5.23.1 - infrastructure.planninginspectorate.gov.uk... · cyf1 cb1 cb7 cb6 cb5 cb4 cb3 cb8 cb2 grg1...

6
5.23.1.2 Statutory Designated Sites Detailed Document 23 – Figure 2 National Grid (North Wales Connection Project) Regulation 5(2)(g) of the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 DOCUMENT September 2018 Application Reference EN020015

Upload: others

Post on 18-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 5.23.1 - infrastructure.planninginspectorate.gov.uk... · cyf1 cb1 cb7 cb6 cb5 cb4 cb3 cb8 cb2 grg1 grg8 grg7 grg6 grg2 grg3 grg4 gr 5 link aq1 nwc route legend legend order limits

5.23.1.2

Statutory Designated Sites Detailed Document 23 – Figure 2

National Grid (North Wales Connection Project) Regulation 5(2)(g) of the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009

DO

CU

MEN

T

September 2018 Application Reference EN020015

Page 2: 5.23.1 - infrastructure.planninginspectorate.gov.uk... · cyf1 cb1 cb7 cb6 cb5 cb4 cb3 cb8 cb2 grg1 grg8 grg7 grg6 grg2 grg3 grg4 gr 5 link aq1 nwc route legend legend order limits

3 of 4

1 of 4

2 of 4

4 of 4

LINK 27

LINK 35

LINK 23

LINK 28

LINK 3

LINK4.1

LINK 29

LINK 25

LINK 1

ANGLESEY TERNS /MORWENOLIAID YNYS MÔN

ANGLESEY TERNS /MORWENOLIAID YNYS MÔN

BAE CEMLYN/ CEMLYN

BAY

NORTH ANGLESEYMARINE / GOGLEDD

M8N FOROL

SECTION C

SECTION B

SECTION B

SECTION A

NWC ROUTE LEGEND

LEGENDORDER LIMITSSECTION CUTLINESSPECIAL AREA OF CONSERVATION(SAC)SPECIAL AREA OF CONSERVATION -CANDIDATE SITE (CSAC)SPECIAL PROTECTION AREA (SPA)RAMSARPRIMARY LIGHT GOODS VEHICLE(LGV) / HEAVY GOODS VEHICLE (HGV)1

LGV / TRACTOR TRAILER ROUTEPRIMARY LGV ROUTELGV / HGV ENABLING WORKS ROUTELGV / HGV CONTINGENCY ROUTETUNNEL HEAD HOUSE (THH) ANDCABLE SEALING END COMPOUND(CSEC) EMERGENCY ACCESSTHH / CSEC OPERATION ANDMAINTAINENCE ROUTETRUNK ROAD NETWORK

Rev Date Description ChkGIS App0 09/02/2018 HRA JB JF CC

Document Title:

Creator:JB

Date:Approver:Date:Checker:Date:09/02/2018 JF CC 09/02/201809/02/2018

Document Type: Scale: Rev:Sheets:Format:FIGURE 0A3

¯

Document Path: \\Ukmcr1fp002\ukmcr1fp002-v1ie\Proposal\3512\North Wales Connection - NG\GIS\02 Maps\Ecology\HRA\ALL_Fig_2_STAT-DESIG-SITES_PlanSeries_20180813_JB.mxd

Contains OS data © Crown copyright and database right 2018. Background Mapping information has been reproduced from the Ordnance Survey map by permission of Ordnance Survey on behalf of The controller of Her Majesty's Stationery Office. ©Crown Copyright Ordnance Survey. National Grid Electricity - 100024241. National Grid Gas -100024886Contains Natural Resources Wales information © Natural Resources Wales and Database Right. All rights Reserved.

0 1 20.5

Kilometres

FIGURE 2STATUTORY DESIGNATED SITES DETAILED

SECTION A & B

1 of 4 1:45,000

Document Number:

Scheme:

5.23.1.2

NORTH WALES CONNECTION PROJECT

NOTES

1: LIGHT GOODS VEHICLE (LGV) 3.5T OR BELOWHEAVY GOODS VEHICLE (HGV) ABOVE 3.5T2: PRIMARY LGV / HGV ROUTE, LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE3: LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE 4: LGV / HGV ENABLING WORKS ROUTE, LGV / HGV CONTINGENCY ROUTE5: PRIMARY LGV ROUTE, LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE 6: THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE7: FOR DESCRIPTIONS OF THE TRAFFIC ROUTESAND LINK REFERENCES SEE THE ENVIRONMENTAL STATEMENT AIR QUALITY CHAPTER (DOCUMENT 5.14)

Page 3: 5.23.1 - infrastructure.planninginspectorate.gov.uk... · cyf1 cb1 cb7 cb6 cb5 cb4 cb3 cb8 cb2 grg1 grg8 grg7 grg6 grg2 grg3 grg4 gr 5 link aq1 nwc route legend legend order limits

3 of 4

1 of 4

2 of 4

4 of 4

LINK 2

LINK 26

SECTION B

SECTION CSECTION B

NWC ROUTE LEGEND

LEGENDSECTION CUTLINESSPECIAL AREA OF CONSERVATION(SAC)SPECIAL AREA OF CONSERVATION -CANDIDATE SITE (CSAC)SPECIAL PROTECTION AREA (SPA)RAMSARPRIMARY LIGHT GOODS VEHICLE(LGV) / HEAVY GOODS VEHICLE (HGV)1

LGV / TRACTOR TRAILER ROUTEPRIMARY LGV ROUTELGV / HGV ENABLING WORKS ROUTELGV / HGV CONTINGENCY ROUTETUNNEL HEAD HOUSE (THH) ANDCABLE SEALING END COMPOUND(CSEC) EMERGENCY ACCESSTHH / CSEC OPERATION ANDMAINTAINENCE ROUTETRUNK ROAD NETWORK

Rev Date Description ChkGIS App0 09/02/2018 HRA JB JF CC

Document Title:

Creator:JB

Date:Approver:Date:Checker:Date:09/02/2018 JF CC 09/02/201809/02/2018

Document Type: Scale: Rev:Sheets:Format:FIGURE 0A3

¯

Document Path: \\Ukmcr1fp002\ukmcr1fp002-v1ie\Proposal\3512\North Wales Connection - NG\GIS\02 Maps\Ecology\HRA\ALL_Fig_2_STAT-DESIG-SITES_PlanSeries_20180813_JB.mxd

Contains OS data © Crown copyright and database right 2018. Background Mapping information has been reproduced from the Ordnance Survey map by permission of Ordnance Survey on behalf of The controller of Her Majesty's Stationery Office. ©Crown Copyright Ordnance Survey. National Grid Electricity - 100024241. National Grid Gas -100024886Contains Natural Resources Wales information © Natural Resources Wales and Database Right. All rights Reserved.

0 1 20.5

Kilometres

FIGURE 2STATUTORY DESIGNATED SITES DETAILED

SECTION A & B

2 of 4 1:45,000

Document Number:

Scheme:

5.23.1.2

NORTH WALES CONNECTION PROJECT

NOTES

1: LIGHT GOODS VEHICLE (LGV) 3.5T OR BELOWHEAVY GOODS VEHICLE (HGV) ABOVE 3.5T2: PRIMARY LGV / HGV ROUTE, LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE3: LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE 4: LGV / HGV ENABLING WORKS ROUTE, LGV / HGV CONTINGENCY ROUTE5: PRIMARY LGV ROUTE, LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE 6: THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE7: FOR DESCRIPTIONS OF THE TRAFFIC ROUTESAND LINK REFERENCES SEE THE ENVIRONMENTAL STATEMENT AIR QUALITY CHAPTER (DOCUMENT 5.14)

Page 4: 5.23.1 - infrastructure.planninginspectorate.gov.uk... · cyf1 cb1 cb7 cb6 cb5 cb4 cb3 cb8 cb2 grg1 grg8 grg7 grg6 grg2 grg3 grg4 gr 5 link aq1 nwc route legend legend order limits

3 of 4

1 of 4

2 of 4

4 of 4

LINK 32

LINK 33

LINK 6

LINK 7

LINK 28

LINK8.2

LINK 24

LINK 8

LINK 22

LINK8.1

LINK4.1

LINK 5

LINK 29

LINK 31

LINK7.1

LINK 4

CORSYDD MÔN ALLYN / ANGLESEYAND LLYN FENS

CORSYDD MÔN ALLYN / ANGLESEYAND LLYN FENS

CORSYDD MÔN ALLYN / ANGLESEYAND LLYN FENS

CORSYDD MÔN ALLYN / ANGLESEYAND LLYN FENS

CORSYDD MÔN ALLYN / ANGLESEYAND LLYN FENS

LIVERPOOL BAY/ BAE LERPWL

(WALES)

ANGLESEY TERNS /MORWENOLIAID YNYS MÔN

CORSYDD MON /ANGLESEY FENSCORSYDD MON /ANGLESEY FENSCORSYDD MON /ANGLESEY FENS

CORSYDD MON /ANGLESEY FENS

CORSYDD MON /ANGLESEY FENS

CORSYDD MON /ANGLESEY FENS CORSYDD MON

/ ANGLESEYFENS

CORSYDD MON /ANGLESEY FENS

CORSYDD MON /ANGLESEY FENS

CORSYDD MON /ANGLESEY FENS

Y FENAI A BAECONWY / MENAI

STRAIT AND CONWY BAY

SECTION E

SECTION C

SECTION E

SECTION D

SECTION D

SECTION B

SECTION D

SECTION C

ce22

ce21

ce27

ce26ce6a

ce3

ce6

ce4

ce11ce5

ce10

ce11a

ce12

ce2a

ce2

ce7

ce16

ce13b

ce13f

ce13c

ce17

ce13ace20

ce29ce27c

ce27bce30

we1

cg1

cg5cg7cg10

cg3

cg2cg19

cg18

cg17cg15

cg14cg11

cg12cg13

ct1

ct2

ct4ct3

cyf1

cb1

cb7cb6

cb5 cb4cb3

cb8cb2

grg1 grg8grg7

grg6

grg2

grg3grg4

grg5

LINK AQ1

NWC ROUTE LEGEND

LEGENDORDER LIMITS - OPTION ASECTION CUTLINESSPECIAL AREA OF CONSERVATION(SAC)SPECIAL AREA OF CONSERVATION -CANDIDATE SITE (CSAC)SPECIAL PROTECTION AREA (SPA)RAMSARANGLESEY FENS SAC & RAMSARSITE MANAGEMENT UNITSPRIMARY LIGHT GOODS VEHICLE(LGV) / HEAVY GOODS VEHICLE (HGV)1

LGV / TRACTOR TRAILER ROUTEPRIMARY LGV ROUTELGV / HGV ENABLING WORKS ROUTELGV / HGV CONTINGENCY ROUTETUNNEL HEAD HOUSE (THH) ANDCABLE SEALING END COMPOUND(CSEC) EMERGENCY ACCESSTHH / CSEC OPERATION ANDMAINTAINENCE ROUTETRUNK ROAD NETWORK

Rev Date Description ChkGIS App0 09/02/2018 HRA JB JF CC

Document Title:

Creator:JB

Date:Approver:Date:Checker:Date:09/02/2018 JF CC 09/02/201809/02/2018

Document Type: Scale: Rev:Sheets:Format:FIGURE 0A3

¯

Document Path: \\Ukmcr1fp002\ukmcr1fp002-v1ie\Proposal\3512\North Wales Connection - NG\GIS\02 Maps\Ecology\HRA\ALL_Fig_2_STAT-DESIG-SITES_PlanSeries_20180813_JB.mxd

Contains OS data © Crown copyright and database right 2018. Background Mapping information has been reproduced from the Ordnance Survey map by permission of Ordnance Survey on behalf of The controller of Her Majesty's Stationery Office. ©Crown Copyright Ordnance Survey. National Grid Electricity - 100024241. National Grid Gas -100024886Contains Natural Resources Wales information © Natural Resources Wales and Database Right. All rights Reserved.

0 1 20.5

Kilometres

FIGURE 2STATUTORY DESIGNATED SITES DETAILED

SECTION B, C, D OPTION A

3 of 4 Option A1:48,000

Document Number:

Scheme:

5.23.1.2

NORTH WALES CONNECTION PROJECT

NOTES

1: LIGHT GOODS VEHICLE (LGV) 3.5T OR BELOWHEAVY GOODS VEHICLE (HGV) ABOVE 3.5T2: PRIMARY LGV / HGV ROUTE, LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE3: LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE 4: LGV / HGV ENABLING WORKS ROUTE, LGV / HGV CONTINGENCY ROUTE5: PRIMARY LGV ROUTE, LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE 6: THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE7: FOR DESCRIPTIONS OF THE TRAFFIC ROUTESAND LINK REFERENCES SEE THE ENVIRONMENTAL STATEMENT AIR QUALITY CHAPTER (DOCUMENT 5.14)

Page 5: 5.23.1 - infrastructure.planninginspectorate.gov.uk... · cyf1 cb1 cb7 cb6 cb5 cb4 cb3 cb8 cb2 grg1 grg8 grg7 grg6 grg2 grg3 grg4 gr 5 link aq1 nwc route legend legend order limits

3 of 4

1 of 4

2 of 4

4 of 4

LINK 32

LINK 33

LINK 6

LINK 7

LINK 28

LINK8.2

LINK 24

LINK 8

LINK 22

LINK8.1

LINK4.1

LINK 5

LINK 29

LINK 31

LINK7.1

LINK 4

CORSYDD MÔN ALLYN / ANGLESEYAND LLYN FENS

CORSYDD MÔN ALLYN / ANGLESEYAND LLYN FENS

CORSYDD MÔN ALLYN / ANGLESEYAND LLYN FENS

CORSYDD MÔN ALLYN / ANGLESEYAND LLYN FENS

CORSYDD MÔN ALLYN / ANGLESEYAND LLYN FENS

LIVERPOOL BAY/ BAE LERPWL

(WALES)

ANGLESEY TERNS /MORWENOLIAID YNYS MÔN

CORSYDD MON /ANGLESEY FENSCORSYDD MON /ANGLESEY FENSCORSYDD MON /ANGLESEY FENS

CORSYDD MON /ANGLESEY FENS

CORSYDD MON /ANGLESEY FENS

CORSYDD MON /ANGLESEY FENS CORSYDD MON

/ ANGLESEYFENS

CORSYDD MON /ANGLESEY FENS

CORSYDD MON /ANGLESEY FENS

CORSYDD MON /ANGLESEY FENS

Y FENAI A BAECONWY / MENAI

STRAIT AND CONWY BAY

SECTION E

SECTION C

SECTION E

SECTION D

SECTION D

SECTION B

SECTION D

SECTION C

ce22

ce21

ce27

ce26ce6a

ce3

ce6

ce4

ce11ce5

ce10

ce11a

ce12

ce2a

ce2

ce7

ce16

ce13b

ce13f

ce13c

ce17

ce13ace20

ce29ce27c

ce27bce30

we1

cg1

cg5cg7cg10

cg3

cg2cg19

cg18

cg17cg15

cg14cg11

cg12cg13

ct1

ct2

ct4ct3

cyf1

cb1

cb7cb6

cb5 cb4cb3

cb8cb2

grg1 grg8grg7

grg6

grg2

grg3grg4

grg5

LINK AQ1

NWC ROUTE LEGEND

LEGENDORDER LIMITS - OPTION BSECTION CUTLINESSPECIAL AREA OF CONSERVATION(SAC)SPECIAL AREA OF CONSERVATION -CANDIDATE SITE (CSAC)SPECIAL PROTECTION AREA (SPA)RAMSARANGLESEY FENS SAC & RAMSARSITE MANAGEMENT UNITSPRIMARY LIGHT GOODS VEHICLE(LGV) / HEAVY GOODS VEHICLE (HGV)1

LGV / TRACTOR TRAILER ROUTEPRIMARY LGV ROUTELGV / HGV ENABLING WORKS ROUTELGV / HGV CONTINGENCY ROUTETUNNEL HEAD HOUSE (THH) ANDCABLE SEALING END COMPOUND(CSEC) EMERGENCY ACCESSTHH / CSEC OPERATION ANDMAINTAINENCE ROUTETRUNK ROAD NETWORK

Rev Date Description ChkGIS App0 09/02/2018 HRA JB JF CC

Document Title:

Creator:JB

Date:Approver:Date:Checker:Date:09/02/2018 JF CC 09/02/201809/02/2018

Document Type: Scale: Rev:Sheets:Format:FIGURE 0A3

¯

Document Path: \\Ukmcr1fp002\ukmcr1fp002-v1ie\Proposal\3512\North Wales Connection - NG\GIS\02 Maps\Ecology\HRA\ALL_Fig_2_STAT-DESIG-SITES_PlanSeries_20180813_JB.mxd

Contains OS data © Crown copyright and database right 2018. Background Mapping information has been reproduced from the Ordnance Survey map by permission of Ordnance Survey on behalf of The controller of Her Majesty's Stationery Office. ©Crown Copyright Ordnance Survey. National Grid Electricity - 100024241. National Grid Gas -100024886Contains Natural Resources Wales information © Natural Resources Wales and Database Right. All rights Reserved.

0 1 20.5

Kilometres

FIGURE 2STATUTORY DESIGNATED SITES DETAILED

SECTION B, C, D OPTION B

3 of 4 Option B1:48,000

Document Number:

Scheme:

5.23.1.2

NORTH WALES CONNECTION PROJECT

NOTES

1: LIGHT GOODS VEHICLE (LGV) 3.5T OR BELOWHEAVY GOODS VEHICLE (HGV) ABOVE 3.5T2: PRIMARY LGV / HGV ROUTE, LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE3: LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE 4: LGV / HGV ENABLING WORKS ROUTE, LGV / HGV CONTINGENCY ROUTE5: PRIMARY LGV ROUTE, LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE 6: THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE7: FOR DESCRIPTIONS OF THE TRAFFIC ROUTESAND LINK REFERENCES SEE THE ENVIRONMENTAL STATEMENT AIR QUALITY CHAPTER (DOCUMENT 5.14)

Page 6: 5.23.1 - infrastructure.planninginspectorate.gov.uk... · cyf1 cb1 cb7 cb6 cb5 cb4 cb3 cb8 cb2 grg1 grg8 grg7 grg6 grg2 grg3 grg4 gr 5 link aq1 nwc route legend legend order limits

3 of 4

1 of 4

2 of 4

4 of 4

LINK 36

LINK36.1

LINK11.1

LINK 12

LINK 15

LINK 32

LINK 14

LINK 30

LINK 11

LINK 34

LINK15.1

LINK 18

LINK 17

LINK 7

LINK 16

LINK 21

LINK18.1

LINK 9

LINK8.2

LINK8.1

LINK 13

LINK 19

LINK 20

LINK7.1

ERYRI /SNOWDONIA

Y FENAI A BAECONWY / MENAI

STRAIT AND CONWY BAY

SECT

ION

ESECTION E

SECT

ION F

SECT

ION

DSECTION D

SECT

ION E

SEENOTE 2

SEENOTE 3

SEENOTE 4

SEENOTE 5

SEENOTE 6

SEENOTE 3

LINK AQ2

LINK AQ3

LINK AQ4

LINK AQ5

LINK AQ6

LINK AQ7

NWC ROUTE LEGEND

LEGENDORDER LIMITSSECTION CUTLINESSPECIAL AREA OF CONSERVATION(SAC)SPECIAL AREA OF CONSERVATION -CANDIDATE SITE (CSAC)SPECIAL PROTECTION AREA (SPA)RAMSARPRIMARY LIGHT GOODS VEHICLE(LGV) / HEAVY GOODS VEHICLE (HGV)1

LGV / TRACTOR TRAILER ROUTEPRIMARY LGV ROUTELGV / HGV ENABLING WORKS ROUTELGV / HGV CONTINGENCY ROUTETUNNEL HEAD HOUSE (THH) ANDCABLE SEALING END COMPOUND(CSEC) EMERGENCY ACCESSTHH / CSEC OPERATION ANDMAINTAINENCE ROUTETRUNK ROAD NETWORK

Rev Date Description ChkGIS App0 09/02/2018 HRA JB JF CC

Document Title:

Creator:JB

Date:Approver:Date:Checker:Date:09/02/2018 JF CC 09/02/201809/02/2018

Document Type: Scale: Rev:Sheets:Format:FIGURE 0A3

¯

Document Path: \\Ukmcr1fp002\ukmcr1fp002-v1ie\Proposal\3512\North Wales Connection - NG\GIS\02 Maps\Ecology\HRA\ALL_Fig_2_STAT-DESIG-SITES_PlanSeries_20180813_JB.mxd

Contains OS data © Crown copyright and database right 2018. Background Mapping information has been reproduced from the Ordnance Survey map by permission of Ordnance Survey on behalf of The controller of Her Majesty's Stationery Office. ©Crown Copyright Ordnance Survey. National Grid Electricity - 100024241. National Grid Gas -100024886Contains Natural Resources Wales information © Natural Resources Wales and Database Right. All rights Reserved.

0 1 20.5

Kilometres

FIGURE 2STATUTORY DESIGNATED SITES DETAILED

SECTION E, F

4 of 4 1:40,000

Document Number:

Scheme:

5.23.1.2

NORTH WALES CONNECTION PROJECT

NOTES

1: LIGHT GOODS VEHICLE (LGV) 3.5T OR BELOWHEAVY GOODS VEHICLE (HGV) ABOVE 3.5T2: PRIMARY LGV / HGV ROUTE, LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE3: LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE 4: LGV / HGV ENABLING WORKS ROUTE, LGV / HGV CONTINGENCY ROUTE5: PRIMARY LGV ROUTE, LGV / HGV ENABLING WORKS ROUTE, THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE 6: THH / CSEC EMERGENCY ACCESS AND THH / CSEC OPERATION AND MAINTENANCE ROUTE7: FOR DESCRIPTIONS OF THE TRAFFIC ROUTESAND LINK REFERENCES SEE THE ENVIRONMENTAL STATEMENT AIR QUALITY CHAPTER (DOCUMENT 5.14)