6.18.2013 system development - change/configuration and collaboration - rtc

48
Rational Team Concert for Systems and Software Development Rolf Nelson IBM Rational [email protected] June 18, 2013

Upload: ibm-rational

Post on 15-Nov-2014

666 views

Category:

Technology


2 download

DESCRIPTION

Series Name: System Development Webcast Title: Change/Configuration and Collaboration - RTC Date: 6.18.2013 Presenter: Rolf Nelson

TRANSCRIPT

Page 1: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

Rational Team Concert for Systems and Software Development

Rolf NelsonIBM [email protected]

June 18, 2013

Page 2: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation2

IBM Systems and Software Symposium – February 2013

Agenda

Quick overview of Rational Team Concert

Strategic direction with regard to Systems development

Highlights from recent releases, focus on Systems

Enhancing your current CCM environment with Team Concert

2013 priorities

Page 3: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation3

IBM Systems and Software Symposium – February 2013

Be lean at scale. Work together. Deliver quality results.

Process your way – Scrum, waterfall or hybrid; adapt planning to meet your team needs and rhythm.

Friction free communication by smart linking of tasks, code changes, builds and releases as you work

Transparency through live dashboards - write code not status reports – live web based dashboards tell everyone the story

Empower developers - Juggle tasks, patch in seconds, easily add or remove features as required to meet business needs

Runs anywhere – open platform Works with your existing tools and data for incremental adoption

Agile Formal

Page 4: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation4

IBM Systems and Software Symposium – February 2013

Team advisor for defining / refining “rules” and enabling continuous improvement

Process enactment and enforcement In-context collaboration enables team members

to communicate in context of their work

Single structure for project related artifacts World-class team on-boarding / offboarding

including team membership, sub-teams and project inheritance

Role-based operational control for flexible definition of process and capabilities

Jazz Team Server

Component based SCM enables reuse across projects

Change set based for easy addition or removal of features

Server-based sandboxes

SCM Work Items

Defects, enhancements and conversations

View and share query results Support for approvals and

discussions Query editor interface

Automated Work item and change set traceability

Build definitions for team and personal builds

Local or remote build servers Multi-level continuous

integration

Build

PlanningIntegrated release/iteration planningEffort estimation & progress tracking taskboards Out of the box process templates: formal or agile

Project Transparency Customizable web based dashboards Real time metrics and reports Project milestone tracking and status

Rational Team Concert functionality

Page 5: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation5

IBM Systems and Software Symposium – February 2013

Dynamic planning with multiple views

5

• Provide both traditional and agile views on the same plan

Taskboard

Gantt/Roadmaps

Support any planning method Enable success w/ transparency

Page 6: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation6

IBM Systems and Software Symposium – February 2013

Add process improvement – Scrum, waterfall, …Making process executable and repeatable

ProcessArchitect

Variant #1

Step 1: Customize

Step 2: Enact

Variant #2

Variant #3

ProjectManager

Scrum

Waterfall

Iterative

Project C

WaterfallAnalyst Release

EngineerDeveloper QualityProfessional

Project B

Analyst ReleaseEngineerDeveloper Quality

Professional

Project A

Product Owner Scrum Master Team Member

Agile

Iterative

For

mal

pro

ject

mgt

tem

plat

eS

crum

agi

le t

empl

ate

Page 7: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation7

IBM Systems and Software Symposium – February 2013

Provide transparency and automated status for everyoneEvery stakeholder knows project status without having to ask

Page 8: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation8

IBM Systems and Software Symposium – February 2013

Improve team collaboration across silos

8

• Silo’d teams; disconnected data

• Important discussions are lost to email -project records are missing the “real reason” for decisions

• Unified team shares linked data

• ALM environment tracks what is important for delivering

• “Am I blocking others”

• “Are others waiting for my approval”

www

Every artifact is a web link. Traceability is automated as you perform work. Empower teams and provide flexibility to utilize resources from anywhere.

Page 9: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation9

IBM Systems and Software Symposium – February 2013

Strategic Direction

Page 10: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation10

IBM Systems and Software Symposium – February 2013

Rational Addresses Two Key Market Segments - Systems and IT

Complex and Embedded Systems

Software and systems engineering and lifecycle mgt for products and complex systems• WW shipment leader in 3 categories; Embedded requirements #1, modeling #1, and testing #3• Grew ecosystem of partners, eg new ISV solutions +34% yty• Strategic alliances for adjacent market reach & industry solutions: National Instruments for HW/SW

test integration; Siemens PLM for integrated product development

AcceleratingProductand ServiceInnovationApplication Lifecycle

Management (ALM) Software application lifecycle mgt, multiplatform development and modernization for IT

applications• #1 market share in Application Development and Lifecycle Management Software (11

consecutive years, Gartner) • User’s Choice Award in software development platforms for the last 5 years (Evans Data)• 7 category leader/visionary recognitions by analysts• Expanded open, standards-based lifecycle platform via OSLC specs and workgroups• Grew community and user base to of Jazz.net members +45% yty

& Enterprise Modernization (EM)

Page 11: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation11

IBM Systems and Software Symposium – February 2013

Trends: Development Complexity and Delivery Cycles are Increasing

Heterogeneous Environments

Public CloudPrivate Cloud

Data Warehouse MainframeEnterprise

Service Bus

Directory Identity

File systems

Collaboration

Web/Internet

Routing Service

Third-partyServices Portals

ContentProviders EJB

SharedServicesArchives

Business Partners

Messaging Services

Product and application complexity and size

are increasing

Development delivery is more rapid, with impacts to how we test and release.

Increasing Development Complexity

IncreasingDelivery Cycles

Page 12: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation12

IBM Systems and Software Symposium – February 2013

Rational Team Concert for Systems

Focus on meeting the needs of Systems clients

High rigor

– Rigorous specifications and intensive testing

– Safety critical or expensive to fix failures

– Security and compliance

High variance

– Complex component-based development

– Extensive reuse

– Variant management

– Product lines

Software and systems engineering and lifecycle management for products and complex systems

Page 13: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation13

IBM Systems and Software Symposium – February 2013

Highlights from Rational Team Concert 4.0 – June 2012

Page 14: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation14

IBM Systems and Software Symposium – February 2013

Highlights from Rational Team Concert 4.0 – June 2012

Improved planning

Cross-project planning

– New plan type: Cross Project Plan

– New type of link: Work item can track other work items

– Roll up the schedule across projects

Kanban task board visualization support

– Visualize the flow of work through the process

– Easily see bottlenecks and inefficiencies

Page 15: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation15

IBM Systems and Software Symposium – February 2013

Highlights from Rational Team Concert 4.0 – June 2012

Compliance and Security

Finer grained security control

– Define roles with specific capabilities

SCM read permissions and IP security

– Ability to set SCM read permissions at the file/folder level

– Delete file contents from source control

CLI support for compliance audit

– Extract BOM and content

Page 16: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation16

IBM Systems and Software Symposium – February 2013

Highlights from Rational Team Concert 4.0 – June 2012

Variant management Managing deliveries to many streams

Find which release streams contain a set of changes

Select change sets you want to search for

Select streams you want to search

Page 17: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation17

IBM Systems and Software Symposium – February 2013

Highlights from Rational Team Concert 4.0 – June 2012

Usability and flexibility – users can work where they are comfortable

New! Windows 7 Explorer integration

– Simple file menus for versioning and locking

– Icons show version status

– Good for users who don’t need Eclipse or Visual Studio

New! Microsoft Source Code Control Interface (MSCCI) interface

– Integrate with Rhapsody, Matlab Simulink

Integrated with Rational Engineering Lifecycle Manager (RELM)

– Visualize, navigate, and query on work items and their relationships

Improved CLI for scripting and automation

Page 18: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation18

IBM Systems and Software Symposium – February 2013

Highlights from Rational Team Concert 4.0 – June 2012

Enterprise scalability

High availability with clustering (WAS-ND)

N-1 Client compatibility

– Supports incremental adoption of new releases

– Upgrade the server first

– Teams can upgrade their clients at their pace

Ability to rename a server URL and update the links

Page 19: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation19

IBM Systems and Software Symposium – February 2013

Highlights: Rational Team Concert 4.0.1 - November 2012

Page 20: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation20

IBM Systems and Software Symposium – February 2013

IBM Rational Team Concert v4.0.1 Highlights - November 2012

Improved performance and usability - Up to 25% faster plan rendering; And new auto-scrolling support

Process sharing and customization - Inherit process across projects and add local project customizations

Better support for code reviews – View cumulative file changes in a feature – Change Summary view

Extended platform support – Mac OS X clients, Visual Studio 2012 IDE, and Chrome browser

Rational LifeCycle Adaptors – Integrate w/ HPQC, Git, Jira, Visual Studio Team System and more!

Page 21: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation21

IBM Systems and Software Symposium – February 2013

Rational Team Concert 4.0.1

Usability and Getting Started Display plans up to 25% faster Working with large

plans now render faster

Up to 25% faster than 4.0 release

Auto-scrolling for plans makes it easier to move work items across plans

New zip install for RTC standalone installs Gets you up and running with RTC faster, with smaller footprint

Need to install just RTC?

Just download the zip install

Usability and Getting Started Display plans up to 25% faster Working with large

plans now render faster

Up to 25% faster than 4.0 release

Auto-scrolling for plans makes it easier to move work items across plans

New zip install for RTC standalone installs Gets you up and running with RTC faster, with smaller footprint

Need to install just RTC?

Just download the zip install

201320122011

Page 22: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation22

IBM Systems and Software Symposium – February 2013

Rational Team Concert 4.0.1

Process Sharing and Customization Allows project areas to extend a shared process

without cutting off inheritance from the parent.

Project areas can now define configuration deltas to a shared work item configuration.

Initial customizations supported

Adding a new attribute to a work item type and adding that attribute to the work item editor for that type

Adding a new literal to an existing enumeration

Adding a new enumeration type

Process Sharing and Customization Allows project areas to extend a shared process

without cutting off inheritance from the parent.

Project areas can now define configuration deltas to a shared work item configuration.

Initial customizations supported

Adding a new attribute to a work item type and adding that attribute to the work item editor for that type

Adding a new literal to an existing enumeration

Adding a new enumeration type

201320122011

“We are maintaining a common process template for all projects, however many project owners have requested minor process changes to their projects.”

“We are maintaining a common process template for all projects, however many project owners have requested minor process changes to their projects.”

Page 23: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation23

IBM Systems and Software Symposium – February 2013

Rational Team Concert 4.0.1

Code Reviews and Audits New Change Summary view

Makes code reviews easier

Details pane

Shows cumulative file changes in a feature

Dependency graph can help identify errors

Code Reviews and Audits New Change Summary view

Makes code reviews easier

Details pane

Shows cumulative file changes in a feature

Dependency graph can help identify errors

201320122011

Page 24: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation24

IBM Systems and Software Symposium – February 2013

Rational Team Concert 4.0.1

Automate more – New SCM CLI commands View and update workspace properties such as name, owned

by, visibility and description

View and update workspace flow targets

Component properties such as name, owned by and visibility can be viewed and updated

View and update baseline and snapshot properties

Diff the state of artifacts in a snapshot with their state in a workspace, stream, or another snapshot

Diff the state of artifacts in a baseline with their state in a component, contained in a workspace, stream, or snapshot; or another baseline

Display property differences

Scope diff by component

Automate more – New SCM CLI commands View and update workspace properties such as name, owned

by, visibility and description

View and update workspace flow targets

Component properties such as name, owned by and visibility can be viewed and updated

View and update baseline and snapshot properties

Diff the state of artifacts in a snapshot with their state in a workspace, stream, or another snapshot

Diff the state of artifacts in a baseline with their state in a component, contained in a workspace, stream, or snapshot; or another baseline

Display property differences

Scope diff by component

201320122011

Page 25: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation25

IBM Systems and Software Symposium – February 2013

Introducing the Rational Lifecycle Integration Adapters

Both Editions have IBM Rational branding and work with RTC/CLM 4.0 and 4.0.1

Both Editions are sold through standard IBM sales channels

Both Editions are supported by standard IBM customer support channels

Available 11/27/12Available 11/27/12Available 10/12/12Available 10/12/12

Standard EditionStandard Edition Tasktop EditionTasktop Edition

Page 26: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation26

IBM Systems and Software Symposium – February 2013

Open Lifecycle Integration and Services Management Platform

IBM Rational Team Concert v4.0.3

Deliver faster with improved performance

– Load plans in the web UI up to 50% faster

Focus on developer productivity

– Rank plans simpler and faster with explicit ranking options

– New customizable developer view across all projects for Visual Studio developers. Track my to do list and approvals

Report and act on more data

– Out of the box reports to track time spent

– Ability to report on approval descriptions and complex attributes such as team structure, components and iterations

Get started quicker than ever– New Jenkins plug-in with traceability to Rational Team

Concert work items and SCM to allow faster adoption without having to change your existing build tooling.

– Easier importing of ClearCase data with support for multi-branch, multi-baseline version history.

Build better software and products with an all-in-one development environment

Rational Team Concert

“Plans load much faster, ranking is simpler and now I can expand our adoption of Rational Team Concert to teams using Jenkins”

Development Team Lead

DRAFT: IBM Confidential Until June 2, 201326

AgileFormal

Page 27: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation

Software and Systems Engineering | Rational

Rational Team Concert 4.0.3 Performance

Performance: User Productivity

SCM command line:

10% boost in CLI execution

Plan loading performance: Phase II

In RTC 4.0.1 we improved performance by 25%

In RTC 4.0.3 plan loading uses a new “pay as you go” model and other optimizations that improve performance by up to 40 to 50 percent. For example, the Rational Team Concert product backlog now loads in 10 seconds, compared to 20 seconds in 4.0.3 M3, over a network latency shown in the image above using browser Mozilla Firefox 17.0.5.

Pay as you go: When we load a plan, not all plan view data is loaded until you ask for it.

Parallelize requests: Parallel requests when loading data rather than sequential requests

201320122011

Page 28: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation

Software and Systems Engineering | Rational

Rational Team Concert 4.0.3: Usability

Usability: Simple and fast agile ranking

Simplify ranking (218174)

Today:

We support automated stack based ranking in backlogs, which can sometimes lead to ranking gaps during drag operations.

Now we allow more explicit control over ranking.

New explicit actions to assign row numbers as rank numbers

Make the rank number manually editable

Improve drag and drop behavior

Make it much faster to rank order a large backlog and maintain consecutive rank when using drag and drop.

Usability: Simple and fast agile ranking

Simplify ranking (218174)

Today:

We support automated stack based ranking in backlogs, which can sometimes lead to ranking gaps during drag operations.

Now we allow more explicit control over ranking.

New explicit actions to assign row numbers as rank numbers

Make the rank number manually editable

Improve drag and drop behavior

Make it much faster to rank order a large backlog and maintain consecutive rank when using drag and drop.

201320122011

Page 29: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation

Software and Systems Engineering | Rational

RTC 4.0.3 : Apply Rank Action Examples

“I’ve got the plan ordered the way I want. One click to apply rank across the plan”

“I’ve moved a group of lower priority tasks

to the bottom of the backlog, apply an ordered

rank below, from my current selected task”

201320122011

Page 30: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation

Software and Systems Engineering | Rational

201320122011

Rational Team Concert 4.0.3 : Usability

Usability: Visual Studio Developers see all their work

organized in one place

[CCM] As a user make it easy for me to see what I'm working on, in the VS Client (227379)

We improved the current “My Dashboard” UI to make it very easy for a developer to see:

Current Work - my to do list of work items in the current iteration

Future Work - my to do list of work items grouped by future iterations

Pending Approvals – my work items owned by me in “pending” approval state

Pending Requests - All work items that require my approval

User customization of these views (sort order, bar charts, rich hovers)

See work across multiple Visual Studio projects.

Usability: Visual Studio Developers see all their work

organized in one place

[CCM] As a user make it easy for me to see what I'm working on, in the VS Client (227379)

We improved the current “My Dashboard” UI to make it very easy for a developer to see:

Current Work - my to do list of work items in the current iteration

Future Work - my to do list of work items grouped by future iterations

Pending Approvals – my work items owned by me in “pending” approval state

Pending Requests - All work items that require my approval

User customization of these views (sort order, bar charts, rich hovers)

See work across multiple Visual Studio projects.

Page 31: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation

Software and Systems Engineering | Rational

Rational Team Concert 3.x and 4.x – New Jenkins OSS plug-in. Available from the Jenkins plug-in site.

Incremental Adoption: New Jenkins plug-in Installs into Jenkins as a Jenkins plug-in, not shipped with the RTC

product

Runs SCM phase of a Jenkins build when you’re using RTC SCM

Supports integration at both SCM level and Build level with traceability from RTC build result.

Works with multiple versions of RTC (RTC 3.0.1.5 and 4.x and later)

Benefits:

Simpler to set up – provides incremental adoption of RTC

Automatically creates an RTC build result for you

Provides traceability to build workspace, snapshot, SCM changes link and “included in build” work item links

Leverage other Jenkins plug-ins / ecosystem

More details about obtaining the plug-in see our wiki page:

https://wiki.jenkins-ci.org/display/JENKINS/Team+Concert+Plugin

Incremental Adoption: New Jenkins plug-in Installs into Jenkins as a Jenkins plug-in, not shipped with the RTC

product

Runs SCM phase of a Jenkins build when you’re using RTC SCM

Supports integration at both SCM level and Build level with traceability from RTC build result.

Works with multiple versions of RTC (RTC 3.0.1.5 and 4.x and later)

Benefits:

Simpler to set up – provides incremental adoption of RTC

Automatically creates an RTC build result for you

Provides traceability to build workspace, snapshot, SCM changes link and “included in build” work item links

Leverage other Jenkins plug-ins / ecosystem

More details about obtaining the plug-in see our wiki page:

https://wiki.jenkins-ci.org/display/JENKINS/Team+Concert+Plugin

201320122011

Page 32: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation

Software and Systems Engineering | Rational

New Jenkins plug-in for Rational Team Concert

After the SCM phase has run, the build change log captures:

SCM change sets and snapshot, with links to associated work items

201320122011

Page 33: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation

Software and Systems Engineering | Rational

RTC 4.0.3 Plans : Enhanced ClearCase Importer

ClearCase Multi-branch Importer Improvements

Import baselines for multiple related releases or branches

– Must import streams in dependency order

Baselines are created in RTC automatically

– Now the version trees of imported files are comparable across ClearCase and RTC

Main line R8.0

R7 branch

R7.x

R6 branch

R6.x

201320122011

Page 34: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation

Software and Systems Engineering | Rational

RTC 4.0.3 Plans - Reporting

Regulatory Reporting: Report on Time Spent, approval descriptors and Modified By custom attributes

[CCM] Improve ability to report on time spent / lean metrics (213855)

[CCM] Make complex custom work item attributes, approval descriptors and Modified By data reportable and available in the data warehouse (242806)

Data collected in time sheets (via time tracking) can be reported on using RPE

– Time sheet data has a REST interface (4.0.1) for RPE

– Time sheet data is available for live reporting using BIRT reports

New out of the box timesheet reports

201320122011

Page 35: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation

Software and Systems Engineering | Rational

Details: New Approvals and Attribute Data Available for Reporting

ETL for "modified by" data

RICALM.REQUEST_HISTORY (Field: MODIFIER_ID)

ETL for approvals and approval descriptors

RICALM.REQUEST_APPROVAL_STATE

RICALM.REQUEST_APPROVAL_TYPE

RICALM.REQUEST_APPROVAL

RICALM.REQUEST_APPROVAL_DESCRIPTOR

ETL for complex custom attributes

The complex custom attributes data is now loaded into the data warehouse. The data includes complex custom attributes of these types: Category, Contributor, Deliverable, Item, Iteration, Process Area, Project Area, Team Area, Timeline, Work Item, and SCM Component.

RICALM.REQUEST_COMPONENT_EXT

RICALM.REQUEST_CATEGORY_EXT

RICALM.REQUEST_RESOURCE_EXT

RICALM.REQUEST_RELEASE_EXT

RICALM.REQUEST_ITERATION_EXT

RICALM.REQUEST_PROJECT_EXT

RICALM.REQUEST_TEAM_EXT

35 IBM Confidential

Page 36: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation

Software and Systems Engineering | Rational

Improved Process Permissions Configuration – Web UI

The contents of the Permissions tab were replaced with a new Permissions editor. Features include merging of project and team permissions, inheritance of permissions from the parent when customizing, filtering by operation name, and visibility of roles and time periods configured

36

201320122011

Page 37: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation

Software and Systems Engineering | Rational

Process Area History

History tab in the web UI, shows the history for project and team areas: who made each change, when it was made, and what was changed.

UI details what’s currently included (membership, roles, iterations, process xml)

37

201320122011

Page 38: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation

Software and Systems Engineering | Rational

Process Guidance in Work Items

38

201320122011

Page 39: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation

Software and Systems Engineering | Rational

RTC 4.0.3 Plans – Complex Cross Project Plans

Increased hierarchy levels for drill down

– Previously cross-project plans displayed a single hierarchy level. Now, they support multiple hierarchy levels for items that are tracked in the plan. The level is configurable.

201320122011

Page 40: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation

Software and Systems Engineering | Rational

RTC 4.0.3 Plans – Complex Cross Project Plans

Cross-project plans support three new plan checks for items that are tracked in a plan.

– Visual warnings are displayed when the following situations occur:

• The rolled-up schedule for an item in the plan exceeds the end date of the iteration that the plan is associated with.

• The "planned for" date of a plan item exceeds the plan's iteration end date.

• The rolled-up schedule for an item in the plan exceeds the due date that is specified for the item.

Colorizers and filters now support date expressions

– To highlight or hide items in the plan by date

201320122011

Page 41: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation41

IBM Systems and Software Symposium – February 2013

Enhance your CCM environment with Team Concert

Page 42: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation42

IBM Systems and Software Symposium – February 2013

Team ConcertState of the art collaborative development

solution

Goes beyond traditional CCMState-of-the-art collaborative

development platformIntegration hub with Jazz OSLCOne product with integrated CM

and SCM + planning, build and reporting

Designed for web and high performance over WAN’s

Easier to use and low administration Ideal for Agile developmentScalable from small to large globally

distributed teamsCan also “surround” other SCM’s:

Subversion, Git, ClearCase, SynergyCM functionality available separately

How do you get the most out of your CCM investment?

ClearCase / ClearQuest

Very large scale enterprise

development solutions

Build on your current investments to realize a collaborative change and configuration management solution

Build on your current investments to realize a collaborative change and configuration management solution

Very large development projectsVery complex and customized

workflowsBuild auditing and optimized build

avoidanceTwo products: ClearCase (SCM),

ClearQuest (CM)Stringent compliance requirements

(eg CMMi, SPICE) Complex requirements

management through DOORS integration

Specialized systems software development

Two products: Synergy (SCM), Change (CM)

Synergy / ChangeStringent compliance requirements for very specialized systems

development

Page 43: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation43

IBM Systems and Software Symposium – February 2013

Jazz is… A scalable, extensible team collaboration platform

A community at Jazz.net, where you can see Jazz-based products built in the open

An open architecture for lifecycle integration (OSLC - www.open-services.net)

Co-existence: Unifying Rational CCM product usageEnabled by Jazz: an open platform with a shared set of services

ClearCase & ClearQuest Synergy &

ChangeBuild Forge

3rd-PartyJazz

Capabilities

FutureIBM

Capabilities

StorageCollaboration

QueryDiscovery

Administration: Users, projects,

process

Best Practice Processes

Presentation:Mashups

Requisite Pro

& DOORS

HP Quality CenterSubversion

Co-existence... Enables teams to reuse enterprise

assets, process and investment in ClearCase/ClearQuest or Synergy/Change

Leverage new Collaborative Lifecycle Management in an evolutionary way with lower business risk

Use the “right-sized” governance solution for different project needs. Teams can collaborate and exchange Change Requests and Code

Page 44: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation44

IBM Systems and Software Symposium – February 2013

2013 Directions for Rational Team Concert

Page 45: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation45

IBM Systems and Software Symposium – February 2013

Follow Systems priorities in the RTC backlog on Jazz.net

Monitor progress here:https://jazz.net/jazz/web/projects/Rational%20Team%20Concert#action=com.ibm.team.apt.viewPlan&page=com.ibm.team.apt.web.ui.plannedItems&id=_vbiXZqC5EeCGUsd9CqIfuw&planMode=com.ibm.team.apt.viewmodes.internal.productBacklog.ranking

Page 46: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation46

IBM Systems and Software Symposium – February 2013

www.ibm.com/software/rational

Page 47: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation47

IBM Systems and Software Symposium – February 2013

Acknowledgements and Disclaimers:

© Copyright IBM Corporation 2012. All rights reserved.

– U.S. Government Users Restricted Rights - Use, duplication or disclosure restricted by GSA ADP Schedule Contract with IBM Corp.

IBM, the IBM logo, ibm.com, Rational, the Rational logo, Telelogic, the Telelogic logo, Green Hat, the Green Hat logo, and other IBM products and services are trademarks or registered trademarks of International Business Machines Corporation in the United States, other countries, or both. If these and other IBM trademarked terms are marked on their first occurrence in this information with a trademark symbol (® or ™), these symbols indicate U.S. registered or common law trademarks owned by IBM at the time this information was published. Such trademarks may also be registered or common law trademarks in other countries. A current list of IBM trademarks is available on the Web at “Copyright and trademark information” at www.ibm.com/legal/copytrade.shtml

Other company, product, or service names may be trademarks or service marks of others.

Availability. References in this presentation to IBM products, programs, or services do not imply that they will be available in all countries in which IBM operates.

The workshops, sessions and materials have been prepared by IBM or the session speakers and reflect their own views. They are provided for informational purposes only, and are neither intended to, nor shall have the effect of being, legal or other guidance or advice to any participant. While efforts were made to verify the completeness and accuracy of the information contained in this presentation, it is provided AS-IS without warranty of any kind, express or implied. IBM shall not be responsible for any damages arising out of the use of, or otherwise related to, this presentation or any other materials. Nothing contained in this presentation is intended to, nor shall have the effect of, creating any warranties or representations from IBM or its suppliers or licensors, or altering the terms and conditions of the applicable license agreement governing the use of IBM software.

All customer examples described are presented as illustrations of how those customers have used IBM products and the results they may have achieved. Actual environmental costs and performance characteristics may vary by customer. Nothing contained in these materials is intended to, nor shall have the effect of, stating or implying that any activities undertaken by you will result in any specific sales, revenue growth or other results.

Page 48: 6.18.2013 System Development - Change/Configuration and Collaboration - RTC

© 2012 IBM Corporation48

IBM Systems and Software Symposium – February 2013

© Copyright IBM Corporation 2012. All rights reserved. The information contained in these materials is provided for informational purposes only, and is provided AS IS without warranty of any kind, express or implied. IBM shall not be responsible for any damages arising out of the use of, or otherwise related to, these materials. Nothing contained in these materials is intended to, nor shall have the effect of, creating any warranties or representations from IBM or its suppliers or licensors, or altering the terms and conditions of the applicable license agreement governing the use of IBM software. References in these materials to IBM products, programs, or services do not imply that they will be available in all countries in which IBM operates. Product release dates and/or capabilities referenced in these materials may change at any time at IBM’s sole discretion based on market opportunities or other factors, and are not intended to be a commitment to future product or feature availability in any way. IBM, the IBM logo, Rational, the Rational logo, Telelogic, the Telelogic logo, and other IBM products and services are trademarks of the International Business Machines Corporation, in the United States, other countries or both. Other company, product, or service names may be trademarks or service marks of others.

www.ibm.com/software/rational