7-8 april , 2016 - allahabad - government of uttar · pdf file7-8 april , 2016 . coordinates:...
TRANSCRIPT
Coordinates: 25.45°N 81.85°E Elevation : 98 m (322 ft)
Area of ULB • 82 sq Km
Municipal Wards • 80; Zone • 5
Population • 59,54,391 Growth 20.63%
Urban Population • * 14,20,873;
Urban Population Growth 24.74%
Projected Population • 20.50 lakh
(as per Master Plan-2021)
Average House Hold-07
Density •1,087/km2 (2,820/sq mi)
ALLAHABAD (PRAYAG) : AT A GALANCE
The city of Allahabad is among the largest cities of Uttar Pradesh
and situated at the confluence of three rivers –
Ganga, Yamuna and the invisible Saraswati.
Govt Type • Mayor–Council
Body •Allahabad Municipal Corporation
Mayor • Smt. Abhilasha Gupta ‘Nandi’
M.P. • Shri Shyama Charan Gupta • Shri Keshav Prasad Maurya
M.L.A. • Shri Anugrah Narayan Singh • Shri Hazi Parvez Ahmad • Smt. Puja Pal
*Source- Final Census Report of U.P.- 2011; Source & http://allahabad.nic.in
Tel. code 91-532 ; Vehicle Reg. • UP-70 Sex ratio • 901 ♂/♀; Official lang.•Hindi Demonym •Allahabadi; PIN 211001-18
ASSESS THE SERVICE LEVEL GAP AND BRIDGING THE GAP
Existing Sanitation Services
Total Popu-lation
of town/
city
Total House holds
Households access to toilets(%)
No. of Toilets to be built
% of households toilets connected to
Community toilets
Individual toilets
No Toilets
Individual
Comm-unity
Public Sewerage network
Septic tank No out- let Comm-
unity individual
Soak pit
Non soak pit
14.20 Lacs
2.26 Lacs
11.2 83.25 5.54 9984 138 620 8.16 28.4 34.26 20.17 9.01
Method of disposal of sludge generated from toilet having no outlet There are several areas where no. of houses dispose their sludge from toilets to open or closed channel/ nala/ nalies. Survey are being made for identifying such houses and converting into Sewered or Pit latrines.
• Integrated Plan of Centralized and Decentralized Waste Treatment System :- Centralized Processing Plants for SWM situated at Baswar (Naini) constructed under JnNURM Project. LAYOUT MAP FLOW CHART
Decentralized Waste Water Treatment Plant are constructed 7 different location in the City.
VIDEO OF SWM ACTIVITY
• Measures for collection and treatment of sewage from on-site sanitation system (e.g. septic tank):- There are 7 locations of STPs in different locations out of which 6 STPs are running & 01 STPs is proposed to provide the decentralized system of sanitation.
• Convergence with other program and funding sources (Govt., other Funding, PPP):- Viability Gap Funding from SBM : Additional facilities and resources required to make the SWM in more effective and environment friendly. 13th & 14th Finance Commission : To meet out the day-to-day requirement such as, Purchasing of necessary equipments & maintenance of infrastructure. ULBs Funds : Utilized for day-to-day Sanitation Work including Cleaning, Sweeping & Wages of manpower required for such purposes.
PPP Mode : (I) Operation & Maintenance of existing ULB assets. (II) Waste to Energy Plant. (III) C&D waste to Eco Brick Plant.
Financial Planning
• Measures to recover the O&M costs User Charges
1- Municipal Corporation finalize the tariff of different categories of Household.
2- Total Revenue potential from user charge 1.2 Cr. Per Month • Current status – DTDC Services on 51 wards out of 80 wards with
average 50% coverage. • User Charge Collected (Avrg.) 15 Lac Per Month
Waste to Compost : Revenue potential 0.5 Cr. Per Month
Waste to RDF : Revenue potential 0.45 Cr. Per Month
Plastic pellets : Revenue potential 0.05 Cr. Per Month Note : Total Revenue potential is higher than total expenditure involve but, there are uncertainty to collect
1- User Charge 2- Selling / Marketing of By Products.
Financial Planning
• Measures to recover the O&M costs Collection of User Charge :
Approx. 50-60% of total Revenue potential are collected from the different category of User’s due to non willingness to Pay.
Sale of Compost
Approx 75 MT /day Compost produce
10,000 MT Stock are available.
Approx. 100-120 MT /day RDF produce.
License from Pollution Control Board are issue.
License from Agriculture Department for selling of compost is still
awaited.
Financial Planning
• Plan for Recycle and reuse of treated waste water- There are no plan for recycle of Treated Waste Water, reuse of
Treated Waste Water for irrigation purpose of agriculture land.
• Status and components covered under ongoing projects; MCA proceed to execute SWM & maintenance of Waste Water
Treatment under PPP mode
• Individual projects which is being financed by various stakeholders :- SWM Project finance by JnNURM, SBM, ULBs and PPP Mode. Waste water treatment project finance by JnNURM and NGRBA
Scheme.
Financial Planning
• Best Practices and Innovative solutions to make city ODF:- 1010 IHHL application are approved & construction work in progress under SBM (1st Installment released)
Construction of 54 Units of CTs & 90 Units of PTs. Mass awareness campaign & prevent the open defecation through Road Play (Nukkad Natak & Magic Show), Pamphlets, Hoardings, Banners, Broadcast of awareness Message on Radio’s Channel and by Loud Speaker), Advertisement in Media, Wall Cleanliness Activity etc.,.
Financial Planning
• Methodology adopted to involve stakeholders at every level:- Regular meeting with different stakeholders. Workshop organized with stakeholders. Timely organized Zonal Citizens Committee Meeting in every zones. Timely organized Ward level Citizens Committee Meeting .
Citizen Engagement
• Methodology adopted for prioritizing the alternatives:- To avoid the Open Defecation : Purchased 9 Mobile Toilets & Provides for this purpose in different area’s of Malin Basti & other important places. Scientifically Treatment of Waste : ULBs initiate Waste to Energy Plants.
• Conditionality's in terms of availability of land, environmental obligation and clearances, required NOC, financial commitment, approval and permission needed to implement the project :- In case of construction of CTs & PTs, there is no need of NOC from Pollution Control Board & other agencies. The main issues are the availability of Land & citizen support for identified places. In case of SWM, NOC for water & air pollution is taken for Pollution Control Board For manufacturing of By-Product of Waste, NOC from PCB issued & license from agriculture department is still awaited.
Prioritization, Conditionality's and Resilience
• Resilience factor to be built in to ensure environmentally sustainable sewerage scheme :- Allahabad City : Sewerage Network is divided into 7 Sewerage Districts. In each District the entire Sewerage Networks with Pumping Station & Sewerage Treatment Plants are used to provide the Environmentally Sustainable Program.
Prioritization, Conditionality's and Resilience
Nawada
POLICE LINES
RAJAPUR
NY
AY
MA
RG
NY
AY
MA
RG
SA
RO
JIN
IN
AID
UM
AR
G
LA L BAHADUR SHASTR I MARG
LA L BAHADUR SHASTR I MARG ( E LG I N ROAD )
SA
RD
AR
PA
TE
LM
AR
G
MAHARSH I DAYANAND MARG
RA
MM
AN
OH
AR
LO
HI
AM
AR
G
HIR
AL
AL
VA
LM
IK
IM
AR
G
CL
IV
ER
OA
D
N K MUKHER JEE ROAD
AS
TU
RB
AG
AN
DH
IM
AR
G
PA
TR
IK
AM
AR
G
KAM
LA
NE
HR
UM
AR
G
PA
NN
AL
AL
MA
RG
SA
RO
JI
NI
NA
ID
UM
AR
G
TASHKENT MARG
TASHKENT MARG
MAHATMA GANDH I MARG
ST
RA
CH
EY
RO
AD
CL
IV
ER
OA
D
MIS
SIO
N
ROAD
MI N
TO
R
OAD
CO
OP
ER
RO
AD
TE J BAHADUR SAPRU MARG
SH I VRAMDAS GUL A T I MARG
KA TCHERYROAD
CIVIL LINES
CIVIL LINES
CIVIL LINES
MAH
AD
EV
IVE
RMA
MA
RG
MAHARSH I DAYANAND MARG
PURUSHOTTAMDAST ANDON
MARG
MU I R ROADMUI R ROAD
CIVIL LINES
KHUSRUBAGH
ATALA
RAILWAY COLONY
SHAHGANJ
SABZI MANDIPan Dariba
JauharitolaMirganj
ROSHANBAGH
BADSHAHIMANDI
BAHADURGANJ
SARAI MIRKHAN
KOLHANTOLA
Shararabagh
MOHSINGANJ
Rani Mandi
MALVIYA NAGAR
MUTTHIGANJ
AKBARPUR
SULTANPUR
BAKSHI BAZARKHULDABAD
ATARSUIYA
MAHATMA GANDH I MARG
NAWAB YUSU F ROAD
AP
BA
NE
RJ
EE
RO
AD
BHART I BHAWAN ROAD
RN
BHARGAVAMARG
SEVA SAM I T I MARG
KP
K AKKAR MARG
SWAM I V I VEKANAND MARG
DR
OA
D
HIN
DI
SA
HI
TY
AS
AM
ME
LA
NM
AR
G
PANCHKROSH I SAM I T I MG
SM I TH ROAD
SH
AH
I DR
OS
HA
NS
I NG
HR
D
LA
LA
SIT
AR
AM
RO
AD
NE
TA
JI
SU
BH
AS
CH
AN
DR
AR
D
MIR
ZA
GH
AL
IB
RD
LEADER ROAD
DR
KA
TJ
UR
OA
D
BH
ARG
AVA
R
D
GRAND TRUNK ROAD
CIVIL LINES
HIM
AR
OA
D
SA
RO
JIN
IN
AI
DU
MA
RG
NU
RU
LL
AH
RO
AD
NU
RU
LL
AH
RO
AD
LA
UT
HE
RR
OA
D
NORTH EASTERN RAILWAY - MAIN LINE
JOHNSTONGANJ
LALIT NAGAR
SOUTH
NORTHMALAKA
MALAKA
GADIWANTOLA
Nakhas Khana
KOLHAN TOA L STREET
COLONELGANJ
ALLENGANJ
TAGORE TOWN
KATRA
FATEHPUR
BICHHWA
DARBHANGA CASTLE
DARBHANGA COLONY
PA
NN
AL
AL
MA
RG
JAW
AH
AR
LA
LN
EH
RU
RO
AD
BA
GH
AM
BA
RI
RO
AD
BANDHROAD
AN
NI E
BESAN
TROAD
CY
CHI NTAMAN I
MARG
PC
BAN
ER
JE
ER
D
RA
MP
RI
YA
RO
AD
KANOX RD
CHURCH LANE
HASHIM
PURROAD
PT
GANGANATHJHA
MARG
CHI NTAMAN
IG
HOSH
MARG
UN I V ERS I TY ROA D
RAMNARAYAN L A L AGARWA L RD
MA
ST
ER
ZA
HR
UL
HA
SA
NR
OA
D
NO
RT
H E
AS
TE
RN
RA
ILW
AY
AL
LA
HA
BA
D -
VA
RA
NA
SI S
EC
TIO
N
MAHARSH I DAYANAND MARG
MO
TI
LA
LN
EH
RU
MA
RG
CHOTA BAGHARA
Dhaurahra
ALLAHPUR
ALOPIBAGH
GEORGE TOWN
KYDGANJNETANAGAR
CHAUKHANDI
Khalasi LineKasai Tola
MINTOPARK
RAMBAGH
BAI KA BAG
BAHRANA
SITARAMPUR
TULARAMBAGH
MADHAVPUR
CHHIDPUR
PA
NN
AL
A
MAHA TM AGANDH I
MARG
GRANDTRUNK
ROAD
LID
DL
ER
OA
D
RN
BHARGAVAMARG
SEVA SAM I T I MARG
SHANKAR LA L RGA VA
RO
SH
AN
SI N
GH
RD
LA
LA
SIT
AR
AM
RO
AD
BH
ARG
AVA
R
D
LA L ROAD
K AL I ROAD
DR
AM
AR
NA
TH
JH
AR
OA
D
HIM
AR
OA
D
TR I VEN I ROAD
GRAND TRUNK ROAD
TR I VEN I ROAD
FO
RT
RO
AD
MAHATMAGANDH I
ROAD
FO
RT
RO
AD
Allahabad - Varanasi - Chhapra Branch
BE
NI
BA
ND
HR
OAD
GRANDTRUNK
ROAD
SHASTRI BRIDGE
KYDGANJNAIBASTI
SHANKAR LA L BHARGA VA ROA D
ML
BH
ARG
AVA
R
D
FORTYAMUNA BANK ROAD
YAMUNABANK ROAD
Balikapur
Jondhwal
RASULABADBAZAR
Mahdeori
Haulipar PurwaSHILAKHANA
Ghusayna PurwaTARBAGIYA
Rambagh
KUTI MAHADEV
Saraiyan
Kalakari Purwa
GOBINDPUR
Chilla
PuraGadaria
BISHANPUR
PH
AP
HA
MA
UR
OA
D
OLD CANTONMENT
LAW
RE
NC
ER
OA
D
PH
AP
HA
MA
UR
OA
D
ROBERT ROAD
SYED AHMED KHAN ROAD
BA
LM
IK
RO
AD
LO
CK
HA
RT
RO
AD
HAVE LOCK ROAD
NAYAPURA
MUIRABAD
ASHOK NAGAR
Pura Mau Saraiyan
Beli
Uchwan Garhi
H
PO
NA
PP
AR
OA
D
R
ST
AN
LE
YR
OA
D
MUMFORDGANJ SPS
RANIPUR
NAYA KATRA
BISHANPUR
GALLA BAZAR
ISHAWARSHARANNAGAR
HUTURKHAN
AKBAR I ROAD
BATUKKR
I SHNABANER J EE
RD
ALAMJAFR
IROA
D
LA LA L A J PATRA I ROAD
MO
TI
LA
LN
EH
RU
RO
AD
BE
LI
RO
AD
RAMNARAYAN L A L AGARWA L RD
Cemetry
ST
AN
LE
YR
OA
D
StPeter
Shadiabad
Chandpur
Salori
SULEM SARAI
BA I JNATHGUPT A R O A
D
GRAND TRUNK ROAD
PO
NA
PP
AR
OA
D
CA
RIA
PP
AR
OA
D
NIW
ANRO
AD
LAW
RE
NC
ER
OA
D
AKBAR ROAD
MAGDAL A RD
V I KRAMAD I T YA MARG
KAB I RMARG
TO
MB
SR
OA
D
CANTONMENT
CANTONMENT
HAVEL OCK ROAD
CANTONMENT
NIHALPUR
KALADANDA
PURSHOTTAM
LUKARGANJ
KARBALA
RAJRUPPUR
BENIGANJ
SUBEDARGANJ
MA
HA
TM
AR
AV
ID
AS
M
ARG
LA
TU
SH
RO
AD
LUKAR ROAD
KH
US
RU
BA
GH
RO
AD
PURUSHOT T AMDAST ANDON
MARG
CHAKNIRATUL
CHAKIYA
RA
JI
VG
AN
DH
IM
AR
G
GRANDTRUNK
ROAD
GRAND TRUNK ROAD
SHERWANI NAGAR
Raiway
JAYANTIPUR
Dhumanganj
Jairampur
DhussaJhalwa
RailwayColony
Colony
GRAND TRUNK ROADNAT I ON AL H IGH WAY NO . 2
NAYA PURWA(KARELI)
SASUR KHADER I NAD I
NUR
UL
LAH
RO
AD
Graveyard
GTB NAGAR
BANS
MANDI
KALYANIDEVI
DARIYABADMIRAPUR
RASULPUR
KATGHAR
NEHRU NAGAR
TULSIPUR
KARELABAGHCOLONY
ATARSUIYA
LA
XM
IN
AR
AY
AN
MA
RG
SA L I KGAN J RD
KR
IS
HN
AK
AN
TR
OA
D
NU
RU
LL
AH
RO
AD
SH
AU
KAT
ALI
MARG
YAMUNA ROAD
LA
UD
ER
RO
AD
TI
LA
KR
OA
D
ML
BH
ARG
AVA
R
D
Gurudwara
RIV
ER
GA
NG
A
RIVER YAMUNA RIV
ER G
ANG
A
RIVER
GA
NG
A
RIVER GANG
A
RIV
ER
GA
NG
A
RIVER YAMUNA
RIVER G
ANGA
RIVER G
ANGA
PHAPHAMAU
MO
TIL
AL N
EH
RU
RD
Graveyard
Graveyard
GR
AV
ITY
M
AIN
ALOPIBAG SPS MORIGATE NALA
RISING MAIN
ALLAHPUR SPS
DARAGANJ SPS
GAUGHAT PS
EXISTING PIPE
RIS
ING
MA
INLUKAR
SPSGANJ
SASUR KHADERISPS
RAJAPUR STP
MUMFORDGANJ PS
CHACHAR NALA SPS
LOCAL IMPROVEMENT
40 MLD - 1st STAGE 50 MLD - FINAL
PROPOSED
CAPACITY28 MLD
WITH ADDITIONAL PUMPING
60 MLD - 1st STAGE
80 MLD - FINAL
PONGHAT STP
10 MLD - 1st STAGE
15 MLD - FINAL
KODARA NALA STP
25 MLD - 1st STAGE
35 MLD - FINAL
NEW PUMP HOUSE INCREASED
CAPACITY FROM 8 MLD TO 55 MLD
RIS
ING
MA
IN
UPTO 42 MLD
NAGAR
GR
AV
ITY
M
AIN
GRAVITY MAIN
GRAVITY MAIN
RIS
ING
MA
IN
GRAVITY MAIN
GRAVITY MAIN
GR
AV
ITY
MA
IN
GRAVITY MAIN
MORIGATE 9 MLD
NEW PUMPING STATION MORIGATE 12 MLD
F
15E
15D
15C
15B
15A
15
14F
14E
14D1
4C14B
14
A
14
11
E
11
A
11
11
F
11
D
11
B
11
C
19
18
17
16
RAJAPUR MPS
KODARA MPS
PONGHAT MPS
RAJAPUR INTERCEPTOR
COLONY
SALORI STP - 29 MLD
COLONY
14 MLD - FINAL
SPS
SPS
SPS
G
3 4 . 6 2 58
2 8 . 6 8 41
NUMAYA DAHI STP
50 MLD CAPACITY
NAINI STP
GHAGGAR PROPOSED
NALA SPS
40 MLD -
CITY SEWERAGE PLAN - ALLAHABAD
Jhunsi
Town Area
Cantonment
Area
W/S INTAKE WELL
Jhunsi STP
18 MLD
Salori MPS
Phaphamau SPS
Phaphamau STP
10 MLD
TELIARGANJ
SALORI
KATRA
RAJAPUR
CIVIL LINES
CHAUK
KARELI
SULEM SARAI
NAINI
JHUNSI
PHAPHAMAU
PRITAM NAGAR
MUNDERA
NIM SARAI
RAJROOPPUR KHULDABAD
KYEDGANJ
MUTHIGANJFORT
SANGAM NOSE
GEORGE TOWN
TAGORE TOWN
A
B
C
D
E
F
G
SEWERAGE
DISTRICTStatus of Sewerage Work
Existing Works Ongoing Works Work under Planing
STP 60MLD, 2SPS,
Partial Sewer
Temporary Works,
1 SPS
STP 29MLD, 1SPS
-
By Defence Department
STP 20MLD, Renovation of
2SPS & Some existing sewer
STP 50MLD, 2SPS &
Renovation of 1 Old SPS
STP 60MLD, 3SPS,
Upgradation of Existing 3
SPS, Sewer Network
2 STP of 25 MLD & 10 MLD,
4 SPS, Sewer Network
-
Sewer Network
Sewer Network
STP 14 MLD, 1 SPS &
Sewer Network
STP 10 MLD, 1 SPS,
Sewer Network
STP 35 MLD, 2 SPS,
Sewer Network
STP 18 MLD, 2 SPS,
Sewer Network
5 SPS, Partial Sewer
Network
-
-
-
-
-
-
-
Waste to Energy Is the Process of
generating energy in the form of electricity and /or heat from the
management of Waste.
Waste to Energy Flow Chart
Heating
Electricity
The Stoked clean gas free Of CO2 go to the Steamers To boil the water
The Steam goes to ENVA Generator to produce Energy
The Leftover steam and water from steam operation will be used, mixed With outside
air, from the AWG to produce more water for the system operation
To Clean gas produce to
Steamer
ENVA
Syn Gas Storage
Syn Gas Storage
Syn Gas Filter
Start Compost Plant by M/s Hari-Bhari
SWACHH BHARAT MISSION
Scheme Public Toilets
Com- munity Toilets
Total No. of Toilets
Toilets constructed
after 2 Oct, 14 Constructed Public Com-
munity
1 2 3 4 5 6 Toilets Constructed under
different Scheme 74 38 112 & &
Constructed under NGRBA
Scheme 44 24 68 14 07
Total No. of Toilets 118 62 180
Total No. of Active Seats. 860 410 1270
Statement of Constructed Toilets
Zon al Citizen Committee
tksu&02 ds itkok jke yhyk eSnku esa
dslj fo|kkihB esa cSBd
jlwyiqj okMZ esa
Ward Level Citizen Committee