48NPFC70 Lithium Battery Training

For Globe Philippines

An Expert of Lithium battery Solutions.

April.11.2016

Page 2: 48NPFC70 litihum battery training for globe

Company profiles

Page 3: 48NPFC70 litihum battery training for globe

Stored Energy Solutions for a Demanding World!

BackgroundWho are we

Narada Holdings

Electrochemical Power products

Financial service

Cable networks

Narada foundation

Infrastructures projects

Property & Hotel management

Narada Power Source Co., Ltd.

Page 4: 48NPFC70 litihum battery training for globe

Stored Energy Solutions for a Demanding World!

Facts and figuresWho are we

• Established in 1994

• Listed in 2010

• $875.2mil. revenue in 2015

• $785.1 mil. total assets

• 5143 employees

• Top 1st brand in China

• 10% profit for invest in R&D

Page 5: 48NPFC70 litihum battery training for globe

Stored Energy Solutions for a Demanding World!

MilestonesWho are we

Narada wuhan

established

2014

Narada power

established

1998

Licom power

established

2001

Listed

company

2010

Narada Asia

established

2005

Foundation

of Narada

1994

Page 6: 48NPFC70 litihum battery training for globe

Stored Energy Solutions for a Demanding World!

Distinct cultureWho are we

To be a provider for a complete power solution in the world

Mission

To be a respected global player for the energy storage solutions

Vision

Create value for customers and win together with customers

Value

Page 7: 48NPFC70 litihum battery training for globe

Stored Energy Solutions for a Demanding World!

Manufacturing locationsWhere are we

Lin'an Area: 113,333 ㎡ Linping Area: 166,667 ㎡ Sichuan Area: 110,667 ㎡

Wuhan Area: 413,333 ㎡ Anhui Area: 106,667 ㎡

Page 8: 48NPFC70 litihum battery training for globe

Stored Energy Solutions for a Demanding World!

Product applicationWhat we do

To be whole solution provider in Telecom, motive power and energy storage

Motive power

Telecom & IDC Energy storage

Page 9: 48NPFC70 litihum battery training for globe

Stored Energy Solutions for a Demanding World!

Strong R&D strength Why choose us

Mr. Herbert K. Giess

• 86 valid patents, 30 invention patents

• National R&D center & CNAS certified Labs

• Totally 215 highly educated engineers

• Participate in setting 20 industry standards

> Head of Narada tech center

> Group leader for IEC standard for VRLA batteries IEC 60896-21

> Chairman of IEC/EN TC21 cells

Page 10: 48NPFC70 litihum battery training for globe

Stored Energy Solutions for a Demanding World!

Quality managementWhy choose us

By BUREAU VERITAS

SA8000

By DNV

ISO14001

By DNV

TL-9000

By DNV

OHSAS18001

By TUV

ISO9001> Head of Narada QM system

> 42 years QM experience in Toyota TPS system

> NPS, Narada production system

Mr. Hagimori Hajime

TS16949

Page 12: 48NPFC70 litihum battery training for globe

Stored Energy Solutions for a Demanding World!

Clients of motive powerHow is our performance

Page 13: 48NPFC70 litihum battery training for globe

Stored Energy Solutions for a Demanding World!

Clients of energy storageHow is our performance

Page 14: 48NPFC70 litihum battery training for globe

Stored Energy Solutions for a Demanding World!

Clients of IDC & UPSHow is our performance

Page 15: 48NPFC70 litihum battery training for globe

Product introduction

Page 16: 48NPFC70 litihum battery training for globe

Products:

LiFePO4 Lithium Battery

Type:

48NPFC series

Application:

Telecom, Energy storage system

What is our product

Page 17: 48NPFC70 litihum battery training for globe

Model Specification H×W×D (mm)

48NPFC10 48V 10Ah 442*245*44 (1U)

48NPFC20 48V 20Ah 442*245*88 (2U)

48NPFC30 48V 30Ah 442*245*132.5 (3U)

48NPFC50 48V 50Ah 442*390*132.5 (3U)

48NPFC70 48V 70Ah 442*450*132.5 (3U)

48NPFC75 48V 75Ah 442*400*220 (5U)

48NPFC80 (coming soon) 48V 80Ah 442*400*220 (5U)

Serials SpecificationWhat is our product

Page 18: 48NPFC70 litihum battery training for globe

Cell: 15 cells series connection

BMS: Integrated Monitor/ protection

Connection system: power line & signal line

The composition of batteryWhat is our product

Page 19: 48NPFC70 litihum battery training for globe

The composition: CellWhat is our product

NLC36130208PFPrismatic cell

15 cells into one group

Cell

Barcode

Heat shrink tube

Page 20: 48NPFC70 litihum battery training for globe

NLC36130208PF specificationWhat is our product

Page 21: 48NPFC70 litihum battery training for globe

Stored Energy Solutions for a Demanding World!

Prismatic cell designWhat is our product

Positive/Negative terminalCell cover

Cell tabs

Aluminum case

Cell group: Positive:LiFePO4 platesNegative: Graphite plates Separators: Organic material

Safety valve

Page 22: 48NPFC70 litihum battery training for globe

BMS Job: Make Battery Reliable And Safety !

1. Various protected function

2. Monitor voltage/current/temperature

3. high-efficiency cell balance function

4. LCD Display function

5. Dry contact function

6. Charge current limited function

7. Dormant function

8. Multiple communication interface

9. Narada customized/Modbus protocol

10. Maintenance management

11. Provide PC software to visualized operation

Built-in BMS functionWhat is our product

Page 23: 48NPFC70 litihum battery training for globe

Stored Energy Solutions for a Demanding World!

Monitor

1. Single cell voltage

2. Module voltage/current

3. Module capacity

4. Module/ambient

temperature

5. Cumulative

Charge/discharge KWH

6. …

Protection

1. Cell over/under voltage

2. Module over/under voltage

3. Over/under temperature

4. Charge/discharge over-

current

5. Short-circuit

6. Communication fail

7. …

Communication port

1. RS232

2. RS485

Built-in BMS functionWhat is our product

Page 24: 48NPFC70 litihum battery training for globe

BMS protection parameterWhat is our product

BMS function Description Active point

Single cell over-charge

Over-charge protection threshold voltage

3.80±0.02V

Over-charge protection delay time 1.0-2.5s

Single-cell over-discharge

Over-discharge protection threshold voltage

2.80±0.02V

Over-discharge protection delay time

1.0-2.5s

Discharge recover threshold voltage 3.1±0.02V

Module over charge

Over-charge protection threshold voltage

56.0±0.3V

Over-charge protection delay time 1.0-2.5s

Over-charge recover threshold voltage

54.5±0.3V

Module over discharge

Over-discharge protection threshold voltage

42±0.3V

Over-discharge protection delay time

1.0-2.5s

Discharge recover threshold voltage 48.00±0.02V

Over current protection

Over-current protection delay time 1 in discharge

5.0±2s

Over-current protection 2 in discharge 90±4A

Over-current protection delay time 2 in discharge

500±50ms

Over-Current protection in charge 50±3A

Short circuit

Short circuit protection 150±10A

Protection conditionLoad short

circuit

detection delay time About 500us

Recover conditionLoad cut-off /

charge module

Over Temperature

protection

High temperature protection in charge 70±3℃

Recover temperature in charge 60±3℃

High temperature protection in discharge 70±3℃

Recover temperature in discharge 60±3℃

Low temperature protection in charge 0±3℃

Recover temperature in charge 5±3℃

Low temperature protection in discharge -10±3℃

Recover temperature in discharge 0±3℃

Page 25: 48NPFC70 litihum battery training for globe

No. Name Functions Remark

1 SOC Indicators for capacityThere are four green LED lights in front panel indicating SOC. SOC is short for state of charge. Each SOC LED light

represents 25% of rated capacity

CapacityLED Status

● ● ● ●

LED1 LED2 LED3 LED4

0-25% ON OFF OFF OFF

25%-50% ON ON OFF OFF

50%-75% ON ON ON OFF

75%-100% ON ON ON ON

Battery interfaceWhat is our product

Page 26: 48NPFC70 litihum battery training for globe

No. Name Functions Remark

4 ADDAddress of

communication

ADD is applicable to modules connected in parallel. ADD consists of four binary bits, and maximum quantity of

batteries connected in parallel is 16pcs .

Battery interfaceWhat is our product

Page 27: 48NPFC70 litihum battery training for globe

2 ALM Indicator for alarms There is one red LED light in front panel indicating alarms.

3 RUN Indicator for running status There is one green LED light in front panel indicating running status

Battery Status IndicatorRUN ALM SOC

Remark● ● ● ● ● ●

OFF or sleep mode / OFF OFF OFF OFF OFF OFF ——

Idle Normal0.25S ON3.75S OFF

OFF Battery SOC

Charge Normal0.5S ON0.5S OFF

OFF Battery SOC

Discharge Normal Continuous on OFF Battery SOC

Charge/discharge/Idle Protection According to battery

statusFlash ON OFF

Over-voltage under voltage ALM not flash

Charge/discharge/Idle BMS Fail OFF Continuous ON OFF Hardware fail

Battery interfaceWhat is our product

Page 28: 48NPFC70 litihum battery training for globe

No. Name Functions Remark

5 RS232 Up-link communication portIt is adopting RS-232 series port to upload data, it only support single

battery communication. Also use for upgrading BMS firmware.

6 RS485Cascading communication

portIt is adopting RS485 series port communication pattern to upload data. It

can support multiple battery paralleling communication

RJ45 pins Definition

1 GND

2 RS485_A

3 RS485_B

4,5,6,7,8 Void

Battery interfaceWhat is our product

Page 29: 48NPFC70 litihum battery training for globe

No. Name Functions Remark

7 RESET Reset buttonPress RESET button when abnormity occurs to assure stability of battery

performance.

8 Dry contact Dry contact indicators

Failure Alarm: indicate BMS or battery fail including but not limited to charge and discharge MOS fail, cell voltage under 0.5V, NTC disconnect.

Protection Alarm: Output short circuit, charge and discharge over current, charge and discharge over temperature/low temperature.

9 Power switch ON/OFF switchWhen turn-off, battery get into sleep mode, and cut-off output, the alarm

output also will be stopped.

Battery interfaceWhat is our product

Page 30: 48NPFC70 litihum battery training for globe

No. Name Functions Remark

10 Battery Output Terminals for battery outputUsing terminals with four cores. Polarities are +, -, +, - from left to right.

The two ‘+’ and ‘-’ are equal relatively

11 LCD (optional) Display battery information Battery status, cell status, firmware version, protection/alarm

12 GND Ground screwConnect earth by flexible cable above 16AWG through earth connecting

hole on right side of cabinet back, assure well connection.

Battery interfaceWhat is our product

Page 31: 48NPFC70 litihum battery training for globe

13Maintenance

InterfaceUsed for battery

maintenance

Using for measure cell/cells voltage and resistance.

Charge cell/cells directly with 2A current max.

Battery interfaceWhat is our product

Page 32: 48NPFC70 litihum battery training for globe

Commissioning &Installation

Page 33: 48NPFC70 litihum battery training for globe

• Battery maintenance should be carried out by the professional staff who are experienced and aware of the

preventive measures on the potential harm of the battery.

• Be care of the risk of electric shock for large current in case of battery short circuit, pay attention to the

following points during operation

• Remove watches, rings or other metal objects use tools with insulated handles

• Do not place tools or metal objects on the battery

• Do not direct access to the battery system to the mains grid power outlet

• Do not put the battery system into fire, do not use or storage the battery near to the high temperature source

• Do not use liquid or other objects placed into the battery system.

• Do not open or cut the battery, not to hit, throw or step on the battery

• Using special communication lithium battery charging rectifier power supply module to charge battery

• Do not to change default BMS parameters setting during usage

• The output interface of the system is still voltage when grid power cut, avoid electric shock or short circuit

when operation

• Please check if the box is damaged. If damaged, please immediately notify the supplier

• If you find leaking liquid or white powder residue on product, prohibit operation.

Do’s & Don’tWhat is our product

Page 34: 48NPFC70 litihum battery training for globe

Stored Energy Solutions for a Demanding World!

Commissioning What is our product

Items Check point Judgment Result

1 Appearance

Module surface should be clean without rust, no scratch, no deformation and mechanical damage, no leakage phenomenon, interface contact no rust;

Barcode and trademark is clear.

□With clear surface

□ No leakage or erosion;

□ No physical damage

□ Barcode is clear

□ Trademark is clear

2 ConnectionBattery modules are fixed in cabinet properly;

Screws for connection are tighten properly.

□ Cable layout accordingly

□ Battery module fasten well

□ Screw tighten properly

3Performance

inspection

OCV: 48.9-51.0V

Normal charging test:

1) Set up charge voltage 54V, charge current 0.2C, Voltage range 48.0-54.0V Charge for 10s;

2) RUN indicator light Intermittent flash;

Normal discharge test:

1) Set up discharge current 0.2C, voltage range 46-50V, discharge time 5S;

2) RUN indicator always light-on.

□ OCV is in range

□ System can do charging

□ System can do discharging

4 BMS inspection

Battery module can communication with computer software successfully;

Data of battery voltage from upper computer software is consistent with manual tested OCV.

□ Can read data from computer software;

□ Data from upper computer software is correct.

Page 35: 48NPFC70 litihum battery training for globe

No. Tool Items Remarks for Use

T1 Insulation gloves Insulation protection for body

T2 Insulation taps Insulation protection for tools

T3 Screw drivers Fix the cables of the batteries & power plant

T4 Multi meter (Fluke) Measure the module voltage in commission

T5 Current meter (Fluke) Measure the module current in commission

T6 USB to RS485 cable For communication between the batteries and laptop

T7 Laptop Operate the software

Pre-installationWhat is our product

Page 36: 48NPFC70 litihum battery training for globe

Stored Energy Solutions for a Demanding World!

Pre-installationWhat is our product

Page 37: 48NPFC70 litihum battery training for globe

Stored Energy Solutions for a Demanding World!

1. Whether the cabinet is stable to the ground

2. Whether passageway for maintenance is reserved

3. The distance between the battery and the heat source shall be more than 0.5 meters; the batteries

shall be installed in the bottom of the cabinet

4. Suggest the user to make modifications if the condition is not suitable. A memorandum should be

kept after modification.

Check of the installation conditionWhat is our product

Page 38: 48NPFC70 litihum battery training for globe

Stored Energy Solutions for a Demanding World!

a) The battery shall not be crashed anyway;

b) The screws for the battery handle shall not be bumped with the rack;

c) The direction of the front case of the battery shall be right.

d) The batteries shall be fixed with the rack via the handles

During InstallationWhat is our product

Page 39: 48NPFC70 litihum battery training for globe

Flexible InstallationWhat is our product

Four direction installation

48NPFC70 module can support 4 direction installation.

Page 40: 48NPFC70 litihum battery training for globe

Stored Energy Solutions for a Demanding World!

1. Connect GND for the batteries

2. Connect and tight the power cables of batteries to cabinet terminal or switching power supply.

(The battery gaps shall be more than 10mm.)

3. Connect the communication cables of batteries to computer

4. Switch on the battery switch.

ConnectionWhat is our product

Page 41: 48NPFC70 litihum battery training for globe

Not Recommend

paralleling batteriesWhat is our product

OK, but not good Good choice

Page 42: 48NPFC70 litihum battery training for globe

Stored Energy Solutions for a Demanding World!

• Check the screws and other connection to ensure a reliable installation.

• Have a data read test for the batteries with software, and download the

information into the computer. If the displays passed, then we can know the

battery is well and the parameter settings are right.

• Please fill in related forms after installation and debugging, check and record

battery conditions. Ask the user to sign and confirm the records.

• Please turn off the switch of the batteries if main power is not connected.

• Please recharge the battery before put into use according to operation manual, or

it will do great harm to battery.

After-installationWhat is our product

Page 43: 48NPFC70 litihum battery training for globe

Stored Energy Solutions for a Demanding World!

Power plant settingWhat is our product

No. Parameters Units Defaults

1 Float charge voltage V 54.0

2 Equalization charge voltage V NA or 54.1

3 Standard charge current A 0.2C

4 Charge current limitation A 0.5C ~ 1.0C

5 Equalization charge interval day NA

6 Equalization charge duration h NA

7 Condition to equalization charge A NA

8 Condition to float charge A 0.05C

9 LVLD (Low voltage load disconnection) V > 43.2

10 LVBD (Low voltage battery disconnection) V > 40.5

11 Restore voltage for LVBD V /

12 Temperature compensation for float charge -mV/℃ NA

13 Temperature compensation for equalization charge -mV/℃ NA

Page 44: 48NPFC70 litihum battery training for globe

PC software setting

Page 45: 48NPFC70 litihum battery training for globe

Stored Energy Solutions for a Demanding World!

• We provide 485_to_USB adapter data cable. This module converts

485 signal to USB signal for PC.

ToolsWhat is our product

Page 46: 48NPFC70 litihum battery training for globe

Stored Energy Solutions for a Demanding World!

• Desktop → My Computer → Popup Right Menus → Properties → Device Manager

Check COM portWhat is our product

ATTENTION: WIN7/WIN8, this Software must be used by Administrator.

(click right mouse on software figure, then select ‘run by administrator’)

Page 47: 48NPFC70 litihum battery training for globe

Stored Energy Solutions for a Demanding World!

PC interfaceWhat is our product

Page 48: 48NPFC70 litihum battery training for globe

Stored Energy Solutions for a Demanding World!

PC interfaceWhat is our product

Page 49: 48NPFC70 litihum battery training for globe

Stored Energy Solutions for a Demanding World!

PC interfaceWhat is our product

Page 50: 48NPFC70 litihum battery training for globe

Stored Energy Solutions for a Demanding World!

PC interfaceWhat is our product

Page 51: 48NPFC70 litihum battery training for globe

Stored Energy Solutions for a Demanding World!

PC interfaceWhat is our product

Page 52: 48NPFC70 litihum battery training for globe

Maintenance

Page 53: 48NPFC70 litihum battery training for globe

In order to assure service life, the batteries should be correctly inspected and maintained. Maintenance procedures are

recommended as follows:

1 Monthly Maintenance

— Keep the battery-room clean.

— Measure and record the ambient temperature of the battery-room.

— Check each battery’s cleanness; check damage and overheating trace of the terminal, container and lid.

— Measure and record the total voltage and current of the online battery system to make sure no abnormal system issue.

2 Quarterly Maintenance

— Repeat monthly inspection.

— Discharge battery and recharge battery to 80%SOC

— Measure and record voltage of individual cell during discharge

3 Yearly Maintenance

— Repeat quarterly maintenance and inspection.

— Check whether connectors are loose or not and tight them

— Make a discharge test to check with exact load, discharging 50% of rated capacity.

Maintenance in warehouseWhat is our product

Page 54: 48NPFC70 litihum battery training for globe

54

1. Discharge test Periodicity

Optional every 3 months per once.

2. Rate of Discharge

Discharge current according to load power and discharge rate no more than 0.2C.

3. Depth of discharge

a) 50%DOD;

b) Discharge end voltage: 48V.

Maintenance for long floating batteryWhat is our product

Page 55: 48NPFC70 litihum battery training for globe

1. Insufficient Charge

If charge voltage is not set correctly (lower than 3.8Vpc or 54.75V per 48V string), the battery system

will in an insufficient charge state, which may not impact battery service life, but may reduce battery

backup time as request.

2. Over Charge

If charge voltage is not set correctly (higher than 3.8Vpc individual or 54.75V per 48V string), the

battery system will be over charged, which may impact battery service life and even bring further safety

issue.

3. Too low or too high temperature

Too low temperature will affect the capacity of battery when discharge, and may destroy battery when

charge. While too high temperature will also cause problems, such as water loss, life decrease, thermal

runaway, deformation, etc.

Maintenance precautionsWhat is our product

Page 56: 48NPFC70 litihum battery training for globe

Reasons:1. If communication failed and LED turn off which means BMS is not work, might be caused by B-/B+ cable or

sensor cable looseness;2. LED flashing but communication failed, might be used wrong PC software;3. LED flashing but communication failed, might be used wrong 485 to USB communication cable;4. LED flashing but communication failed, might be connection of 485 to USB communication cable is not well;5. LED flashing but communication failed, might be chosen wrong ADD channel;6. LED flashing but communication failed, might be 485 to USB communication cable broken.7. LED flashing but communication failed, might be BMS failed.

Solution:1. For reason a): Make sure B-/B+ cable and all sensor cables are connected well, if still looseness, please change

new cables;2. For reason b): Use right PC software;3. For reason c): Replace right 485 to USB communication cable;4. For reason d): Detect connection of 485 to USB communication cable, if still looseness, please change new

cables;5. For reason e): Choose right ADD channel;6. For reason f): Replace right 485 to USB communication cable;7. For reason g): Make sure U6 component is failed, if yes, return to the factory for repair.

Probable failures & solutions: communication

What is our product

Page 57: 48NPFC70 litihum battery training for globe

Status Probable Reason How to check Solution

Battery module can'tdischarge

1)Low voltage protection is activated

Check if battery is over discharged.Read BMS if individual cell voltage has been lower than 2.5V

Charging the battery for at least 3hours

2)Over temperature protection

Check if battery temperature is higher than 70℃ or lower than 0℃

Regulate environment temperature to between 65℃to -5 ℃

3) Output is short circuit Visual checkRelieve short circuit and charging

4) Over load protection

Check if the load capacity (A) is higher then the limitation of battery module discharge current:1, Measure load capacity, or2, Check history data of

Remove unimportant load and recharge battery;Or, add more battery modules in parallel for proper backup

5) System failure

Check if BMS is fail1, check if is on working properlyIf yes, 2, check if indicator light of battery module is on; 3, battery information data can be monitor

Replace the BMS in battery module if it is failure

Battery module can'tcharge

6)In full charged, normal stopped by charging control

Check if battery is fully charged1, Read BMS if individual cell voltage is higher than 3.7V

Skip

7)Over temperature protection

Check if battery temperature is higher than 70℃ or lower than -10℃

Waiting for environment temperature be below 65 ℃ or above -5℃

8) System failure As issue 5) As issue 5)

Probable failures & solutions:What is our product