Town of MadisonCarver-Martin Neighborhood

Flood Reduction Drainage Improvement Study

Presentation Agenda

Study Scope of Work

1. Limited Survey of Neighborhood2. Modeling

• Hydrologic• 1-D Hydraulic• 2-D Hydraulic

3. Conceptual Engineering Design4. Conceptual Cost Estimates

Current Study Flood Mapping

Limited Survey of Neighborhood

Presentation Agenda

Study Scope of Work

1. Limited Survey of Neighborhood2. Modeling

• Hydrologic• 1-D Hydraulic• 2-D Hydraulic

3. Conceptual Engineering Design4. Conceptual Cost Estimates

Modeling Study Limits

Watershed area = 735 acres

Carver-Martin Neighborhood

2010 Arboretum Pond 3 Design & Martin Street Pond Study

2008 Pond 4 Design Study

Expansion of Previous Design Studies

Modeling Study Limits

Modeling Study Limits

Pond 3

Pond 4Martin St. Pond

Presentation Agenda

Study Scope of Work

1. Limited Survey of Neighborhood2. Modeling

• Hydrologic• 1-D Hydraulic• 2-D Hydraulic

3. Conceptual Engineering Design4. Conceptual Cost Estimates

Past Modeling Studies - FEMA

FEMA mapping shows only 100-yr and 500-yr flood boundaries

Past Modeling Studies - FEMA

Current Study Flood Mapping

2-D Modeling

Current Study Flood Mapping Event Rainfall Depth

1-yr 24-hr 2.49 in.

10-yr 24-hr 4.09 in

25-yr 24-hr 5.01 in

50-yr 24-hr 5.80 in

100-yr 24-hr 6.66 in

Current Study Flood Mapping Event Rainfall Depth

1-yr 24-hr 2.49 in.

10-yr 24-hr 4.09 in

25-yr 24-hr 5.01 in

50-yr 24-hr 5.80 in

100-yr 24-hr 6.66 in

Current Study Flood Mapping Event Rainfall Depth

1-yr 24-hr 2.49 in.

10-yr 24-hr 4.09 in

25-yr 24-hr 5.01 in

50-yr 24-hr 5.80 in

100-yr 24-hr 6.66 in

Current Study Flood Mapping Event Rainfall Depth

1-yr 24-hr 2.49 in.

10-yr 24-hr 4.09 in

25-yr 24-hr 5.01 in

50-yr 24-hr 5.80 in

100-yr 24-hr 6.66 in

Current Study Flood Mapping Event Rainfall Depth

1-yr 24-hr 2.49 in.

10-yr 24-hr 4.09 in

25-yr 24-hr 5.01 in

50-yr 24-hr 5.80 in

100-yr 24-hr 6.66 in

Presentation Agenda

Study Scope of Work

1. Limited Survey of Neighborhood2. Modeling

• Hydrologic• 1-D Hydraulic• 2-D Hydraulic

3. Conceptual Engineering Design4. Conceptual Cost Estimates

Common Philosophy:• Most municipal strategies geared toward protecting homes and

businesses from 100-yr flooding.

• Solutions generally target improvements to publicly owned drainage systems.

• Drainage issues that are not caused by stormwater runoff from public infrastructure (streets, greenways, ponds, etc.) are generally not included in municipal flood control strategies.

• Nevertheless, the health of a community as well as local property values can be negatively affected by widespread drainage and flooding problems, regardless of cause.

Flood Reduction and Drainage Improvement Policy

Flood Reduction and Drainage Improvement Policy

City of Madison Approach

Conceptual Engineering Designs - Regional

Conceptual Engineering Designs - Regional

Raise Berm on Martin Street Pond

Improve Drainage East of Dodge St.

Conceptual Engineering Designs - Regional

Raise Berm on Martin Street Pond

Improve Drainage East of Dodge St.

Conceptual Engineering Designs - Regional

Raise Berm on Martin Street Pond

Improve Drainage East of Dodge St.

Conceptual Engineering Designs - Regional

Conceptual Engineering Designs - Local

Stormwater Pump Station

Conceptual Engineering Designs - Local

Systemic Roadside Swales

Conceptual Engineering Designs - Local

Systemic Roadside SwalesMay have limited effectiveness serving backyard areas

Conceptual Engineering Designs - Local

Systemic Drain Tile System

Conceptual Engineering Designs - Local

Presentation Agenda

Study Scope of Work

1. Limited Survey of Neighborhood2. Modeling

• Hydrologic• 1-D Hydraulic• 2-D Hydraulic

3. Conceptual Engineering Design4. Conceptual Cost Estimates

Conceptual Engineering Cost Estimates

Regional• Martin Street Pond Improvement - $300,000• Dodge Street Improvements - $70,000

Local• Stormwater Pump Station - $200,000

• Roadside Swales - $1,300,000 (+ Pump Station)OR

• Backyard Tiles - $1,400,000 (+ Pump Station)

The challenges to achieving either of the above regional drainage improvements will be substantial and will require additional study and design as well as a great deal of coordination and cooperation with neighborhood residents.