in electrical inspection
TRANSCRIPT
IN_Electrical Inspection
Factory Name : ARVIND LIMITED
Address: 26/2, 27/2, Kenchenahalli Post, Kengri Hobli, Mysore Road,Karnataka, India Bangalore India
Discipline Name: IN_Electrical Inspection
Assessment Date : 31 Jul 2019
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 1/30
Table of Contents
I Factory Information
II Findings and Remediation Issues
III Photo Evidence
IV Photo Documentation
Factory Name : ARVIND LIMITED
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 2/30
FACTORY INFORMATION
Basic information
Country India
City/Town Bangalore
Postal Code
Phone 919739781199
Office Fax
Office City
Office Country India
Office Address
Country Code
Office Email
Assessment Information
Auditor Bureau Veritas_IN
Executive Summary
1552 Assessment Closing Comments
Factory Name : ARVIND LIMITED
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 3/30
EPB - 01.jpg
EPB - 02.jpg
FINDINGS AND REMEDIATION ISSUES
E2: Earthing and Bonding - Insufficient bonding of equipment (IND)
Issue type E2: Earthing and Bonding
Details Of Issue Found Body earthing connection strip found not tight and secure with overlapping of three stripfor continity.
Recommended ActionDeadline Date
01 Sep 2019
Photo(s)
CAP Priority EP2
Reference Number EPB-01
Suggested Plan
Sub Issue Detail IND_E2.6.1
Sub Issue Type Insufficient bonding of equipment (IND)
Recommended Action Earthing connection and contuinity of GI strips should be tight and secure for betterconductivity as per IS-3043 & LABS 10.4.6
Issue type E2: Earthing and Bonding
Details Of Issue Found HT Metering panel body earthing connection hardware found rusted.
Recommended ActionDeadline Date
21 Aug 2019
Photo(s)
Factory Name : ARVIND LIMITED
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 4/30
EBE - 01A.jpg
EBE - 01B.jpg
EBE - 01C.jpg
CAP Priority EP1
Reference Number EPB-02
Suggested Plan
Sub Issue Detail IND_E2.6.2
Sub Issue Type Insufficient bonding of equipment (IND)
Recommended Action Hardware connection of GI earth strip should be free from rust and maintained as per IS-3043 & LABS 10.4.6
Issue type E2: Earthing and Bonding
Details Of Issue Found Few of Electrical switch board panel and Distribution board body earthing not providedlike Sampling 2nd floor DB, Dry process area UPS DB, Compressor DB, UPS room DB andControl MCB box etc..
Recommended ActionDeadline Date
21 Aug 2019
Photo(s)
CAP Priority EP1
Reference Number EBE -01
Suggested Plan
Sub Issue Detail IND_E2.6.3
Sub Issue Type Insufficient bonding of equipment (IND)
Recommended Action All Electrical switch board panel and DB should be provided with bosy earthing as per IS-3043 ,LABS 10.4.6
E2: Earthing and Bonding - Other
Issue type E2: Earthing and Bonding
Details Of Issue Found Earth pit stations in GOS not maintained as per IS-3043 & LABS 10.4.6
Recommended Action 15 Sep 2019
Factory Name : ARVIND LIMITED
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 5/30
EP - 1.jpg
EP - 2.jpg
Deadline Date
Photo(s)
CAP Priority EP3
Reference Number EP 01
Suggested Plan
Sub Issue Detail IND_E2.9.1
Sub Issue Type Other
Recommended Action Earth pit stations should be provided with display of Earth pit name, measured value anddue date as per IS-3043 & LABS 10.4.6
Issue type E2: Earthing and Bonding
Details Of Issue Found Earth pit cover plate found broken.
Recommended ActionDeadline Date
01 Sep 2019
Photo(s)
CAP Priority EP2
Reference Number EP 02
Suggested Plan
Sub Issue Detail IND_E2.9.2
Sub Issue Type Other
Recommended Action Cover plate of earth pit station should be free from damage as per IS-3043 & LABS
Factory Name : ARVIND LIMITED
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 6/30
EP - 3.jpg
EP - 4.jpg
10.4.6
Issue type E2: Earthing and Bonding
Details Of Issue Found In transformer yard earth pit station waste debris found accumulated in earth pit notmaintained as per IS-3043 & LABS 10.4.6
Recommended ActionDeadline Date
01 Sep 2019
Photo(s)
CAP Priority EP2
Reference Number EP 03
Suggested Plan
Sub Issue Detail IND_E2.9.3
Sub Issue Type Other
Recommended Action Earth pit station periodocal maintenance to be done and construction and maintenance ofearth pit station should be as per IS-3043 & LABS 10.4.6
Issue type E2: Earthing and Bonding
Details Of Issue Found Transformer yard displayed plate not provided with last measured value and due date.
Recommended ActionDeadline Date
01 Sep 2019
Photo(s)
CAP Priority EP2
Factory Name : ARVIND LIMITED
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 7/30
DG - 01.JPG
DGF - 01.jpg
Reference Number EP 04
Suggested Plan
Sub Issue Detail IND_E2.9.4
Sub Issue Type Other
Recommended Action Earth pit should be displayed with last measured value, Due date and earth pit no & nameas per IS-3043 & LABS 10.4.6
E3: Generators - Fuel pump not on life safety supply (IND)
Issue type E3: Generators
Details Of Issue Found Required Fire fighting equipments not provided near to fuel storage.
Recommended ActionDeadline Date
01 Sep 2019
Photo(s)
CAP Priority EP2
Reference Number DGF-01
Suggested Plan
Sub Issue Detail IND_E3.4.1
Sub Issue Type Fuel pump not on life safety supply (IND)
Recommended Action Required no and type of fire fighting equipments should be kept near to fuel storage Ref-10.7.1
E3: Generators - Generator Battery
Issue type E3: Generators
Details Of Issue Found Diesel generator battery terminal protection cap not providedd.
Recommended ActionDeadline Date
01 Sep 2019
Photo(s)
Factory Name : ARVIND LIMITED
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 8/30
DGB - 01.jpg
EDG - 01.jpg
CAP Priority EP2
Reference Number DGB-01
Suggested Plan
Sub Issue Detail IND_E3.6.1
Sub Issue Type Generator Battery
Recommended Action Battery terminal caps to be provided for battery terminals to protect terminals of thebattery.
E3: Generators - Generator earthing
Issue type E3: Generators
Details Of Issue Found Eath strip contuinity connection are npt and secure, Dust and diesel traces foun on strip.
Recommended ActionDeadline Date
21 Aug 2019
Photo(s)
CAP Priority EP1
Reference Number EDG-01
Suggested Plan
Sub Issue Detail IND_E3.8.4
Sub Issue Type Generator earthing
Recommended Action Earth strip connection should be tight and secure, Periodical maintenance should be taken
Factory Name : ARVIND LIMITED
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 9/30
EDG - 02.jpg
DGH - 01.jpg
care as per IS-3043 & LABS 10.4.6
Issue type E3: Generators
Details Of Issue Found DG earth pit station not displayed with last measured value and due date.
Recommended ActionDeadline Date
15 Sep 2019
Photo(s)
CAP Priority EP3
Reference Number EDG-02
Suggested Plan
Sub Issue Detail IND_E3.8.5
Sub Issue Type Generator earthing
Recommended Action Earth pit station should be dislayed with measured resisitance value and due date as perIS-3043 & LABS 10.4.6
E3: Generators - Housekeeping
Issue type E3: Generators
Details Of Issue Found Inside the accoustic enclosure of DG combustible material observed and lack ofmaintenance diesel spillage & dust observed.
Recommended ActionDeadline Date
21 Aug 2019
Photo(s)
Factory Name : ARVIND LIMITED
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 10/30
DGO - 01.jpg
CAP Priority EP1
Reference Number DGH-01
Suggested Plan
Sub Issue Detail IND_E3.10.1
Sub Issue Type Housekeeping
Recommended Action Maintain electrical systems in good working order and keep free of lint buildup to reducethe potential for ignition. This includes cleaning inside junction boxes, buses, trays,tunnels, etc Ref- 12.6.1.2
Issue type E3: Generators
Details Of Issue Found Starter panel inside the accoustic enclosure of DG body earthing not provided.
Recommended ActionDeadline Date
01 Sep 2019
Photo(s)
CAP Priority EP2
Reference Number DGO-01
Suggested Plan
Sub Issue Detail IND_E3.12.1
Sub Issue Type Other
Recommended Action All metal casings or metallic coverings containing or protecting any switchgear shall beconnected to earth
Issue type E3: Generators
Details Of Issue Found Cables haphazardly laid inside the DG enclosure.
Recommended ActionDeadline Date
15 Sep 2019
Photo(s)
Factory Name : ARVIND LIMITED
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 11/30
DGO - 02.jpg
DGO - 03A.jpg
DGO - 03B.JPG
CAP Priority EP3
Reference Number DGO-02
Suggested Plan
Sub Issue Detail IND_E3.12.2
Sub Issue Type Other
Recommended Action Cables should be laid with proper support and dressing required.
Issue type E3: Generators
Details Of Issue Found DG doors kept open observed during the of audit.
Recommended ActionDeadline Date
01 Sep 2019
Photo(s)
CAP Priority EP2
Reference Number DGO-03
Suggested Plan
Sub Issue Detail IND_E3.12.3
Sub Issue Type Other
Recommended Action DG doors should be closed to prevent entry of foreign particles in side the DG.
Issue type E3: Generators
Factory Name : ARVIND LIMITED
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 12/30
DGO - 04.jpg
TS - 01A.jpg
TS - 01B.jpg
Details Of Issue Found DG-3 inside the accoustic enclosure electrical utility DB installed on wooden ply board andwooden rack found in DG.
Recommended ActionDeadline Date
15 Sep 2019
Photo(s)
CAP Priority EP3
Reference Number DGO-04
Suggested Plan
Sub Issue Detail IND_E3.12.4
Sub Issue Type Other
Recommended Action Combustible material like wooden ply board used for electrical installation should beavoided
E4: Substations - Equipment condition
Issue type E4: Substations
Details Of Issue Found Transformer and votage stabilizer silica gel found out out of order.
Recommended ActionDeadline Date
01 Sep 2019
Photo(s)
CAP Priority EP2
Reference Number STS - 01
Suggested Plan
Factory Name : ARVIND LIMITED
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 13/30
SSGOS - 01.jpg
SST - 02.jpg
Sub Issue Detail IND_E4.1.1
Sub Issue Type Equipment condition
Recommended Action Remove the moisture content from silica gel from transformer.
Issue type E4: Substations
Details Of Issue Found GOS Substation vegetation of plant found and waste debris accumulated.
Recommended ActionDeadline Date
01 Sep 2019
Photo(s)
CAP Priority EP2
Reference Number SSGOS-01
Suggested Plan
Sub Issue Detail IND_E4.2.1
Sub Issue Type Housekeeping
Recommended Action Substation should be free from vegetation and waste debris.
Issue type E4: Substations
Details Of Issue Found Material storage and tree found near to the transformer substation.
Recommended ActionDeadline Date
01 Sep 2019
Photo(s)
Factory Name : ARVIND LIMITED
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 14/30
SST - 04.jpg
ELP - 01A.jpg
ELP - 01B.jpg
ELP - 01C.jpg
ELP - 01 D.jpg
CAP Priority EP2
Reference Number SST- 02
Suggested Plan
Sub Issue Detail IND_E4.5.1
Sub Issue Type Other
Recommended Action Substation should be free from vegetation tree, waste debris and storage of material.
Issue type E4: Substations
Details Of Issue Found Fire fighting equipment not provided near to substation.
Recommended ActionDeadline Date
21 Aug 2019
Photo(s)
CAP Priority EP1
Reference Number SST - 03
Suggested Plan
Sub Issue Detail IND_E4.5.2
Sub Issue Type Other
Recommended Action Required no and type of fire fighting equipments should be kept near to fuel storage Ref-10.7.1
Issue type E4: Substations
Details Of Issue Found Inatallation of Submain electrical panels in Stiching, Sewing and Finishing area with metalenclosure without maintaining maintenance space of 1 meter.
Recommended ActionDeadline Date
17 Oct 2019
Photo(s)
Factory Name : ARVIND LIMITED
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 15/30
CAP Priority EP4
Reference Number ELEP - 01
Suggested Plan
Sub Issue Detail IND_E4.5.3
Sub Issue Type Other
Recommended Action Minimum 1meter space should be maintain infront of switch board box for easy accessand maintenance Ref- LABS 10.8.11
Issue type E4: Substations
Details Of Issue Found Installation of some of switch board without safety barricade like - PDB - 3,5 & 7
Recommended ActionDeadline Date
01 Sep 2019
Photo(s)
CAP Priority EP2
Reference Number ELEP - 02
Suggested Plan
Sub Issue Detail IND_E4.5.4
Sub Issue Type Other
Recommended Action Installation of switch board should be provided with barricade for entry of authorizedperson Ref- LABS 10.8.13.4
Issue type E4: Substations
Details Of Issue Found Metal enclosure or barricade provided for all switch board not provided with body earthig.
Recommended ActionDeadline Date
01 Sep 2019
Photo(s)
Factory Name : ARVIND LIMITED
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 16/30
ELBD - 01.jpg
SSGOS - 02.jpg
CAP Priority EP2
Reference Number ESBE - 01
Suggested Plan
Sub Issue Detail IND_E4.5.5
Sub Issue Type Other
Recommended Action All metal casings or metallic coverings containing or protecting any switchgear shall beconnected to earth Ref - 10.8.10
E4: Substations - Substation access (IND)
Issue type E4: Substations
Details Of Issue Found GOS substation access doors kept open observed during the time of visit.
Recommended ActionDeadline Date
21 Aug 2019
Photo(s)
CAP Priority EP1
Reference Number SSGOS-02
Suggested Plan
Sub Issue Detail IND_E4.6.1
Sub Issue Type Substation access (IND)
Recommended Action Lockable door with restricted access to those only competent to entry substations Ref -
Factory Name : ARVIND LIMITED
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 17/30
SST - 01.jpg
WS - 01A.jpg
WS - 01B.jpg
WS - 01C.jpg
LABS 10.5.3.6
E4: Substations - Warning/danger signage
Issue type E4: Substations
Details Of Issue Found Transformer yard warning signages are not adequate.
Recommended ActionDeadline Date
01 Sep 2019
Photo(s)
CAP Priority EP2
Reference Number SST - 01
Suggested Plan
Sub Issue Detail IND_E4.9.1
Sub Issue Type Warning/danger signage
Recommended Action Warning signages should provide on all sides of yard fencing to avoid the entry ofunauthorized person Ref- LABS 10.5.3.6
Issue type E4: Substations
Details Of Issue Found Warning signages not provided for some of electrical switch board and Most Distributionboard like washing PDB'S and UPS, Lighting and power DB.
Recommended ActionDeadline Date
15 Sep 2019
Photo(s)
Factory Name : ARVIND LIMITED
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 18/30
SST - 03.jpg
CAP Priority EP3
Reference Number WS - 01
Suggested Plan
Sub Issue Detail IND_E4.9.2
Sub Issue Type Warning/danger signage
Recommended Action All electrical outlet boxes should be provided with danger signages Ref- LABS 10.8.13.4
E4: Substations - Water ingress (IND)
Issue type E4: Substations
Details Of Issue Found Water ingree found in substation.
Recommended ActionDeadline Date
15 Sep 2019
Photo(s)
CAP Priority EP3
Reference Number SST - 03
Suggested Plan
Sub Issue Detail IND_E4.11.1
Sub Issue Type Water ingress (IND)
Recommended Action Arrangements should be provided to prevent the entrance of storm or flood water into thesubstation area Ref-LABS 10.5.2
E5: Distribution - Cable / Circuit identification
Issue type E5: Distribution
Details Of Issue Found Cable dressing not done in cable tray, Cables haphazardly liad without proper support anddistance.
Recommended ActionDeadline Date
15 Sep 2019
Factory Name : ARVIND LIMITED
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 19/30
CT - 01.jpg
CL - 01A.jpg
CL - 01B.jpg
CL - 01C.jpg
Photo(s)
CAP Priority EP3
Reference Number CL - 01
Suggested Plan
Sub Issue Detail IND_E5.3.1
Sub Issue Type Cable / Circuit identification
Recommended Action Cable dressing should be in cable tray with proper support and standard in electricalroom.
Issue type E5: Distribution
Details Of Issue Found In most of distribution board and sub main electrical panels of factory circuit identificationand labelling not done.
Recommended ActionDeadline Date
01 Sep 2019
Photo(s)
CAP Priority EP2
Reference Number CI - 01
Suggested Plan
Sub Issue Detail IND_E5.3.2
Sub Issue Type Cable / Circuit identification
Recommended Action Every circuit shall be legibly identified as to its clear, evident, and specific purpose or use.Spare positions that contain unused overcurrent devices or switches shall be described
Factory Name : ARVIND LIMITED
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 20/30
CTL - 01A.jpg
CTL - 01B.jpg
CTL - 01C.jpg
CTL - 01D.jpg
CG - 01A.jpg
CG - 01B.jpg
CG - 01C.jpg
CG - 01D.jpg
accordingly. The identification shall include a circuit directory that
Issue type E5: Distribution
Details Of Issue Found Most of Distribution board and in sub main distribution panel like sewing panel, Sewingline DB and washing section panel cable/wire termination directly terminated withoutlugs.
Recommended ActionDeadline Date
21 Aug 2019
Photo(s)
CAP Priority EP1
Reference Number CTL - 01
Suggested Plan
Sub Issue Detail IND_E5.3.3
Sub Issue Type Cable / Circuit identification
Recommended Action Outgoing cables shall be connected to terminals only by soldered or welded lugs, unlessthe terminal are of such form that it is possible to securely clamp them without cuttingaway the cable strands. Terminals shall be wired to the correct circuit protec
Issue type E5: Distribution
Details Of Issue Found Most of Sub main electrical panel and DB like main LT panel, Incomer COS, COS DB,Sewing panel 02 & 01, Knit PDB, Washing PDB and Voltage stabilizer etc..
Recommended ActionDeadline Date
01 Sep 2019
Photo(s)
Factory Name : ARVIND LIMITED
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 21/30
CG - 01E.jpg
CTB - 01A.jpg
CAP Priority EP2
Reference Number CG - 01
Suggested Plan
Sub Issue Detail IND_E5.3.4
Sub Issue Type Cable / Circuit identification
Recommended Action Hinged type metal boards shall consist of a box made of sheet metal not less than 2 mmthick and shall be provided with a hinged cover to enable the board to swing open forexamination of the wiring at the back. The joints shall be welded. The board shall
Issue type E5: Distribution
Details Of Issue Found Termination of cable to the breaker terminal without using lugs directly connected sewingpanel 02.
Recommended ActionDeadline Date
01 Sep 2019
Photo(s)
CAP Priority EP2
Reference Number CTB - 01
Suggested Plan
Sub Issue Detail IND_E5.3.5
Sub Issue Type Cable / Circuit identification
Recommended Action Termination of cable to the breaker should be done by using suitable size cable lugs to
Factory Name : ARVIND LIMITED
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 22/30
CBP - 01.jpg
avoid the short circuit due to over load or voltage fluctuation Ref- 10.8.15.2
E5: Distribution - Cable current carrying capacity
Issue type E5: Distribution
Details Of Issue Found In most of Distribution board protection device like ELCB/RCCB not installed.
Recommended ActionDeadline Date
21 Aug 2019
Photo(s)
CAP Priority EP1
Reference Number CBP - 01
Suggested Plan
Sub Issue Detail IND_E5.2.1
Sub Issue Type Cable current carrying capacity
Recommended Action Appropriate protection shall be provided at switchboards and distribution boards for allcircuits and subcircuits against short circuit and overcurrent and the protective apparatusshall be capable of interrupting any short circuit current that may occur
E5: Distribution - Cable support / Installation
Issue type E5: Distribution
Details Of Issue Found Cables laid haphazardly observed in most of Sub main electrical panel and Distributionboard of factory different section like- COS 2, COS DB, Stitching section sub main paneland Knits power DB etc..
Recommended ActionDeadline Date
15 Sep 2019
Photo(s)
Factory Name : ARVIND LIMITED
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 23/30
CLT - 01A.jpg
CLT - 01B.jpg
CLT - 01C.jpg CLT - 01D.jpg
EPI - 01A.jpg
EPI - 01B.jpg
EPI - 01C.jpg
CAP Priority EP3
Reference Number CLT - 01
Suggested Plan
Sub Issue Detail IND_E5.1.1
Sub Issue Type Cable support / Installation
Recommended Action Cables should be laid in cable tray or in proper routing to be done as per LABS 1.5.10.1
Issue type E5: Distribution
Details Of Issue Found Electrical panel board below HR office installed in wooden enclosure, MDB washing areainstalled on wooden base support and 2nd floor Dry process area panel with wooden baseplate support.
Recommended ActionDeadline Date
01 Sep 2019
Photo(s)
CAP Priority EP2
Reference Number EPI -01
Suggested Plan
Sub Issue Detail IND_E5.1.2
Sub Issue Type Cable support / Installation
Recommended Action All Electrical panels and DB should be free from use of combustible material like WoodRef- LABS 10.8.13
Issue type E5: Distribution
Details Of Issue Found Provided rubber mats in most of electrical switch board panel in washing, finishing anddry pressure area not adequate & ISO certified.
Recommended Action 21 Aug 2019
Factory Name : ARVIND LIMITED
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 24/30
EPR - 01A.jpg
EPR - 01B.jpg
EPR - 01C.jpg
EPR - 01D.jpg
EPW - 01A.jpg
Deadline Date
Photo(s)
CAP Priority EP1
Reference Number EPR - 01
Suggested Plan
Sub Issue Detail IND_E5.1.3
Sub Issue Type Cable support / Installation
Recommended Action Infront of all Electrical switch board panel should be provided with ISO certified rubbermats.
Issue type E5: Distribution
Details Of Issue Found PDB-03 in washing area water seepage infront of the panel board, chemical stored barrelsnesr panel and rubber mats not provided.
Recommended ActionDeadline Date
21 Aug 2019
Photo(s)
CAP Priority EP1
Reference Number EPW - 01
Suggested Plan
Sub Issue Detail IND_E5.1.4
Sub Issue Type Cable support / Installation
Factory Name : ARVIND LIMITED
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 25/30
EPO - 01A.jpg
EPO - 01B.jpg
EPO - 01C.jpg
CMB - 01B.jpg
Recommended Action Insallation and maintainance of switch board panel should be as per standard free fromwater seepage, combustible material and rubber mats should be provided Ref- LABS10.8.13
Issue type E5: Distribution
Details Of Issue Found Some of elctrical panel like MDB washing, PDB and Knit DB etc..
Recommended ActionDeadline Date
21 Aug 2019
Photo(s)
CAP Priority EP1
Reference Number EPD - 01
Suggested Plan
Sub Issue Detail IND_E5.1.5
Sub Issue Type Cable support / Installation
Recommended Action Electrical switch board panel doors should be closed all time to avoid the entry of foreignparticles.
E5: Distribution - Combustible/flammable materials (IND)
Issue type E5: Distribution
Details Of Issue Found Storage of combustible material near to electrical installation observed in many locationof factory like Main LT panel room, Finishing area main panel, Finishing starter DB andsewing main panel 01 etc..
Recommended ActionDeadline Date
21 Aug 2019
Photo(s)
Factory Name : ARVIND LIMITED
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 26/30
CMB - 01A.jpg CMB - 01C.jpg
CDH 01A.jpg
CDH 01B.jpg
CDH 01C.jpg
CDH 01D.jpg
CAP Priority EP1
Reference Number CMB -01
Suggested Plan
Sub Issue Detail IND_E5.6.1
Sub Issue Type Combustible/flammable materials (IND)
Recommended Action Avoid the storage of combustible material near to electrical installations Ref- LABS10.8.13
E5: Distribution - Lint / dust present
Issue type E5: Distribution
Details Of Issue Found In many areas of factory like stiching, Finishing, washing, Knit and sewing area Sub mainelectrical panel and Distribution Board like PDB -01 Washing area,Main LT panel, Sewingline 1 to 10 lighting DB and finishing area DB dust and lint observed.
Recommended ActionDeadline Date
21 Aug 2019
Photo(s)
CAP Priority EP1
Reference Number CDH - 01
Suggested Plan
Sub Issue Detail IND_E5.4.1
Sub Issue Type Lint / dust present
Recommended Action Maintain electrical systems in good working order and keep free of lint buildup to reducethe potential for ignition. This includes cleaning inside junction boxes, buses, trays,tunnels, etc. Ref- LABS 12.6.1.2
E6: Drawings - Switchboard diagrams not available (IND)
Issue type E6: Drawings
Factory Name : ARVIND LIMITED
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 27/30
TG - 01 .jpg
Details Of Issue Found Single line diagram not displayed in all Lighting and power disstribution board, Electricalsub main panels also not displayed with SLD.
Recommended ActionDeadline Date
15 Sep 2019
Photo(s)
CAP Priority EP3
Reference Number SLD - 01
Suggested Plan
Sub Issue Detail IND_E6.5.1
Sub Issue Type Switchboard diagrams not available (IND)
Recommended Action All Electrical Panels and Distribution Board should be displayed with SLD Ref - 10.18.3
E8: Thermographic Scanning - Cable connection / termination
Issue type E8: Thermographic Scanning
Details Of Issue Found Washing Area MDB – R phase terminal observed at 104 Celcius
Recommended ActionDeadline Date
21 Aug 2019
Photo(s)
CAP Priority EP1
Reference Number TG - 01
Suggested Plan
Sub Issue Detail IND_E8.2.1
Sub Issue Type Cable connection / termination
Recommended Action Load balancing needs to check in MDB Ref- LABS 10.31.2.3
Factory Name : ARVIND LIMITED
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 28/30
PHOTO EVIDENCE
Factory Name : ARVIND LIMITED
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 29/30
PHOTO DOCUMENTATION
SharingPlatformReminder
Factory Name : ARVIND LIMITED
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 30/30