THE CHALLENGE:
Develop a system for attachment of a glass rail system to an old, outdated set of stairs built in the
late 1960’s early 1970’s with no “As Built” drawings. Also, do installation while the hotel is open.
OUR SOLUTION:
Develop a glass support system that attached to the step threads. As far as installation, it was
done with great patience and understanding.
PRODUCTS USED IN PRODUCTION:
Steel, aluminum, polished 304 stainless steel and ½” thick clear tempered glass.
CLIENT TESTIMONIAL:
“Your railing looks excellent! Thanks for the outstanding hard work.”
Andy LyonsProject ManagerNix-Unger Construction
The Challenge & The Solution
railingCASE STUDY
AWNINGSOLUTIONS
ARCHITECTURAL
RAILINGSOLUTIONS
ARCHITECTURAL
SIGNAGESOLUTIONS
ARCHITECTURAL
MILLWORKSOLUTIONS
ARCHITECTURAL
...................................................
...................................................
...................................................
TOLL FREE: 800.459.5161 | LOCAL: 770.720.1100