4.3.2013 tool demo - traditional development rtc planning in context collaboration

25
© 2013 IBM Corporation Rational Team Concert Traditional Development Real-Time Planning and In-Context Collaboration (Part 2: Demonstration) Don Cunningham, Rational CTP [email protected] 3 April 2013

Upload: ibm-rational

Post on 29-Nov-2014

793 views

Category:

Technology


0 download

DESCRIPTION

Series Name: Tool Demonstration for ALM Wecast Title: Tool Demo - Traditional Development RTC Planning In Context Collaboration Date: 4.3.2013 Presenter: Don Cunningham

TRANSCRIPT

Page 1: 4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collaboration

© 2013 IBM Corporation

Rational Team Concert Traditional Development Real-Time Planning and In-Context Collaboration (Part 2: Demonstration)

Don Cunningham, Rational CTP

[email protected]

3 – April – 2013

Page 2: 4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collaboration

© 2013 IBM Corporation

Business needs software & systems development that supports agility…

Must Deliver:

More solutions

More flexibility

More quality

More value -yet-

Less risk

Less costs

Less or flat resources

Resources

Business

Needs

Effective software & systems development

promotes a delicate balance of resources,

reducing costs while delivering more, higher-

quality business solutions.

Page 3: 4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collaboration

© 2013 IBM Corporation 3

Rational Team Concert is the core of our CLM Solution Improve productivity with an integrated ALM solution

Rational Requirements

Composer

Rational Team Concert

Rational Quality

Manager

IBM Rational Collaborative

Lifecycle Management Solution

Architect

Analyst Developer

Quality

Professional

Deployment

Engineer

Optimize your team through

support of the 5 ALM Imperatives

• Real-time planning

• Lifecycle traceability

• In-context collaboration

• Development Intelligence

• Continuous Improvement

Get up and running quickly

Extend as your needs evolve

Support heterogeneous

development across multiple

platforms and technologies

Page 4: 4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collaboration

© 2013 IBM Corporation

Real-time dynamic planning

4

• Plans live outside of ALM environment

• Manual, error-prone updates

• Separate from team activities and assignments

• Plans fully integrated with execution

• Continuous planning

• Instantly see the impact of changes to delivery dates

What is the impact of business trade-offs on our current delivery dates?

Page 5: 4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collaboration

© 2013 IBM Corporation

Team collaboration across silos

5

• Silo’d teams; disconnected data

• Important discussions are lost to email -project records are missing the “real

reason” for decisions

• Unified team shares linked data

• ALM environment tracks what is important for delivering

• “Am I blocking others”

• “Are others waiting for my approval”

www

Every artifact is a web link. Traceability is automated as you perform work.

Empower teams AND provide flexibility to utilize resources from anywhere.

Page 6: 4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collaboration

© 2013 IBM Corporation

Rational Team Concert

Software

Configuration

Management

Change

Management

Work Items

Build

Management

Planning

Project Transparency

Page 7: 4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collaboration

© 2013 IBM Corporation

Rational Team Concert

Software

Configuration

Management

Change

Management

Work Items

Build

Management

Planning

Project Transparency

Page 8: 4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collaboration

© 2013 IBM Corporation

Traditional Plans

Release plan

This type of plan is the highest-level plan. It provides a brief overview of the project goals.

Although you can create a release plan for any phase, create this type of plan for an overall

release.

Phase plan

This type of plan displays the goals to be achieved in a phase. You can create a phase plan

and assign work items that are to be completed in that phase.

Cross Project plan

This type of plan tracks the schedule of work items in other projects. You can create a cross

project plan, create a tracking work item and add Tracks link to work items in different

projects/plans.

8

Page 9: 4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collaboration

© 2013 IBM Corporation

Demonstration #1 – Formal Project Creation

1. Formal Project Creation

2. Review Plans Created

3. Create Backlog Plan

4. Query Work Items Assigned to Me

5. Move Work Items to Requirements Plan

Page 10: 4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collaboration

© 2013 IBM Corporation

Project Management Capabilities

Resource management The Plan view has an additional Resources tab to manage the allocation of resources to the plan. You can

search for resources with specific start and finish dates and work hours, and add them to the plan. You can

edit or remove these allocations any time. You can also view and manage the use of resources within the

plan period. Warnings are displayed when the work assignments for a resource exceed the availability of

the resource for the plan period.

Risk management You can create risk work items to identify problems that might arise during the project, and then create risk

actions to mitigate or counter those problems.

Gantt chart and critical path You can use the Gantt chart in the Plan view to see a graphical representation of the plan schedule,

including work item durations and dependencies. The critical path identifies work items that have negative

or no slack and consequently can delay the project.

10

Page 11: 4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collaboration

© 2013 IBM Corporation

Demonstration #2 – Resource Management

User Work Area

o Work Week Allocation

o Project Allocation

Project Plan Resource Allocation

o Project Exception

Page 12: 4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collaboration

© 2013 IBM Corporation

Rational Team Concert

Software

Configuration

Management

Change

Management

Work Items

Build

Management

Planning

Project Transparency

Page 13: 4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collaboration

© 2013 IBM Corporation

Formal Project Template – Work Items

Defect – correct verification test finding

Task – activity to do something in the project

Project Change Request – Change something in a project

Business Need – Define a need for some feature

Issue – Unforeseen project need that needs to be addressed

Risk – Identify and quantify risk of something happening

Risk Action – Activity to mitigate risk occurrence

Milestone – A date something needs to start or end

13

Page 14: 4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collaboration

© 2013 IBM Corporation

Demonstration #3 – Project Plan Development

Review Work Items Created

Create Risk & Risk Action Work Items

Create Risk Parent – Child Relationship

Page 15: 4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collaboration

© 2013 IBM Corporation

Dependencies and Constraints

Dependencies

Finish-to-start

Constraints

As soon as possible

Start no earlier than

Finish no later than

15

Page 16: 4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collaboration

© 2013 IBM Corporation

Creating Dependency – Link Relationship

16

Page 17: 4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collaboration

© 2013 IBM Corporation

Constraints

17

Page 18: 4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collaboration

© 2013 IBM Corporation

Critical Path

18

Page 19: 4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collaboration

© 2013 IBM Corporation

Demonstration #4 – Project Plan Development

Add Task & Milestone Work Items

Create a Dependencies

Create a Planned Snapshot

Compare Snapshots

Review Schedule Variance

Page 20: 4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collaboration

© 2013 IBM Corporation

Summary

Formal Project Template

Traditional Project Management (Waterfall, Iterative)

Project Plans (Release, Plan, Cross Project)

Work Items (Task, Project Change Requests, Risk, Milestone)

Dependency and Constraints (As Soon As Possible, Dates)

Benefits (Real-Time Updates)

Project Status

Critical Path Analysis

Resource Management

Risk Identification & Mitigation

20

Page 21: 4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collaboration

© 2013 IBM Corporation

Delivering greater value with reduced cost..

Pains

Information was distributed

No single view of work, productivity, quality, etc across the

enterprise

Supporting Multiple Tools: Mingle, Rally, Xplanner,

Version One

Goals

Lower our maintenance cost by moving to a single

platform

Gain visibility into work across the enterprise

through reporting

Lower training costs

Reduce time spent on work item mgmt and

planning

Results

Summary of Annual Savings - Total $ 4.79 M

Planning automation - $ 389 K

Daily scrum meetings time reduced - $ 810 K

Quality Improvement - $ 194 K

Reduced effort to manage work items - $1.2 M

Project reporting - $ 130 K

Reduced time determining project status - $987 K

Reduced time to establish new teams - $ 432 K

Reduction of duplicate efforts - $ 648 K

“We are able to build dashboards and wikis to push information back to the

project teams, They don’t have to waste time coming down and waiting for

status reports , they can actually see real time information on a daily basis as

opposed to waiting for a weekly or biweekly report, tremendous benefit across

the organization as a whole”.

Bryan Alltop, Iteration Manager Competency Leader

Video Link

Page 22: 4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collaboration

© 2013 IBM Corporation

For more information

Find out more about Rational Team Concert

• http://ibm.com/rational/rtc

Explore Rational Team Concert tutorials, demos, downloads

and other developer learning resources

• https://jazz.net/projects/rational-team-concert/

Check for the latest RTC integrations

• http://jazz.net/projects/rational-team-concert/integrations/

Watch a customer video testimonial (4 min)

• http://www.mdma.tv/tc/short.html

Try the RTC ROI Calculator

• http://www.ibm.com/rational/rtc/roi

Page 23: 4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collaboration

© 2013 IBM Corporation

Presentation Resources

The traditional scheduler in IBM Rational Team Concert 4.0

Traditional planning: Managing formal projects in Rational Team Concert 4.0

Microsoft Project integration with Rational Team Concert, Version 4.0

Sharoon Shetty Kuriyala, IBM

Last updated: May 18, 2012

Build basis: Rational Team Concert 4.0

23

Page 24: 4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collaboration

© 2013 IBM Corporation 24

www.ibm.com/software/rational

Page 25: 4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collaboration

© 2013 IBM Corporation 25

© Copyright IBM Corporation 2011. All rights reserved. The information contained in these materials is provided for informational purposes only, and is provided AS IS without warranty of any kind, express or implied. IBM shall not be responsible for any damages arising out of the use of, or otherwise related to, these materials. Nothing contained in these materials is intended to, nor shall have the effect of, creating any warranties or representations from IBM or its suppliers or licensors, or altering the terms and conditions of the applicable license agreement governing the use of IBM software. References in these materials to IBM products, programs, or services do not imply that they will be available in all countries in which IBM operates. Product release dates and/or capabilities referenced in these materials may change at any time at IBM’s sole discretion based on market opportunities or other factors, and are not intended to be a commitment to future product or feature availability in any way. IBM, the IBM logo, Rational, the Rational logo, Telelogic, the Telelogic logo, and other IBM products and services are trademarks of the International Business Machines Corporation, in the United States, other countries or both. Other company, product, or service names may be trademarks or service marks of others.

www.ibm.com/software/rational