7.1.2 environmental consciousness and sustainability (10 ... · alternate energy initiatives such...

3
7.1.2 Environmental Consciousness and Sustainability (10) Alternate Energy initiatives such as: 1. Percentage of power requirement of the Institution met by the renewable energy sources (1) Power requirement met by renewable energy sources Total power requirement Renewable energy source Renewable energy generated and used Energy supplied to the grid 43500 units / YEAR 523513units / YEAR SOLAR 43500 units / YEAR NIL

Upload: others

Post on 10-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 7.1.2 Environmental Consciousness and Sustainability (10 ... · Alternate Energy initiatives such as: 1. Percentage of power requirement of the Institution met by the renewable energy

7.1.2 Environmental Consciousness and Sustainability (10)

Alternate Energy initiatives such as: 1. Percentage of power requirement of the Institution met by the renewable energy sources (1)

Power requirement met by renewable energy sources

Total power requirement

Renewable energy source

Renewable energy generated and used

Energy supplied to the grid

43500 units / YEAR 523513units /

YEAR SOLAR 43500 units / YEAR NIL

Page 2: 7.1.2 Environmental Consciousness and Sustainability (10 ... · Alternate Energy initiatives such as: 1. Percentage of power requirement of the Institution met by the renewable energy

wswelect

Tax Invoice(ORIGINAL FOR RECIPIENT)

SWELECT ENERGY SYSTEMS LTDS.NO.58/3 NACHIYUR.SALEM MAIN ROAD IDAPPA D I.SA LEM DT PIN -637105 Regd Office :N0 5 P.S.SIVASAMY SALAI Mytapore.Chennai - 600004 G STIN /U IN : 33A A A C N 2366F2ZS State Nam e ; Tamil Nadu, Code : 33 CIN: L 93090T N 1994P LC 028578

Invoice No. 300752Delivery Note

BuyerRAMCO INSTITUTE OF TECHNOLOGYNORTH VENGANALLURRAJAPALAYAMVIRUDHUNAGARState Name : Tamil Nadu, Code : 33

Supplier’s Ref. 300752Buyer's Order No. LETTER/30.05-2018Despatch Document No.

Despatched through METRO PLUS LOGISTICSBill of Lading/LR-RR No.

Dated12-Jun-2018Mode/Terms of Payment

Other Reference(s)

Dated12-Jun-2018Delivery Note Date

DestinationRAJAPALAYAMMotor Vehicle No.

TN 33 U 5148Terms of Delivery

S I; No. & Kind [0.| ofPkgs

Mr] 112d

Description of Goods

SOLAR POWER GENERATING SYSTEM 20KWp

(SL NO.SP180300056)

HSN/SAC Quantity

CGSTSGST

8502 1.00 PC

Rate

10,88,000.00

per i Amount

PC

TotalfAmount Chargeabfe (in words)

INR Eleven Lakh Forty Two Thousand Four Hundred Onlyl i n k i / f t * « “

1.00 PC

10 ,88 ,000.00

27.200.0027.200.00

X 11,42,400.00E & O.t

HSN/SACL Central Tax

Amount I RateState Tax

2.50% 27.200 nn_ 2 7 , 2 0 0 . 0 0 l_____________________ ■ W W I I i u , u a , U U U . U U I ______________ !

Tax Amount (In words) : INR Fifty Four Thousand Four Hundred Only

Total Tax Amoun

27.200.00 54,400.027,200.00) 54.400.0

AAACN2366FCompany’s PAN Declaration

TERMS OF SALE 1 .Goods Once Sold Will not be taken back or exchanged. 2..COVERED UNDER MARINE 3ARGO OPEN POLICY NO: 7180321170200000002 /ALID UPTO 11.07.2018 WITH THE NEW INDIAASSURANCE C O . L T D . 3 . R e v e r s e Charge Tax-Not Applicable

____ i__________ 3SUBJECT TO SALEM JURISDIC. .ycj

This is a Computer Generated Invoice

CT ENERGY SYSTEMS LTD

,— — - ^^ __ Authorised Signatory]

Page 3: 7.1.2 Environmental Consciousness and Sustainability (10 ... · Alternate Energy initiatives such as: 1. Percentage of power requirement of the Institution met by the renewable energy