3g kpis to be monitored v4
TRANSCRIPT
-
8/13/2019 3G KPIs to Be Monitored V4
1/30
3G KPIs to be Monitored
Reference Number MIC1/MO/CTO-RE/93-11/V2
Owner RE Department
Revision Code 2
ImplementationDate
Sep. 8, 2011
Ref.: MIC1/MO/CTO-RE/93-11/V2 Page2/30
This document is the property ofORASCOM TELECOMLEBANON S.A.L. and can not be diffused externally without the prior approval of themanagement
3G KPIs to be monitored
Radio Engineering DepartmentRAN Research and Studies Unit
Prepared by In collaboration with Approved by
Position RAN Radio StudiesSpecialist RAN Research and StudiesHead Of Unit
Name Issam Khoury Hanna Wafaa Bazzi
Signature
Date September 8, 2011
-
8/13/2019 3G KPIs to Be Monitored V4
2/30
3G KPIs to be Monitored
Reference Number MIC1/MO/CTO-RE/93-11/V2
Owner RE Department
Revision Code 2
ImplementationDate
Sep. 8, 2011
Ref.: MIC1/MO/CTO-RE/93-11/V2 Page3/30
This document is the property ofORASCOM TELECOMLEBANON S.A.L. and can not be diffused externally without the prior approval of themanagement
1.Versions Follow Up and H istory:
2.Distri bution li st
TABLE OF CONTENT
1. VERSIONS FOLLOW UP AND HISTORY:..................................................................................................................... 3
2. DISTRIBUTION LIST.................................................................................................................................................. 3
3. TARGET KPIS ............................................................................................................................................................ 5
4. DEFINITION OF DRIVE TEST KPIS .............................................................................................................................. 7
5. CSSR SPEECH ........................................................................................................................................................... 9
6. CSSR VP ................................................................................................................................................................... 9
7. CSSR PS R99 ............................................................................................................................................................11
8. CSSR PS HS .............................................................................................................................................................11
9. SPEECH DROP CALL RATE ........................................................................................................................................12
10. VP DROP CALL RATE............................................................................................................................................13
DateRevisionCode
Status Objective
AUG 10, 2011 1.0 First issue
September 8, 2011 1.1 Adding traffic counters (section 20,21,22,23)
POSITION NAME FORACTION FOR INFO
RAN Research & StudiesHoU
Wafaa BAZZI
Radio EngineeringDepartment
Radio Engineering HoD Chadi SALIM
Techn. Common Func. & PMHoD
Bassem WAKIM
Quality & Performance Mgt HoU Cosette ABOU RJEILY
Performance Mgt Engineer Mohammad EL HINNAWI
-
8/13/2019 3G KPIs to Be Monitored V4
3/30
3G KPIs to be Monitored
Reference Number MIC1/MO/CTO-RE/93-11/V2
Owner RE Department
Revision Code 2
ImplementationDate
Sep. 8, 2011
Ref.: MIC1/MO/CTO-RE/93-11/V2 Page4/30
This document is the property ofORASCOM TELECOMLEBANON S.A.L. and can not be diffused externally without the prior approval of themanagement
11. PS INTERACTIVE DROP CALL RATE.......................................................................................................................13
12. HS DROP CALL RATE ............................................................................................................................................14
13. CS IRAT HO SUCCESS RATE (%) ............................................................................................................................15
14. PS IRAT (UMTS TO GSM) SUCCESS RATE (%) .......................................................................................................15
15. SOFT HANDOVER SUCCESS RATE (%) .......................................................................................................................16
16. DL CE CONGESTION RATE ........................................................................................................................................16
17. UL CE CONGESTION RATE ........................................................................................................................................17
18. DL POWER CONGESTION RATE ...............................................................................................................................18
19. RADIO CONGESTION RATE ......................................................................................................................................18
20. CS SPEECH TRAFFIC -- ERLANG .................................................................................................................................19
21. PS TRAFFIC R99 ........................................................................................................................................................21
22. PS TRAFFIC DL HSDPA ..............................................................................................................................................21
23. PS TRAFFIC UL HSUPA ..............................................................................................................................................22
24. PS INTERACTIVE DL USER THROUGHPUT .................................................................................................................23
25. PS INTERACTIVE UL USER THROUGHPUT .................................................................................................................24
26. PS INTERACTIVE HS USER THROUGHPUT .................................................................................................................25
27. PS INTERACTIVE EUL USER THROUGHPUT ...............................................................................................................25
-
8/13/2019 3G KPIs to Be Monitored V4
4/30
3G KPIs to be Monitored
Reference Number MIC1/MO/CTO-RE/93-11/V2
Owner RE Department
Revision Code 2
ImplementationDate
Sep. 8, 2011
Ref.: MIC1/MO/CTO-RE/93-11/V2 Page5/30
This document is the property ofORASCOM TELECOMLEBANON S.A.L. and can not be diffused externally without the prior approval of themanagement
3. Target KPIs
Classes Indicators Services STATISTIC
METHOD
Min accepted at
RNC level
comments
Accessibility Call setup
success rate
Voice Statistical Higher than 99%
Video Statistical Higher than
98.5%
PS R99 Statistical Higher than
98.5%
HSDPA Statistical Higher than
98.5%
Retainability Call drop rate Voice Statistical Less than 0.7%
Video Statistical Less than 1.5%
PS R99 Statistical Less than 2%
HSDPA Statistical Less than 2%
Mobility SHO success
ratio
NA Statistical Higher than 99%
CS IRAT HO
Succes Ratio
Statistical Higher than 95%
PS IRAT Success
Rate
Statistical Higher than 94%
Quality DL BLER All services DRIVE TEST 90% samples
lower than 1%
Voice Quality
MOS (waiting
Qvoice 3g)
Voice DRIVE TEST 90% samples
higher than 3.8
Capacity and
congestion
Radio
Congestion
NA Statistical Less than 1.5 %
Channel element
congestion
Statistical Less than 1%
Data
Performance
PS UL interactive
128RAB
throughput in
R99 for FTP
Transfers
R99 PS UL
interactive
128 Data
Services
Drive Test No target KPI
needs to be
specified. A plot
of the throughput
in the cluster will
be provided
HSDPA 21.1
Measured onApplicationLevel
HSDPA
Data
services
DRIVE TEST
BASED ON
SELECTED STATIC
LOCATIONS
Average is higher
than 10 Mbps
Peak value is 15
Mbps
Minimum of 5 and up to 10 test location will
be defined:
3 tests locations will be in very goodconditions for which the average and peach
values will be achieved and 2 test locations
will be in normal conditions. For these 2
-
8/13/2019 3G KPIs to Be Monitored V4
5/30
3G KPIs to be Monitored
Reference Number MIC1/MO/CTO-RE/93-11/V2
Owner RE Department
Revision Code 2
ImplementationDate
Sep. 8, 2011
Ref.: MIC1/MO/CTO-RE/93-11/V2 Page6/30
This document is the property ofORASCOM TELECOMLEBANON S.A.L. and can not be diffused externally without the prior approval of themanagement
Classes Indicators Services STATISTIC
METHOD
Min accepted at
RNC level
comments
PS DL FTP
Throughput
for HSDPA
(UE Category.
20,) (FTP);
TCP, window
size = 256k
locations Ericsson will also show the achievedvalues.
Very good conditions: RSCP > -60 dBm, Ec/N0
> -7, CQI > 27
HSDPA 14.4Measured on
Application Level
HSDPA
Data
services
DRIVE TEST
BASED ONSELECTEDSTATICLOCATIONS
Average is higher
than 7 Mbps
Peak value is 11
Mbps
Minimum of 5 and up to 10 test location will
be defined:
3 tests locations will be in very good
conditions for which the average and peach
values will be achieved and 2 test locations
will be in normal conditions. For these 2
locations Ericsson will also show the achieved
values .
Very good conditions: RSCP > -65 dBm,
Ec/N0 > -9, CQI > 25
HSDPA 7.2
Measured onApplication Level
HSDPA
Dataservices
DRIVE TEST
BASED ONSELECTEDSTATICLOCATIONS
Average is higher
than 4 MbpsPeak value is 5.5
Mbps
Minimum of 5 and up to 10 test location will
be defined:3 tests locations will be in very good
conditions for which the average and peach
values will be achieved and 2 test locations
will be in normal conditions.
Very good conditions: RSCP > -65 dBm,
Ec/N0 > -9, CQI > 25
HSDPA 3.6
Measured on
Application Level
Drive TestBASED ON
SELECTED STATIC
LOCATIONS
Average is higher
than 1.5 Mbps
Peak value is 3
Mbps
Minimum of 5 and up to 10 test location will
be defined:
3 tests locations will be in very good
conditions for which the average and peach
values will be achieved and 2 test locations
will be in normal conditions.
Very good conditions: RSCP > -65 dBm, Ec/N0
> -9, CQI > 25
PS latency Ping R99,HSDPA
(latency)
R99 Drive Test Average response
time is less than
200 ms
Server will be connected directly to Core.
Drive Test
HSDPA Drive Test Average response
time is less than
100 ms
Server will be connected directly to Core.
Drive Test
Call Set up
Time
Call set up time Voice DRIVE TEST Average 3s to 4s will be extracted from astellia 3G when
available
Video DRIVE TEST Average 5s to 6s will be extracted from astellia 3G when
available
-
8/13/2019 3G KPIs to Be Monitored V4
6/30
3G KPIs to be Monitored
Reference Number MIC1/MO/CTO-RE/93-11/V2
Owner RE Department
Revision Code 2
ImplementationDate
Sep. 8, 2011
Ref.: MIC1/MO/CTO-RE/93-11/V2 Page7/30
This document is the property ofORASCOM TELECOMLEBANON S.A.L. and can not be diffused externally without the prior approval of the management
Definition of Drive Test KPIs
KPI ClassKPI Name Description
FormulaStart Trigger
Stop
Trigger
Accessibility
SpeechCall SetupTime
The Call Setup TimeSpeech (CST Speech) isdefined as the duration oftime taken to access theSpeech servicesuccessfully, meaning thatspeech connection isestablished. The setup timeis a taken as a MobileOriginating Connection(MOC) for Speech from aUE to a PSTN terminatingconnection.
1st RRCConnectionRequest
AlertingDL
Integrity
HSDPAUserThroughput
The PS Interactive HSDPAUser Throughput (UserThroughput HSDPA) is theaverage user throughput forPS Data in Downlink orUplink evaluation (kbps) ona HSDPA Radio Bearer. Itincludes user data but
excluding retransmissions,padding bits, data PDUheaders and RLC controlPDU's.
Time forSessionStart for thedownload
Time forSessionEnd forthedownload
AttemptsCallCS SetupsCallCSSuccessfulCSCSSR __64# __64_#)64( AttemptsCallPS SetupsCallPSSuccessfulPSCSSR __# ___#)( AttemptsCallSpeech SetupsCallSpeechSuccessfulSpeechCSSR __# ___#)(
SetupsCallSpeechSuccessful ionsDisconnectCallSpeechAbnormalSpeechDCR ___# ___#)( SetupsCallCSSuccessful ionsDisconnectCallCSAbnormalCSDCR __64_# __64_#)64( SetupsCallPSSuccessful ionsDisconnectCallPSAbnormalPSDCR ___# ___#)(
)(__)(__
____)_(_
sTimeStartSessionsTimeEndSession
kbitsinSizeFileDownloadHSDPAThroughputUser
SetupsCallSpeechSuccessful
TriggerStopTimeTriggerStartTimeCSTSpeechSpeechCST
___#
)_@_@(__)(
-
8/13/2019 3G KPIs to Be Monitored V4
7/30
3G KPIs to be Monitored
Reference Number MIC1/MO/CTO-RE/93-11/V2
Owner RE Department
Revision Code 2
ImplementationDate
Sep. 8, 2011
Ref.: MIC1/MO/CTO-RE/93-11/V2 Page8/30
This document is the property ofORASCOM TELECOMLEBANON S.A.L. and can not be diffused externally without the prior approval of the management
EUL UserThroughput
The PS Interactive EULUser Throughput (UserThroughput EUL) is theaverage user throughput forPS Data in Uplinkevaluation (kbps) on a EULRadio Bearer. It includesuser data but excludingretransmissions, padding
bits, data PDU headers andRLC control PDU's.
Time forSessionStart for thedownload
Time forSessionEnd forthedownload
R99 UserThroughput
The Packet-SwitchedInteractive R99 UserThroughput (UserThroughput R99) is theaverage user throughput forPS Data (kbps) on a R99DCH/FACH Radio Bearer. Itincludes user data butexcluding retransmissions,padding bits, data PDUheaders and RLC controlPDU's.
Time forSessionStart for thedownload
Time forSessionEnd forthedownload
)(__)(______)_(_
sTimeStartSessionsTimeEndSessionkbitsinSizeFileUploadEULThroughputUser
)(__)(__
____)99_(_
sTimeStartSessionsTimeEndSession
kbitsinSizeFileDownloadRThroughputUser
-
8/13/2019 3G KPIs to Be Monitored V4
8/30
3G KPIs to be Monitored
Reference Number MIC1/MO/CTO-RE/93-11/V2
Owner RE Department
Revision Code 2
ImplementationDate
Sep. 8, 2011
Ref.: MIC1/MO/CTO-RE/93-11/V2 Page9/30
This document is the property ofORASCOM TELECOMLEBANON S.A.L. and can not be diffused externally without the prior approval of themanagement
5. CSSR Speech
6. CSSR VP
KPI Call Setup Success Rate for Videophony
KPI
DefinitionCall Setup Success Rate for VP
Level Cell
Ericsson
Formula
Counters
Definition
RRC Connection Setup - CS:pmTotNoRrcConnectReqCsSuccTotal number of successful Conversational Call (Originating & Terminating) and Emergency CallRRC Connection attemptspmTotNoRrcConnectReqCsTotal number of Conversational Call (Originating & Terminating) and Emergency Call RRCConnection attemptspmNoLoadSharingRrcConnCsNumber of Conversational (emergency, originating & terminating) Load Sharing RRC Connectionattempts.RAB Establishment:
pmNoRabEstablishAttemptSpeechNumber of RAB establishment attempts for CS Conversational Speech RABs. Includes all speech
RABs, including AMR Single-mode 12.2, AMR-NB Multi-mode (single- and multi-rate) and AMR-WB.pmNoRabEstablishSuccessSpeech
Number of successful RAB establishments for CS Conversational Speech RABs. Includes allspeech RABs, including AMR Single-mode 12.2, AMR-NB Multi-mode (single- and multi-rate) andAMR-WBSignaling Connection Release:pmNoNormalNasSignReleaseCsNumber of successful normal releases of the NAS signalling sequence at call setup towards a CSCN from the originating states Idle, URA_PCH, CELL_FACH, CELL_DCH andURA_PCH/CELL_FACH. Incremented in the best cell in the active set.pmNoSystemNasSignReleaseCs
Number of system releases of the NAS signalling sequence at call setup towards a CS CN from theoriginating states Idle, URA_PCH, CELL_FACH, CELL_DCH and URA_PCH/CELL_FACH.Incremented in the best cell in the active set
Inter-Radio Access Technology Handover, Outgoing:pmNoDirRetryAttNumber of attempted outgoing inter RAT handover to GSM due to capacity reasons
ryAttpmNoDirRetmptSpeechablishAttepmNoRabEst
essSpeechablishSuccpmNoRabEst
*easeCsNasSignRelpmNoSystemeaseCsNasSignRelpmNoNormal
easeCsNasSignRelpmNoNormal
*nnCsaringRrcCopmNoLoadShCsConnectReqpmTotNoRrc
CsSuccConnectReqpmTotNoRrc
100*
http://c/TEMP/ALEX_TMP/1003/alex2100.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex2100.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex1659.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex1659.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex2011.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex2011.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex2541.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex2541.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex2541.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex2011.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex1659.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex2100.htm%23TOP -
8/13/2019 3G KPIs to Be Monitored V4
9/30
3G KPIs to be Monitored
Reference Number MIC1/MO/CTO-RE/93-11/V2
Owner RE Department
Revision Code 2
ImplementationDate
Sep. 8, 2011
Ref.: MIC1/MO/CTO-RE/93-11/V2 Page10/30
This document is the property ofORASCOM TELECOMLEBANON S.A.L. and can not be diffused externally without the prior approval of themanagement
Definition
Level Cell
Ericsson
Formula
Counters
Definit ion
RRC Connection Setup - CS:pmTotNoRrcConnectReqCsSuccTotal number of successful Conversational Call (Originating & Terminating) and Emergency Call
RRC Connection attemptspmTotNoRrcConnectReqCsTotal number of Conversational Call (Originating & Terminating) and Emergency Call RRCConnection attemptspmNoLoadSharingRrcConnCsNumber of Conversational (emergency, originating & terminating) Load Sharing RRC Connectionattempts.RAB Establishment:pmNoRabEstablishAttemptCs64Number of RAB establishment attempts for the CS 64 RAB. Incremented in the best cell in theactive set.pmNoRabEstablishSuccessCs64Number of successful RAB establishments for the CS 64 RAB. Incremented in the best cell in theactive set.
Signaling Connection Release:pmNoNormalNasSignReleaseCsNumber of successful normal releases of the NAS signalling sequence at call setup towards a CSCN from the originating states Idle, URA_PCH, CELL_FACH, CELL_DCH andURA_PCH/CELL_FACH. Incremented in the best cell in the active set.pmNoSystemNasSignReleaseCsNumber of system releases of the NAS signalling sequence at call setup towards a CS CN from theoriginating states Idle, URA_PCH, CELL_FACH, CELL_DCH and URA_PCH/CELL_FACH.Incremented in the best cell in the active set.
mptCs64ablishAttepmNoRabEst
essCs64ablishSuccpmNoRabEst
*easeCsNasSignRelpmNoSystemeaseCsNasSignRelpmNoNormal
easeCsNasSignRelpmNoNormal
*nnCsaringRrcCopmNoLoadShCsConnectReqpmTotNoRrc
CsSuccConnectReqpmTotNoRrc
100*
http://c/TEMP/ALEX_TMP/1003/alex1393.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex1393.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex1659.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex1659.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex2011.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex2011.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex2011.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex1659.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex1393.htm%23TOP -
8/13/2019 3G KPIs to Be Monitored V4
10/30
3G KPIs to be Monitored
Reference Number MIC1/MO/CTO-RE/93-11/V2
Owner RE Department
Revision Code 2
ImplementationDate
Sep. 8, 2011
Ref.: MIC1/MO/CTO-RE/93-11/V2 Page11/30
This document is the property ofORASCOM TELECOMLEBANON S.A.L. and can not be diffused externally without the prior approval of themanagement
7. CSSR PS R99
KPI
DefinitionCall Setup Success Rate for R99 data Services
Level Cell
Ericsson
Formula
Counters
DefinitionRRC Connection Setup - PS:pmTotNoRrcConnectReqPsSuccTotal number of successful Interactive and Background (Originating & Terminating) RRCConnection attemptspmTotNoRrcConnectReqPs
Total number of Interactive and Background (Originating & Terminating) RRC Connection attemptspmNoLoadSharingRrcConnPsNumber of Packet (originating & terminating) Load Sharing RRC Connection attempts.RAB Establishment:pmNoRabEstAttemptPsIntNonHsNumber of RAB establishment attempts for the PS Interactive RAB mapped on a non-HS RBconfiguration (DCH or FACH). Incremented in the best cell in the active set.pmNoRabEstSuccessPsIntNonHs
Number of successful RAB establishments for the PS Interactive RAB mapped on a non-HS RBconfiguration (DCH or FACH). Incremented in the best cell in the active set.Signaling Connection Release:pmNoNormalNasSignReleasePsNumber of successful normal releases of the NAS signalling sequence at call setup towards a PSCN from the originating states Idle, URA_PCH, CELL_FACH, CELL_DCH andURA_PCH/CELL_FACH. Incremented in the best cell in the active setpmNoSystemNasSignReleasePsNumber of system releases of the NAS signalling sequence at call setup towards a PS CN from theoriginating states Idle, URA_PCH, CELL_FACH, CELL_DCH and URA_PCH/CELL_FACH.Incremented in the best cell in the active set
8. CSSR PS HSKPIDefinition
Call Setup Success Rate for HSDPA data Services
Level Cell
Ericsson
Formula
tNonHsAttempPsInpmNoRabEst
ntNonHsSuccessPsIpmNoRabEst
*easePsNasSignRelpmNoSystemeasePsNasSignRelpmNoNormal
easePsNasSignRelpmNoNormal
*nnPsaringRrcCopmNoLoadShPsConnectReqpmTotNoRrc
PsSuccConnectReqpmTotNoRrc
100*
iveHsetInteractAttempPackpmNoRabEst
tiveHsketInteracSuccessPacpmNoRabEst
*easePsNasSignRelpmNoSystemeasePsNasSignRelpmNoNormal
easePsNasSignRelpmNoNormal
*nnPsaringRrcCopmNoLoadShPsConnectReqpmTotNoRrc
PsSuccConnectReqpmTotNoRrc
100*
http://c/TEMP/ALEX_TMP/1003/alex2629.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex2629.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex2805.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex2805.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex2893.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex2893.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex2893.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex2805.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex2629.htm%23TOP -
8/13/2019 3G KPIs to Be Monitored V4
11/30
-
8/13/2019 3G KPIs to Be Monitored V4
12/30
3G KPIs to be Monitored
Reference Number MIC1/MO/CTO-RE/93-11/V2
Owner RE Department
Revision Code 2
ImplementationDate
Sep. 8, 2011
Ref.: MIC1/MO/CTO-RE/93-11/V2 Page13/30
This document is the property ofORASCOM TELECOMLEBANON S.A.L. and can not be diffused externally without the prior approval of themanagement
10. VP Drop Call Rate
KPI
DefinitionDrop Call Rate for Video phony
Level Cell
Ericsson
Formula
Counters
Definition
Signaling Connection Release:pmNoNormalRabReleaseCs64Number of normal RAB releases for the CS Conversational 64 kbps [UDI] RAB.Incremented in the best cell in the active set.pmNoSystemRabReleaseCs64Number of system RAB releases for the CS Conversational 64 kbps [UDI] RAB.Incremented in the best cell in the active set.
11. PS Interactive Drop Call Rate
KPI
DefinitionDrop Call Rate for R99 data Services
Level Cell
Ericsson
Formula
Counters
Definition
RAB Release:pmNoSystemRabReleasePacket
Number of system releases of PS Interactive RABs.A system RAB release has 'release cause' = anything except 'Normal Release',
'Successful Relocation', 'Resource Optimisation Relocation', 'User Inactivity' or 'release-due-to-UE-generated-signalling-connection-release'
pmNoSystemRbReleaseHs
Number of system-initiated RAB releases for the PS Interactive RAB mapped on HS-DSCH.Incremented in the serving HS-DSCH cell.For Multi Carrier connections, this counter is incremented only if this cell is a servingHS-DSCH cell
pmNoNormalRabReleasePacket
Number of normal releases of PS Interactive RABs.A normal RAB release has 'release cause' = 'Normal Release', 'Successful Relocation','Resource Optimisation Relocation', 'User Inactivity' or 'release-due-to-UE-generated-signalling-connection-release'.
pmNoNormalRbReleaseHsNumber of normal RAB releases for the PS Interactive RAB mapped on HS-DSCH.Incremented in the serving HS-DSCH cell.For Multi Carrier connections, this counter is incremented only if this cell is a serving
Cs64RabReleasepmNoSystem
Cs64RabReleasepmNoNormal/Cs64RabReleasepmNoSystem100*
aSuccFachUrpmChSwitch
PsIntDchReconfOrigpmNoSuccRb
essFachHsSuccpmUpswitch
sRbReleaseHpmNoSystem
PacketUraRabReleasepmNoSystem
Packet -RabReleasepmNoSystemsRbReleaseHpmNoNormal
PacketUra-RabReleasepmNoNormal
Packet -RabReleasepmNoNormal
/
PacketUraRabReleasepmNoSystem
s -RbReleaseHpmNoSystem
Packet -RabReleasepmNoSystem
100*
http://c/TEMP/ALEX_TMP/1003/alex2893.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex2893.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex3249.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex3249.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex3249.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex2893.htm%23TOP -
8/13/2019 3G KPIs to Be Monitored V4
13/30
3G KPIs to be Monitored
Reference Number MIC1/MO/CTO-RE/93-11/V2
Owner RE Department
Revision Code 2
ImplementationDate
Sep. 8, 2011
Ref.: MIC1/MO/CTO-RE/93-11/V2 Page14/30
This document is the property ofORASCOM TELECOMLEBANON S.A.L. and can not be diffused externally without the prior approval of themanagement
HS-DSCH cell.RRC Connection Release:
pmNoSystemRabReleasePacketUraNumber of system RAB releases for Packet RABs while in URA_PCH state
pmNoNormalRabReleasePacketUra
Number of normal RAB releases for Packet RABs while in URA_PCH state.Channel Switching, Common to Dedicated:
pmUpswitchFachHsSuccessNumber of successful Upswitches from FACH to RB combinations containing HS thatwere caused by increased throughput (in downlink or uplink).RAB Establishment:
pmNoSuccRbReconfOrigPsIntDch
Number of successful reconfigurations of PS Interactive RABs on CELL_DCH fromDCH/DCH at RAB Establishment, RAB Release and Channel Switching (any triggerreason). Incremented in the best cell in the active setChannel Switching, Common to URA_PCH:
pmChSwitchSuccFachUraNumber of successful channel downswitches from CELL_FACH to URA_PCH.
12. HS Drop Call Rate
KPI
DefinitionDrop Call Rate for HSDPA data Services
level Cell
Ericsson
Formula
Counters
Definition
RAB Release:pmNoNormalRbReleaseHsNumber of normal RAB releases for the PS Interactive RAB mapped on HS-DSCH.Incremented in the serving HS-DSCH cell.For Multi Carrier connections, this counter is incremented only if this cell is a serving HS-DSCH cell.pmNoSystemRbReleaseHsNumber of system-initiated RAB releases for the PS Interactive RAB mapped on HS-DSCH.Incremented in the serving HS-DSCH cell.For Multi Carrier connections, this counter is incremented only if this cell is a serving HS-DSCH cell.pmNoSuccRbReconfPsIntDchNumber of successful reconfigurations of PS Interactive RABs on CELL_DCH to DCH/DCH at RABEstablishment, RAB Release and Channel Switching (any trigger reason). Incremented in the bestcell in the active setpmPsIntHsToFachSuccNumber of successful reconfigurations from DCH/HS or EUL/HS to RACH/FACH for a PSInteractive RAB. Incremented in the serving HS-DSCH cell
oFachSuccpmPsIntHsT
tDchReconfPsInpmNoSuccRbsRbReleaseHpmNoSystem
sRbReleaseHpmNoNormal
/sRbReleaseHpmNoSystem100*
http://c/TEMP/ALEX_TMP/1003/alex3337.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex3337.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex3513.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex3513.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex3601.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex3601.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex3689.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex3689.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex3777.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex3777.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex3777.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex3689.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex3601.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex3513.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex3337.htm%23TOP -
8/13/2019 3G KPIs to Be Monitored V4
14/30
3G KPIs to be Monitored
Reference Number MIC1/MO/CTO-RE/93-11/V2
Owner RE Department
Revision Code 2
ImplementationDate
Sep. 8, 2011
Ref.: MIC1/MO/CTO-RE/93-11/V2 Page15/30
This document is the property ofORASCOM TELECOMLEBANON S.A.L. and can not be diffused externally without the prior approval of themanagement
13. CS IRAT HO Success Rate (%)
KPI
DefinitionCS Inter-RAT Handover Success Rate
Granularity Cell
Ericsson
Formula
Counters
Definition
Inter-Radio Access Technology Handover, Outgoing:pmNoSuccessOutIratHoSpeechNumber of successful outgoing coverage-based inter-RAT handovers to GSM for calls that includedCS Conversational Speech RABs. Includes all speech RABs, including AMR Single-mode 12.2,AMR-NB Multi-mode (single- and multi-rate) and AMR-WB.
pmNoSuccessOutIratHoMultiNumber of successful outgoing inter-RAT handovers to GSM for calls that included a 'multi-RAB'.'multi-RAB' for GSM = Multi-RAB combination containing any speech RAB (including AMR Single-mode 12.2, AMR-NB Multi-mode single- and multi-rate, and AMR-WB), and one or several of thefollowing RABs:- PS Interactive mapped on DCH/DCH, DCH/HS or EUL/HS- PS Streaming mapped on DCH/DCH or DCH/HSpmNoAttOutIratHoSpeechNumber of attempted outgoing coverage-based inter-RAT handovers to GSM for calls that includedCS Conversational Speech RABs. Includes all speech RABs, including AMR Single-mode 12.2,AMR-NB Multi-mode (single- and multi-rate) and AMR-WB.pmNoAttOutIratHoMultiNumber of attempted outgoing inter-RAT handovers to GSM for calls that included a 'multi-RAB'.'multi-RAB' for GSM = Multi-RAB combination containing any speech RAB (including AMR Single-mode 12.2, AMR-NB Multi-mode single- and multi-rate, and AMR-WB), and one or several of thefollowing RABs:- PS Interactive mapped on DCH/DCH, DCH/HS or EUL/HS- PS Streaming mapped on DCH/DCH or DCH/HS
14. PS IRAT (UMTS to GSM) Success Rate (%)
KPI
DefinitionPS Inter-RAT Handover Success Rate
level Cell
Ericsson
Formula
Counters
Definition
Inter-Radio Access Technology Cell Change, Outgoing:pmNoOutIratCcAttNumber of PS IRAT cell change attempts for a UE on dedicated channels. Incremented in therelation between the best cell in the active set and the target cell. If the best cell in the active set hasno cell relation towards the target cell, the cell change will not be counted in this RNC.pmNoOutIratCcSuccessNumber of successful PS IRAT cell change attempts for a UE on dedicated channels. Incrementedin the relation between the best cell in the active set and the target cell. If the best cell in the activeset has no cell relation towards the target cell, the cell change will not be counted in this RNC
iIratHoMultpmNoAttOut
chIratHoSpeepmNoAttOut/
MultisOutIratHopmNoSucces
SpeechsOutIratHopmNoSucces100 *
tCcAttpmNoOutIra
tCcSuccesspmNoOutIra*%100
http://c/TEMP/ALEX_TMP/1003/alex3865.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex3865.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex3954.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex3954.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex3954.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex3865.htm%23TOP -
8/13/2019 3G KPIs to Be Monitored V4
15/30
3G KPIs to be Monitored
Reference Number MIC1/MO/CTO-RE/93-11/V2
Owner RE Department
Revision Code 2
ImplementationDate
Sep. 8, 2011
Ref.: MIC1/MO/CTO-RE/93-11/V2 Page16/30
This document is the property ofORASCOM TELECOMLEBANON S.A.L. and can not be diffused externally without the prior approval of themanagement
15. Soft Handover Success Rate (%)
KPI
DefinitionSoft Handover Success Rate
Level Cell
Ericsson
Formula
Counters
Definition
Soft Handover - Radio Link Addition case:pmNoTimesRlAddToActSetNumber of times that a radio link was added to the active set of a UE or replaced in the active set ofa UE.pmNoTimesCellFailAddToActSetNumber of times that a cell could not be added to the active set of a UE.
16. DL CE Congestion Rate
KPI
DefinitionChannel Elements Congestion rate
Level Cell
Ericsson
Formula
Counters
Definition
RAB Establishment:pmNoFailedRabEstAttemptLackDlHwBest
Number of failed RAB establishment attempts due to lack of downlink hardware resources, for whichthis cell was the best cell in the active setpmNoRabEstablishAttemptSpeechNumber of RAB establishment attempts for CS Conversational Speech RABs. Includes all speech
RABs, including AMR Single-mode 12.2, AMR-NB Multi-mode (single- and multi-rate) and AMR-WB.pmNoDirRetryAttNumber of attempted outgoing inter RAT handover to GSM due to capacity reasonspmNoRabEstablishAttemptCs64Number of RAB establishment attempts for the CS 64 RAB. Incremented in the best cell in the activeset.pmNoRabEstAttemptPsIntNonHsNumber of RAB establishment attempts for the PS Interactive RAB mapped on a non-HS RBconfiguration (DCH or FACH). Incremented in the best cell in the active set.pmNoRabEstablishAttemptPacketInteractiveHsNumber of RAB establishment attempts for the PS Interactive RAB mapped on a RB containing HS-DSCH.pmNoRabEstablishAttemptPacketInteractiveEulNumber of RAB establishment attempts for the PS Interactive RAB mapped on a RB containing E-
DCH/HS-DSCH. Incremented in the serving E-DCH cell.For Multi Carrier connections, this counter is incremented only if this cell is a serving HS-DSCH cell.
dToActSetCellFailAdpmNoTimesetlAddToActSpmNoTimesRetlAddToActSpmNoTimesR
100 *
veEultInteractitemptPackestablishAtpmNoRabE
HS +nteractivemptPacketIablishAttepmNoRabEst
+PsIntNonHsEstAttempt+ pmNoRab64mptCsablishAttepmNoRabEsttryAtt +Re- pmNoDirmptSpeechablishAttepmNoRabEst
wBestmptLackDlHRabEstAttepmNoFailed%*100
http://c/TEMP/ALEX_TMP/1003/alex4042.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex4042.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex4130.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex4130.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex4130.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex4042.htm%23TOP -
8/13/2019 3G KPIs to Be Monitored V4
16/30
3G KPIs to be Monitored
Reference Number MIC1/MO/CTO-RE/93-11/V2
Owner RE Department
Revision Code 2
ImplementationDate
Sep. 8, 2011
Ref.: MIC1/MO/CTO-RE/93-11/V2 Page17/30
This document is the property ofORASCOM TELECOMLEBANON S.A.L. and can not be diffused externally without the prior approval of themanagement
17. UL CE Congestion Rate
KPI
DefinitionChannel Elements Congestion rate
Level Cell
Ericsson
Formula
Counters
Definition
RAB Establishment:pmNoFailedRabEstAttemptLackUlHwBest
Number of failed RAB establishment attempts due to lack of uplink hardware resources, for which thiscell was the best cell in the active set.pmNoRabEstablishAttemptSpeech
Number of RAB establishment attempts for CS Conversational Speech RABs. Includes all speechRABs, including AMR Single-mode 12.2, AMR-NB Multi-mode (single- and multi-rate) and AMR-WB.pmNoDirRetryAttNumber of attempted outgoing inter RAT handover to GSM due to capacity reasons
pmNoRabEstablishAttemptCs64Number of RAB establishment attempts for the CS 64 RAB. Incremented in the best cell in the activeset.pmNoRabEstAttemptPsIntNonHsNumber of RAB establishment attempts for the PS Interactive RAB mapped on a non-HS RBconfiguration (DCH or FACH). Incremented in the best cell in the active set.pmNoRabEstablishAttemptPacketInteractiveHsNumber of RAB establishment attempts for the PS Interactive RAB mapped on a RB containing HS-DSCH.pmNoRabEstablishAttemptPacketInteractiveEulNumber of RAB establishment attempts for the PS Interactive RAB mapped on a RB containing E-DCH/HS-DSCH. Incremented in the serving E-DCH cell.For Multi Carrier connections, this counter is incremented only if this cell is a serving HS-DSCH cell.
veEultInteractitemptPackestablishAtpmNoRabE
HS +nteractivemptPacketIablishAttepmNoRabEst
+PsIntNonHsEstAttempt+ pmNoRab64mptCsablishAttepmNoRabEst
tryAtt +Re- pmNoDirmptSpeechablishAttepmNoRabEst
wBestmptLackUlHRabEstAttepmNoFailed%*100
http://c/TEMP/ALEX_TMP/1003/alex4130.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex4130.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex4130.htm%23TOP -
8/13/2019 3G KPIs to Be Monitored V4
17/30
3G KPIs to be Monitored
Reference Number MIC1/MO/CTO-RE/93-11/V2
Owner RE Department
Revision Code 2
ImplementationDate
Sep. 8, 2011
Ref.: MIC1/MO/CTO-RE/93-11/V2 Page18/30
This document is the property ofORASCOM TELECOMLEBANON S.A.L. and can not be diffused externally without the prior approval of themanagement
18. DL Power Congestion Rate
KPI
DefinitionRadio Congestion rate
Level Cell
Ericsson
Formula
CountersDefinition
RAB Establishment:pmNoFailedRabEstAttemptLackDlPwr
Number of failed RAB establishment attempts due to lack of downlink power.
pmNoRabEstablishAttemptSpeechNumber of RAB establishment attempts for CS Conversational Speech RABs. Includes all speechRABs, including AMR Single-mode 12.2, AMR-NB Multi-mode (single- and multi-rate) and AMR-WBpmNoRabEstablishAttemptCs64
Number of RAB establishment attempts for the CS 64 RAB. Incremented in the best cell in the activeset.pmNoRabEstAttemptPsIntNonHsNumber of RAB establishment attempts for the PS Interactive RAB mapped on a non-HS RBconfiguration (DCH or FACH). Incremented in the best cell in the active setpmNoRabEstablishAttemptPacketInteractiveHs
Number of RAB establishment attempts for the PS Interactive RAB mapped on a RB containing HS-DSCH.This counter will be stepped even when HS resources are unavailable and the child Hsdsch MO isdisabled. To avoid this, the Hsdsch MO must be locked for cells in which HS is not available.pmNoRabEstablishAttemptPacketInteractiveEulNumber of RAB establishment attempts for the PS Interactive RAB mapped on a RB containing E-DCH/HS-DSCH. Incremented in the serving E-DCH cell.For Multi Carrier connections, this counter is incremented only if this cell is a serving HS-DSCH cell.Inter-Radio Access Technology Handover, Outgoing:pmNoDirRetryAttNumber of attempted outgoing inter RAT handover to GSM due to capacity reasons
19. Radio Congestion Rate
KPI
DefinitionRadio Congestion rate
Level Cell
Ericsson
Formula
http://c/TEMP/ALEX_TMP/1003/alex4218.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex4218.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex4218.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex4218.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex4218.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex4218.htm%23TOP -
8/13/2019 3G KPIs to Be Monitored V4
18/30
3G KPIs to be Monitored
Reference Number MIC1/MO/CTO-RE/93-11/V2
Owner RE Department
Revision Code 2
ImplementationDate
Sep. 8, 2011
Ref.: MIC1/MO/CTO-RE/93-11/V2 Page19/30
This document is the property ofORASCOM TELECOMLEBANON S.A.L. and can not be diffused externally without the prior approval of themanagement
Counters
Definition
RRC Connection Setup - PS:pmNoReqDeniedAdm
Number of RAB establishment and RRC requests rejected by admission controlpmTotNoRrcConnectReqTotal number of RRC Connection RequestspmNoLoadSharingRrcConnNumber of Load Sharing diversions when establishing an RRC connectionRAB Establishment:pmNoRabEstablishAttemptSpeech
Number of RAB establishment attempts for CS Conversational Speech RABs. Includes all speechRABs, including AMR Single-mode 12.2, AMR-NB Multi-mode (single- and multi-rate) and AMR-WBpmNoRabEstablishAttemptCs64
Number of RAB establishment attempts for the CS 64 RAB. Incremented in the best cell in the activeset.pmNoRabEstAttemptPsIntNonHsNumber of RAB establishment attempts for the PS Interactive RAB mapped on a non-HS RBconfiguration (DCH or FACH). Incremented in the best cell in the active set
pmNoRabEstablishAttemptPacketInteractiveHsNumber of RAB establishment attempts for the PS Interactive RAB mapped on a RB containing HS-DSCH.This counter will be stepped even when HS resources are unavailable and the child Hsdsch MO isdisabled. To avoid this, the Hsdsch MO must be locked for cells in which HS is not available.pmNoRabEstablishAttemptPacketInteractiveEulNumber of RAB establishment attempts for the PS Interactive RAB mapped on a RB containing E-DCH/HS-DSCH. Incremented in the serving E-DCH cell.For Multi Carrier connections, this counter is incremented only if this cell is a serving HS-DSCH cell.Inter-Radio Access Technology Handover, Outgoing:pmNoDirRetryAttNumber of attempted outgoing inter RAT handover to GSM due to capacity reasons
20. CS Speech Traffic -- Erlang
KPI
DefinitionCS Speech Traffic -- Erlang
Level Cell
Ericsson
Formula
shRabEstabliestAmrNbMmpmSamplesB
blishmrNbMmEstapmSumBestA
bEstablishestAmrWbRapmSamplesB
ablishmrWbRabEstpmSumBestA
ish0RabEstablestAmr1220pmSamplesB
Establishmr12200RabpmSumBestA
shRabEstabliestAmr7950pmSamplesB
stablishmr7950RabEpmSumBestA
shRabEstabliestAmr5900pmSamplesB
stablishmr5900RabEpmSumBestA
shRabEstabliestAmr4750pmSamplesB
stablishmr4750RabEpmSumBestA
EstablishestCs12RabpmSamplesB
blishs12RabEstapmSumBestC
http://c/TEMP/ALEX_TMP/1003/alex4218.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex4218.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex4218.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex4218.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex4218.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex4218.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex4218.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex4218.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex4218.htm%23TOP -
8/13/2019 3G KPIs to Be Monitored V4
19/30
3G KPIs to be Monitored
Reference Number MIC1/MO/CTO-RE/93-11/V2
Owner RE Department
Revision Code 2
ImplementationDate
Sep. 8, 2011
Ref.: MIC1/MO/CTO-RE/93-11/V2 Page20/30
This document is the property ofORASCOM TELECOMLEBANON S.A.L. and can not be diffused externally without the prior approval of themanagement
Counters
Definition Radio Link SetuppmSumBestAmr12200RabEstablish
Sum of all sample values recorded during a ROP for the number ofestablished AMR-NB Multi-mode single-rate 12.2 speech RABs.
Incremented in the best cell in the active set. Not stepped for AMR-NBMulti-mode multi-rate.
pmSumBestAmr4750RabEstablish
Sum of all sample values recorded during a ROP for the number ofestablished AMR-NB Multi-mode single-rate 4.75 speech RABs.Incremented in the best cell in the active set. Not stepped for AMR-NB
Multi-mode multi-rate.pmSumBestAmr5900RabEstablish
Sum of all sample values recorded during a ROP for the number of
established AMR-NB Multi-mode single-rate 5.9 speech RABs.Incremented in the best cell in the active set. Not stepped for AMR-NBMulti-mode multi-rate.
pmSumBestAmr7950RabEstablish
Sum of all sample values recorded during a ROP for the number ofestablished AMR-NB Multi-mode single-rate 7.95 speech RABs.Incremented in the best cell in the active set. Not stepped for AMR-NB
Multi-mode multi-rate.
pmSumBestAmrNbMmRabEstablish
Sum of all sample values recorded during a ROP for number of
established AMR-NB Multi-mode multi-rate RABs. Incremented in the best
cell in the active setpmSumBestAmrWbRabEstablish
Sum of all sample values recorded during a ROP for number ofestablished AMR-WB RABs. Incremented in the best cell in the active set.
pmSumBestCs12Establish
Sum of all sample values recorded during a ROP for the number of
established AMR Single-mode 12.2 speech RABs. Incremented in the bestcell in the active set. Not stepped for AMR-NB Multi-mode multi-rate.
pmSamplesBestCs12Establish
Number of samples recorded within the ROP for pmSumBestCs12Establish.
pmSamplesBestAmrWbRabEstablish
Number of samples recorded within the ROP for pmSumBestAmrWbRabEstablish.
pmSamplesBestAmrNbMmRabEstablish
Number of samples recorded within the ROP forpmSumBestAmrNbMmRabEstablish
pmSamplesBestAmr7950RabEstablish
Number of samples recorded within the ROP for pmSumBestAmr7950RabEstablish
pmSamplesBestAmr5900RabEstablish
Number of samples recorded within the ROP for pmSumBestAmr5900RabEstablish
pmSamplesBestAmr4750RabEstablish
Number of samples recorded within the ROP forpmSumBestAmr4750RabEstablish.
pmSamplesBestAmr12200RabEstablish
Number of samples recorded within the ROP forpmSumBestAmr12200RabEstablish.
http://c/TEMP/ALEX_TMP/1003/alex1568.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex1568.htm%23TOPhttp://c/TEMP/ALEX_TMP/1003/alex1568.htm%23TOP -
8/13/2019 3G KPIs to Be Monitored V4
20/30
3G KPIs to be Monitored
Reference Number MIC1/MO/CTO-RE/93-11/V2
Owner RE Department
Revision Code 2
ImplementationDate
Sep. 8, 2011
Ref.: MIC1/MO/CTO-RE/93-11/V2 Page21/30
This document is the property ofORASCOM TELECOMLEBANON S.A.L. and can not be diffused externally without the prior approval of themanagement
21. PS Traffic R99
KPI
DefinitionPS Traffic R99
Level Cell
Ericsson
Formula
Counters
DefinitionpmSamplesBestDchPsIntRabEstablish
Number of samples recorded within the ROP for pmSumBestDchPsIntRabEstablish.
pmSumBestDchPsIntRabEstablish
Sum of all sample values recorded during a ROP for the number of established PSInteractive RABs, regardless of rate. Incremented in the best cell in the active set.
pmSumFachPsIntRabEstablish
Sum of all sample values recorded during a ROP for the number of established' PSRABs in state FACH. Incremented in the best cell in the active set.
pmSamplesFachPsIntRabEstablish
Number of samples recorded within the ROP for pmSumFachPsIntRabEstablish.
22. PS Traffic DL HSDPA
bEstablishachPsIntRapmSamplesF
ablishsIntRabEstpmSumFachP
ishtRabEstablestDchPsInpmSamplesB
EstablishchPsIntRabpmSumBestD
-
8/13/2019 3G KPIs to Be Monitored V4
21/30
3G KPIs to be Monitored
Reference Number MIC1/MO/CTO-RE/93-11/V2
Owner RE Department
Revision Code 2
ImplementationDate
Sep. 8, 2011
Ref.: MIC1/MO/CTO-RE/93-11/V2 Page22/30
This document is the property ofORASCOM TELECOMLEBANON S.A.L. and can not be diffused externally without the prior approval of themanagement
KPI
DefinitionPS Traffic DL HSDPA
Level Cell
Ericsson
Formula
Counters
DefinitionpmSumBestPsHsAdchRabEstablish
Sum of all sample values recorded during a ROP for the number of A-DCH radiobearers established in the cell carrying HS-DSCH in the active set.
pmSamplesBestPsHsAdchRabEstablish
Number of samples recorded within the ROP for pmSumBestPsHsAdchRabEstablish.
23. PS Traffic UL HSUPA
KPIDefinition
PS Traffic UL HSUPA
Level Cell
Ericsson
Formula
Counters
Definition
pmSamplesBestPsEulRabEstablish
Number of samples recorded within the ROP for pmSumBestPsEulRabEstablish.
pmSumBestPsEulRabEstablish
Sum of all sample values recorded during a ROP for the number of E-DCH radiobearers established in the best cell.
For Multi Carrier connections, this counter is incremented only if this cell is aserving HS-DSCH cell.
bEstablishestPsEulRapmSamplesB
ablishsEulRabEstpmSumBestP
-
8/13/2019 3G KPIs to Be Monitored V4
22/30
3G KPIs to be Monitored
Reference Number MIC1/MO/CTO-RE/93-11/V2
Owner RE Department
Revision Code 2
ImplementationDate
Sep. 8, 2011
Ref.: MIC1/MO/CTO-RE/93-11/V2 Page23/30
This document is the property ofORASCOM TELECOMLEBANON S.A.L. and can not be diffused externally without the prior approval of themanagement
24. PS Interactive DL User throughput
KPI
DefinitionPacket-Switched (PS) Interactive DCH/FACH User Throughput, Downlink(kbit/s)
Level Cell
Ericsson
Formula
Counters
Definition pmSumDchDlRlcUserPacketThp
Sum of all sample values recorded during a ROP for downlink user RLCthroughput for PS Interactive on R99 DCH.
Incremented in the best cell in the active set.The user RLC throughput includes user data but excludes retransmissions,padding bits, data PDU headers and RLC control PDUs.
pmSamplesDchDlRlcUserPacketThp
Number of samples recorded within the ROP forpmSumDchDlRlcUserPacketThp.
-
8/13/2019 3G KPIs to Be Monitored V4
23/30
3G KPIs to be Monitored
Reference Number MIC1/MO/CTO-RE/93-11/V2
Owner RE Department
Revision Code 2
ImplementationDate
Sep. 8, 2011
Ref.: MIC1/MO/CTO-RE/93-11/V2 Page24/30
This document is the property ofORASCOM TELECOMLEBANON S.A.L. and can not be diffused externally without the prior approval of themanagement
25. PS Interactive UL User throughput
KPI
DefinitionPacket-Switched (PS) Interactive DCH/FACH User Throughput, Uplink(kbit/s)
Level Cell
Ericsson
Formula
Counters
Definition pmSumDchUlRlcUserPacketThp
Sum of all sample values recorded during a ROP for uplink user RLCthroughput for PS Interactive on R99 DCH.
Incremented in the best cell in the active set.The user RLC throughput includes user data but excludes retransmissions,padding bits, data PDU headers and RLC control PDUs.
pmSamplesDchUlRlcUserPacketThp
Number of samples recorded within the ROP forpmSumDchUlRlcUserPacketThp.
-
8/13/2019 3G KPIs to Be Monitored V4
24/30
3G KPIs to be Monitored
Reference Number MIC1/MO/CTO-RE/93-11/V2
Owner RE Department
Revision Code 2
ImplementationDate
Sep. 8, 2011
Ref.: MIC1/MO/CTO-RE/93-11/V2 Page25/30
This document is the property ofORASCOM TELECOMLEBANON S.A.L. and can not be diffused externally without the prior approval of themanagement
26. PS Interactive HS User throughput
KPI
DefinitionPacket-Switched (PS) Interactive HS User Throughput, Downlink (kbit/s)
Level Cell
Ericsson
Formula
Counters
Definition pmSumHsDlRlcUserPacketThp
Sum of all sample values recorded during a ROP for HS-DSCH user RLCthroughput measurements.The user RLC throughput includes user data but excludes retransmissions.
pmSamplesHsDlRlcUserPacketThpNumber of samples recorded within the ROP forpmSumHsDlRlcUserPacketThp
27. PS Interactive EUL User throughput
-
8/13/2019 3G KPIs to Be Monitored V4
25/30
3G KPIs to be Monitored
Reference Number MIC1/MO/CTO-RE/93-11/V2
Owner RE Department
Revision Code 2
ImplementationDate
Sep. 8, 2011
Ref.: MIC1/MO/CTO-RE/93-11/V2 Page26/30
This document is the property ofORASCOM TELECOMLEBANON S.A.L. and can not be diffused externally without the prior approval of themanagement
KPI
Definition
Packet-Switched (PS) Interactive EUL User Throughput, Uplink (kbit/s)
Level Cell
Ericsson
Formula
Counters
Definition pmSumEulRlcUserPacketThp
Sum of all sample values recorded during a ROP for EUL user RLCthroughput measurements.
Incremented in the best cell in the active set.The user RLC throughput includes user data but excludes retransmissions.
pmSamplesEulRlcUserPacketThp
Number of samples recorded within the ROP forpmSumEulRlcUserPacketThp.
28. Total Volume of User Data ( DCH+HS) DL (Kbits)
KPI
DefinitionTotal Volume of User Data ( DCH+HS) DL (Kbits)
Level Cell
Ericsson
Formula
Counters
Definition
pmDlTrafficVolumePs128
Payload traffic in the downlink for the PS Interactive part of the UeRcconfigurations that carry a downlink Interactive transport channel with a
maximum bit rate equal to 128 kbps. Only the PS Interactive part of the trafficvolume is included. Payload traffic volume includes user data, Medium AccessControl (MAC) and Radio Link Control (RLC) header information andretransmissions, but not control frames.
pmDlTrafficVolumePs16
Payload traffic in the downlink for the PS Interactive part of the UeRc
)(
)(
UtranCellacketThpulRlcUserPpmSamplesE
UtranCelltThpcUserPackepmSumEulRl
-
8/13/2019 3G KPIs to Be Monitored V4
26/30
3G KPIs to be Monitored
Reference Number MIC1/MO/CTO-RE/93-11/V2
Owner RE Department
Revision Code 2
ImplementationDate
Sep. 8, 2011
Ref.: MIC1/MO/CTO-RE/93-11/V2 Page27/30
This document is the property ofORASCOM TELECOMLEBANON S.A.L. and can not be diffused externally without the prior approval of themanagement
configurations that carry a downlink Interactive transport channel with amaximum bit rate equal to 16 kbps. Only the PS Interactive part of the traffic
volume is included. Payload traffic volume includes user data, Medium AccessControl (MAC) and Radio Link Control (RLC) header information andretransmissions, but not control frames.
pmDlTrafficVolumePs384
Payload traffic in the downlink for the PS Interactive part of the UeRcconfigurations that carry a downlink Interactive transport channel with amaximum bit rate equal to 384 kbps. Only the PS Interactive part of the trafficvolume is included. Payload traffic volume includes user data, Medium AccessControl (MAC) and Radio Link Control (RLC) header information andretransmissions, but not control frames.
pmDlTrafficVolumePs64
Payload traffic in the downlink for the PS Interactive part of the UeRc
configurations which carry a downlink Interactive transport channel with amaximum bit rate equal to 64 kbps. Only the PS Interactive part of the trafficvolume is included. Payload traffic volume includes user data, Medium AccessControl (MAC) and Radio Link Control (RLC) header information andretransmissions, but not control frames.
pmDlTrafficVolumePs8
Payload traffic in the downlink for the PS Interactive part of the UeRcconfigurations that carry a downlink Interactive transport channel with amaximum bit rate equal to 8 kbps. Only the PS Interactive part of the trafficvolume is included. Payload traffic volume includes user data, Medium AccessControl (MAC) and Radio Link Control (RLC) header information andretransmissions, but not control frames.
pmDlTrafficVolumePsIntHs
Payload traffic in the downlink for the PS Interactive part of the UeRc
configurations on HS-DSCH. Only the PS Interactive part of the traffic volume isincluded. Payload traffic volume includes user data, Medium Access Control (MAC)and Radio Link Control (RLC) header information and retransmissions, but notcontrol frames.
pmDlTrafficVolumePsCommon
Payload traffic in the downlink for the PS RAB on FACH, excluding SRB. Payloadtraffic volume includes user data, Medium Access Control (MAC) and Radio Link
Control (RLC) header information and retransmissions, but not control frames
29. Total volume of DCH User Data DL (Kbits)
KPI
DefinitionTotal volume of DCH User Data DL (Kbits)
Level Cell
-
8/13/2019 3G KPIs to Be Monitored V4
27/30
3G KPIs to be Monitored
Reference Number MIC1/MO/CTO-RE/93-11/V2
Owner RE Department
Revision Code 2
ImplementationDate
Sep. 8, 2011
Ref.: MIC1/MO/CTO-RE/93-11/V2 Page28/30
This document is the property ofORASCOM TELECOMLEBANON S.A.L. and can not be diffused externally without the prior approval of themanagement
Ericsson
Formula
Counters
Definition
pmDlTrafficVolumePs128
Payload traffic in the downlink for the PS Interactive part of the UeRcconfigurations that carry a downlink Interactive transport channel with a
maximum bit rate equal to 128 kbps. Only the PS Interactive part of the trafficvolume is included. Payload traffic volume includes user data, Medium AccessControl (MAC) and Radio Link Control (RLC) header information andretransmissions, but not control frames.
pmDlTrafficVolumePs16
Payload traffic in the downlink for the PS Interactive part of the UeRcconfigurations that carry a downlink Interactive transport channel with amaximum bit rate equal to 16 kbps. Only the PS Interactive part of the trafficvolume is included. Payload traffic volume includes user data, Medium AccessControl (MAC) and Radio Link Control (RLC) header information andretransmissions, but not control frames.
pmDlTrafficVolumePs384
Payload traffic in the downlink for the PS Interactive part of the UeRc
configurations that carry a downlink Interactive transport channel with amaximum bit rate equal to 384 kbps. Only the PS Interactive part of the trafficvolume is included. Payload traffic volume includes user data, Medium AccessControl (MAC) and Radio Link Control (RLC) header information andretransmissions, but not control frames.
pmDlTrafficVolumePs64
Payload traffic in the downlink for the PS Interactive part of the UeRcconfigurations which carry a downlink Interactive transport channel with amaximum bit rate equal to 64 kbps. Only the PS Interactive part of the trafficvolume is included. Payload traffic volume includes user data, Medium AccessControl (MAC) and Radio Link Control (RLC) header information andretransmissions, but not control frames.
pmDlTrafficVolumePs8
Payload traffic in the downlink for the PS Interactive part of the UeRcconfigurations that carry a downlink Interactive transport channel with amaximum bit rate equal to 8 kbps. Only the PS Interactive part of the trafficvolume is included. Payload traffic volume includes user data, Medium AccessControl (MAC) and Radio Link Control (RLC) header information andretransmissions, but not control frames.
pmDlTrafficVolumePsCommon
Payload traffic in the downlink for the PS RAB on FACH, excluding SRB. Payloadtraffic volume includes user data, Medium Access Control (MAC) and Radio LinkControl (RLC) header information and retransmissions, but not control frames
30. Total volume of DCH User Data UL (Kbits)
6cVolumePs1pmDlTrafficVolumePs8pmDlTraffi84cVolumePs3pmDlTraffi
128icVolumePspmDlTraff64icVolumePspmDlTraffommoncVolumePsCpmDlTraffi
-
8/13/2019 3G KPIs to Be Monitored V4
28/30
3G KPIs to be Monitored
Reference Number MIC1/MO/CTO-RE/93-11/V2
Owner RE Department
Revision Code 2
ImplementationDate
Sep. 8, 2011
Ref.: MIC1/MO/CTO-RE/93-11/V2 Page29/30
This document is the property ofORASCOM TELECOMLEBANON S.A.L. and can not be diffused externally without the prior approval of themanagement
KPI
DefinitionTotal volume of DCH User Data UL (Kbits)
Level CellEricsson
Formula
Counters
Definition pmUlTrafficVolumePs128
Payload traffic in the uplink for the PS Interactive part of the UeRcconfigurations that carry an uplink Interactive transport channel with amaximum bit rate equal to 128 kbps. Only the PS Interactive part of the
traffic volume is included. Payload traffic volume includes user data,Medium Access Control (MAC) and Radio Link Control (RLC) headerinformation and retransmissions, but not control frames.
pmUlTrafficVolumePs16
Payload traffic in the uplink for the PS Interactive part of the UeRc
configurations that carry an uplink Interactive transport channel with amaximum bit rate equal to 16 kbps. Only the PS Interactive part of thetraffic volume is included. Payload traffic volume includes user data,
Medium Access Control (MAC) and Radio Link Control (RLC) headerinformation and retransmissions, but not control frames.
pmUlTrafficVolumePs384
Payload traffic in the uplink for the PS Interactive part of the UeRcconfigurations that carry an uplink Interactive transport channel with amaximum bit rate equal to 384 kbps. Only the PS Interactive part of thetraffic volume is included. Payload traffic volume includes user data,Medium Access Control (MAC) and Radio Link Control (RLC) headerinformation and retransmissions, but not control frames.
pmUlTrafficVolumePs64
Payload traffic in the uplink for the PS Interactive part of the UeRc
configurations that carry an uplink Interactive transport channel with amaximum bit rate equal to 64 kbps. Only the PS Interactive part of thetraffic volume is included. Payload traffic volume includes user data,
Medium Access Control (MAC) and Radio Link Control (RLC) headerinformation and retransmissions, but not control frames.
pmUlTrafficVolumePs8
Payload traffic in the uplinkfor the PS Interactive part of the UeRc
configurations that carry an uplink Interactive transport channel with amaximum bit rate equal to 8 kbps. Only the PS Interactive part of thetraffic volume is included. Payload traffic volume includes user data,Medium Access Control (MAC) and Radio Link Control (RLC) header
information and retransmissions, but not control frames.
pmUlTrafficVolumePsCommon
Payload in the uplink for the PS RAB on RACH, excluding SRB. Payloadtraffic volume includes user data, Medium Access Control (MAC) andRadio Link Control (RLC) header information and retransmissions, but not
6cVolumePs1pmUlTraffi8icVolumePspmUlTraff84cVolumePs3pmUlTraffi
128icVolumePspmUlTraff64icVolumePspmUlTraffommoncVolumePsCpmUlTraffi
-
8/13/2019 3G KPIs to Be Monitored V4
29/30
3G KPIs to be Monitored
Reference Number MIC1/MO/CTO-RE/93-11/V2
Owner RE Department
Revision Code 2
ImplementationDate
Sep. 8, 2011
Ref.: MIC1/MO/CTO-RE/93-11/V2 Page30/30
This document is the property ofORASCOM TELECOMLEBANON S.A.L. and can not be diffused externally without the prior approval of themanagement
control frames.
31. Total volume of HS User Data DL (Kbits)
KPI
Definition
Total volume of HS User Data DL (Kbits)
Level Cell
Ericsson
Formula
Counters
Definition pmDlTrafficVolumePsIntHs
Payload traffic in the downlink for the PS Interactive part of the UeRcconfigurations on HS-DSCH. Only the PS Interactive part of the traffic volume isincluded. Payload traffic volume includes user data, Medium Access Control (MAC)
and Radio Link Control (RLC) header information and retransmissions, but notcontrol frames.
32. Total volume of EUL User Data UL (Kbits)
KPI
DefinitionTotal volume of EUL User Data UL (Kbits)
Level Cell
EricssonFormula
Counters
Definition pmUlTrafficVolumePsIntEul
Payload traffic in the uplink for the PS Interactive part of the UeRcconfigurations on E-DCH. Only the PS Interactive part of the trafficvolume is included. Payload traffic volume includes user data, MediumAccess Control (MAC) and Radio Link Control (RLC) header information
and retransmissions, but not control frames.
ntHscVolumePsIpmDlTraffi
ntEulcVolumePsIpmUlTraffi
-
8/13/2019 3G KPIs to Be Monitored V4
30/30
3G KPIs to be Monitored
Reference Number MIC1/MO/CTO-RE/93-11/V2
Owner RE Department
Revision Code 2
ImplementationDate
Sep. 8, 2011