IN_Electrical Inspection Factory Name : ARVIND LIMITED Address: 26/2, 27/2, Kenchenahalli Post, Kengri Hobli, Mysore Road, Karnataka, India Bangalore India Discipline Name: IN_Electrical Inspection Assessment Date : 31 Jul 2019 Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 1/30

Upload: others

Post on 19-Dec-2021

21 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: IN Electrical Inspection

IN_Electrical Inspection

Factory Name : ARVIND LIMITED

Address: 26/2, 27/2, Kenchenahalli Post, Kengri Hobli, Mysore Road,Karnataka, India Bangalore India

Discipline Name: IN_Electrical Inspection

Assessment Date : 31 Jul 2019

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 1/30

Page 2: IN Electrical Inspection

Table of Contents

I Factory Information

II Findings and Remediation Issues

III Photo Evidence

IV Photo Documentation

Factory Name : ARVIND LIMITED

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 2/30

Page 3: IN Electrical Inspection

FACTORY INFORMATION

Basic information

Country India

City/Town Bangalore

Postal Code

Phone 919739781199

Office Fax

Office City

Office Country India

Office Address

Country Code

Office Email

Assessment Information

Auditor Bureau Veritas_IN

Executive Summary

1552 Assessment Closing Comments

Factory Name : ARVIND LIMITED

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 3/30

Page 4: IN Electrical Inspection

EPB - 01.jpg

EPB - 02.jpg

FINDINGS AND REMEDIATION ISSUES

E2: Earthing and Bonding - Insufficient bonding of equipment (IND)

Issue type E2: Earthing and Bonding

Details Of Issue Found Body earthing connection strip found not tight and secure with overlapping of three stripfor continity.

Recommended ActionDeadline Date

01 Sep 2019

Photo(s)

CAP Priority EP2

Reference Number EPB-01

Suggested Plan

Sub Issue Detail IND_E2.6.1

Sub Issue Type Insufficient bonding of equipment (IND)

Recommended Action Earthing connection and contuinity of GI strips should be tight and secure for betterconductivity as per IS-3043 & LABS 10.4.6

Issue type E2: Earthing and Bonding

Details Of Issue Found HT Metering panel body earthing connection hardware found rusted.

Recommended ActionDeadline Date

21 Aug 2019

Photo(s)

Factory Name : ARVIND LIMITED

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 4/30

Page 5: IN Electrical Inspection

EBE - 01A.jpg

EBE - 01B.jpg

EBE - 01C.jpg

CAP Priority EP1

Reference Number EPB-02

Suggested Plan

Sub Issue Detail IND_E2.6.2

Sub Issue Type Insufficient bonding of equipment (IND)

Recommended Action Hardware connection of GI earth strip should be free from rust and maintained as per IS-3043 & LABS 10.4.6

Issue type E2: Earthing and Bonding

Details Of Issue Found Few of Electrical switch board panel and Distribution board body earthing not providedlike Sampling 2nd floor DB, Dry process area UPS DB, Compressor DB, UPS room DB andControl MCB box etc..

Recommended ActionDeadline Date

21 Aug 2019

Photo(s)

CAP Priority EP1

Reference Number EBE -01

Suggested Plan

Sub Issue Detail IND_E2.6.3

Sub Issue Type Insufficient bonding of equipment (IND)

Recommended Action All Electrical switch board panel and DB should be provided with bosy earthing as per IS-3043 ,LABS 10.4.6

E2: Earthing and Bonding - Other

Issue type E2: Earthing and Bonding

Details Of Issue Found Earth pit stations in GOS not maintained as per IS-3043 & LABS 10.4.6

Recommended Action 15 Sep 2019

Factory Name : ARVIND LIMITED

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 5/30

Page 6: IN Electrical Inspection

EP - 1.jpg

EP - 2.jpg

Deadline Date

Photo(s)

CAP Priority EP3

Reference Number EP 01

Suggested Plan

Sub Issue Detail IND_E2.9.1

Sub Issue Type Other

Recommended Action Earth pit stations should be provided with display of Earth pit name, measured value anddue date as per IS-3043 & LABS 10.4.6

Issue type E2: Earthing and Bonding

Details Of Issue Found Earth pit cover plate found broken.

Recommended ActionDeadline Date

01 Sep 2019

Photo(s)

CAP Priority EP2

Reference Number EP 02

Suggested Plan

Sub Issue Detail IND_E2.9.2

Sub Issue Type Other

Recommended Action Cover plate of earth pit station should be free from damage as per IS-3043 & LABS

Factory Name : ARVIND LIMITED

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 6/30

Page 7: IN Electrical Inspection

EP - 3.jpg

EP - 4.jpg

10.4.6

Issue type E2: Earthing and Bonding

Details Of Issue Found In transformer yard earth pit station waste debris found accumulated in earth pit notmaintained as per IS-3043 & LABS 10.4.6

Recommended ActionDeadline Date

01 Sep 2019

Photo(s)

CAP Priority EP2

Reference Number EP 03

Suggested Plan

Sub Issue Detail IND_E2.9.3

Sub Issue Type Other

Recommended Action Earth pit station periodocal maintenance to be done and construction and maintenance ofearth pit station should be as per IS-3043 & LABS 10.4.6

Issue type E2: Earthing and Bonding

Details Of Issue Found Transformer yard displayed plate not provided with last measured value and due date.

Recommended ActionDeadline Date

01 Sep 2019

Photo(s)

CAP Priority EP2

Factory Name : ARVIND LIMITED

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 7/30

Page 8: IN Electrical Inspection

DG - 01.JPG

DGF - 01.jpg

Reference Number EP 04

Suggested Plan

Sub Issue Detail IND_E2.9.4

Sub Issue Type Other

Recommended Action Earth pit should be displayed with last measured value, Due date and earth pit no & nameas per IS-3043 & LABS 10.4.6

E3: Generators - Fuel pump not on life safety supply (IND)

Issue type E3: Generators

Details Of Issue Found Required Fire fighting equipments not provided near to fuel storage.

Recommended ActionDeadline Date

01 Sep 2019

Photo(s)

CAP Priority EP2

Reference Number DGF-01

Suggested Plan

Sub Issue Detail IND_E3.4.1

Sub Issue Type Fuel pump not on life safety supply (IND)

Recommended Action Required no and type of fire fighting equipments should be kept near to fuel storage Ref-10.7.1

E3: Generators - Generator Battery

Issue type E3: Generators

Details Of Issue Found Diesel generator battery terminal protection cap not providedd.

Recommended ActionDeadline Date

01 Sep 2019

Photo(s)

Factory Name : ARVIND LIMITED

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 8/30

Page 9: IN Electrical Inspection

DGB - 01.jpg

EDG - 01.jpg

CAP Priority EP2

Reference Number DGB-01

Suggested Plan

Sub Issue Detail IND_E3.6.1

Sub Issue Type Generator Battery

Recommended Action Battery terminal caps to be provided for battery terminals to protect terminals of thebattery.

E3: Generators - Generator earthing

Issue type E3: Generators

Details Of Issue Found Eath strip contuinity connection are npt and secure, Dust and diesel traces foun on strip.

Recommended ActionDeadline Date

21 Aug 2019

Photo(s)

CAP Priority EP1

Reference Number EDG-01

Suggested Plan

Sub Issue Detail IND_E3.8.4

Sub Issue Type Generator earthing

Recommended Action Earth strip connection should be tight and secure, Periodical maintenance should be taken

Factory Name : ARVIND LIMITED

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 9/30

Page 10: IN Electrical Inspection

EDG - 02.jpg

DGH - 01.jpg

care as per IS-3043 & LABS 10.4.6

Issue type E3: Generators

Details Of Issue Found DG earth pit station not displayed with last measured value and due date.

Recommended ActionDeadline Date

15 Sep 2019

Photo(s)

CAP Priority EP3

Reference Number EDG-02

Suggested Plan

Sub Issue Detail IND_E3.8.5

Sub Issue Type Generator earthing

Recommended Action Earth pit station should be dislayed with measured resisitance value and due date as perIS-3043 & LABS 10.4.6

E3: Generators - Housekeeping

Issue type E3: Generators

Details Of Issue Found Inside the accoustic enclosure of DG combustible material observed and lack ofmaintenance diesel spillage & dust observed.

Recommended ActionDeadline Date

21 Aug 2019

Photo(s)

Factory Name : ARVIND LIMITED

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 10/30

Page 11: IN Electrical Inspection

DGO - 01.jpg

CAP Priority EP1

Reference Number DGH-01

Suggested Plan

Sub Issue Detail IND_E3.10.1

Sub Issue Type Housekeeping

Recommended Action Maintain electrical systems in good working order and keep free of lint buildup to reducethe potential for ignition. This includes cleaning inside junction boxes, buses, trays,tunnels, etc Ref- 12.6.1.2

Issue type E3: Generators

Details Of Issue Found Starter panel inside the accoustic enclosure of DG body earthing not provided.

Recommended ActionDeadline Date

01 Sep 2019

Photo(s)

CAP Priority EP2

Reference Number DGO-01

Suggested Plan

Sub Issue Detail IND_E3.12.1

Sub Issue Type Other

Recommended Action All metal casings or metallic coverings containing or protecting any switchgear shall beconnected to earth

Issue type E3: Generators

Details Of Issue Found Cables haphazardly laid inside the DG enclosure.

Recommended ActionDeadline Date

15 Sep 2019

Photo(s)

Factory Name : ARVIND LIMITED

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 11/30

Page 12: IN Electrical Inspection

DGO - 02.jpg

DGO - 03A.jpg

DGO - 03B.JPG

CAP Priority EP3

Reference Number DGO-02

Suggested Plan

Sub Issue Detail IND_E3.12.2

Sub Issue Type Other

Recommended Action Cables should be laid with proper support and dressing required.

Issue type E3: Generators

Details Of Issue Found DG doors kept open observed during the of audit.

Recommended ActionDeadline Date

01 Sep 2019

Photo(s)

CAP Priority EP2

Reference Number DGO-03

Suggested Plan

Sub Issue Detail IND_E3.12.3

Sub Issue Type Other

Recommended Action DG doors should be closed to prevent entry of foreign particles in side the DG.

Issue type E3: Generators

Factory Name : ARVIND LIMITED

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 12/30

Page 13: IN Electrical Inspection

DGO - 04.jpg

TS - 01A.jpg

TS - 01B.jpg

Details Of Issue Found DG-3 inside the accoustic enclosure electrical utility DB installed on wooden ply board andwooden rack found in DG.

Recommended ActionDeadline Date

15 Sep 2019

Photo(s)

CAP Priority EP3

Reference Number DGO-04

Suggested Plan

Sub Issue Detail IND_E3.12.4

Sub Issue Type Other

Recommended Action Combustible material like wooden ply board used for electrical installation should beavoided

E4: Substations - Equipment condition

Issue type E4: Substations

Details Of Issue Found Transformer and votage stabilizer silica gel found out out of order.

Recommended ActionDeadline Date

01 Sep 2019

Photo(s)

CAP Priority EP2

Reference Number STS - 01

Suggested Plan

Factory Name : ARVIND LIMITED

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 13/30

Page 14: IN Electrical Inspection

SSGOS - 01.jpg

SST - 02.jpg

Sub Issue Detail IND_E4.1.1

Sub Issue Type Equipment condition

Recommended Action Remove the moisture content from silica gel from transformer.

Issue type E4: Substations

Details Of Issue Found GOS Substation vegetation of plant found and waste debris accumulated.

Recommended ActionDeadline Date

01 Sep 2019

Photo(s)

CAP Priority EP2

Reference Number SSGOS-01

Suggested Plan

Sub Issue Detail IND_E4.2.1

Sub Issue Type Housekeeping

Recommended Action Substation should be free from vegetation and waste debris.

Issue type E4: Substations

Details Of Issue Found Material storage and tree found near to the transformer substation.

Recommended ActionDeadline Date

01 Sep 2019

Photo(s)

Factory Name : ARVIND LIMITED

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 14/30

Page 15: IN Electrical Inspection

SST - 04.jpg

ELP - 01A.jpg

ELP - 01B.jpg

ELP - 01C.jpg

ELP - 01 D.jpg

CAP Priority EP2

Reference Number SST- 02

Suggested Plan

Sub Issue Detail IND_E4.5.1

Sub Issue Type Other

Recommended Action Substation should be free from vegetation tree, waste debris and storage of material.

Issue type E4: Substations

Details Of Issue Found Fire fighting equipment not provided near to substation.

Recommended ActionDeadline Date

21 Aug 2019

Photo(s)

CAP Priority EP1

Reference Number SST - 03

Suggested Plan

Sub Issue Detail IND_E4.5.2

Sub Issue Type Other

Recommended Action Required no and type of fire fighting equipments should be kept near to fuel storage Ref-10.7.1

Issue type E4: Substations

Details Of Issue Found Inatallation of Submain electrical panels in Stiching, Sewing and Finishing area with metalenclosure without maintaining maintenance space of 1 meter.

Recommended ActionDeadline Date

17 Oct 2019

Photo(s)

Factory Name : ARVIND LIMITED

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 15/30

Page 16: IN Electrical Inspection

CAP Priority EP4

Reference Number ELEP - 01

Suggested Plan

Sub Issue Detail IND_E4.5.3

Sub Issue Type Other

Recommended Action Minimum 1meter space should be maintain infront of switch board box for easy accessand maintenance Ref- LABS 10.8.11

Issue type E4: Substations

Details Of Issue Found Installation of some of switch board without safety barricade like - PDB - 3,5 & 7

Recommended ActionDeadline Date

01 Sep 2019

Photo(s)

CAP Priority EP2

Reference Number ELEP - 02

Suggested Plan

Sub Issue Detail IND_E4.5.4

Sub Issue Type Other

Recommended Action Installation of switch board should be provided with barricade for entry of authorizedperson Ref- LABS 10.8.13.4

Issue type E4: Substations

Details Of Issue Found Metal enclosure or barricade provided for all switch board not provided with body earthig.

Recommended ActionDeadline Date

01 Sep 2019

Photo(s)

Factory Name : ARVIND LIMITED

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 16/30

Page 17: IN Electrical Inspection

ELBD - 01.jpg

SSGOS - 02.jpg

CAP Priority EP2

Reference Number ESBE - 01

Suggested Plan

Sub Issue Detail IND_E4.5.5

Sub Issue Type Other

Recommended Action All metal casings or metallic coverings containing or protecting any switchgear shall beconnected to earth Ref - 10.8.10

E4: Substations - Substation access (IND)

Issue type E4: Substations

Details Of Issue Found GOS substation access doors kept open observed during the time of visit.

Recommended ActionDeadline Date

21 Aug 2019

Photo(s)

CAP Priority EP1

Reference Number SSGOS-02

Suggested Plan

Sub Issue Detail IND_E4.6.1

Sub Issue Type Substation access (IND)

Recommended Action Lockable door with restricted access to those only competent to entry substations Ref -

Factory Name : ARVIND LIMITED

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 17/30

Page 18: IN Electrical Inspection

SST - 01.jpg

WS - 01A.jpg

WS - 01B.jpg

WS - 01C.jpg

LABS 10.5.3.6

E4: Substations - Warning/danger signage

Issue type E4: Substations

Details Of Issue Found Transformer yard warning signages are not adequate.

Recommended ActionDeadline Date

01 Sep 2019

Photo(s)

CAP Priority EP2

Reference Number SST - 01

Suggested Plan

Sub Issue Detail IND_E4.9.1

Sub Issue Type Warning/danger signage

Recommended Action Warning signages should provide on all sides of yard fencing to avoid the entry ofunauthorized person Ref- LABS 10.5.3.6

Issue type E4: Substations

Details Of Issue Found Warning signages not provided for some of electrical switch board and Most Distributionboard like washing PDB'S and UPS, Lighting and power DB.

Recommended ActionDeadline Date

15 Sep 2019

Photo(s)

Factory Name : ARVIND LIMITED

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 18/30

Page 19: IN Electrical Inspection

SST - 03.jpg

CAP Priority EP3

Reference Number WS - 01

Suggested Plan

Sub Issue Detail IND_E4.9.2

Sub Issue Type Warning/danger signage

Recommended Action All electrical outlet boxes should be provided with danger signages Ref- LABS 10.8.13.4

E4: Substations - Water ingress (IND)

Issue type E4: Substations

Details Of Issue Found Water ingree found in substation.

Recommended ActionDeadline Date

15 Sep 2019

Photo(s)

CAP Priority EP3

Reference Number SST - 03

Suggested Plan

Sub Issue Detail IND_E4.11.1

Sub Issue Type Water ingress (IND)

Recommended Action Arrangements should be provided to prevent the entrance of storm or flood water into thesubstation area Ref-LABS 10.5.2

E5: Distribution - Cable / Circuit identification

Issue type E5: Distribution

Details Of Issue Found Cable dressing not done in cable tray, Cables haphazardly liad without proper support anddistance.

Recommended ActionDeadline Date

15 Sep 2019

Factory Name : ARVIND LIMITED

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 19/30

Page 20: IN Electrical Inspection

CT - 01.jpg

CL - 01A.jpg

CL - 01B.jpg

CL - 01C.jpg

Photo(s)

CAP Priority EP3

Reference Number CL - 01

Suggested Plan

Sub Issue Detail IND_E5.3.1

Sub Issue Type Cable / Circuit identification

Recommended Action Cable dressing should be in cable tray with proper support and standard in electricalroom.

Issue type E5: Distribution

Details Of Issue Found In most of distribution board and sub main electrical panels of factory circuit identificationand labelling not done.

Recommended ActionDeadline Date

01 Sep 2019

Photo(s)

CAP Priority EP2

Reference Number CI - 01

Suggested Plan

Sub Issue Detail IND_E5.3.2

Sub Issue Type Cable / Circuit identification

Recommended Action Every circuit shall be legibly identified as to its clear, evident, and specific purpose or use.Spare positions that contain unused overcurrent devices or switches shall be described

Factory Name : ARVIND LIMITED

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 20/30

Page 21: IN Electrical Inspection

CTL - 01A.jpg

CTL - 01B.jpg

CTL - 01C.jpg

CTL - 01D.jpg

CG - 01A.jpg

CG - 01B.jpg

CG - 01C.jpg

CG - 01D.jpg

accordingly. The identification shall include a circuit directory that

Issue type E5: Distribution

Details Of Issue Found Most of Distribution board and in sub main distribution panel like sewing panel, Sewingline DB and washing section panel cable/wire termination directly terminated withoutlugs.

Recommended ActionDeadline Date

21 Aug 2019

Photo(s)

CAP Priority EP1

Reference Number CTL - 01

Suggested Plan

Sub Issue Detail IND_E5.3.3

Sub Issue Type Cable / Circuit identification

Recommended Action Outgoing cables shall be connected to terminals only by soldered or welded lugs, unlessthe terminal are of such form that it is possible to securely clamp them without cuttingaway the cable strands. Terminals shall be wired to the correct circuit protec

Issue type E5: Distribution

Details Of Issue Found Most of Sub main electrical panel and DB like main LT panel, Incomer COS, COS DB,Sewing panel 02 & 01, Knit PDB, Washing PDB and Voltage stabilizer etc..

Recommended ActionDeadline Date

01 Sep 2019

Photo(s)

Factory Name : ARVIND LIMITED

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 21/30

Page 22: IN Electrical Inspection

CG - 01E.jpg

CTB - 01A.jpg

CAP Priority EP2

Reference Number CG - 01

Suggested Plan

Sub Issue Detail IND_E5.3.4

Sub Issue Type Cable / Circuit identification

Recommended Action Hinged type metal boards shall consist of a box made of sheet metal not less than 2 mmthick and shall be provided with a hinged cover to enable the board to swing open forexamination of the wiring at the back. The joints shall be welded. The board shall

Issue type E5: Distribution

Details Of Issue Found Termination of cable to the breaker terminal without using lugs directly connected sewingpanel 02.

Recommended ActionDeadline Date

01 Sep 2019

Photo(s)

CAP Priority EP2

Reference Number CTB - 01

Suggested Plan

Sub Issue Detail IND_E5.3.5

Sub Issue Type Cable / Circuit identification

Recommended Action Termination of cable to the breaker should be done by using suitable size cable lugs to

Factory Name : ARVIND LIMITED

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 22/30

Page 23: IN Electrical Inspection

CBP - 01.jpg

avoid the short circuit due to over load or voltage fluctuation Ref- 10.8.15.2

E5: Distribution - Cable current carrying capacity

Issue type E5: Distribution

Details Of Issue Found In most of Distribution board protection device like ELCB/RCCB not installed.

Recommended ActionDeadline Date

21 Aug 2019

Photo(s)

CAP Priority EP1

Reference Number CBP - 01

Suggested Plan

Sub Issue Detail IND_E5.2.1

Sub Issue Type Cable current carrying capacity

Recommended Action Appropriate protection shall be provided at switchboards and distribution boards for allcircuits and subcircuits against short circuit and overcurrent and the protective apparatusshall be capable of interrupting any short circuit current that may occur

E5: Distribution - Cable support / Installation

Issue type E5: Distribution

Details Of Issue Found Cables laid haphazardly observed in most of Sub main electrical panel and Distributionboard of factory different section like- COS 2, COS DB, Stitching section sub main paneland Knits power DB etc..

Recommended ActionDeadline Date

15 Sep 2019

Photo(s)

Factory Name : ARVIND LIMITED

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 23/30

Page 24: IN Electrical Inspection

CLT - 01A.jpg

CLT - 01B.jpg

CLT - 01C.jpg CLT - 01D.jpg

EPI - 01A.jpg

EPI - 01B.jpg

EPI - 01C.jpg

CAP Priority EP3

Reference Number CLT - 01

Suggested Plan

Sub Issue Detail IND_E5.1.1

Sub Issue Type Cable support / Installation

Recommended Action Cables should be laid in cable tray or in proper routing to be done as per LABS 1.5.10.1

Issue type E5: Distribution

Details Of Issue Found Electrical panel board below HR office installed in wooden enclosure, MDB washing areainstalled on wooden base support and 2nd floor Dry process area panel with wooden baseplate support.

Recommended ActionDeadline Date

01 Sep 2019

Photo(s)

CAP Priority EP2

Reference Number EPI -01

Suggested Plan

Sub Issue Detail IND_E5.1.2

Sub Issue Type Cable support / Installation

Recommended Action All Electrical panels and DB should be free from use of combustible material like WoodRef- LABS 10.8.13

Issue type E5: Distribution

Details Of Issue Found Provided rubber mats in most of electrical switch board panel in washing, finishing anddry pressure area not adequate & ISO certified.

Recommended Action 21 Aug 2019

Factory Name : ARVIND LIMITED

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 24/30

Page 25: IN Electrical Inspection

EPR - 01A.jpg

EPR - 01B.jpg

EPR - 01C.jpg

EPR - 01D.jpg

EPW - 01A.jpg

Deadline Date

Photo(s)

CAP Priority EP1

Reference Number EPR - 01

Suggested Plan

Sub Issue Detail IND_E5.1.3

Sub Issue Type Cable support / Installation

Recommended Action Infront of all Electrical switch board panel should be provided with ISO certified rubbermats.

Issue type E5: Distribution

Details Of Issue Found PDB-03 in washing area water seepage infront of the panel board, chemical stored barrelsnesr panel and rubber mats not provided.

Recommended ActionDeadline Date

21 Aug 2019

Photo(s)

CAP Priority EP1

Reference Number EPW - 01

Suggested Plan

Sub Issue Detail IND_E5.1.4

Sub Issue Type Cable support / Installation

Factory Name : ARVIND LIMITED

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 25/30

Page 26: IN Electrical Inspection

EPO - 01A.jpg

EPO - 01B.jpg

EPO - 01C.jpg

CMB - 01B.jpg

Recommended Action Insallation and maintainance of switch board panel should be as per standard free fromwater seepage, combustible material and rubber mats should be provided Ref- LABS10.8.13

Issue type E5: Distribution

Details Of Issue Found Some of elctrical panel like MDB washing, PDB and Knit DB etc..

Recommended ActionDeadline Date

21 Aug 2019

Photo(s)

CAP Priority EP1

Reference Number EPD - 01

Suggested Plan

Sub Issue Detail IND_E5.1.5

Sub Issue Type Cable support / Installation

Recommended Action Electrical switch board panel doors should be closed all time to avoid the entry of foreignparticles.

E5: Distribution - Combustible/flammable materials (IND)

Issue type E5: Distribution

Details Of Issue Found Storage of combustible material near to electrical installation observed in many locationof factory like Main LT panel room, Finishing area main panel, Finishing starter DB andsewing main panel 01 etc..

Recommended ActionDeadline Date

21 Aug 2019

Photo(s)

Factory Name : ARVIND LIMITED

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 26/30

Page 27: IN Electrical Inspection

CMB - 01A.jpg CMB - 01C.jpg

CDH 01A.jpg

CDH 01B.jpg

CDH 01C.jpg

CDH 01D.jpg

CAP Priority EP1

Reference Number CMB -01

Suggested Plan

Sub Issue Detail IND_E5.6.1

Sub Issue Type Combustible/flammable materials (IND)

Recommended Action Avoid the storage of combustible material near to electrical installations Ref- LABS10.8.13

E5: Distribution - Lint / dust present

Issue type E5: Distribution

Details Of Issue Found In many areas of factory like stiching, Finishing, washing, Knit and sewing area Sub mainelectrical panel and Distribution Board like PDB -01 Washing area,Main LT panel, Sewingline 1 to 10 lighting DB and finishing area DB dust and lint observed.

Recommended ActionDeadline Date

21 Aug 2019

Photo(s)

CAP Priority EP1

Reference Number CDH - 01

Suggested Plan

Sub Issue Detail IND_E5.4.1

Sub Issue Type Lint / dust present

Recommended Action Maintain electrical systems in good working order and keep free of lint buildup to reducethe potential for ignition. This includes cleaning inside junction boxes, buses, trays,tunnels, etc. Ref- LABS 12.6.1.2

E6: Drawings - Switchboard diagrams not available (IND)

Issue type E6: Drawings

Factory Name : ARVIND LIMITED

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 27/30

Page 28: IN Electrical Inspection

TG - 01 .jpg

Details Of Issue Found Single line diagram not displayed in all Lighting and power disstribution board, Electricalsub main panels also not displayed with SLD.

Recommended ActionDeadline Date

15 Sep 2019

Photo(s)

CAP Priority EP3

Reference Number SLD - 01

Suggested Plan

Sub Issue Detail IND_E6.5.1

Sub Issue Type Switchboard diagrams not available (IND)

Recommended Action All Electrical Panels and Distribution Board should be displayed with SLD Ref - 10.18.3

E8: Thermographic Scanning - Cable connection / termination

Issue type E8: Thermographic Scanning

Details Of Issue Found Washing Area MDB – R phase terminal observed at 104 Celcius

Recommended ActionDeadline Date

21 Aug 2019

Photo(s)

CAP Priority EP1

Reference Number TG - 01

Suggested Plan

Sub Issue Detail IND_E8.2.1

Sub Issue Type Cable connection / termination

Recommended Action Load balancing needs to check in MDB Ref- LABS 10.31.2.3

Factory Name : ARVIND LIMITED

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 28/30

Page 29: IN Electrical Inspection

PHOTO EVIDENCE

Factory Name : ARVIND LIMITED

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 29/30

Page 30: IN Electrical Inspection

PHOTO DOCUMENTATION