LARSEN & TOUBRO LIMITED: ECC DIVISION BULDINGS AND FACTORIES OPERATING COMPANY ELECTRICAL SAFETY INSPECTION REPORT Name of site : HCIL NARSINGARH Region : HYCO Area/ location inspected : ALL OVER THE SITE To: P&M incharge cc: Project incharge P&M Personal accompanying HSEO Points Observation Recommendation Action By 1 Earthing 2 Neutral earthing: 3 RCCB 4 Insulation 5 Cable Layout ASP 6 Protection from water 7 Lightning Arrester 8 ANTONY 9 Installation Cover & Seals 10 Electrical fire hazards SI NO. ramesh naidu's welding machine found with out earthing at cooler house Earthing should be provided. electrician of the cooler house at the weigh bridge cables are routed on surface of theground. cables are routed above the ground level. Plug Tops & Cable Joints at the raw mill silo welding machine cable having multiple joints cable is replaced by new one

Upload: imaduddin91

Post on 21-Jul-2015

63 views

Category:

Documents


4 download

TRANSCRIPT

LARSEN & TOUBRO LIMITED: ECC DIVISION

BULDINGS AND FACTORIES OPERATING COMPANYRef; IM-09-C REV00

ELECTRICAL SAFETY INSPECTION REPORT

Name of site : HCIL NARSINGARHRegion : HYCOArea/ location inspected : ALL OVER THE SITETo: P&M inchargecc: Project inchargeP&M Personal accompanying HSEO

PointsObservation Recommendation Action By

1 Earthing

2 Neutral earthing:3 RCCB4 Insulation

5 Cable Layout ASP

6 Protection from water 7 Lightning Arrester

8 ANTONY

9 Installation Cover & Seals10 Electrical fire hazards

SI NO.

ramesh naidu's welding machine found with out earthing at cooler house

Earthing should be provided.

electrician of the cooler house

at the weigh bridge cables are routed on surface of theground.

cables are routed above the ground level.

Plug Tops & Cable Joints

at the raw mill silo welding machine cable having multiple joints

cable is replaced by new one

11 Safety gaurds. TVL/MNK

12

Date:02/09/2010

grinding machine found with out safety guard.at fabrication yard

safety guard should be provided.

Others (Specify)

LARSEN & TOUBRO LIMITED: ECC DIVISION

BULDINGS AND FACTORIES OPERATING COMPANYRef; IM-09-C REV00

ELECTRICAL SAFETY INSPECTION REPORT

Name of site : HCIL NARSINGARHRegion : HYCOArea/ location inspected : ALL OVER THE SITETo: P&M inchargecc: Project inchargeP&M Personal accompanying HSEO

Target Remarks

w.i.e

w.i.e

w.i.e

w.i.e

Signed BYHSEO

LARSEN & TOUBRO LIMITED: ECC DIVISION

BULDINGS AND FACTORIES OPERATING COMPANYRef; IM-09-C REV00

ELECTRICAL SAFETY INSPECTION REPORT

Name of site : HCIL NARSINGARHRegion : HYCOArea/ location inspected : ALL OVER THE SITETo: P&M inchargecc: Project inchargeP&M Personal accompanying HSEO

PointsObservation Recommendation Action By

1 Earthing earthing is provided SRINIVAS

2 Neutral earthing:3 RCCB4 Insulation

5 Cable Layout SUDHAKAR

6 Protection from water 7 Lightning Arrester

8 PRATAP

9

Installation Cover & Seals

PRATAP

10 Electrical fire hazards11 Safety gaurds.12

SI NO.

cutting machines using with out earthing at pre heater

at the steel yard rods are placing on the cable

cables are covered by ledgar pipe.

Plug Tops & Cable Joints

switch board having no water protection

proper covering is provided

water pump having no proper protection

proper covering is provided

Others (Specify)

Date:09/09/2010

LARSEN & TOUBRO LIMITED: ECC DIVISION

BULDINGS AND FACTORIES OPERATING COMPANYRef; IM-09-C REV00

ELECTRICAL SAFETY INSPECTION REPORT

Name of site : HCIL NARSINGARHRegion : HYCOArea/ location inspected : ALL OVER THE SITETo: P&M inchargecc: Project inchargeP&M Personal accompanying HSEO

Target Remarks

w.i.e

w.i.e

w.i.e

w.i.e

Signed BYHSEO

LARSEN & TOUBRO LIMITED: ECC DIVISION

BULDINGS AND FACTORIES OPERATING COMPANYRef; IM-09-C REV00

ELECTRICAL SAFETY INSPECTION REPORT

Name of site : HCIL NARSINGARHRegion : HYCOArea/ location inspected : ALL OVER THE SITETo: P&M inchargecc: Project inchargeP&M Personal accompanying HSEO

PointsObservation Recommendation Action By

1 Earthing TVL/MNK

2 Neutral earthing:

3

RCCB

TVL/MNK

4 Insulation

5 Cable Layout SRINIVAS

6 Protection from water 7 Lightning Arrester

8 ASP

SI NO.

P&M welding machine found with out earthing

Earthing should be provided.

halogen lamps are having loose connections

cables are properly arranged

In kiln pier-3 cables are routed through ground.

cables are routed above the ground level.

Plug Tops & Cable Joints

at the weigh bridge cable is having multiple joints

cable is replaced by new one

9

Installation Cover & Seals

TVL/MNK

10 Electrical fire hazards11 Safety gaurds.12

Date:16/09/2010

welding machine is not having proper connection

proper connection is provided

Others (Specify)

LARSEN & TOUBRO LIMITED: ECC DIVISION

BULDINGS AND FACTORIES OPERATING COMPANYRef; IM-09-C REV00

ELECTRICAL SAFETY INSPECTION REPORT

Name of site : HCIL NARSINGARHRegion : HYCOArea/ location inspected : ALL OVER THE SITETo: P&M inchargecc: Project inchargeP&M Personal accompanying HSEO

Target Remarks

w.i.e

w.i.e

w.i.e

w.i.e

w.i.e

Signed BYHSEO

LARSEN & TOUBRO LIMITED: ECC DIVISION

BULDINGS AND FACTORIES OPERATING COMPANYRef; IM-09-C REV00

ELECTRICAL SAFETY INSPECTION REPORT

Name of site : HCIL NARSINGARHRegion : HYCOArea/ location inspected : ALL OVER THE SITETo: P&M inchargecc: Project inchargeP&M Personal accompanying HSEO

PointsObservation Recommendation Action By

1 Earthing SRINIVAS

2 Neutral earthing:

3

RCCB

proper action is taken PRATAP

4 Insulation

5 Cable Layout SRINIVAS

6 Protection from water 7 Lightning Arrester

8 replaced by new one PRATAP

9 Installation Cover & Seals

SI NO.

pabala welding machine found with out earthing at pre heater

Earthing should be provided.

halogen lamps are having loose connections at cooler house

In pre heater cables are found routed above the ground level.

cables are covered with ledgar pipes

Plug Tops & Cable Joints

at the cooler house cable is having multiple joints

10 Electrical fire hazards11 Safety gaurds.12

Date:23/09/2010

Others (Specify)

LARSEN & TOUBRO LIMITED: ECC DIVISION

BULDINGS AND FACTORIES OPERATING COMPANYRef; IM-09-C REV00

ELECTRICAL SAFETY INSPECTION REPORT

Name of site : HCIL NARSINGARHRegion : HYCOArea/ location inspected : ALL OVER THE SITETo: P&M inchargecc: Project inchargeP&M Personal accompanying HSEO

Target Remarks

w.i.e

w.i.e

w.i.e

w.i.e

Signed BYHSEO

LARSEN & TOUBRO LIMITED: ECC DIVISION

BULDINGS AND FACTORIES OPERATING COMPANYRef; IM-09-C REV00

ELECTRICAL SAFETY INSPECTION REPORT

Name of site : HCIL NARSINGARHRegion : HYCOArea/ location inspected : ALL OVER THE SITETo: P&M inchargecc: Project inchargeP&M Personal accompanying HSEO

PointsObservation Recommendation Action By

1 Earthing TVL/MNK

2 Neutral earthing:

3

RCCB

connection is provided CHANDRA SEKHAR

4 Insulation

5 Cable Layout SRINIVAS

6 Protection from water 7 Lightning Arrester

8 Plug top to be provided. TEJA

SI NO.

welding machine found with out earthing at the batching plant

Earthing should be provided.

halogen lamps are not having proper connections at the quality center

cables are routed on ground at pre heater at blending silo

cables are routed above the ground level.

Plug Tops & Cable Joints

S/c. pabla drilling machine found with out plug top.

9 Installation Cover & Seals10 Electrical fire hazards

11 Safety gaurds. SUDHAKAR

12

Date:10/11/08

cutting machine found with out safety guard steel yard

safety guard should be provided.

Others (Specify)

LARSEN & TOUBRO LIMITED: ECC DIVISION

BULDINGS AND FACTORIES OPERATING COMPANYRef; IM-09-C REV00

ELECTRICAL SAFETY INSPECTION REPORT

Name of site : HCIL NARSINGARHRegion : HYCOArea/ location inspected : ALL OVER THE SITETo: P&M inchargecc: Project inchargeP&M Personal accompanying HSEO

Target Remarks

w.i.e

w.i.e

w.i.e

w.i.e

w.i.e

Signed BYHSEO

LARSEN & TOUBRO LIMITED: ECC DIVISIONBULDINGS AND FACTORIES OPERATING COMPANY

Ref; IM-09-C REV00ELECTRICAL SAFETY INSPECTION REPORT

Name of site : HCIL NARSINGARHRegion : HYCOArea/ location inspected : ALL OVER THE SITETo: P&M inchargecc: Project inchargeP&M Personal accompanying HSEO

SI NO.Points

Observation Action By

1 Earthing SHIVA

2 Neutral earthing:

3

RCCB

CHANDRA SEKHAR

4 Insulation

5 Cable Layout SRINIVAS

6 Protection from water 7 Lightning Arrester

8 TEJA

9 Installation Cover & Seals10 Electrical fire hazards

Recommendation

earthing cable is not properly attached to the welding machine at pre heater

Earthing cable is properly attached

halogen lamps are not having proper connections at the quality center

connection is provided

cables are routed on ground at pre heater at blending silo

cables are routed above the ground level.

Plug Tops & Cable Joints

S/c. pabla drilling machine found with out plug top.

Plug top to be provided.

11 Safety gaurds. SUDHAKAR

12

Date:10/11/08

cutting machine found with out safety guard steel yard

safety guard should be provided.

Others (Specify)

LARSEN & TOUBRO LIMITED: ECC DIVISIONBULDINGS AND FACTORIES OPERATING COMPANY

Ref; IM-09-C REV00ELECTRICAL SAFETY INSPECTION REPORT

Name of site : HCIL NARSINGARHRegion : HYCOArea/ location inspected : ALL OVER THE SITETo: P&M inchargecc: Project inchargeP&M Personal accompanying HSEO

Target Remarks

w.i.e

w.i.e

w.i.e

w.i.e

w.i.e

Signed BYHSEO