Q1: Is the
SARP10:
Q2: You resistance
SARP10:required.
Q3: If wethe under
SARP10:
Q4: Wha
SARP10:unsuitableresolve th
Q5: Wha
SARP10:
Q6: If thecost includ
SARP10: storage si
Old Loo
wing informatiand acknowleesult in the rej
– Pre-bid Me
– Additional
– Updated 00
– MLG&W U
– Links to Ge
---------------
e bypass pum
No, the bypa
mentioned we include an e
The corrosioWaterproofin
e have to excarcut and relate
Yes, a line it
at is the backf
In general the material is ehe issue.
t type of back
See specifica
e contractor dded in any of
The intent ofite as to not c
os Hwy 51 Em
on encompasedge this Addjection of the
eeting Questio
Questions an
0370 Comme
Utility Maps
eotechnical R
---------------
Section 1
mp located in
ass pump is lo
ater proofing epoxy coating
on resistance g on the exte
avate additioned foundation
em is provide
ill material req
he suitable onencountered d
kfill material d
ation Section
isturbs any imthe bid items
f the design iscause any sur
Reqmergency Se
RFB NoJun
sses Addenduendum in theBid.
ons and Repl
nd Replies
ercial Bid Form
Report and Pro
---------------
1: Pre-bid Me
our construct
ocated on the
the manholesg in addition to
admixture wirior of the ma
nal material bn material?
ed on the Bid
quirement for
-site materialduring excava
do we use for
02530.
mproved areas?
s to jack and brface disruptio
quest for Bidewer Line Re. 179821.71.0ne 05, 2015
1
um # 2 for the
e preparation
ies
m
oject Plans
---------------
eeting Quest
tion easemen
e other side of
s and providino the admixtu
ll be in the coanholes shall
eneath the pi
Form for Und
r the unimprov
removed duration, enginee
the undercut?
as on site of th
bore the pipeons.
eplacement A0405
e above referand submitta
----------------
tions and Re
nt?
f Highway 51
ng corrosion ure to the con
oncrete. No adbe provided a
ipe, will there
dercut Backfil
ved areas?
ring excavatioering judgmen
?
he storage fac
through the
Addendum #
renced RFB. al of its formal
----------------
eplies
.
resistance. Wcrete to preve
dditional corroas specified.
be additiona
l.
on can be usent will be used
cilities is there
improved are
2 to
Bidders shall Bid. Failure
----------------
Will the corrosent corrosion?
osion coating
l compensatio
ed for backfilld at that time
e a restoratio
ea of the mini-
l fully to do
-------
ion ?
g is
on for
. If to
n
-
Q7: You
SARP10:
Q8: Howmay also
SARP10:Watkins. Hand respo
Q9: Can the street?
SARP10:
Q10: Can
SARP10:pre-qualifas a vend
Q11: Wh
SARP10:
Q12: Wiltop of the
SARP10:
Q13: For
SARP10:carrier pip
Q14: Wh
SARP10:
Q15: If s
SARP10:EBO list, t
Q16: Thematerials
SARP10:
Old Loo
mention offse
The distance
do you expehave to offse
See the revisHowever, theonse above).
we move the?
See revised
n the low bidd
In order for Sied with SAR
dor before a c
en we aband
See revised
l there be anymanhole fram
See revised
r the sewer in
Bidders shoupes (including
o will verify th
The contract
sub is a mino
No, they havthey qualify fo
e plans and aacceptable?
See updated
os Hwy 51 Em
etting the line
e from the cen
ct the contract this pipe sec
sed plans wh alignment sh
manhole bac
plan sheet.
der be someo
SARP10 to acP10 by June ontract will be
on a manhole
notes on the
y transition onme and cover
notes on the
jacked liner w
uld include alg spacers and
he elevation o
tor.
ority woman d
ve to be MBE or both the SR
dvertisement
d plans which
Reqmergency Se
RFB NoJun
near the stor
nterline of the
ctor to bore uction as well.
ich show the hown across t
ck off the med
one who is no
ccept and ope4th, as statede executed.
e should we f
plans.
n the manholer?
plans.
will you be inc
l labor and md resilient con
of the casing
does it count f
or WBE, theyRF Fair Share
state that the
reference Gl
quest for Bidewer Line Re. 179821.71.0ne 05, 2015
2
rage facility. W
e existing pipe
nder Watkins Also the 10’
new alignmethe mini-stora
dian on Watk
t qualified yet
en a bid the b in Addendum
fill it with sand
e? Do you wa
cluding the pr
aterials relatenectors) in th
under Highwa
for both MBE
y cannot be be goal and the
e pipe materia
ass Fiber Re
eplacement A0405
What is the di
e to the cente
s using the ex offset is tight
nt for the crosage must rem
ins so we wo
t in the SARP
bidder must bem 1. The low
d or concrete?
ant us to have
rice of spacer
ed to the instahe line item en
ay 51?
E & WBE?
both. Howevee City’s M/WB
al to be used
inforced Poly
Addendum #
istance of the
erline of the ne
xisting locationt can we incre
ssing under tmain at 10’ (se
n’t have to sh
P10 program?
e in the procebidder shall o
?
e the 6’ diame
rs?
allation of thentitled “Sewer
er, if a vendor BE goal.
is Hobas. Are
ymer Mortar P
2 to
e offset?
ew pipe is 10
n? We believeease the offse
he stream anee related que
heet pile the n
?
ess of becomobtain full app
eter all the wa
encasementr in Jacked Li
is on the City
e other pipe
Pipe.
’
e we et?
nd estion
near
ing proval
ay to
t and ner.”
y’s
Q17: Wil
SARP10:
Q18: Wh
SARP10:
Q19: Wh
SARP10:
Q20: Do
SARP10:
Q21: Do
SARP10:
Q22: Wil
SARP10:
Q23: Do
SARP10:
Q24: If o
SARP10:
Q25: Wh
SARP10:
Q26: Wh
SARP10:
Q27: Are
SARP10:
Q28: Wil
SARP10:
Old Loo
l you conside
No.
at type of doc
Please refer
at do you wa
Please refer
we have com
Refer to Spe
you consider
Yes it is cons
l you require
A means of f
we need tie o
Fall protectio
ur trench is d
A means of f
at do we nee
A qualified ri
at type of cer
Documented
e you going by
OSHA 1926
l the suppliers
No.
os Hwy 51 Em
r using plastic
cuments will w
to RFB for re
nt in the digita
to RFB for re
mpaction requ
ecification Sec
r the trench a
sidered a con
harnesses on
fall protection
off when we g
on is required
eeper than 12
fall protection
d for rigging f
gger is requir
rtification is re
d training on s
y general indu
Construction
s be required
Reqmergency Se
RFB NoJun
c pipe to mak
we have to su
equired docum
al submittal?
equired docum
irements in th
ction 02530.
confined spa
nfined space.
n the system f
n is required w
get into the tre
for access g
2’ we required
n is required w
for the excava
red for all rigg
equired for the
specific equip
ustry OSHA s
Standards
to attend saf
quest for Bidewer Line Re. 179821.71.0ne 05, 2015
3
ke the bid mo
ubmit for the b
ments.
ments.
he unimprove
ace?
for the trench
when fall heig
ench?
reater than 12
d additional fa
when fall heig
ator?
ging.
e rigging exca
pment.
standards or C
fety orientatio
eplacement A0405
re competitive
bid?
ed areas?
h?
ht is greater t
2’ in climb he
all protection?
ht is greater t
avator?
Construction?
on?
Addendum #
e?
than 6’.
eight.
?
than 6’.
?
2 to
Q29: Wh
SARP10:
Q30: Are
SARP10:
Q31: Do
SARP10:
Q32: Is th
SARP10:
Q33: Are
SARP10:the mater
Old Loo
at type of saf
A designated
e you required
Yes.
you require m
Yes, STAs a
he weekly saf
No, just with
e there any sp
All materials rial in the pipe
os Hwy 51 Em
fety personne
d competent p
d to have a no
mandatory da
are required fo
fety meeting h
the contracto
pecial requirem
must be legae and the pipe
Reqmergency Se
RFB NoJun
el do the contr
person to add
on-working at
aily morning sa
or each crew.
held with the
or and subs.
ments for disp
ally disposed e and manhol
quest for Bidewer Line Re. 179821.71.0ne 05, 2015
4
ractors need o
dress safety h
tendant obse
afety meeting
contractor an
posal of the p
of by the cones themselve
eplacement A0405
on site?
hazards and c
erving during a
gs?
nd the SARP1
pipes and man
ntractor. For bes are non-ha
Addendum #
concerns.
a confined sp
10 team?
nholes?
bidding purposazardous.
2 to
pace entry?
ses, assume that
Q1: PleasConShieldalternative
SARP10: all pre-casfilling in th
Q2: Will aCurrently prohibit) a
SARP10:
Q3: Will athe produThey norm
SARP10: exterior jo
Q4: It appEntering fprovide a
SARP10:
Q5: Theresecurity p
SARP10: property d
Q6: Doeswould onl
SARP10:
Q7: The ato the MillGilliland plimits? If
SARP10: ContractoRoad and
Q8: How
SARP10: Robertson
Old Loo
se confirm if thd Admix was e produce suc
Manhole prest manholes. he lifting holes
an interior lininthere are two
and Quadex A
No other inte
an exterior joinct if required.mally carry th
A double maoint wrap shal
pears that thefrom Watkins temporary ac
It is the Cont
e is a chain linpurposes whe
It is the Contduring constru
s the pipe havy allow the co
Deflection te
available worington Road
property to stof this allowanc
At this time wor will have acd Old Millingto
long can Rob
Vehicular acn must be ma
os Hwy 51 Em
Sectio
he use of a cotalked about ch as Xypex C
e-caster shall Any additiona
s) shall be pe
ng that is curro approved mAluminaliner s
erior coatings
nt wrap be req Conseal CSis in two width
astic seal shall be used at a
ere is no accedoesn’t appe
ccess easeme
tractor’s respo
nk fence alonn it intersects
tractor’s respouction.
ve to be defleontractor 90 d
sting is requir
rk space in thetaking up a p
ore the excavce is up to the
we do not expccess to the Con Road.
bertson Road
cess to the Paintained at al
Reqmergency Se
RFB NoJun
on 2: Additio
oncrete admixfor use on thiC-1000 admix
include an anal touchup worformed with
rently requiredethods of this
spray-on coat
or linings wil
quired at manS-212 info is ahs (8” and 12
ll be used in aall joints. Join
ess provided fear to be an oent for this se
onsibility to ac
g Millington Rs the construc
onsibility to re
ection tested pdays to constr
red per the sp
e constructionortion of it. Wated material
e bidder, it wil
pect any extraCity of Memph
d be closed, if
olice and Firell times.
quest for Bidewer Line Re. 179821.71.0ne 05, 2015
5
nal Question
xture will be ris project. Wilxture be acce
nti-microbial cork conducteda grout that c
d for sewers os: T-Lock PVCting (which is
l be allowed o
nhole joints? Aattached whic”) and two dif
all joints betwnt wrap shall b
for the work tooption with theection of the p
cquire access
Road. Will thection limits?
each an agree
prior to the 12ruct the pipe l
pecifications.
n limits are grWill the Owne
that will not fll be consider
a easements ohis property n
f Millington Ro
e Training Aca
eplacement A0405
ns and Repli
required for thll that be the peptable for us
concrete admd on the intericontains anti-
of this size beC lining (whicapplied after
on the interior
Also, what wich is a typical fferent thickne
ween precast sbe a minimum
o be done froe guard rail anproject?
s easements
e contractor h
ement with th
20 calendar dline.
See revised
reatly reducedr provide morfit in the currered a great ris
on the Gillilannorth of the int
oad is left ope
ademy north
Addendum #
es
his project. I bproduct spece?
ixture that preior of the manmicrobial adm
e required in tch the timing o
manhole inst
r of the manh
ill be the widtmanufactureesses (0.065”
sections of eam of 0.065” th
om stations 0+nd steep slop
from the prop
have to keep
he property ow
ay completion
contract mile
d from 17+50re easement oently providedsk to the cost
nd property. tersection of
en?
of the work s
2 to
believe that ified? Will an
events corrosnholes (includmixture as we
the manholesof this projecttallation).
holes.
h and thickner used for this” and 0.100”)
ach manhole.hick and 8” wi
+00 to 7+00. pe. Will the O
perty owners.
this fence up
wner to secur
n? If so, this
estone dates.
0 thru 24+00 don the Mike d constructionof the project
However, theOK Roberson
site along OK
sion in de ell.
s? t will
ess of s. .
. An de.
Owner
.
for
re his
due
n t.
e n
Q9: Old LBID in thewith 42” Hfollowing: Polymer Mwill make referencePipe (FW Form. Thspec” wheyour Old L
SARP10:
Q10: CCproject bidto be instaCan you pother CCFyour proje
SARP10: Flowtite, a
Q11: OLDthat therereport to t
SARP10: from 1989Loosahatc
Q12: The54-in & ab
SARP10:
Q13: As dcasing at
SARP10:
Q14: In oways (Nosouth? T
SARP10:
Note: Thevent of a MLG&W U
Old Loo
Loosahatchie e second paraHobas pipe.”
“The ContraMortar (FRPMthe inclusion to one specif& CCF) is sp
he competitionere they can. Loosahatchie
See revised
FRPM PRINTd set, “PR 42 alled. CCFRPplease changFRPM locatioect.
See revised and other ma
D GEOTECHis “Geotechn
the bidders / s
The geotech9 and was notchie River ne
e specs show bove?
See revised
discussed in station 4+24.
See revised
order to decrerth and Southhis will decrea
See revised
e Bid Documa conflict betw
Utility Maps a
os Hwy 51 Em
HW 51 Emeragraph of pagIn Addendum
actor will be reM) Pipe?” I kn
of Flowtite Ofic product ind
pecified in then has taken d Please clarif HW 51 Eme
plans
TED ON REVInch CCFRP
PM is “Centrife this wording
ons, please ch
plans. The pnufacturers th
NICAL REPOnical Report” fsuppliers?
nical report ist performed foar Benjestow
casing pipe w
plans.
the pre-bid m92 (Creek) &
plans.
ease the jackih). Can the base the depth
plans.
ents contain ween the spec
are included a
Reqmergency Se
RFB NoJun
rgency Sewege 1 states: “Tm #2, can youeplacing the cnow we discu
Official and elidicates a “So City of Mempocuments simfy that Flowtitrgency Sewe
VISED PROJEPM” appears ofugally Cast Fg on the drawhange those t
plans call for Ghat meet the s
ORT FROM 1from 1989 fro
s included as or this specifi
wn Road.
wall thickness
meeting, can th 6+98.61 (N.
ng pit depth oore under norh of pit approx
the City of Mecifications and
as part of this
quest for Bidewer Line Re. 179821.71.0ne 05, 2015
6
r Line ReplacThe Contractoplease retrac
current intercessed this at thminate any cole Source Spphis Standardmilar to this ane Filament-W
er Line replace
ECT DRAWINon the Profile FRPM” or Hobwings from CCoo. This will
Glass Fiber Rspecification w
989. After Brom close to th
part of this adc project. Th
s for sizes up
he line be shiWatkins St.)?
on the south srth Watkins bx. 10-ft.
emphis Standd the drawing
addendum
eplacement A0405
cement’ LEGAor will be replct that statemeptor with 42”he Pre-Bid, bontractor’ conec.” Glass Fd Specificationd tried to re-
Wound (FW-FRement Projec
NGS. On drawView of the d
bas; Flowtite CFRPM to FRhelp clarify th
Reinforced Powill be allowe
rad Davis lefthe same area
ddendum. Plhe area in this
to 42-in. Wh
ifted to accom?
side of N. Wabe increased a
dard Construcgs, the drawin
Addendum #
AL NOTICE / lacing the cur
ment and resta” Glass Fiber
but stating thisnfusion. The iber Reinforc
ons and is liste-instate their “RPM) Pipe is
ct.
wing numbersdrawing whereis “Filament-W
RPM? Brad, ihat there is pi
olymer Mortar ed on the proj
t the meeting,. Can you ple
lease note ths report is adja
hat will be the
mmodate the
atkins St. as wapprox. 60-ft
ction Specificgs shall gove
2 to
REQUEST Frrent intercepate with the Reinforced
s in the Addenwording with ed Polymer Med on your Bi“old sole sour also specifie
s 7-8-9-10 of e the new pipWound FRPMf I missed anype competitio
pipe. HOBAect.
, Justin Aventease forward
at this report acent to the
e wall thicknes
new jack and
well as jack boin length to th
cations. In theern.
FOR tor
ndum
Mortar id rce
ed for
the pe is M.” y on on
AS,
t said that
is
ss for
d bore
oth he
e
The c
1. U
2. 00si
3. 00to
Old Loo
changes summ
Unit Pricing lin
0370.2 Optionignificant cost
0370.7.1 Cono Proceed.
os Hwy 51 Em
Section
marized:
e item 02530
n/Alternate Pt savings if te
nstruction Mile
Reqmergency Se
RFB NoJun
3: Updated 0
0-6.28 descrip
ricing added tchnically acc
estone Comp
quest for Bidewer Line Re. 179821.71.0ne 05, 2015
7
00370 Comm
ption changed
to allow biddeeptable.
letion Date ch
eplacement A0405
mercial Bid F
d to “Silt Fenc
er to propose
hanged to “15
Addendum #
Form
ce”.
e alternate des
50” Calendar
2 to
sign that may
Days after N
y offer
otice
SARP10 Program179821.71.0405
Old Loos Hwy 51 Emergency Sewer Line Replacement
RFB Issue1Jun2015
Bidder Response Column
Bidder Response Column
( ) - ( )( ) - ( )( ) - ( )
Bidder Response ColumnReceived and Incorporated
See Attached Pricing Table 00370.3.1
Bidder provides the following information to supplement the Bidder's bid pricing.Bidder Response Column
Bidder acknowledges receipt and inclusion of the following Addenda to the RFB - Yes/No
Business Interruption Plan
Confirm that Bidder maintains a Business Interruption/Disaster Recovery Plan that documents how Bidder will respond to disaster or pandemic to help minimize impact - Yes/NoIf Yes, plan should be submitted with RFB.
00370.2.2 Addenda to Request for Bid
Date Issued
00370.4.1 Company Status
in State ofin Country of
Bidder's company status is:(i.e., partnership, individual owned, joint venture, corporation, etc.)
Mobile Phone NumberFax Number
Addenda Number
Phone Number
TitleMailing Address/Number, Street
Mailing Address/CityMailing Address/State, Zip Code
Email Address
Delivery Address/Number, StreetDelivery Address/State, Zip Code
Country
Bidder's Representative Name
Country
Bidder's Bid DateBidder's Bid No.
Bidder is providing the information defined by the articles comprising Section 00270, INSTRUCTIONS TO BIDDERS, in the corresponding fields of this Section 00370, COMMERCIAL BID FORM.00370.2.1 Bidder's Contact Information
00370 - Commercial Bid Form
Bidder should refer to Section 00270, Instructions to Bidders, when completing this Bid Form. Bidder shall complete this form entirely and return it with Bidder's Bid.
00370.2 General Bid Parameters
Mailing Address/Number, StreetMailing Address/State, Zip Code
Taxpayer ID Number (or EIN)
00370.1 Bid Submitted byCompany Name
DUN'S #
00370.3 Bid Pricing Information00370.3.1 Bid Prices
00370.4 Supplemental Bid Information
Source: 00370, 2012, v.1.0 Commercial Bid Form Page 1 of 11
SARP10 Program179821.71.0405
Old Loos Hwy 51 Emergency Sewer Line Replacement
RFB Issue1Jun2015
Bidder Response Column
Bidder Response Column
Bidder Response Column
Bidder Response Column
Bidder Response Column
Bidder Response Column
00370.4.2 Contractor License
License Number
All of Bidder's prices herein bid are firm and are non-escalatable. - Yes/NoIf No, explanation is included as an Exception.
00370.4.6 Taxes
Bidder certifies that it is licensed, as required, to engage in the RFB Work scope in the State/Province/Country the RFB Work is to be performed. - Yes/No
1st License Title
00370.4.3 Not Used
00370.4.5 Firm Non-Escalatable Pricing
2nd License Title in State/Province of
License Number
Bidder's bid is valid for acceptance by the Purchaser for a period of 180 days from the bid due date. - Yes/No
00370.4.7 Work at Jobsite
If no, Bidder's bid is valid for indicated days from bid due date. - No. Days
00370.4.4 Bid Validity Duration
Bidder has indicated proposed sub-subcontracted Work in attached Table 00370.4.7. - Yes/No
Bidder has accounted for all Jobsite existing and controlling conditions and limitations which may affect the Work performance and the Bidder's Bid. - Yes/No If No, explanation is included in Exception.
Bidder proposes that it will perform all the Work at the Jobsite with its own forces. -Yes/No
Bidder's prices included herein are in accordance with Article 00571.6 Taxes. - Yes/NoIf No, explanation is included as an Exception.
00370.5 Schedule Compliance
in State/Province of
Bidder has provided proposed Small Business/Minority/Disadvantaged Entrepreneur Participation Plan with its bid. - Yes/No
If No, Bidder has completed and submitted an attached alternative summary level schedule: - Yes/No
00370.6.1 Exceptions
Bidder certifies that its bid complies with all RFB commercial and technical requirements without exception and clarification. - Yes/No
Bidder certifies that its bid complies with all RFB commercial and technical requirements except for the following:
00370.6 Compliance with Request for BidNOTE: A bid based on Bidder's standard terms and conditions will not be considered. The bid must address specific exceptions, if any, to Purchaser's terms and conditions.
Bidder's source of craft labor to be utilized in the performance of the Work is
Bid is based on acceptance of all commercial requirements of this RFB. - Yes/NoIf No, all Commercial Exceptions have been accurately defined and identified as "Commercial Exceptions" on the Purchaser provided and Bidder attached Exceptions Form: - Yes/NoBid is based on acceptance of all technical requirements of this RFB. - Yes/NoIf No, all Technical Exceptions have been accurately defined and identified as "Technical Exceptions" on the Purchaser provided and Bidder attached Exceptions Form. - Yes/No
Bidder agrees to meet the schedule dates indicated in the RFB documents: - Yes/No If No, explanation is included in Exception.
Source: 00370, 2012, v.1.0 Commercial Bid Form Page 2 of 11
SARP10 Program179821.71.0405
Old Loos Hwy 51 Emergency Sewer Line Replacement
RFB Issue1Jun2015
Bidder Response Column
Bidder Response Column
(Attachment 3)(Attachment 4)(Attachment 5) (Add additional lines as needed)
00370.6.2 Clarifications
The Bidder declares that it has familiarized itself with the conditions affecting the Work. The Bidder also declares that only the persons or firms interested in the bid as principal or principals are named herein; that no other persons or firms have any interest in this bid or in the Subcontract to be entered into; that this bid is made without connection with any person, company, or party likewise submitting a bid; and that it is in all respects for and in good faith, without collusion or fraud. - Yes/No
If written notice of acceptance of this bid is delivered to the Bidder within “Bid Validity” days after the date set for receipt of bid, or any time thereafter before the bid validity expires, the Bidder will, within 5 days after receipt of a formal Subcontract for signature, exercise and deliver to Purchaser a signed Subcontract in the form provided by the Purchaser in accordance with the documents provided herein. - Yes/No
If No, all Commercial Clarifications have been accurately defined and identified as "Commercial Clarifications" on the Purchaser provided and Bidder attached Clarification Form. - Yes/No
If No, all Technical Clarification have been accurately defined and identified as "Technical Clarifications" on the Purchaser provided and Bidder attached Clarification Form. - Yes/No
Bidder certifies that its bid complies with all RFB commercial and technical requirements without clarification. - Yes/No
00370.8 Declarations
00370.7 Bid AttachmentsIn addition to this Commercial Bid Form and Tables indicated herein, the Bidder's Bid contains supplemental information and details attached to this bid consisting of the following:(Attachment 1)(Attachment 2)
Source: 00370, 2012, v.1.0 Commercial Bid Form Page 3 of 11
SARP10 Program179821.71.0405
Old Loos Hwy 51 Emergency Sewer Line Replacement
RFB Issue1Jun2015
Estimated Quantity Unit Price Extension Price
1 6595
1 900
3500 6020 575
5545 1050
1 $ 20,000.00
6020 1
14000
16
317
16 16 2
480
330
1 $ - $ -
-$
Seeding (with mulch)
LSLF
EA
VF
EAEAEA
Unit of 1000 SF
02531-6.14
02920-5.01
Traffic ControlSilt Fence
6' Diameter Standard Depth Precast Concrete Manhole
6' Diameter Extra Depth Precast Concrete Manhole Vertical Foot
Sewer Manhole Rim and CoverDewatering for Manhole InstallationAbandonment of Existing Manhole
02530-6.27
02531-6.02
02531-6.0602531-6.10
LF
02530-6.25LF
LF LF
Site Preparation and Restoration
02530-6.04Glass Fiber Reinforced Polymer Mortar Pipe
LF
Pavement Backfill02530-6.07.16.42
Bid Submitted by (Company Name)
Light Cleaning & Mainline CCTV Inspection02530-6.01
In the event of a Purchaser-approved change in the scope of Work for which a unit price from this Table is not applicable, as determined by the Purchaser, the Subcontractor shall provide a new unit price for review and acceptance by the Purchaser. Subcontractor shall provide all information requested by the Purchaser to substantiate the value of the new unit price.
Item Description
LFLS
Abandonment of Existing Pipe02530-6.22 Removal of Existing Pipe
Table 00370.3.1 - Unit Price Bid Form
0000100003-6.01
Bidder should refer to Section 00270, Instructions to Bidders, when completing this Bid Form. Bidder shall complete this form entirely and return it with Bidder's Bid.
00370.3 Bid Pricing Information
LS
Unit of Measure
00370.3.1 Unit Pricing
Item NumberMobilization
Bidder proposes to complete the RFB Work based on firm, fixed, unit prices (US dollars), which prices multiplied by the final Work quantities would represent the full consideration to Bidder for its complete and satisfactory performance of the Work in compliance with all the terms and conditions of the RFB Documents. The Unit Prices in this Table include the cost of all the work which is required or implied by the RFB documents or which may be inferred therefrom, and which is customarily provided in furnishing a complete and finished work item of its kind. Further, any and all alterations, modifications, and adjustments to the work item, which is reasonably foreseeable or customarily encountered in providing and installing equipment, material, and services of the work item kind, will be performed without additional compensation.
Ton
Bidder Response Columns00370.3.1.1 Unit Prices
02530-6.23
Note the Subcontractor shall provide documentation to determine compensated cost per each manhole adjustment using the rates described above.
02530-6.02 Undercut Backfill Ton
02530-6.26
3" Asphalt Concrete Removal and Replacement
02530-6.19.01.84 Sewer in Jacked Liner
02950-01.01
100% Performance and Payment Bonds Lot
Total Estimated Unit Price Value
SY
LSAllowance of Property RestorationDewatering for the Installation of Sewer Pipe
02530-6.28
02531-6.01.06
Source: 00370, 2012, v.1.0 Commercial Bid Form Page 4 of 11
SARP10 Program179821.71.0405
Old Loos Hwy 51 Emergency Sewer Line Replacement
RFB Issue1Jun2015
Add or Deduct Extended Price
$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
00370.2 Option/Alternate Pricing00370.2.1 Subcontractor-Offered Option/Alternate Price
Item Description
Source: 00370, 2012, v.1.0 Commercial Bid Form Page 5 of 11
SARP 10 Program179821.71.0405
Old Loos Hwy 51 Emergency Sewer Line Replacement
RFB Issue1Jun2015
00370.4.7.1 Sub-Subcontracted Work
Scope of Sub-Subcontracted Work Sub-subcontractors (Name and Address)
MBE or WBE
% of Total Work Value
Safety Information
Included (Y/N)
Current EMR
% of Work performed by Bidder. (Bidder Company Name) 100.0%(a)(b)(c)(d)(e)(f)(g)
100.0%Total Percentage Value (Must Equal 100%)
Bid Submitted by (Company Name)
Table 00370.4.7 - Sub-Subcontracts
Bidder should refer to Section 00270, Instructions to Bidders, when completing this Table.
00370.4.7 Sub-SubcontractsBidder proposes that specific portions of the Work scope not performed by Bidder will be Sub-Subcontracted to the Sub-subcontractors indicated below. The value of each Sub-subcontract is indicated as an approximate percentage value of the total monetary value of the Bidder's Bid.
Source: 00370, 2012, v.1.0 Commercial Bid Form Page 6 of 11
SARP 10 Program179821.71.0405
Old Loos Hwy 51 Emergency Sewer Line Replacement
RFB Issue1Jun2015
Bid Submitted by (Company Name)
Count Reference ArticleCE1CE2CE3CE4CE5CE6CE7CE8CE9
Count ReferenceTE1TE2TE3TE4TE5TE6TE7TE8TE9
TE10TE11TE12TE13TE14TE15TE16TE17TE18TE19TE20
00370.6.1.2 Technical ExceptionsStated Technical Exceptions
Bidder should refer to Section 00270, Instructions to Bidders, when completing this Form.
00370.6.1 ExceptionsThe Bidder’s specific Exceptions herein itemized and included with the bid represent an exhaustive list of any and all explicit variations or deviations from the requirements of the RFB documents. Bidder confirms that otherwise, it is the intent of Bidder's bid that the Work will be performed in strict accordance with the requirements of the RFB documents.
Table 00370.6.1 - Exceptions Form
00370.6.1.1 Commercial ExceptionsStated Commercial Exception
Source: 00370, 2012, v.1.0 Commercial Bid Form Page 7 of 11
SARP 10 Program179821.71.0405
Old Loos Hwy 51 Emergency Sewer Line Replacement
RFB Issue1Jun2015
Bid Submitted by (Company Name)
Count Reference ArticleCC1CC2CC3CC4CC5CC6CC7CC8CC9
Count ReferenceTC1TC2TC3TC4TC5TC6TC7TC8TC9
TC10TC11TC12TC13TC14TC15TC16TC17TC18TC19TC20
Table 00370.6.2 - Clarifications Form
00370.6.2.1 Commercial ClarificationsStated Commercial Clarification
Bidder should refer to Section 00270, Instructions to Bidders, when completing this Form.
00370.6.2 ClarificationsAll of Bidder’s Clarifications herein itemized and included with the bid do not constitute explicit variation or deviation from performance of the Work by the Bidder in strict accordance with the requirements of RFB documents.
00370.6.2.2 Technical ClarificationsStated Technical Clarification
Source: 00370, 2012, v.1.0 Commercial Bid Form Page 8 of 11
SARP 10 Program179821.71.0405
Old Loos Hwy 51 Emergency Sewer Line Replacement
RFB Issue1Jun2015
Item Milestone Description*LDs
Apply?
BidderComplies?(Yes/No)
1Completion of the Work after issuance of the Notice to Proceed.
Yes
Note: Subcontractor performance will directly impact future procurements for the SARP10 Program, schedule is critical and must be maintained.
00370.7 Schedule ComplianceState any exceptions in 00370.6.1.
00370.7.1 Construction Milestone Completion Dates
Construction MilestoneCompletion Date
150 Calendar Days after NTP
*LD indicate that completion of the Work after the "Construction Milestone Completion Date" is subject to liquidated damages per applicable Articles of Section 00571.
Source: 00370, 2012, v.1.0 Commercial Bid Form Page 9 of 11
SARP 10 Program179821.71.0405
Old Loos Hwy 51 Emergency Sewer Line Replacement
RFB Issue1Jun2015
TBD
EventDueDate
C01 None Executed Subcontract in the form provided by thePurchaser
5 After Receipt of Subcontract for Signature
C02 00571 Payment Estimate Breakdown 10 After Effective Date and Prior to First Payment with monthly updates
C03 00572 Lien Waivers and Report of Disadvantaged Business Enterprise Participation Form
With Each Invoice
C04 00572 Final Lien Waivers from Subcontractor and Sub-subcontractors and Sub-subcontractors subcontractors and Report of Disadvantaged Business Enterprise Participation Form
With Final Invoice
C05 00571 Final Payment Invoice and Report of Disadvantaged Business Enterprise Participation Form
45 After Issuance of the Notice Of Final Completion and Acceptance
C06 00572 Contractor Licenses 14 Before Mobilization OnsiteC07 00572 Written Notice and Supporting Documentation, of
all Claims10 After Occurrence of Event Giving
Rise to the Claim
C08 00572 Insurance Certificates for Purchaser Approval Prior to MobilizationC09 00572 Initial Issue Subcontractor's Work Execution
Schedule30 After Effective Date
C10 00571 Subcontractor Actual Man-hours Expended and Quantities Installed
Weekly After Mobilization Onsite
C11 00575 Subcontractor's Daily Report Daily After Mobilization Onsite
C12 00575 Signed Daily Reports Daily After Mobilization Onsite
C13 00575 Weekly Coordination Meeting Agenda Input Weekly Prior to Weekly Coordination Meeting
C14 00575 Subcontractor's Safety, Health and Accident Prevention Program
Prior to Mobilization Onsite
C15 00575 Subcontractor’s Hazardous Waste Project Health and Safety Plan
Prior to Mobilization Onsite
C16 00575 Safety and Health Representative Resume Prior to Assignment and Mobilization
C17 00575 Verification of meeting Hazardous Waste Requirements of 29CFR1910.120
5 Prior to Mobilization Onsite
C18 00575 Hazardous Materials Documentation With Each Hazmat Shipment
C19 00575 Safety and Health Records Monthly After Mobilization Onsite
C20 00575 Evidence that Jobsite Personnel have Passed Drug Testing
10 Prior to Mobilization Onsite
C21 Loss Control Manual
Fall Protection Plan 5 Prior to Starting Work Operations
C22 Loss Control Manual
Chemical Hazard Communication Plan, as applicable
5 Prior to Mobilization Onsite
C23 Loss Control Manual
Substance Abuse Program 5 Prior to Mobilization Onsite
C24 00672.4 W-9 of Subcontractor and Sub-subcontractors also include Contact Information for each including email and address
With Bid
C25 00672.3 Certificate of Nondiscrimination for Subcontractor and Sub-subcontractors
With Bid
C26 00672.4 Equal Business Opportunity Program Compliance Form for Subcontractor and Sub-subcontractors
With Bid
C27 00672.4 M/WBE Certificates for both Subcontractor and Sub-subcontractors as applicable
With Bid
ItemReference
Section Submittal Item
Submittal DatesCalendar
Days00370.8.1 Commercial Submittals
00370.8 Schedule of SubmittalsEffective Date:
Bid
der A
gree
s?Ye
s/N
o
The following are post-award Subcontract submittals. This list is not all-inclusive. The RFB documents contain submittal requirements that are not included in this list. It will, however, remain the successful Bidder's responsibility to comply with submittal requirements whether or not the submittal is included in the following list:If Bidder does not agree, state an exception in 00370.6.1.
Source: 00370, 2012, v.1.0 Commercial Bid Form Page 10 of 11
SARP 10 Program179821.71.0405
Old Loos Hwy 51 Emergency Sewer Line Replacement
RFB Issue1Jun2015
TBD
EventDueDateItem
ReferenceSection Submittal Item
Submittal DatesCalendar
Days
00370.8 Schedule of SubmittalsEffective Date:
Bid
der A
gree
s?Ye
s/N
o
The following are post-award Subcontract submittals. This list is not all-inclusive. The RFB documents contain submittal requirements that are not included in this list. It will, however, remain the successful Bidder's responsibility to comply with submittal requirements whether or not the submittal is included in the following list:If Bidder does not agree, state an exception in 00370.6.1.
C28 00170 Bid Bonds With Bid
C29 00571 Security Instruments 10 Effective Date
Source: 00370, 2012, v.1.0 Commercial Bid Form Page 11 of 11
Old Looos Hwy 51 Em
Reqmergency Se
RFB NoJun
Section 4: M
quest for Bidewer Line Re. 179821.71.0ne 05, 2015
8
MLG&W Utilit
eplacement A0405
ty Maps
Addendum # 2 to
Old Loo
S
ht
ht
os Hwy 51 Em
Section 5: Li
Thettps://www5.
ttps://www5.
Reqmergency Se
RFB NoJun
nks to Geote
e Geotechnic.ibackup.com
The Projectibackup.com
quest for Bidewer Line Re. 179821.71.0ne 05, 2015
9
echnical Rep
cal Report can
m/qmanager/s
Plans can be/qmanager/s
eplacement A0405
port and Proj
n be downloaservlet/share
e downloadedservlet/share
Addendum #
ject Plans
aded at: e?key=t69de6
d at: e?key=y2c996
2 to
60090
68708