living room hall Utility in Basement wc 5000 utility Demolition The Contractor shall be deemed to have visited the site and ascertained the full extent and nature of the demolitions. Allow for all necessary temporary supports, which must be agreed with the Structural Engineer prior to commencement of the works. The demolition work comprises of removal of internal and external masonry and/or studwork partitions where indicated on the drawings. Please note that any traces of asbestos discovered on site must be reported immediately to the CA and disposed of strictly in accordance with all current legislation relating to the removal and disposal of asbestos. Groundworks The contractor is to adjust levels over the area of the new extension as necessary, inclusive of the formation of the new ground floor slab area. Allow for removal of excavated material. Excavate for drain trenches and soakaway. Excavate trenches for strip footings and pad foundations to the required widths and depths as required by the SE / Building Inspector and as shown on the drawings. Concrete All concrete work is to be carried out in accordance with the relevant British Standards and Codes of Practice. Cement shall be Portland Cement ordinary grade to BS 12, in accordance with Structural Engineers spec. Concrete strength, mix, reinforcement, cube tests etc. to be as specified by the Structural Engineer. Foundations Foundation trenches are to be dug for the full extent of all new walls. Excavate trenches for foundations to dimensions as indicated on the drawings. CONSTRUCTION SUSPENDED CONCRETE GROUND FLOOR CONSTRUCTION TO ACHIEVE 0.22 W/m²K 75mm Screed on 75mm Celotex GA4000 PIR insulation (or similar with thermal conductivity of 0.022 (W/mK) on Polythene DPM min 1200 guage on 225mm thick RC suspended slab to SE Spec on 150mm Ventilated void Below void lay hardcore and install anti-root protection CONSTRUCTION CAVITY WALL CONSTRUCTION TO ACHIEVE 0.28 W/m²K Brickwork to match existing on 100mm Cavity with 60mm Ecotherm Eco-Cavity with 40mm air gap or 105mm Cavity with 75mm Celotex CW4000 with 30mm air gap on 100mm Thermalite blockwork (to SE spec) on 15mm wet plaster finish Cavity walls to include cavity closers to all openings, Ancon HRT4 wall ties and cavity trays in accordance with insulation manufacturer installation guides and best practice and structural engineers information Cement shall be Portland Masonry Cement above d.p.c. level. Sulphate-resisting cement to BS 4027 to be used below d.p.c. level. Sand for mortar shall comply in all respects with BS 1200. Plasticizers may be used at the discretion of the architect and used strictly in accordance with the manufacturer's directions. Damp-proof courses shall be 'Hyload' laid full width and length of walls, stepped as required, with laps in the length not less than 100mm as necessary. Trim to the face of the render and point up. Allow for making good any areas of the existing external or internal brick and block walls that are damaged by the demolitions. Allow for DPCs to all new external walls and any parapet up stand at a minimum 150mm above prevailing ground level. Movement joints to SE details FD20 FD20 FD20 SVP Floor Finish - Hallway Tiling - black and white checker sizing TBC Floor Finish - Utility TBC Fireplace 1 Install Wood burning stove. Line breast with flue Fireplace 2 To be removed Main Communal Sewer running as existing Main Communal Sewer running as existing New connection to mains sewer Chimney to be removed subject to neighbour agreement - otherwise potential boxing for chimney Floor Finish - Living Room TBC Floor Finish - Living Room TBC ACO drain to threshold 1473 1515 2500 1041 3750 2355 600 982 900 2191 7352 Install rodding point to drainage 17 / 73W / C 100 date drawing no. OCT 2017 scale 1:25 @ A1 client MR & MRS MANTELL revision A 73 WALDRON, EARLSFIELD, SW18 3TA CONSTRUCTION PROPOSED GROUND FLOOR PLAN M I K E B E C K D E S I G N t: 07961 031 843 w: www.mikebeckdesign.co.uk e: [email protected] Copyright - Mike Beck Design

Upload: others

Post on 01-Oct-2021

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 5000 2191 SVP Copyright - Mike Beck Design

living room

hall

Utility inBasem

ent

wc

5000

utility

Demolition

The Contractor shall be deemed to have visited the site and ascertained the full extent and nature of the demolitions.Allow for all necessary temporary supports, which must be agreed with the Structural Engineer prior tocommencement of the works. The demolition work comprises of removal of internal and external masonry and/orstudwork partitions where indicated on the drawings. Please note that any traces of asbestos discovered on site mustbe reported immediately to the CA and disposed of strictly in accordance with all current legislation relating to theremoval and disposal of asbestos.

Groundworks

The contractor is to adjust levels over the area of the new extension as necessary, inclusive of the formation of thenew ground floor slab area. Allow for removal of excavated material. Excavate for drain trenches and soakaway.Excavate trenches for strip footings and pad foundations to the required widths and depths as required by the SE /Building Inspector and as shown on the drawings.

Concrete

All concrete work is to be carried out in accordance with the relevant British Standards and Codes of Practice.Cement shall be Portland Cement ordinary grade to BS 12, in accordance with Structural Engineers spec. Concretestrength, mix, reinforcement, cube tests etc. to be as specified by the Structural Engineer.

Foundations

Foundation trenches are to be dug for the full extent of all new walls. Excavate trenches for foundations to dimensionsas indicated on the drawings.

CONSTRUCTION

SUSPENDED CONCRETE GROUND FLOOR CONSTRUCTION TOACHIEVE 0.22 W/m²K

75mm Screed on75mm Celotex GA4000 PIR insulation (or similar with thermalconductivity of 0.022 (W/mK) onPolythene DPM min 1200 guage on225mm thick RC suspended slab to SE Spec on150mm Ventilated voidBelow void lay hardcore and install anti-root protection

CONSTRUCTIONCAVITY WALL CONSTRUCTION TO ACHIEVE 0.28 W/m²K

Brickwork to match existing on100mm Cavity with 60mm Ecotherm Eco-Cavity with 40mm air gap or

105mm Cavity with 75mm Celotex CW4000 with 30mm air gap on100mm Thermalite blockwork (to SE spec) on

15mm wet plaster finish

Cavity walls to include cavity closers to all openings, Ancon HRT4 wall ties and cavity trays inaccordance with insulation manufacturer installation guides and best practice and

structural engineers information

Cement shall be Portland Masonry Cement above d.p.c. level. Sulphate-resisting cement toBS 4027 to be used below d.p.c. level. Sand for mortar shall comply in all respects with BS

1200. Plasticizers may be used at the discretion of the architect and used strictly inaccordance with the manufacturer's directions. Damp-proof courses shall be 'Hyload' laid

full width and length of walls, stepped as required, with laps in the length not less than100mm as necessary. Trim to the face of the render and point up.

Allow for making good any areas of the existing external or internal brick and block wallsthat are damaged by the demolitions. Allow for DPCs to all new external walls and any

parapet up stand at a minimum 150mm above prevailing ground level.

Movement joints to SE details

FD20

FD20

FD20

SVP

Floor Finish - HallwayTiling - black and white checker

sizing TBC

Floor Finish - UtilityTBC

Fireplace 1Install Wood burning

stove. Line breast with flue

Fireplace 2To be removed

Main Communal Sewer runningas existing

Main Communal Sewer runningas existing

New connection to mainssewer

Chimney to be removed subject toneighbour agreement - otherwise

potential boxing for chimney

Floor Finish - Living RoomTBC

Floor Finish - Living Room TBC

AC

O d

rain

to th

resh

old

1473

1515

2500

1041

3750

2355

600 982 900

2191

7352

Install rodding point to drainage

17 / 73W / C 100

date

drawing no.

OCT 2017

scale

1:25 @ A1

client

MR & MRS MANTELL

revision

A

73 WALDRON, EARLSFIELD, SW18 3TA

CONSTRUCTION

PROPOSED GROUND FLOOR PLAN

M I K E B E C K D E S I G N

t: 07961 031 843w: www.mikebeckdesign.co.uke: [email protected]

Copyr

ight -

Mike

Bec

k Des

ign

Page 2: 5000 2191 SVP Copyright - Mike Beck Design

bedroom

3bed

room 2

bedroom

1

bathroomlanding

Extensionconstructed fullywithin boundary

edge of v o i d edge of v o i d

PAINTING AND DECORATING

Decoration work will consist of painting all new and existing walls, ceilings, internal timberwork and external timberwork. All paint to be applied strictlyin accordance with the Manufacturer's instructions.

PreparationPreparation of all new surfaces (walls ceilings and joinery) to be strictly in accordance with manufacturer's written recommendations.New plastered walls are to be prepared and then painted using 1 mist coat and 2 full coats of vinyl matt emulsion, colour to be advised by client

Apply 1 mist coat and 2 full coats of white vinyl matt emulsion to all ceiling areas.

Joinery (Internal and External)Prime new r internal joinery and paint in 1 undercoat and 2 top coats to a white satin gloss finish. Apply two coats of Shellac to internal oak doors,where required.

Existing ceilings and walls are, where applicable, to have all cracks filled with interior 'Polyfiller' and are to be rubbed down and cleaned so as toprovide a smooth, clean and stable surface for repainting.

GLAZING

Glazing within zone between finished floor level and 1500mm above(800mm in any internal glazed paritions) must be either:

a. toughened or toughened and break safely to B.S 6206 orb. robust i.e 8mm annealed glass in panes not exceeding 1.1m in bothheight and width orc. 6mm annealed glass in small panes i.e max width 250mm and area0.5m2 all in accordance with Building Regulation Approved Document1991 Part N1. All opening lights (and doors) to be fitted with effectivedraught-strips.

STAIRCASES

New Softwood staircase

Pine riser and treads, fixed using battens with solidwall / double floor joist support as specified by SE.Risers. treads and pitch below 42°.2.0m headroom to be maintained in all instances.Handrail fixed to wall.

New ballustarding to landing to be 900mm above FFL

Spindles installed to match existing. Centres to ensuregaps between verticals do not exceed 95mm

FIRE RESISTANCE

All steelwork to be encased to provide half-hour fire protection, in accordance with approveddocument. Where meter boxes are situated externally, they are to be non-combustable, lockedand fully sealed.Smoke detectors to latest Relevatn Building Standards: To be BS 5446: Part 1. To be mains poweredand interlinked on all levels. All structural steel to be encased with 12.5mm Gyproc Fireline board.

All new doors from habitable room opening onto the stairwell to be ½ hr fire resistance onto 35 x 25stop screwed and glued to door lining. All structural steel to be encased with 12.5mm GyprocFireline board.Existing first floor ceiling retained. Install fireline board between first floor structure and existing ceilingif required by Building Control. Use 50mm mineral wool to floor zone.

For any escape route serving a second floor (or above), confirm with building control any requiredfire upgrade. Minimum to be 2 layers of plasterboard and skim (to acheive 30 min fire protection) tonew staircase serving the second floor. Other upgrades to be confirmed once build-ups have beenconfirmed.

Escape windows: Any window being used as part of fire strategy for means of escape to beminimum 0.33m² in area. To be min dimension of 850mm high and 500mm wide. Cill dimension to bebetween 800mm - 1100mm.

FD20 FD20

FD20

STRUCTURAL DESIGN - ANY STRUCTURAL ITEMS SHOWNWITHIN DRAWINGS, ARE FOR PRICING PURPOSES ONLY.ALL STRUCTURE MUST BE CONSTRUCTED FROMSTRUCTURAL ENGINEER'S DRAWINGS AND CALCULATIONS.

GENERAL NOTEALL MATERIALS AND COMPONENTS MUST BE SUITABLE FORTHEIR INTENDED PURPOSE AND LOCATION AND MUST BEMANUFACTURED AND INSTALLED IN ACCORDANCE WITHALL RELEVANT, CURRENT BRITISH STANDARDS AND CODESOF PRACTICE, NHBC REQUIREMENTS ANDMANUFACTURER'S SPECIFICATION.

To entire house. Strip wallpaper whererequired. New skim to all walls

SVP

Waste to track acrossceiling to SVPLowered ceiling to hidepipe

485

1040

485

1805

1160

date

drawing no.

OCT 2017

scale

1:25 @ A1

client

revision

A

73 WALDRON, EARLSFIELD, SW18 3TA

CONSTRUCTION

PROPOSED FIRST FLOOR PLAN

M I K E B E C K D E S I G N

t: 07961 031 843w: www.mikebeckdesign.co.uke: [email protected]

17 / 73W / C 101

MR & MRS MANTELL

Copyr

ight -

Mike

Bec

k Des

ign

Page 3: 5000 2191 SVP Copyright - Mike Beck Design

1250mm

master

bedroom

landing

1500mm

1750mm

2000mm

2250mm

Ensuite

Full Height

CONSTRUCTION

INTERMEDIATE FLOOR CONSTRUCTION

Floor finish to Client Spec on22mm Caberfloor P5 Chipboard (water resistant tokitchens and bathrooms (density 15kg/m²) onFloor joists to SE Spec with min 50mm fibreglass insulation between on25x38mm battens withstandard plasterboardFor first floor ceiling install12.5mm Gyproc SoundBloc plasterboard(density 10.6kg/m²) with3mm skim to underside

FD20

NEW STUD PARTITIONS

Construct the new studwork partitions and in-fill stud partitions withrockwool as detail. 70mm Gypframe 'C' Studs at 600mm centres.

Board to either side to be12.5mm plasterboard with 3mm lightweight gypsum plaster skim.Use Moisture Resistant plasterboard to all wet areas (bathrooms,shower rooms, utility and kitchen) . Include for scrim or eml tojunctions between existing plasterwork and new partitions prior toapplying the setting coat.

NEW WINDOWS AND DOORS

New window to be aluminium framed & to contain doubleglazed units - U-Value to be below 1.6 W/m²K

All New external doors to be Aluminum framed, double glazedunits. All windows to meet the security requirements in BS PAS24:2012.

Door sets to meet security requirements in BS PAS 24:2012.

For any new habitable rooms, the opening vent of window to bemin 1/20th of floor area.

FIREPLACE AND CHIMNEYChimney re-lined as required to

accommodate wood burningstove - as confirmed by client

Combustible material should notbe located within close proximity

of fireplace or chimney

DORMER WALL BUILD-UP TO ACHIEVE 0.28 W/m²K

Vertically hung tiles on25 x 25mm treated s/w timber battensTyvek Breather membrane draped between battens25 x 32mm treated s/w timber counter battens100mm Timber Stud with 70mm GA400 between (pushed to inside of timber) withboards sealed as Vapour control layer & air leakage barrier on27.5mm PL4015 Plasterboard with Foil backed insulation to underside of timberwith3mm plaster skim finish

Joinery:

New doors to be 4 panel Georgian doors (FD20 to habitable rooms where noted onplans)

New Architrave throughout: 21mm thick, 95mm high Pine Victorian Architrave,Ogee profileNew Skirting board throughout: 21mm thick, 95mm high Pine Skirting Board OgeeprofileOriginal coving retained and repaired with matching profile, where repair isrequired

910

265 800

750

142

7071

571

557

6

VOID

1119

950

637

2721

MAKESHOWER1100 X1100mm

SVPTo vent throughroof at head of

drainage system- set sufficientdistance from

Velux Windows

5501

1891

1247

1729

date

drawing no.

OCT 2017

scale

1:25 @ A1

client

revision

A

73 WALDRON, EARLSFIELD, SW18 3TA

CONSTRUCTION

PROPOSED SECOND FLOOR PLAN

M I K E B E C K D E S I G N

t: 07961 031 843w: www.mikebeckdesign.co.uke: [email protected]

17 / 73W / C 102

MR & MRS MANTELL

Copyr

ight -

Mike

Bec

k Des

ign

Page 4: 5000 2191 SVP Copyright - Mike Beck Design

SOFFIT BOARDS, EAVES, GUTTERS AND RAINWATER PIPES REPLACEMENT

New Soffit and Fascia Boards to be UPVC

Rainwater downpipes and gutters replaced with black UPVC

New Soil vent Pipes and existing SVPs replaced with black UPVC

Eaves vent to all new eaves, to provide ventilation to top of rafters. intall flyscreened vent to deter insects.

ROOFLIGHTS

New top hung Velux Rooflights to be Velux - See drawing for sizes - to beconfirmed on site and with client prior to installment.

Rooflight cill level to be above 800mm to comply with Building Regs Part K

Clear glazed flat roof lightsVelux Flat Roof Rooflight Ref:100150(1000x1500mm)

Pitched roof lightsVelux Pitched Rooflight: ProductID:

GGL MK08 2070 (780 x 1400 mm)

PITCHED ROOF BUILD UP - COLD ROOF CONSTRUCTION:

New Tiles to match existing (with correct headlap asmanufacturer's specification fixed to25 x 38mm s/w battens onKingspan Nilvent breathable sarking membrane draped between38 x 38mm s/w tanalised counter battens onSE specified rafters @ SE Specified ctrs with62.5mm Celotex GA4000 Insulation fitted between but to undersideof timber allowing min 50mm well ventilated cavity above withboards sealed as Vapour control layer & air leakage barrier onCelotex PL4050 Insulated plasterboard under rafters fully fillingspace between rafters lined internally on3mm skim finish

FLAT ROOF BUILD UP - WARM ROOF CONSTRUCTION:

GRP finish and undercoat / fleece on18mm OSB board on120mm Celotex XR4000 insulation onVCL as BS6229:2003 on22mm WBP plywood onTimber joist / rafter with no insulation betweenPlasterboard to underside

date

drawing no.

OCT 2017

scale

1:25 @ A1

client

revision

A

73 WALDRON, EARLSFIELD, SW18 3TA

CONSTRUCTION

PROPOSED ROOF PLAN

M I K E B E C K D E S I G N

t: 07961 031 843w: www.mikebeckdesign.co.uke: [email protected]

17 / 73W / C 103

MR & MRS MANTELL

Copyr

ight -

Mike

Bec

k Des

ign

Page 5: 5000 2191 SVP Copyright - Mike Beck Design

living room

hall

Utility inBasem

ent

wc

5000

utility

MECHANICAL & ELECTRICAL PLANS

SD

R1

R1

R1

R1

E

IN BASEMENTNew Consumer Unit installed in location of

existing CU.

TAP

HD

Megaflo cylinder

Electric underfloor heating to hall and utilityroom. Radiators to all other rooms

B

Electrical layout withinkitchen, to kitchen

designers requirements

Electrical layout withinkitchen, to kitchen

designers requirements

VENTILATION

Allow for trickle vents in accordance with the building regulations. (8000 cubic mm per habitable room & 2500mm² for kitchens andbathrooms)

Glazing to all windows to be sealed DG Units consisting of 2no. sheets of 6.4mm toughened if below 800mm safety glass with a mimimum6mm cavity. Cavity closers to be in Black.

Kitchen hood and all wet rooms and utility room to be ventilated by mechanical extract fan, operated intermittently.

Ventilation rates in litres / second as follows:Kitchens - 60I/s if incorporated in cooker hoodBathroom/Shower Rooms - 15 I/sWC's - 6 I/s (where applicable)

Intermittent mechanical extract ventilation to utility is to have output rating off at least30 litres/second, any windowless accommodation to have 15 minute over run facility.

Whole house ventilation system with heat recovery, to be installed in loft zone, in line with client requirements.

All vent runs to be in-line with manufacturer's requirements with no lengths exceeded.Ensure all ducting within cold loft spaces, are fully lagged/Ensure a 10mm gap is maintained to all internal doors to maintain air flow.

DOUBLE SWITCHED SOCKET OUTLET

T.V.& FM AERIAL SOCKET (& CABLE)

SMOKE DETECTOR

M&E LEGEND

SWITCHED FUSED SPUR

* N.B. EXACT POSITIONS OF ALL NEW SOCKET, SWITCH, AERIAL AND BT SOCKETPOSITIONS TO BE CONFIRMED BY CLIENT

EXTRACT FAN - VENTAXIA

SHAVER SOCKET

TV

RADIATOR WITHTHERMOSTATIC VALVE

HEATED TOWEL RAIL

R1

THERMOSTATTH

CEILING MOUNTED SPEAKERS

LIGHT SWITCH

LV RECESSED DOWNLIGHT,IP RATED TO SHOWER/BATHROOMS

WALL MOUNTED LIGHT

CEILING MOUNTED PENDANT LIGHT

LIGHT SWITCH - WITH DIMMERD

LV UNDER KITCHEN CUPBOARDDOWNLIGHT

cupboard spotlights on dooractivated push switch

FLOOR MOUNTED SOCKETSRJ45BT

HEAT DETECTOR

EXTERNAL RATED LIGHT

ELECTRIC DOOR BELL

HD

SD

SECURITY LIGHT ON MOTION SENSOR

WWEATHERPROOF SOCKET OUTLET

LIGHT SWITCH - 2 WAY2

VENTILATION TERMINAL VIA AIRBRICK

CONDENSING BOILER FLUE

NEW BOILERB

INCOMING GAS MAINS

WWATER MAINS STOP COCK

METERM

G

ELECTRIC CONSUMER UNITE

date

drawing no.

OCT 2017

scale

1:25 @ A1

client

revision

A

73 WALDRON, EARLSFIELD, SW18 3TA

MECHANICAL AND ELECTRICAL

PROPOSED GROUND FLOOR PLAN

M I K E B E C K D E S I G N

t: 07961 031 843w: www.mikebeckdesign.co.uke: [email protected]

MR & MRS MANTELL

17 / 73W / C 200

Copyr

ight -

Mike

Bec

k Des

ign

Page 6: 5000 2191 SVP Copyright - Mike Beck Design

1250mm

master

bedroom

landing

1500mm

1750mm

2000mm

2250mm

Ensuite

Full Height

Duel FuelHot water with

Electric overide

SD

WATER SUPPLIES

All hot and cold supply pipework to be in copper to BS6700 with non-lead solders and pipework sized to suit byplumber. In line isolation valves to be fitted just beforeany fitting.

Hot water supply to any new fixed bath equipped withtemperature control valve to ensure maximumtemperature 48°

Commissioning certificate to be provided to BuildingControl on completion of installation.

Extend alter all existing gas services as necessary toservice the new hob and boiler positions.

EXTERNAL DRAINAGE

Foul DrainageNew drainage runs in 100mm UPVC pipework and connections to existingdrainage system. To be agred with building control, prior to installation.Pipes to be bedded in 100mm granular material to BS882 and covered aminimum of 300mm selected granular fill free from stones greater than 40mmdiameter. The drainage is to be tested prior to covering up to the satisfaction ofthe Building Inspector. Testing to be in accordance with BSCP 301.

Drainage design all subject to investigation and confirmation of existingdrainage runs.Allow for rodding point to drainage point - with access panel.

Rainwater Drainage

Rainwater to main roof to run into existing drainage run. Rainwater from groundfloor extenion roof (i.e the area where the footprint is extended) to fall tosoakaway - which should be located minimum 8000mm from house.

PLUMBING AND WASTE

Shower room and bathroom to comply with Approved Document Hand BS5572.All plumbing to be copper pipe or Hep 20 pipe.Waste to W.H.B 50mm - uPVCWaste to bath and shower 50mm - uPVCWaste to W.C 100mm - uPVC

SANITARY GOODS

All waste fittings to have 75mm deep seal traps and separateconnections to s.v.p's and to be installed in accordance with B.S. 5572.Soil stack to be extended 0.9m above highest window and to be fittedwith balloon cage terminal.

SOIL AND VENT PIPES AND BOXING

SVP's to be 100mm diameter upvc to B.S.5572 and connected via flexible ductingto proprietary vent, tile or ridge vent. Outlet to terminate min 900mm above anyopening into the building. Soil pipes to be encased in boxing constructed toachieve min, mass of 15kg/m2 formed from 38mm x 38mm s.w. framing faced with2 layers 12.5mm plasterboard, joints staggered, finish with plaster skim. Provisionsto be made for acces to s.v.p at each floor level s.v.p's to be surrounded with25mm thick unfaced mineral wool throughout their length.

Any top end ventilating stack to finish at least 900mm above any opening within3000mm and to be caged. Discharge and stub stacks terminating within thebuilding to be fitted with 100mm DURGO air admittance valve or similar.

Rodding eyes at all changes of direction of waste and soil pipes all comply to thesatisfaction of Building Control.Where necessary, pipes and hot water storage to be thermally insulated tocomply with Approved Document L1, Section 3.

Drainage Work to be in accordance with B.S 8301 and engineering drawings.

DOUBLE SWITCHED SOCKET OUTLET

T.V.& FM AERIAL SOCKET (& CABLE)

SMOKE DETECTOR

M&E LEGEND

SWITCHED FUSED SPUR

* N.B. EXACT POSITIONS OF ALL NEW SOCKET, SWITCH, AERIAL AND BT SOCKETPOSITIONS TO BE CONFIRMED BY CLIENT

EXTRACT FAN - VENTAXIA

SHAVER SOCKET

TV

RADIATOR WITHTHERMOSTATIC VALVE

HEATED TOWEL RAIL

R1

THERMOSTATTH

CEILING MOUNTED SPEAKERS

LIGHT SWITCH

LV RECESSED DOWNLIGHT,IP RATED TO SHOWER/BATHROOMS

WALL MOUNTED LIGHT

CEILING MOUNTED PENDANT LIGHT

LIGHT SWITCH - WITH DIMMERD

LV UNDER KITCHEN CUPBOARDDOWNLIGHT

cupboard spotlights on dooractivated push switch

FLOOR MOUNTED SOCKETSRJ45BT

HEAT DETECTOR

EXTERNAL RATED LIGHT

ELECTRIC DOOR BELL

HD

SD

SECURITY LIGHT ON MOTION SENSOR

WWEATHERPROOF SOCKET OUTLET

LIGHT SWITCH - 2 WAY2

VENTILATION TERMINAL VIA AIRBRICK

CONDENSING BOILER FLUE

NEW BOILERB

INCOMING GAS MAINS

WWATER MAINS STOP COCK

METERM

G

ELECTRIC CONSUMER UNITE

date

drawing no.

OCT 2017

scale

1:25 @ A1

client

revision

A

73 WALDRON, EARLSFIELD, SW18 3TA

MECHANICAL AND ELECTRICAL

PROPOSED SECOND FLOOR PLAN

M I K E B E C K D E S I G N

t: 07961 031 843w: www.mikebeckdesign.co.uke: [email protected]

MR & MRS MANTELL

17 / 73W / C 202

Copyr

ight -

Mike

Bec

k Des

ign

Page 7: 5000 2191 SVP Copyright - Mike Beck Design

225

225

75

75

GROUND BEARING SLAB FLOOR CONSTRUCTION TOACHIEVE 0.22 W/m²K

75mm Screed on75mm Celotex GA4000 PIR insulation (or similar with

thermal conductivity of 0.022 (W/mK) onPolythene DPM min 1200 guage on

Suspened Concrete slab & build up to SE Spec

STEEL IN LINE WITH SE DESIGNSteel located next to wall (for

ease of installation) tosupport wall above using aprojecting plate. Twisting to

be countered with use ofposts at either side. See SE

details and calcs.

Level ceiling to be maintained.drop existing ceiling by up to50mm (if required).ENSURE NO DOWNSTAND /BULKHEAD FOR THE STEEL.

Cavity closer to all head of walls,abutments and window heads, cills and

jambs

PFC with plate below - as SE Design

PITCHED ROOF BUILD UP - COLD ROOF CONSTRUCTION:

New Tiles to match existing (with correct headlap asmanufacturer's specification fixed to25 x 38mm s/w battens onKingspan Nilvent breathable sarking membrane drapedbetween38 x 38mm s/w tanalised counter battens onSE specified rafters @ SE Specified ctrs with62.5mm Celotex GA4000 Insulation fitted between but tounderside of timber allowing min 50mm well ventilatedcavity above withboards sealed as Vapour control layer & air leakagebarrier on62.5mm Celotex PL4050 Insulated plasterboard underrafters fully filling space between rafters lined internally on3mm skim finish

RIW to face of brickwork belowground level

Lean mix concrete fill tobottom of cavity to prevent

compression

Independent foundation toStructural Engineer's detail,

wth slip joint to existingfoundation

Locate steel belowVertical wall

PITCHED ROOF BUILD UP -COLD ROOF

CONSTRUCTION:Insulation between &

Below

FLAT ROOF BUILD UP - COLDROOF CONSTRUCTION

Insulation between & Below

Ventilationvia Eaves

vents totop ofrafters

Ventilation atridge

Ventilation viaEaves vents to topof rafters

Roof and floorsteels, in linewith SE Design

INTERMEDIATE FLOOR CONSTRUCTION

Floor finish to Client Spec on22mm Caberfloor P5 Chipboard (water resistant tokitchens and bathrooms (density 15kg/m²) onFloor joists to SE Spec with min 50mm fibreglass insulationbetween on25x38mm battens withstandard plasterboardFor first floor ceiling install12.5mm Gyproc SoundBloc plasterboard(density 10.6kg/m²) with3mm skim to underside

date

drawing no.

OCT 2017

scale

1:25 @ A1

client

revision

A

73 WALDRON, EARLSFIELD, SW18 3TA

CONSTRUCTION

PROPOSED SECTION

M I K E B E C K D E S I G N

t: 07961 031 843w: www.mikebeckdesign.co.uke: [email protected]

17 / 73W / C 200

MR & MRS MANTELL

Copyr

ight -

Mike

Bec

k Des

ign

Page 8: 5000 2191 SVP Copyright - Mike Beck Design

2750

Min

150

Min

150

3155

Box gutter formed withcoping stone, lapped with

lead flashing and turned upbelow tiling to form fullylapped, weather proof

gutter

Level of ground, to beascertained on site, prior to

start on site. level to berecorded with photo &

tape.

Velux rooflights to beW 800 x H 1000mm

To be electronicallyopening

1000

Entire extension Set withinboundary

Cavity trays, to be installedby all openings and to

discharge at rear ofproperty

date

drawing no.

OCT 2017

scale

1:25 @ A1

client

revision

A

73 WALDRON, EARLSFIELD, SW18 3TA

CONSTRUCTION

PROPOSED SECTION

M I K E B E C K D E S I G N

t: 07961 031 843w: www.mikebeckdesign.co.uke: [email protected]

17 / 73W / C 201

MR & MRS MANTELL

Copyr

ight -

Mike

Bec

k Des

ign

Page 9: 5000 2191 SVP Copyright - Mike Beck Design

Boun

dar

y

Boun

dar

y

Existing Chimney Retained.Dormer stepped aroundchimney

Roof of dormer set belowexisting ridge

Dormer set-back 200mmfrom Edge of roof

200

Dormer cheeks in tiling tomatch existing roof

Clear glazed rooflightswithin pitched roof

Tiling to match existing

2750

3750

All new walls in LondonStock Brickwork

Boun

dar

y

Boun

dar

y

Clear glazed windows withfixed pane to lower half tophung opening to upperpane. Timber frame tomatch existing house

Tiling to match existinghouse

Dormer stepped aroundexisting chimney

2700

2700

Alumasc fascia board -colour to match doors

Brickwork to match Existing

Aluminum framed bi-folddoors

17 / 73W/ C300

date

drawing no.

SEP 2017

scale

1:50 @A1

client

revision

A

73 WALDRON, EARLSFIELD, SW18 3TA

PROPOSED COMBINED - ELEVATIONS

MRS ANETTE MANTELL

0 1 2 3 4 5metres

scale bar for 1:50

Proposed Rear Elevation 1:50 @A1

Proposed Side Elevation1:50 @A1

Proposed Rear Elevation 1:50 @A1

Proposed Side Elevation1:50 @A1

M I K E B E C K D E S I G N

t: 07961 031 843w: www.mikebeckdesign.co.uke: [email protected]

Copyr

ight -

Mike

Bec

k Des

ign