Presentation Agenda
Study Scope of Work
1. Limited Survey of Neighborhood2. Modeling
• Hydrologic• 1-D Hydraulic• 2-D Hydraulic
3. Conceptual Engineering Design4. Conceptual Cost Estimates
Presentation Agenda
Study Scope of Work
1. Limited Survey of Neighborhood2. Modeling
• Hydrologic• 1-D Hydraulic• 2-D Hydraulic
3. Conceptual Engineering Design4. Conceptual Cost Estimates
2010 Arboretum Pond 3 Design & Martin Street Pond Study
2008 Pond 4 Design Study
Expansion of Previous Design Studies
Modeling Study Limits
Presentation Agenda
Study Scope of Work
1. Limited Survey of Neighborhood2. Modeling
• Hydrologic• 1-D Hydraulic• 2-D Hydraulic
3. Conceptual Engineering Design4. Conceptual Cost Estimates
Current Study Flood Mapping Event Rainfall Depth
1-yr 24-hr 2.49 in.
10-yr 24-hr 4.09 in
25-yr 24-hr 5.01 in
50-yr 24-hr 5.80 in
100-yr 24-hr 6.66 in
Current Study Flood Mapping Event Rainfall Depth
1-yr 24-hr 2.49 in.
10-yr 24-hr 4.09 in
25-yr 24-hr 5.01 in
50-yr 24-hr 5.80 in
100-yr 24-hr 6.66 in
Current Study Flood Mapping Event Rainfall Depth
1-yr 24-hr 2.49 in.
10-yr 24-hr 4.09 in
25-yr 24-hr 5.01 in
50-yr 24-hr 5.80 in
100-yr 24-hr 6.66 in
Current Study Flood Mapping Event Rainfall Depth
1-yr 24-hr 2.49 in.
10-yr 24-hr 4.09 in
25-yr 24-hr 5.01 in
50-yr 24-hr 5.80 in
100-yr 24-hr 6.66 in
Current Study Flood Mapping Event Rainfall Depth
1-yr 24-hr 2.49 in.
10-yr 24-hr 4.09 in
25-yr 24-hr 5.01 in
50-yr 24-hr 5.80 in
100-yr 24-hr 6.66 in
Presentation Agenda
Study Scope of Work
1. Limited Survey of Neighborhood2. Modeling
• Hydrologic• 1-D Hydraulic• 2-D Hydraulic
3. Conceptual Engineering Design4. Conceptual Cost Estimates
Common Philosophy:• Most municipal strategies geared toward protecting homes and
businesses from 100-yr flooding.
• Solutions generally target improvements to publicly owned drainage systems.
• Drainage issues that are not caused by stormwater runoff from public infrastructure (streets, greenways, ponds, etc.) are generally not included in municipal flood control strategies.
• Nevertheless, the health of a community as well as local property values can be negatively affected by widespread drainage and flooding problems, regardless of cause.
Flood Reduction and Drainage Improvement Policy
Raise Berm on Martin Street Pond
Improve Drainage East of Dodge St.
Conceptual Engineering Designs - Regional
Raise Berm on Martin Street Pond
Improve Drainage East of Dodge St.
Conceptual Engineering Designs - Regional
Raise Berm on Martin Street Pond
Improve Drainage East of Dodge St.
Conceptual Engineering Designs - Regional
Systemic Roadside SwalesMay have limited effectiveness serving backyard areas
Conceptual Engineering Designs - Local
Presentation Agenda
Study Scope of Work
1. Limited Survey of Neighborhood2. Modeling
• Hydrologic• 1-D Hydraulic• 2-D Hydraulic
3. Conceptual Engineering Design4. Conceptual Cost Estimates
Conceptual Engineering Cost Estimates
Regional• Martin Street Pond Improvement - $300,000• Dodge Street Improvements - $70,000
Local• Stormwater Pump Station - $200,000
• Roadside Swales - $1,300,000 (+ Pump Station)OR
• Backyard Tiles - $1,400,000 (+ Pump Station)
The challenges to achieving either of the above regional drainage improvements will be substantial and will require additional study and design as well as a great deal of coordination and cooperation with neighborhood residents.