5. Maintenance Workshop Uniper Anlagenservice GmbH
5. Uniper Maintenance Workshop Programme
TimeTue1:00
Tue1:30-5:00
7:30-12:00
Wed08:30
12:45
Wed1:30
Generator bus ducts and high current systems, findings and conclusions from audit year 2017 Issues, losses and malfunctions and their remediationBjörn Kördell
National and international performance in the pressure vessel fieldcomplete performance specifications for prior and current projectsDavid Muschalik
Wed2:15
General contractor for industrial turbine retrofitting Mechanical overhaul of the turbine and generators focusing on replacement of the turbine regulator and control system, including turbine hydraulics and electrical protection Guido Nierade
Cooperation between Uniper Anlagenservice and Technologies in modernizing a paper plantUpgrading and modernization of the steam and power supply in the MM Karton Baiersbronn cardboard factoryMarc-Hendrik Prabucki, Uniper Technologies
03:00
Wed3:30
Interruption through coaxial 24 kV disconnectors in pumped-storage power plant Turning the startup system on/offFranck Genie
Establishing technical requirements and evaluating solutions in plant engineeringSystematic evaluation of supply and demand in maintenance tasks, with examples from the spun parts division Ralf Rademacher
Wed4:15
Retrofitting, status monitoring and current developments in electrical medium voltage switch gear Prof. Dr.-Ing Thomas Gräf, Hochschule für Technik und Wirtschaft Berlin
Damages to control devices and advice on how to avoid themVarious examples, typical damages in design and design characteristics Britta Daume, Quesy GmbH & Co. KG
7:00-12:00
Thu9:00
Essen Gas and Heating Institute "Power to Gas" project example Prototype for the storage of excess electric output from the transmission network through "synthetic natural gas"Guido Niehaves
Renovation of superheaters 3 and 2 in a waste-to-energy plant to extend operational period• Checking steam generators • Renovation concept • Designing new superheater surfaces • Construction of new superheater surfaces• Reducing heat surface fouling • Extending operational period • Reducing steam generator downtime • Removal and installation of superheater surfaces • StartupWinfried Griskiewitz
Thu9:45
Continuation and development in a success story the new modular library for the Simatic PCS7 process control system Robin Holldorf
Modernization and operational experience with Alstom turbinesReinhard Schmid, ENGIE AG, KW Zolling
Thu10:30
Sensitive generator connection areaImportant checks and inspections related to heat stressBjörn Kördell
Evaluation of operational safety of piping system bracketingProcedure for evaluating bracketing for piping system operational safetyJörg-Rudolf Jahn, LISEGA
11:15
Thu11:30
Controlling open loop and closed loop actuators using Profibus Experience with planning, installation, startup and test operations Dirk Nagel
Innovatherm Lünen "Damage Analysis"Presentation of most likely loss development based on available findings and fracture mechanical assumptionsDr. Oleg Sukhorukov
Lunch
Mechanics Seminar (only in German)E/IC& Technology Seminar (German/English)
E/C&I Technology Workshop
Lunch
Malfunctions and the respective required maintenance for: -electrical protective devices
- feedthroughs- current and voltage transformers
- sensors and actuatorsUniper Anlagenservice Training Team
Group dinner
Malfunctions and the respective required maintenance for:- generators
- excitation systems- transformers
- electric switching devicesUniper AnlagenserviceTraining Team
Coffee Break
Coffee Break
Group Dinner
5. Uniper Maintenance Workshop Programme
Thu12:15
IT securityPractical requirementsNorbert Kopka, Uniper Technologies
Manufacture, delivery and commissioning of a newly manufactured turbine rotor after a total lossDescription of the procedure used in processing the contract for the new production of an industrial turbine rotor through commissioning.Dr. Matthias Humer
01:00
02:00Progress report on implementation of danger and risk assessment for boilers, turbines and ancillary equipment Thomas Wollnik
Thermal treatments- Induction annealing at the overflow line at Neurath power station- Resistance annealing on a hot reheat line connection and MD turbine in Gelsenkirchen and Maasvlakte Power Plant 3- Resistance annealing on Alloy 617 tests in GelsenkirchenMichael Klein, THERMOPROZESS Wärmebehandlung GmbH
02:45
The latest in transformersShort circuit resistance of outdated components: power transformer exampleManfred Stach (Uniper Technologies GmbH)
Legal security in performing maintenanceMarco Stephan
03:30
04:00
7:30-12:00
Fri.09:00
Ecocontact: our experience over two years Examples of use and resultsFranck Genie
Increased generator load due to overall grid requirements Presentation of increased technical requirements through demands of the liberalized power market and system stability regulationDr. Matthias Humer
Fri.09:45
10:30
Conference feesWorkshop and Main SeminarElectrical Technology EUR 1199.00Main SeminarE, C&I Technology EUR 990.00Mechanical Technology EUR 990.00
Event venueLand Gut Höhne, Mettmann/Düsseldorfwww.guthoehne.deThe price for a single room is EUR 124.00 per nightincluding breakfast
Group Dinner
Break
Closing discussion and group farewell
Luncheon
Work group of all participants and presenters
New Maintenance ConceptChanging of maintenance from an hourly charge to a fixed price in service specifications
Stefan Arenz
Name
Date
Street / Post box
Arrival date
Telephone
Binding conference application
Pre-Seminar and Main Seminar Electrical Technology EUR 1199,00
Main Seminar E, C&I Technology EUR 990,00
Mechanical Technology EUR 990,00
Binding hotel reservation EUR 124.00 per night with breakfast
Company
Title / function
First Name
Signature
Postcode/Town/District
Departure date
-
Enrollment 28 November - 1 December 2017
Please make your hotel reservation exclusively via our contact
(see left).
All prices are exclusive of VAT.
F +49 2 09-6 [email protected]