 0.25
- Red 0.35
- Green 0.5
- Cyan 0.7
B I
ssu
e J
I S
W4
69
5 3
/7/9
5
Ad
ded
:-
Red
lig
ht
cam
era
-
LT
OR
on p
osts
2 &
6.
Alt
ere
d:-
Media
n n
ose i
n
M
ajo
r R
oad
.
-C
on
tro
ller
Lo
cati
on
.
T.H
. 10/8
/95
- Black 2.0 / 2.5**
300 000
*3.5
OPERATIONS & SERVICES
PROJECT DESIGN
RESIDENTIAL
GOLF CLUB
RESIDENTIAL
RESIDENTIAL
To C
ITY
NO
RT
H
3 %
Dow
n
Camera Unit Post
1
SupplyController 9
Flash Unit Post
8
7
3
2
6
54
FN
SG/PS
DS
D D D
FN
SG/PS
DS
A(PB)
A(WALK)
C(L)
A.A(WALK)A
DS
FN
SG/PS
A(PB) C(L)
A/B.A/B(WALK)A/B.A/B(WALK)A-B
B
FN
SG/PS
DS
CC(PB)
C(WALK) C.C(WALK)
A(L)
B.C.D
C.D
A.B.D
D(L)
SIGNAL
GROUP TYPE
TABLEREMARKS
SPECIAL SIGNAL GROUP DISPLAY SEQUENCE
Timed R.A. protection for ‘A’ pedestrians. Z- filter option.
Four additional arrows
at standard spacing
9
Timed R.A. protection for ‘A’ pedestrians.21
A/B 3
B (RT) 41
Ped.A/B
(iii) Timer terminated except under masterlink
(i) Introduction concurrent with A/B Overlap
C C
A
FN
SG/PS
DS
A(L)
A A
FN
SG/PS
DS
FN
SG/PS
DS
A(L)
A/B A
B(NEXT)
B
A(NEXT)
Depart. &
Approach
Approach
FN
SG/PS
DS
FN
SG/PS
DS
A(L).B(L)
A B
A
B(PR)
Z-
A/B
B(L)
B
Z-Z- Z-.A-B1(PR).B(NEXT)
A-B1
A-B1
FN
SG/PS
DS
BB-DD(NEXT)
D
A-B2
D(PR)
D
DETECTOR SPECIFICATION
FN
SG/PS
DS
C(L)
C CC1
C2
C(PR)
A(E1)
B(E3)
A(E2) B(E2)
B(E1) D(E1)
C(E1)
C(E2)
A-B(14)
/B
A/B
NOTES:
A D
2 3
DETECTOR SPECIFICATION
1
1
2
MOVEMENTS
LTOR
2
2 3
A/B
C
A/B
A-B(14)
C(15)
6.9
10.0
C(15)
A D
A
BA/B
C(15)
9 - 1.0
One additional set of arrows
at standard spacing
Existing
5L Existing
1
1
FIL
TE
R O
PT
ION
LTOR LTOR
L1 C
onti
nuous
L1 C
onti
nuous
POST TYPE LENGTH OFFSET REMARKS
POSTS
7
8
2
2
4.1
4.1
1.0
1.0
2
3
4
5
6
6 -
-
-
2
2
2
2
6
4.1
4.1
4.1
4.1
1.0
1.0
1.0
1.0
1.2
Existing
Existing
Existing
Existing
Existing
Existing
Existing
1
R 0.75
INSET
See note 6
and inset
16.0R 40.0
See note 7
R2-6(R)
R2-6(R)
D(E2)
A(E3)
P. B.
P. B.
P. B.(ii) Walk/Clearance Overlap permitted A B
B (L T)
D (L T)
2.0 *
2.0 *
2.0 *
2.0 *
1. This site is SCATS linked.
2. Special STOP sign (R1-4) placed on posts 2 and 7.
3. Audio tactile push buttons are provided on
posts 1,2,3,5,6 & 7.
4. Kerb ramps to be constructed at all pedestrian crossings.
( In accordance with model drawing MD.R173.01.A )
5. Provision made in cabling and ducting for future pedestrian
crossing on southern approach.
6. Civil works : -
(i) Remove 21m of SF kerb.
(ii) Remove 24sq.m of concrete median.
(iii) Construct 17m type SF kerb.
(iv) Construct 24sq.m of new pavement shown
7. Trim trees to improve sight of Post 5.
2.0 *A(13)
C
A
C
A(13)
D
B
A
B-D Detector
D Detector
C PHASED PHASE
A PHASE B PHASE
SCALE 1:100
C2 Detector
C1 Detector
Violation Detector Loops (16)
A-B2 Detectors
A-B1 Detector
A Detectors
D
BA
A B
A/B
A/B B
CADD Manual UNCONTROLLED WHEN COPIED
3.6.8. Appendix C Standard TCS Level Details
June 2005 Version 3.2 OTP-TP-001.1 3.6-13
COLOURS DENOTE
LEVELS
SPECIMEN O
NLY
T.H
. 10/8
/95
-C
on
tro
ller
Lo
cati
on
.
M
ajo
r R
oad
.
Alt
ere
d:-
Media
n n
ose i
n
-
LT
OR
on p
osts
2 &
6.
Ad
ded
:-
Red
lig
ht
cam
era
B I
ssu
e J
I S
W4
69
5 3
/7/9
5
- Red Posts
- Cyan Civil
- Orange Hatching
- Black Base
- Blue Border
NOTE: Colour denotes level
- Green Design
RESIDENTIAL
GOLF CLUB
RESIDENTIAL
RESIDENTIAL
To C
ITY
NO
RT
H
3 %
Dow
n
Camera Unit Post
1
SupplyController 9
Flash Unit Post
Violation Detector Loops (16)
8
7
3
2
6
54
FN
SG/PS
DS
D D D
FN
SG/PS
DS
A(PB)
A(WALK)
C(L)
A.A(WALK)A
DS
FN
SG/PS
A(PB) C(L)
A/B.A/B(WALK)A/B.A/B(WALK)A-B
B
FN
SG/PS
DS
CC(PB)
C(WALK) C.C(WALK)
A(L)
B.C.D
C.D
A.B.D
D(L) A-B1 Detector
SIGNAL
GROUP TYPE
TABLEREMARKS
SPECIAL SIGNAL GROUP DISPLAY SEQUENCE
Timed R.A. protection for ‘A’ pedestrians. Z- filter option.
Four additional arrows
at standard spacing
9
Timed R.A. protection for ‘A’ pedestrians.21
7. Trim trees to improve sight of Post 5.
A/B 3
B (RT) 41
Ped.A/B
(iii) Timer terminated except under masterlink
(i) Introduction concurrent with A/B Overlap
C C
A
FN
SG/PS
DS
A(L)
A A
FN
SG/PS
DS
FN
SG/PS
DS
A(L)
A/B A
B(NEXT)
B
A(NEXT)
Depart. &
Approach
Approach
FN
SG/PS
DS
FN
SG/PS
DS
A(L).B(L)
A B
A
B(PR)
Z-
A/B
B(L)
B
Z-Z- Z-.A-B1(PR).B(NEXT)
A-B1
A-B1
FN
SG/PS
DS
BB-DD(NEXT)
D
A-B2
D(PR)
D
DETECTOR SPECIFICATION
FN
SG/PS
DS
C(L)
C CC1
C2
C(PR)
A(E1)
B(E3)
A(E2) B(E2)
B(E1) D(E1)
C(E1)
C(E2)
A-B(14)
/B
A/B
A/B
A-B2 Detectors
NOTES:
A D
3. Audio tactile push buttons are provided on
posts 1,2,3,5,6 & 7.
(ii) Remove 24sq.m of concrete median.
(iv) Construct 24sq.m of new pavement shown
4. Kerb ramps to be constructed at all pedestrian crossings.
1. This site is SCATS linked.
(iii) Construct 17m type SF kerb.
D Detector
B-D Detector
A PHASE B PHASE
2 3
DETECTOR SPECIFICATION
1
1
2
C PHASED PHASE
MOVEMENTS
LTOR
2
2 3
A/B
C
A/B
A-B(14)
C(15)
6.9
C2 Detector
C1 Detector
C(15)
A D
A
BA/B
C(15)
9 - 1.0
One additional set of arrows
at standard spacing
Existing
5L Existing
1
1
FIL
TE
R O
PT
ION
LTOR LTOR
L1 C
onti
nuous
L1 C
onti
nuous
A Detectors
POST TYPE LENGTH OFFSET REMARKS
POSTS
7
8
2
2
4.1
4.1
1.0
1.0
2
3
4
5
6
6 -
-
-
2
2
2
2
6
4.1
4.1
4.1
4.1
1.0
1.0
1.0
1.0
1.2
Existing
Existing
Existing
Existing
Existing
Existing
Existing
1
R 0.75
INSET
SCALE 1:100
See note 6
and inset
16.0R 40.0
See note 7
R2-6(R)
R2-6(R)
D(E2)
A(E3)
P. B.
P. B.
P. B.(ii) Walk/Clearance Overlap permitted A B
B (L T)
D (L T)
5. Provision made in cabling and ducting for future pedestrian
crossing on southern approach.
(i) Remove 21m of SF kerb.
6. Civil works : -
( In accordance with model drawing MD.R173.01.A )
2. Special STOP sign (R1-4) placed on posts 2 and 7.
C
A(13)
D
B
A
C
A
10.0
A(13)
A/B B
D
BA
A B
00
00
.00
0.V
V.0
00
0DO NOT AMEND MANUALLY
DRAWN BY CADD
A
OR
IGIN
AL
IS
SU
E
APPROVED
RTA ACCEPTANCE
RECOMMENDED
DESIGN PREPARED BY
ACCEPTED
TRAFFIC SIGNALS AT
SYDNEY0000.000.VV.0000
SYDNEY COUNCIL AREA
MAJOR ROAD (M.R. 000) AND MINOR STREET
07/07/2005 16:21:58 PM...\New_VV_0000_001_Ex2.dgn
PUBLIC UTILITY LEGEND REFERENCE PLANS
SYMBOLS/ABBS. VD003-6
STD POSIT VD001-5
DET SCHED EXP VD018-10
PRES. DETECT VC005-17
SSG DIS. SEQ. VD018-8
SURVEYOR :
DATE : N/A
N/A
TELECOM PILLAR
TELEPHONE BOX
STAY POLE
POWER POLE
ELECT LIGHT POLE
TELECOM PIT
SEWER MANHOLE
GAS VALVE
STOP VALVE
HYDRANTCO-ORDS N:
300 000
6 000 000
DESIGNED
CHECKED
SITE CHECKED
RECOMMENDED
U.B.D. Ref. Map 138 F4 DESIGN APPROVAL
................................
POSITION ................................
DATE ................................
................................
POSITION ................................
DATE ................................
................................
POSITION ................................
DATE ................................
....................................................
....................................................
ROADS AND TRAFFIC AUTHORITY OF NSW
DESIGN LAYOUT TCS No 0000
EXISTING PROPOSED
SCALE
FILE
REGN.
REGION:
10(1:200)
505ISSUE
SHEET
SUPERSEDES
SHEET/ISSUE -
C COPYRIGHT ROADS AND TRAFFIC AUTHORITY OF NSW
B
1
000 TS 000
M.G.A. E:
SYDNEY CADD FILE: VV0000_1B.dgn
PROJECT DESIGN
OPERATIONS & SERVICES
DATE IN SERVICE : 08/07/57