3d initiatives for design construction and asset …...• reduced cross component conflicts, •...
TRANSCRIPT
![Page 1: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/1.jpg)
FDOT 3D INITIATIVES
3D Initiatives for Design Construction and Asset Information
![Page 2: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/2.jpg)
FDOT 3D INITIATIVES
![Page 3: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/3.jpg)
To provide a higher quality of design intent for:• reduced cross component conflicts,• better clash detection,• improved constructability, • less field design changes, delays, etc.
To provide for Automated Machine Guidance (AMG) in construction of earthwork, paving, resurfacing, concrete, etc.
To provide digital model the Legal Contract Document, digitally signed by the EOR
To support Construction, Business and Asset Information Modeling - CIM/BIM/AIM data
FDOT 3D DESIGN OBJECTIVES:
![Page 4: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/4.jpg)
3D Design Task Team Advisors (odd months)Districts DesignConsultant CommunityContractor CommunityVendor CommunityOther DOT’s
IHEEP, FHWA, AASHTO, TRB, SMART BIM participation
Central Office • Staff Hour Estimates Task 36• DPR-BPE Rule 61G15 re-definition• NexGen Plans –
• Large Format Sheets • Less Plan Sheets
FDOT 3D INITIATIVES
![Page 5: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/5.jpg)
REVIEW OF FDOT GUIDELINES AND DOCUMENTATION
Project Suite – Work Program Database – 3DPR What is in the Florida Design Manual? What is in the Professional Services Contract? What the CADD Manual defines for deliverables? FDOT Bulletins and Future Goals
![Page 6: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/6.jpg)
When is 3D model delivery required ?
Identified in the Work Program database
![Page 7: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/7.jpg)
When is 3D model delivery required ?
Identified in the Work Program database
![Page 8: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/8.jpg)
When is 3D model delivery required ?
• The Florida Design Manual
![Page 9: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/9.jpg)
When is 3D model delivery required ?The Professional Services Contract?
![Page 10: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/10.jpg)
When is 3D model delivery required ?The Professional Services Contract?
![Page 11: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/11.jpg)
When is 3D model delivery required ?The Professional Services Contract?
![Page 12: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/12.jpg)
What 3D model delivery is required ?
What the CADD Manual defines for deliverables?
![Page 13: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/13.jpg)
3D Design Task Team:
FDOT 3D INITIATIVESApplications Company UseConcept Station, InfraWorks Bentley, Autodesk Concept Model, Preliminary Plans,
MicroStation, AutoCADGEOPAK, Civil3DOpenRoads OpenBridge, Inventor, Revit
Bentley, Autodesk Native 2D/3D CADD ApplicationsCreate 3D PDFs
Acrobat Reader, BlueBeam Revu, Power PDF Adobe, Bluebeam, Nuance 3D PDF viewers, markups
Navigator Bentley imodel format – BIM Data Viewer
Trimble Business Center Trimble Survey, Contractors, - CADD Civil Construction
TOPCON Magnet TOPCON Survey, Contractors, - CADD Civil Construction
Carlson Carlson Survey, Contractors, - CADD Civil Construction
AGTEK, HxGN SMART Build Hexagon Survey, Contractors, - CADD Civil Construction
LumenRT Desktop and VR Bentley Rendering Virtual review of 3D models, markups
3D Studio Max, Revit, Lumion AutoDesk, Lumion Rendering Virtual review of 3D models, markups
BIM360 Docs, Navisworks AutoDesk Web Access, dwf format of 3D models and plans
![Page 14: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/14.jpg)
RECOMMENDATIONS:Any projects that have cross sections should be designed as a 3D Model and should be scoped accordingly and coded with the 3DPR code in Project Suite.
Project Managers should use the 3D Design Deliverables Staff Hour Task List developed by the Production Support Project Management Office to plan and estimate work during the development of the project plans and stage review submittals
Project Managers should agree on a model management plan during project scoping for project estimating and project reviews.
Project Managers, reviewers, and/or consultants should develop a checklist for quality control of 3D deliverables to be used during the development of the project plans and stage review submittals.
Projects submitted for Automated Machine Guidance, or Project Managers should review the created XML surfaces in Trimble, or equivalent software that a contractor would use. Designers
Designers should ensure that corridor models, including templates or assemblies, are left intact and provided with the submitted CADD files so reviewers can verify the quality of the 3D model.
Project Reviewers should review 3D corridor models with VR goggles in software such as Bentley’s LumenRT for DGN models or Autodesk Revit Live for DWG models.
PROJECT DELIVERY QUALITY REVIEWS
![Page 15: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/15.jpg)
PROJECT DELIVERY QUALITY REVIEWS
![Page 16: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/16.jpg)
PROJECT DELIVERY QUALITY REVIEWS
![Page 17: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/17.jpg)
PROJECT DELIVERY QUALITY REVIEWS
![Page 18: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/18.jpg)
PROJECT DELIVERY QUALITY REVIEWS
![Page 19: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/19.jpg)
PROJECT DELIVERY FOR AUTOMATION
![Page 20: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/20.jpg)
Augmented Reality
Data Overlaying Real World• Flat images on flat screens
• Most common usage of AR is
smartphone
• Layer on virtual content on top
of your existing reality
• Google Glass is AR
Mixed Reality
3D Holographic Immersion• Natural Interactions
• Experience 3D in the Real World
• Visualize 3D holograms at scale
• Immersive Collaboration
• Self Contained & Untethered
• No motion sickness
• AR & VR will morph into MR
Virtual Reality
Completely Artificial World
• Reality is replaced completely
• Immersive & separate from others
• Tethered to powerful computer
• Limited movement
• Lots of detail is rendered
• 20% of users experience nausea
AUGMENTED/ MIXED/ VIRTUAL
![Page 21: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/21.jpg)
FUNDAMENTAL SHIFT
![Page 22: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/22.jpg)
MICROSOFT HOLOLENS• See-through 16:9 waveguided lenses• IMU, depth sensing cameras • Holographic processing unit• 2GB of memory• 64GB of storage• 2MP photos, HD videos• 4 microphones and 2 speakers• Wi-Fi and Bluetooth• Windows 10
![Page 23: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/23.jpg)
CHANGING THE MINDSET
DATA PRODUCTIONVS.
PLANS PRODUCTION
![Page 24: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/24.jpg)
D5 PILOT PROJECT
24
• New construction of a 3.5 mile long trail
![Page 25: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/25.jpg)
D5 PILOT PROJECT
![Page 26: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/26.jpg)
D5 PILOT PROJECT
![Page 27: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/27.jpg)
GOAL #1
SIGNED & SEALED 3D MODEL FOR AMG
CONSTRUCTION
![Page 28: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/28.jpg)
PATH TO SUCCESS
![Page 29: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/29.jpg)
PATH TO SUCCESS
• Export 3D Break Lines
![Page 30: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/30.jpg)
PATH TO SUCCESS
• Create Proposed Surface
![Page 31: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/31.jpg)
GOAL #2
NexGen PLANSDATA PRODUCTION
![Page 32: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/32.jpg)
GOAL #2
![Page 33: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/33.jpg)
PATH TO SUCCESS
104 PLAN SHEETSVS.
31 PLAN SHEETS
![Page 34: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/34.jpg)
ALTERNATE DELIVERY -2D KML
![Page 35: 3D Initiatives for Design Construction and Asset …...• reduced cross component conflicts, • better clash detection, • improved constructability, • less field designchanges,](https://reader033.vdocuments.net/reader033/viewer/2022060305/5f096e5f7e708231d426ce33/html5/thumbnails/35.jpg)
ALTERNATE DELIVERY -3D KML