5-year capital improvement plan (cip)
TRANSCRIPT
Sioux Falls, SD ● Watertown, SD ● 605.271.5527 ● InfrastructureDG.com
Your Town
5-Year Capital Improvement Plan (CIP)
Sioux Falls, SD ● Watertown, SD ● 605.271.5527 ● InfrastructureDG.com
Infrastructure Design Group, Inc. is a civil engineering and land surveying services firm providing professional
services to public and private clients in the southeast South Dakota region. Founded in 2012, Infrastructure
Design Group is considered a small firm with BIG experience. The company is focused on listening, providing
personal service, effective communication, and cost-effective solutions.
At the core of all successful projects is the inherent ability of our team to listen to the client’s needs and
effectively communicate throughout the project to all stakeholders. We understand our clients know their
needs better than anyone else possibly could. It is with this mindset, Infrastructure Design Group has built a
reputation of providing unmatched client service and satisfaction.
Municipal Engineering
City Engineering Services
Roadway Design
Infrastructure Assessment
Capital Improvement Planning
Water Systems
Sanitary Sewer Systems
Storm Sewer Systems
Detention Ponds
Planning assistance
Plan submittal and ordinance
reviews
Safe Routes to School
Traffic Signals
Public Involvement
Construction Observation and
Administration Services
Administration
Observation
Documentation
Public Involvement
Water Resources
Drainage Analysis/Studies
Drainage System Design
Detention Ponds
BMP Design
Erosion Control Plans
Parks & Recreation Planning &
Design
Park planning and design
Park trails, bicycle paths
Public Involvement
Sports Facilities
- Football
- Baseball/Softball
- Soccer
- Tennis
Site Development Planning &
Design
Planning
Cost Analysis
Grading
Utilities
Parking Lots
Drainage
Detention Ponds & BMP’s
Transportation
Urban Roadway Design
Highway Design
Traffic Studies and Traffic
Signal Design
Parking Lots
Access Management
Land Surveying
ALTA/NSPS Surveys
Boundary Surveys
Cadastral Surveys
Cell Towers
Construction Staking
Control/GPS Surveys
Elevation Certificates/LOMAS
Legal Descriptions
Plats & Easements
Topographic Surveys
Transmission and Distribution
Surveys
Wind Farm Development
Structural Engineering
Bridge Design
Bridge Rehabilitation
Culvert Design
Hydraulics
Bridge Inspections
Specialty Load Ratings
Retaining Walls
Pedestrian & Bicycle
Infrastructure
Sioux Falls, SD ● Watertown, SD ● 605.271.5527 ● InfrastructureDG.com
WHAT IS A CAPITAL IMPROVEMENT PLAN?
A capital improvement plan is a tool which aids a municipal government, or other organizations,
in identifying priority purchases, financing for such purchases, and schedule of purchases. A CIP
is typically prepared with a timeline of 4 to 10 years. Major steps in preparing a CIP consists of:
Step 1: Establish a CIP Committee or CIP managing lead
Step 2: Identify Capital Projects or Purchases
o Complete a series of interviews with all city departments to identify needed purchases
for the identified CIP timeline.
o Assign budgets for purchasing and projected schedule of purchases
Step 3: Identify Estimated Costs for Each Project or Purchase
Step 4: Evaluate Capital Funding Availability
Step 5: Prioritize Projects Based on Funding Availability and Need
o A complete evaluation of all infrastructure assets shall be taken into account when
prioritizing projects.
A water main or sanitary sewer line might be close to the end of its projected
useful life but the street has many more years of useful life. This may dictate
the need/ability to hold off on the utility improvements until the street needs
to be repaired. Street budget should then include maintenance only based on
pavement life cycle analysis.
A street may be beyond its service life but the utilities do not need to be
replaced for a few more years. It is often times more cost effective to let the
street go instead of throwing maintenance costs at a failed roadway. This will
save money for the overall full street and utility project needed in the future.
Foregoing the street is difficult to communicate to the public without a plan
showing the cost/benefit of such a decision.
Step 6: Plan Funding
o Identify the planned capital, public, and any other additional funding mechanism
planned for each prioritized project or expenditure.
Include funding requirements for any grants or loans planned to be utilized.
Step 7: Present the CIP
o Utilize council and/or public meetings to present the plan. This is valuable in providing
an overview of the priorities identified, funding availability, and prioritization matrix
utilized in finalizing the immediate projects or purchases.
Sioux Falls, SD ● Watertown, SD ● 605.271.5527 ● InfrastructureDG.com
WHAT IS A CAPITAL IMPROVEMENT PLAN?
The following pages are examples to help define what a typical CIP would consist of. An actual
CIP would include many more projects or purchases based on any and all needs identified
within Step 2 as defined above.
Within each section of the plan, every identified project or purchase would have a separate
sheet identifying the project or purchase name, description, justification, expenditure, and
funding source. For the purpose of this sample CIP, we have include just one project or
purchase detail sheet per section.
Detailed cost estimates for each project could also be provided after the respective project
detail within the applicable section or within an appendix.
Your Town5- Year CIP Summary
General Government 2017 2018 2019 2020 2021 TotalLegal $25,000 $25,000 $25,000 $25,000 $25,000 $125,000
Computers $2,000 $2,000 $2,000 $6,000Printer $1,500 $1,500
Engineering $65,000 $65,000 $65,000 $65,000 $65,000 $325,000IT $800 $800 $800 $800 $800 $4,000
General Government Total: $92,800 $92,300 $92,800 $90,800 $92,800 $461,500
Facilities 2017 2018 2019 2020 2021 TotalLibrary $2,000 $2,000 $2,000 $2,000 $2,000 $10,000
New City Hall $150,000 $20,000 $2,000,000 $2,170,000Maintenance Shop $5,000 $8,000 $13,000
Maintenance Shop Addition $65,000 $15,000 $80,000Legion Maintenance $2,500 $2,500 $2,500 $2,500 $2,500 $12,500
Facilities Total: $69,500 $174,500 $24,500 $2,004,500 $12,500 $2,285,500
Equipment 2017 2018 2019 2020 2021 TotalSweeper $175,000 $175,000
Loader $220,000 $220,000Snow Plow $60,000 $60,000
Pickup $32,000 $32,000Sprayer $7,000 $7,000
Equipment Total: $175,000 $60,000 $220,000 $7,000 $32,000 $494,000
Parks Department 2017 2018 2019 2020 2021 TotalNeighborhood Playground Equip. $75,000 $75,000 $150,000Sidewalk - Safety Improvements $25,000 $25,000 $25,000 $25,000 $25,000 $125,000
Bike Trail $350,000 $450,000 $800,000Pool $15,000 $15,000 $15,000 $15,000 $15,000 $75,000
Parks Improvements $35,000 $35,000 $35,000 $35,000 $35,000 $175,000Parks Department Total: $425,000 $150,000 $75,000 $150,000 $525,000 $1,325,000
Streets 2017 2018 2019 2020 2021 Total3rd Street (Main to Maple) $700,000 $700,000
Main Avenue (8th St. S. to 6th St.) N. $1,500,000 $1,500,000Street Maintenance (Chip, Micro, Crack) $65,000 $65,000 $65,000 $65,000 $65,000 $325,000
Blue Avenue (Green to White) $750,000 $750,000Streets Total: $765,000 $815,000 $65,000 $1,565,000 $65,000 $3,275,000
2017 2018 2019 2020 2021Total General Funds: $1,527,300 $1,291,800 $477,300 $3,817,300 $727,300 $7,841,000
Water 2017 2018 2019 2020 2021 TotalWater Project 1 $250,000 $250,000Water Project 2 $125,000 $125,000Water Project 3 $175,000 $175,000Water Project 4 $200,000 $200,000
Water System Study $100,000 $100,000Debt Payment for Project A $60,000 $60,000 $60,000 $60,000 $60,000 $300,000Debt Payment for Project B $50,000 $50,000 $50,000 $50,000 $50,000 $250,000
Paint Tower $200,000 $200,000Water Total: $360,000 $435,000 $285,000 $310,000 $210,000 $1,600,000
Sanitary Sewer 2017 2018 2019 2020 2021 TotalSewer Project 1 $250,000 $250,000Sewer Project 2 $125,000 $125,000Sewer Project 3 $175,000 $175,000
Sewer Study - Basin A $200,000 $200,000Sewer Study - Basin B $320,000 $320,000
Debt Payment for Project C $60,000 $60,000 $60,000 $60,000 $60,000 $300,000Debt Payment for Project D $50,000 $50,000 $50,000 $50,000 $50,000 $250,000
Sanitary Sewer Total: $360,000 $235,000 $285,000 $310,000 $430,000 $1,620,000
Drainage System 2017 2018 2019 2020 2021 TotalDrainage Project 1 $250,000 $250,000Drainage Project 2 $125,000 $125,000Drainage Project 3 $175,000 $175,000
Drainage Basin Study - Basin A $200,000 $200,000Drainage Basin Study - Basin B $320,000 $320,000
Debt Payment for Project E $60,000 $60,000 $60,000 $60,000 $60,000 $300,000Debt Payment for Project F $50,000 $50,000 $50,000 $50,000 $50,000 $250,000
Drainage System Total: $360,000 $235,000 $285,000 $310,000 $430,000 $1,620,000
2017 2018 2019 2020 2021Total Enterprise Funds: $1,080,000 $905,000 $855,000 $930,000 $1,070,000 $4,840,000
2017 2018 2019 2020 2021Total Annual CIP: $2,607,300 $2,196,800 $1,332,300 $4,747,300 $1,797,300 $12,681,000
YOUR TOWN CIP GENERAL GOVERNMENT
Sioux Falls, SD ● Watertown, SD ● 605.271.5527 ● InfrastructureDG.com
GENERAL GOVERNMENT SUMMARY
Items within the General Government category include daily operational costs of City
Government. Typical items include regular fees for engineering, technology or legal services,
computers, printers, or other office equipment expenditures. Typical funds for these items are
accounted for within the General Fund.
General
Government
Source
of
Funds 2017 2018 2019 2020 2021 Total
Legal G $25,000 $25,000 $25,000 $25,000 $25,000 $125,000
Computers G $2,000 $2,000 $2,000 $6,000
Printer G $1,500 $1,500
Engineering G $65,000 $65,000 $65,000 $65,000 $65,000 $325,000
IT G $800 $800 $800 $800 $800 $4,000
General
Government
Total: $92,800 $92,300 $92,800 $90,800 $92,800 $461,500
G = General Fund
YOUR TOWN CIP GENERAL GOVERNMENT
Sioux Falls, SD ● Watertown, SD ● 605.271.5527 ● InfrastructureDG.com
Project Title: Computers
Department: General Government
Department Priority: 1
Total Project Cost: $6,000
Description:
Justification:
Expenditures 2017 2018 2019 2020 2021 Total
Computers $2,000 $2,000 $2,000 $6,000
Total: $2,000 $2,000 $2,000 $6,000
Funding Source 2017 2018 2019 2020 2021 Total
General $2,000 $2,000 $2,000 $6,000
Total: $2,000 $2,000 $2,000 $6,000
This expenditure will include gradually replacing the existing aging computer systems and current
software. The existing computers are 8 years old and are becoming obsolete for current needs.
Additional IT has been required to maintain the current computer systems. Computers are currently not
worth the IT bills incurred.
YOUR TOWN CIP FACILITIES
Sioux Falls, SD ● Watertown, SD ● 605.271.5527 ● InfrastructureDG.com
FACILITIES SUMMARY
Items within the Facilities section include daily operational costs of City owned buildings or
supplemental funding for buildings owned or operated by non-profit organizations. Items also
include planned expenditures for new buildings or building additions. Typical funds for these
items are accounted for within the General Fund.
Facilities
Source
of
Funds 2017 2018 2019 2020 2021 Total
Library G $2,000 $2,000 $2,000 $2,000 $2,000 $10,000
New City Hall G $150,000 $20,000 $2,000,000 $2,170,000
Maintenance
Shop
G
$5,000 $8,000 $13,000
Maintenance
Shop Addition
G
$65,000 $15,000 $80,000
Legion
Maintenance
G
$2,500 $2,500 $2,500 $2,500 $2,500 $12,500
Facilities
Total: $69,500 $174,500 $24,500 $2,004,500 $12,500 $2,285,500
G = General Fund
YOUR TOWN CIP FACILITIES
Sioux Falls, SD ● Watertown, SD ● 605.271.5527 ● InfrastructureDG.com
Project Title: Maintenance Shop Addition
Department: Facilities
Department Priority: 1
Total Project Cost: $80,000
Description:
Justification:
Expenditures 2017 2018 2019 2020 2021 Total
Maintenance Shop
Addition $65,000 $15,000 $80,000
Total: $65,000 $15,000 $80,000
Funding Source 2017 2018 2019 2020 2021 Total
General $65,000 $15,000 $80,000
Total: $65,000 $15,000 $80,000
This expenditure includes adding on a 36’x60’ storage addition to the existing maintenance shop. The
addition will be utilized to store existing equipment and for maintenance and servicing needs.
Existing equipment current sits outside.
YOUR TOWN CIP EQUIPMENT
Sioux Falls, SD ● Watertown, SD ● 605.271.5527 ● InfrastructureDG.com
EQUIPMENT SUMMARY
Items within the Equipment section include purchases of equipment utilized for City use.
Equipment includes maintenance or City vehicles. Typical funds for these items are accounted
for within the General Fund.
Equipment
Source
of
Funds 2017 2018 2019 2020 2021 Total
Sweeper G $175,000 $175,000
Loader G $220,000 $220,000
Snow Plow G $60,000 $60,000
Pickup G $32,000 $32,000
Sprayer G $7,000 $7,000
Equipment
Total: $175,000 $60,000 $220,000 $7,000 $32,000 $494,000
G = General Fund
YOUR TOWN CIP EQUIPMENT
Sioux Falls, SD ● Watertown, SD ● 605.271.5527 ● InfrastructureDG.com
Project Title: Sweeper
Department: Equipment
Department Priority: 1
Total Project Cost: $175,000
Description:
Justification:
Expenditures 2017 2018 2019 2020 2021 Total
Sweeper $175,000 $175,000
Total: $175,000 $175,000
Funding Source 2017 2018 2019 2020 2021 Total
General $175,000 $175,000
Total: $175,000 $175,000
Current sweeper has met its useful life and is no longer operational.
Replace existing sweeper. A substantial amount of maintenance dollars have been spent on the existing
sweeper. The maintenance dollars would be better spent on purchasing a new sweeper.
YOUR TOWN CIP PARKS DEPARTMENT
Sioux Falls, SD ● Watertown, SD ● 605.271.5527 ● InfrastructureDG.com
PARKS DEPARTMENT SUMMARY
Items within the Parks Department section includes new parks, safety improvements for parks
or sidewalks connecting public use facilities. Also includes maintenance costs to parks, pools,
or other public use facilities. Equipment purchases specific to the Parks Department will also be
include in this section. Typical funds for these items are accounted for within the General Fund,
Park Fund, Grants, or Fund Raising.
Parks
Department
Source
of
Funds 2017 2018 2019 2020 2021 Total
Neighborhood
Playground
Equip.
G, P
$75,000 $75,000 $150,000
Sidewalk -
Safety
Improvements
P
$25,000 $25,000 $25,000 $25,000 $25,000 $125,000
Bike Trail
G, Gr,
P, S $350,000 $450,000 $800,000
Pool Gr, P $15,000 $15,000 $15,000 $15,000 $15,000 $75,000
Parks
Improvements
P
$35,000 $35,000 $35,000 $35,000 $35,000 $175,000
Parks
Department
Total: $425,000 $150,000 $75,000 $150,000 $525,000 $1,325,000
G = General Fund
Gr = Grant
P = Parks Fund
F = Fund Raising
S = State
YOUR TOWN CIP PARKS DEPARTMENT
Sioux Falls, SD ● Watertown, SD ● 605.271.5527 ● InfrastructureDG.com
Project Title: Bike Trail
Department: Parks
Department Priority: 1
Total Project Cost: $800,000
Description:
Justification:
Expenditures 2017 2018 2019 2020 2021 Total
Bike Trail $350,000 $450,000 $800,000
Total: $350,000 $450,000 $800,000
Funding Source 2017 2018 2019 2020 2021 Total
General $50,000 $100,000 $150,000
Grant $50,000 $50,000
Parks $50,000 $50,000 $100,000
State $200,000 $300,000 $500,000
Total: $350,000 $450,000 $800,000
Bike trail from Park A to Park B and extends to nature area. Project consists of multiple funding sources
including state TAP money with 27% local match, grant, general fund, and parks department funds.
Segment 1 is identified for 2017 with Segment 2 planned for 2021.
Based on community wide survey, this project is one of the highest priority quality of life initiatives.
There is already high use by pedestrians of the roadways within the identified route. A designated trail
will provide a safe accessible route.
YOUR TOWN CIP STREETS DEPARTMENT
Sioux Falls, SD ● Watertown, SD ● 605.271.5527 ● InfrastructureDG.com
STREETS DEPARTMENT SUMMARY
Items within the Streets Department section includes surfacing projects. Projects include crack
sealing, micro-surfacing, chip seals, and total reconstruct. Typical funds for these items are
accounted for within the General Fund, Street Assessments, or Grants.
Streets
Source
of
Funds 2017 2018 2019 2020 2021 Total
3rd Street
(Main to
Maple)
SA, G
$700,000 $700,000
Main Avenue
(8th St. S. to
6th St.) N.
Gr, SA,
G
$1,500,000 $1,500,000
Street
Maintenance
(Chip, Micro,
Crack)
SA, G, S
$65,000 $65,000 $65,000 $65,000 $65,000 $325,000
Blue Avenue
(Green to
White)
Gr, SA,
G
$750,000 $750,000
Streets Total: $765,000 $815,000 $65,000 $1,565,000 $65,000 $3,275,000
G = General Fund
Gr = Grant
S = State
SA = Street Assessment
YOUR TOWN CIP STREETS DEPARTMENT
Sioux Falls, SD ● Watertown, SD ● 605.271.5527 ● InfrastructureDG.com
Project Title: 3rd Street (Main Ave. to Maple St.)
Department: Streets
Department Priority: 1
Total Project Cost: $700,000
Description:
Justification:
Expenditures 2017 2018 2019 2020 2021 Total
3rd Street $700,000 $700,000
Total: $700,000 $700,000
Funding Source 2017 2018 2019 2020 2021 Total
General $350,000 $350,000
Street Assessment $350,000 $350,000
Total: $700,000 $700,000
Project requires reconstruction. Street surfacing has met its useful life. Water main beneath the street
has experienced several breaks over the last 5 years. Funds for the water main are identified within
the Water section of the CIP.
Water main and street require reconstruction. Water main breaks along with aging surfacing require
immediate attention on this stretch of roadway.
YOUR TOWN CIP WATER DEPARTMENT
Sioux Falls, SD ● Watertown, SD ● 605.271.5527 ● InfrastructureDG.com
WATER DEPARTMENT SUMMARY
Items within the Water Department section includes water main, services, and water
distribution related projects. Projects include water main reconstructs, new water main,
storage, and water related studies. Typical funds for these items are accounted for within the
Water Fund, State Revolving loan Funds (SRF), and/or Grants.
Water
Source
of
Funds 2017 2018 2019 2020 2021 Total
Water
Project 1
WF,
SRF $250,000 $250,000
Water
Project 2
WF,
SRF $125,000 $125,000
Water
Project 3
WF, Gr
$175,000 $175,000
Water
Project 4
WF
$200,000 $200,000
Water
System Study
WF, Gr
$100,000 $100,000
Debt
Payment for
Project A
WF
$60,000 $60,000 $60,000 $60,000 $60,000 $300,000
Debt
Payment for
Project B
WF
$50,000 $50,000 $50,000 $50,000 $50,000 $250,000
Paint Tower WF, Gr $200,000 $200,000
Water
Total: $360,000 $435,000 $285,000 $310,000 $210,000 $1,600,000
W = Water Fund
G = General Fund
Gr = Grant
SRF = State Revolving Fund
YOUR TOWN CIP WATER DEPARTMENT
Sioux Falls, SD ● Watertown, SD ● 605.271.5527 ● InfrastructureDG.com
Project Title: Water Project 1
Department: Water
Department Priority: 1
Total Project Cost: $250,000
Description:
Justification:
Expenditures 2017 2018 2019 2020 2021 Total
Water Project 1 $250,000 $250,000
Total: $250,000 $250,000
Funding Source 2017 2018 2019 2020 2021 Total
Water $50,000 $50,000
SRF $200,000 $200,000
Total: $250,000 $250,000
12” water main replacement on 3rd Street from Main Ave. to Maple Ave. The funds associated to this
item account for the water main only. Costs for street and other infrastructure improvement items are
included under the respective fund sections.
Water main and street require reconstruction. Water main breaks along with aging surfacing require
immediate attention on this stretch of roadway.
YOUR TOWN CIP SANITARY SEWER DEPARTMENT
Sioux Falls, SD ● Watertown, SD ● 605.271.5527 ● InfrastructureDG.com
SANITARY SEWER DEPARTMENT SUMMARY
Items within the Sanitary Sewer Department section includes sewer main, services, and sewer
study related projects. Projects include sewer main reconstructs, new sewer main, storage, and
sewer related studies. Typical funds for these items are accounted for within the Sewer Fund,
State Revolving loan Funds (SRF), Cost Recovery, General Fund, and/or Grants.
Sanitary Sewer
Source
of
Funds 2017 2018 2019 2020 2021 Total
Sewer Project 1 CR, S $250,000 $250,000
Sewer Project 2
CR,
SRF, S $125,000 $125,000
Sewer Project 3
Gr, GF,
S $175,000 $175,000
Sewer Study -
Basin A
GF, S
$200,000 $200,000
Sewer Study -
Basin B
SRF, S
$320,000 $320,000
Debt Payment
for Project C
S, G
$60,000 $60,000 $60,000 $60,000 $60,000 $300,000
Debt Payment
for Project D
S, G
$50,000 $50,000 $50,000 $50,000 $50,000 $250,000
Sanitary Sewer
Total: $360,000 $235,000 $285,000 $310,000 $430,000 $1,620,000
S = Sewer Fund
G = General Fund
CR = Cost Recovery
Gr = Grant
SRF = State Revolving Fund
YOUR TOWN CIP SANITARY SEWER DEPARTMENT
Sioux Falls, SD ● Watertown, SD ● 605.271.5527 ● InfrastructureDG.com
Project Title: Sewer Project 1
Department: Sanitary Sewer
Department Priority: 1
Total Project Cost: $250,000
Description:
Justification:
Expenditures 2017 2018 2019 2020 2021 Total
Sewer Project 1 $250,000 $250,000
Total: $250,000 $250,000
Funding Source 2017 2018 2019 2020 2021 Total
Sewer $50,000 $50,000
Cost Recovery $200,000 $200,000
Total: $250,000 $250,000
8” sanitary sewer replacement on 3rd Street from Main Ave. to Maple Ave. The funds associated to this
item account for the sewer main only. Costs for street and other infrastructure improvement items are
included under the respective fund sections.
Water main and street require reconstruction. Water main breaks along with aging surfacing require
immediate attention on this stretch of roadway. Sewer main inspection reports show multiple joint
failures and high amount of I&I.
YOUR TOWN CIP DRAINAGE SYSTEM DEPARTMENT
Sioux Falls, SD ● Watertown, SD ● 605.271.5527 ● InfrastructureDG.com
DRAINAGE SYSTEM DEPARTMENT SUMMARY
Items within the Drainage System Department section includes ditches, detention ponds,
drainage swales, inlets, junction boxes, storm sewer, and any other related drainage system
devices. Projects include drainage way repair, detention pond cleaning or construction, new
storm sewer main, and/or drainage related studies. Typical funds for these items are
accounted for within the Drainage Fund, Cost Recovery, General Fund, and/or Grants.
Drainage
System
Source
of
Funds 2017 2018 2019 2020 2021 Total
Drainage
Project 1
D, CR
$250,000 $250,000
Drainage
Project 2
D, CR,
G $125,000 $125,000
Drainage
Project 3
D, Gr
$175,000 $175,000
Drainage Basin
Study - Basin A
D, Gr
$200,000 $200,000
Drainage Basin
Study - Basin B
G
$320,000 $320,000
Debt Payment
for Project E
D
$60,000 $60,000 $60,000 $60,000 $60,000 $300,000
Debt Payment
for Project F
D
$50,000 $50,000 $50,000 $50,000 $50,000 $250,000
Drainage
System Total: $360,000 $235,000 $285,000 $310,000 $430,000 $1,620,000
D = Drainage Fund
G = General Fund
CR = Cost Recovery
Gr = Grant
YOUR TOWN CIP DRAINAGE SYSTEM DEPARTMENT
Sioux Falls, SD ● Watertown, SD ● 605.271.5527 ● InfrastructureDG.com
Project Title: Drainage Project 1
Department: Drainage System
Department Priority: 1
Total Project Cost: $250,000
Description:
Justification:
Expenditures 2017 2018 2019 2020 2021 Total
Drainage Project 1 $250,000 $250,000
Total: $250,000 $250,000
Funding Source 2017 2018 2019 2020 2021 Total
Drainage System $50,000 $50,000
Cost Recovery $200,000 $200,000
Total: $250,000 $250,000
Storm sewer and overall drainage system replacement on 3rd Street from Main Ave. to Maple Ave. The
funds associated to this item account for the drainage system only. Costs for street and other
infrastructure improvement items are included under the respective fund sections.
Water main and street require reconstruction. Water main breaks along with aging surfacing require
immediate attention on this stretch of roadway. Sewer main inspection reports show multiple joint
failures and high amount of I&I.
Drainage concerns have been recorded from past public input. Periodic flooding has been experienced
at each intersection and at the major drainage way.