802.11 march 2011 closing plenary reports

87
doc.: IEEE 802.11-11/0471r1 Report March 2011 Adrian Stephens, Intel Corp Slide 1 802.11 March 2011 Closing Plenary Reports Date: 2011-03-17 N am e C om pany A ddress Phone em ail A drian Stephens Intel Corporation +44 792 008 4900 (m obile) [email protected] A lex A shley N D S Ltd +44 792 021 1351 [email protected] Authors:

Upload: cortez

Post on 07-Jan-2016

51 views

Category:

Documents


0 download

DESCRIPTION

802.11 March 2011 Closing Plenary Reports. Authors:. Date: 2011-03-17. Abstract. This document is a digest of the closing reports of all 802.11 sub-groups for presentation at the January 2011 closing plenary meeting. March 2011 Publicity. Authors:. Date: 2011-03-16. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

March 2011

Adrian Stephens, Intel CorporationSlide 1

802.11 March 2011 Closing Plenary Reports

Date: 2011-03-17

Name Company Address Phone email Adrian Stephens Intel

Corporation +44 792 008

4900 (mobile)

[email protected]

Alex Ashley NDS Ltd +44 792 021 1351

[email protected]

Authors:

Page 2: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

Abstract

• This document is a digest of the closing reports of all 802.11 sub-groups for presentation at the January 2011 closing plenary meeting.

March 2011

Adrian Stephens, Intel CorporationSlide 2

Page 3: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 3

March 2011 PublicityDate: 2011-03-16

Name Company Address Phone email

Stephen McCann Research in Motion (RIM) UK Ltd

200 Bath Road, Slough, Berkshire, SL1 3XE, UK

+44 1753 667099 [email protected]

Authors:

from slide 1/2 of 11/415r1 by Stephen McCann, RIM

March 2011

Page 4: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 4

• Press release about recent published drafts– TGu

• 11-11-0365-00-0000-p802-11u-press-release.doc

– TGv• 11-11-0470-00-0000-p802-11v-press-release.doc

– TGz• Leave until Palm Springs

from slide 2/2 of 11/415r1 by Stephen McCann, RIM

March 2011

Page 5: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Slide 5

802.11 WG Editor’s Meeting (Mar ‘11)

Date: 2011-03-11

Name Affiliation Address Phone email Peter Ecclesine Cisco Systems 170 W. Tasman Dr.,

MS SJ-14-4, San Jose, CA 95134-1706

+1-408-527-0815 [email protected]

Authors:

Adrian Stephens, Intel Corporationfrom slide 1/7 of 11/318r2 by Peter Ecclesine (Cisco Systems)

March 2011

Page 6: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Slide 6

Volunteer Editor Contacts• TGs – Kazuyuki Sakoda – [email protected]

• TGmb – Adrian Stephens – [email protected]

• TGaa – Alex Ashley – [email protected]

• TGac – Robert Stacey – [email protected]

• TGad – Carlos Cordeiro – [email protected]

• TGae – Henry Ptasinski – [email protected]

• TGaf – Peter Ecclesine – [email protected]

• TGah – Wongyu Song – [email protected]

• TGai – Tom Siep – [email protected]

• Editors Emeritus:

– TGk – Joe Kwak– [email protected]

– TGp – Wayne Fisher – [email protected]

– TGr – Bill Marshall – [email protected]

– TGu – Necati Canpolat – [email protected]

– TGv – Emily Qi – [email protected]

– TGw – Nancy Cam-Winget – [email protected]

– TGz – Menzo Wentink – [email protected]

Adrian Stephens, Intel Corporationfrom slide 2/7 of 11/318r2 by Peter Ecclesine (Cisco Systems)

March2011

Page 7: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Slide 7

ANA Announcements• Current ANA announced to group is 802.11-11-0270r0. (2011 Feb 25)

– See https://mentor.ieee.org/802.11/dcn/11/11-11-0270-00-0000-ana-database.xls

– All new requests received by end of meeting will be uploaded and announced via 802.11 WG reflector

• Procedure for ANA is contained in 07/0827r0.– See http://mentor.ieee.org/802.11/public/07/11-07-0827-00-0000-assigned-number-authority-ana-mechanisms.ppt

• Editorial Guidance– ANA assignments should be done before the time of moving from WG LB to

Sponsor ballot.

– If a resource number is not in the ANA Database, please use <ANA> in drafts!

– Editors to replace any ANA controlled resources numbers with <ANA> upon incorporation of material into drafts.

– Editors need to check the ANA database to determine which resources are controlled and ensure that values are requested from the ANA.

Adrian Stephens, Intel Corporationfrom slide 3/7 of 11/318r2 by Peter Ecclesine (Cisco Systems)

March 2011

Page 8: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

ANA Report

• Recent allocations to TGad (1 item) and TGs (9 items)

• Two Behavior Limits released (reserved) by TGmb

• Two “temporary” values used by TGmb replaced by allocated values

• Reallocation of two values used by TGmb to avoid collision with published .11v

Adrian Stephens, Intel CorporationSlide 8from slide 4/7 of 11/318r2 by Peter Ecclesine (Cisco Systems)

March 2011

Page 9: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Reportfrom slide 5/7 of 11/318r2 by Peter Ecclesine (Cisco Systems)

Numbering Alignment Process

• Update from all published standards. Posted as 11-08/644r20 (2011 Feb 17) By Kazuyuki Sakoda

• TGz-2010 started a new update cycle. 11v-2011, 11u-2011, REVmb D7.03 numbering needs to be completed. 11ae is the next, then 11af, 11aa, 11ad, 11ac, 11ah, 11ai

• Create a working group MEC that includes numbering and ANA before going to Sponsor Ballot

• We use more columns for the two baselines.

Slide 9 Adrian Stephens, Intel Corporation

March 2011

Page 10: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

802.11 Style Guide

• See 11-09-1034-01-0000-wg11-style-guide.doc

• Editor’s responsibility includes checking the 2009 IEEE Standards Style Manual when creating or updating drafts.

• Call for interest to update this guide to match REVmb conventions

Slide 10 Adrian Stephens, Intel Corporationfrom slide 6/7 of 11/318r2 by Peter Ecclesine (Cisco Systems)

March 2011

Page 11: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

Most current doc shaded green.

TG Published or Draft Baseline DocumentsSource MEC

Style Guide Editor

Snapshot Date

Published

s mb ae af aa ad aa ad ac ah

s Y 9.0 Frame 8.0 Yes 2009 Kazuyuki Sakoda 15-Mar

mb Y 7.03 Frame 9.0 Yes 2009 Adrian Stephens 15-Mar

ae 6.0 2.0 OpenOffice 3.2

No 2009 Henry Ptasinski 19-Jan

af 6.02 1.0 Frame 9.0 No 2009 Peter Ecclesine 15-Mar

aa 7.0 7.0 1.0 0.06 3.01

Word No 2009 Alex Ashley 16-Mar

ad 2.0 Word 2007

No 2009 Carlos Cordero 15-Mar

ac 7.0 0.2 Frame 9.0 No 2009 Robert Stacey 15-Mar

ah Wongyu Song

ai Tom Siep

Changes from last report shown in red.

Mar 2011 Draft Development Snapshot

Slide 11 Adrian Stephens, Intel Corporationfrom slide 7/7 of 11/318r2 by Peter Ecclesine (Cisco Systems)

March 2011

Page 12: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 12

Closing ReportDate: 2011-03-18

Name Company Address Phone email

Clint Chaplin Samsung Electronics 75 W. Plumeria Drive San Jose, Ca 95134

+1 408 544 5815 [email protected]

Authors:

from slide 1/3 of 11/0472r0 by Clint Chaplin, Chair (Samsung)

March2011

Page 13: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 13

Abstract

Closing report for WNG SC for March 2011, Singapore

from slide 2/3 of 11/0472r0 by Clint Chaplin, Chair (Samsung)

March2011

Page 14: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 14

• Presentations at March 2011 meeting– 802.11 WNG Presentation on the use of UWB spectrum for 802.11 (11-11-

0385-00-0wng-ultrwideband-spectrum-for-802-11.ppt) – Jim Lansford

– Lawrence Zimmermann (http://www.ieee802.org/11/Documents/DocumentArchives/1994_docs/1194132.DOC

• Minutes

– 11-11-0393-00-0wng-march-2011-meeting-minutes.doc

• Plans for May 2011

– 1 2 hour session

from slide 3/3 of 11/0472r0 by Clint Chaplin, Chair (Samsung)

March2011

Page 15: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 15

March 2011 Closing Report -TGmbDate: 2011-03-17

Name Affiliations Address Phone email Dorothy Stanley Aruba Networks 1322 Crossman Ave

Sunnyvale, CA 94089

+1 630-363-1389

[email protected]

Authors:

from slide 1/6 of 11/454r0 by Dorothy Stanley (Aruba Networks)

March2011

Page 16: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 16

Abstract

This document contains the TGmb closing report for March 2011.

from slide 2/6 of 11/454r0 by Dorothy Stanley (Aruba Networks)

March2011

Page 17: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 17

Accomplishments

• Completed Initial Recirculation SB Comment Resolution (D7.0)– 178 comments + 11u +11v

– Second Recirculation SB (20 day) to start shortly

• Scheduled Teleconference calls on – April 29, May 6

– 10am Eastern (7am Pacific)

• Timeline Analysis– No change from plan that 11mb will incorporate 11s

– Revisit in May

from slide 3/6 of 11/454r0 by Dorothy Stanley (Aruba Networks)

March2011

Page 18: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 18

Current TGmb Plan of Record May 2008 – Issue Call for Comment/Input July 2008 – begin process input and old Interpretation requests

Acknowledge previous Task Group referrals Sept 2008 – PAR revision process started Nov 2008 – close receipt of new input Nov 2008 – WG/EC approval of PAR Revision Dec 2008 – NesCom/SASB approval PAR Revision May 2009 – First WG Letter ballot Nov 2009 – Recirc start July 2010 – Conditional Sponsor Ballot Approval from EC August 2010 – Form Sponsor Pool (45 days) – Closes Sept 14 November 2010 – Initial Sponsor Ballot completion• Jan 2011 – Sponsor Recirc. Start• Nov 2011 – WG/EC Final Approval• March 2012 – RevCom/SASB Approval

from slide 4/6 of 11/454r0 by Dorothy Stanley (Aruba Networks)

March2011

Page 19: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 19

Goals for March

• Recirculation Sponsor Ballot comment resolution (D8.0)

from slide 5/6 of 11/454r0 by Dorothy Stanley (Aruba Networks)

March2011

Page 20: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 20

References

from slide 6/6 of 11/454r0 by Dorothy Stanley (Aruba Networks)

March2011

Page 21: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 21

TGs Singapore Closing ReportDate: 2011-03-17

Author:

Name Address Affiliation Phone Email

Guido R. Hiertz

Riedel Communications GmbH & Co. KG, Uellendahler Straße 353, 42109 Wuppertal, Federal Republic of Germany

Philips +49-202-292-9987

[email protected]

from slide 1/5 of 11/0468r0 by Guido R. Hiertz (Philips)

March2011

Page 22: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 22

Abstract

TGs closing report for the March 2011 meeting.

from slide 2/5 of 11/0468r0 by Guido R. Hiertz (Philips)

March2011

Page 23: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 23

Status• Before meeting

• TGs passed its second recirculation based on Draft 9.0 with 95.0% approval rate (closed: 2011-03-05)

• We received 291 comments

• 5 general comments

• 142 editorial comments

• 144 technical comments

• During meeting

• The group resolved all comments

• The group approved the third SB recirculation

from slide 3/5 of 11/0468r0 by Guido R. Hiertz (Philips)

March2011

Page 24: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

IEEE 802 Tutorial

• TGs presented a tutorial on 802.11s D9.0– 2011-03-14, 19:30 – 21:00

– Well attended

– Good discussion• ~5 attendees asked detailed questions

• 20 min to 25 min discussion

– Available in 11-11-0380-00-000s from https://mentor.ieee.org/802.11/documents

March 2011

Slide 24 Adrian Stephens, Intel Corporationfrom slide 4/5 of 11/0468r0 by Guido R. Hiertz (Philips)

March2011

Page 25: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 25

Timeline review• TGs reviewed the timeline

• TGs is aware of the need for fast progress

• TGs works hard to finish early to be included in 802.11-2012

Currently envisaged scenario date

Recirculation March 2011

SB Ballot on draft 11 2011-04-20

SB Ballot on unchanged draft 11 2011-05-21

Request EC Unconditional Approval to go to Revcom

2011-07-22

Revcom approval September 2011

Publication September 2011

from slide 5/5 of 11/0468r0 by Guido R. Hiertz (Philips)

March2011

Page 26: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

802.11aa – Robust Audio Video Transport Streaming Singapore Closing Report

Date: 2011-03-17

Authors:

Name Affiliation Address Phone email Ganesh Venkatesan Intel Corporation JF3-336 2111NE 25th Ave +1 503 334 6720 Ganesh.Venkatesan@intel

.com Alex Ashley NDS Ltd One London Road, Staines,

Middlesex, TW18 4EX, England

+44 1784 848770 [email protected]

Adrian Stephens, Intel CorporationSlide 26from slide 1/6 of 11/0430r0 by Ganesh Venkatesan, Intel Corporation et al

March2011

Page 27: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

Technical Presentations

Adrian Stephens, Intel CorporationSlide 27

Document number Title Author(s)

1 11/288r0, 11/289r0 SCS Comment Resolutions Alex Ashley

2 11/300r0 GCR Comment Resolutions Alex Ashley

3 11/324r2 Interworking Comment Resolutions Ganesh Venkatesan

4 11/283r0 Editorial Comment Resolutions Alex Ashley

5 11/360r0 OBSS-MLME Comment Resolutions Alex Ashley

711/292r0, 11/293r2,

11/294r0Support for GCR coded BA using

Overlay FECJochen Miroll

8 11/168r2 Joint Meeting with 802.1AVB Ganesh Venkatesan

9 11/426r0 CID #2096 resolution Qi Wang

from slide 2/6 of 11/0430r0 by Ganesh Venkatesan, Intel Corporation et al

March2011

Page 28: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

LB174 Comment Resolution Status

unresolved Accept Principle Declined Total

Approved_Editor 0 168 28 15 211

Approved_GCR 0 11 68 18 97

Approved_General 0 16 5 21

Approved_Interworking

4 4 2 10

Approved_OBSS 0 19 33 5 57

Approved_SCS 0 7 13 5 25

Total 0 225 151 45 421Completed % 100%

Adrian Stephens, Intel CorporationSlide 28from slide 3/6 of 11/0430r0 by Ganesh Venkatesan, Intel Corporation et al

March2011

Page 29: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

Joint Meeting with 802.1AVB

Adrian Stephens, Intel CorporationSlide 29

1. QoS Maintenance Reports• Are there additional statistics that are not covered by

802.11k/v?

2. Overview of .11aa features3. MaxRes (not in scope for .11aa)

• what would be the default bandwidth value (25% of the potential bandwidth?)

• what would be min link latency (20ms, 100ms, seconds?)

• MaxRes is described in 802.1BA and in P1722

4. STA-Bridge Issue (not in scope for .11aa):• An ad hoc group (of 802.11/802.1AVB) that will create

a presentation on the STA-Bridge problem and bring it to WNG

from slide 4/6 of 11/0430r0 by Ganesh Venkatesan, Intel Corporation et al

March2011

Page 30: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

Teleconferences

Weekly Monday 1130-1230 Hrs ET

Mar 28, Apr 04, 11, 18 2011

Adrian Stephens, Intel CorporationSlide 30from slide 5/6 of 11/0430r0 by Ganesh Venkatesan, Intel Corporation et al

March2011

Page 31: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

Plans for May 2011 meeting

• Resolve Recirculation 3 LB Comments• Complete Draft5.0 and start recirculation• Form Sponsor Pool

Adrian Stephens, Intel CorporationSlide 31from slide 6/6 of 11/0430r0 by Ganesh Venkatesan, Intel Corporation et al

March2011

Page 32: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 32

TGac March 2011 Closing ReportDate: 2011-03-17

Name Affiliations Address Phone email Osama Aboul-Magd Samsung Electronics 75 W. Plumeria Drive

San Jose, CA 95134 408-544-5870 [email protected]

om

Authors:

from slide 1/6 of 11/0463r1 by Osama Aboul-Magd (Samsung)

March2011

Page 33: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 33

Abstract

This document is the closing report for the TGac for the March 2011 session.

from slide 2/6 of 11/0463r1 by Osama Aboul-Magd (Samsung)

March2011

Page 34: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

Work Completed

• Resolutions were approved for 232 (28.5%) technical comments.• Resolutions were discussed for many other comments and approvals were deferred for further review• New revision of the draft (D0.3) will include approved resolutions.• Comments spreadsheet is available in 11-11-0276r6• Meeting Minutes are available in 11-11-461r0.• Agenda is available in 11-11-290r4.

Adrian Stephens, Intel CorporationSlide 34

Comment Type Received Approved Resolutions

Editorial 1000 Assigned to the Editor

Technical 814 232

from slide 3/6 of 11/0463r1 by Osama Aboul-Magd (Samsung)

March2011

Page 35: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 35

March 2011 Goals

• Continue with Draft D0.1 comments resolution.• Prepare TG draft D1.0• Start WG Letter Ballot

from slide 4/6 of 11/0463r1 by Osama Aboul-Magd (Samsung)

March2011

Page 36: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

TG Ad Hoc Meeting in May

• Request the WG to approve an ad hoc meeting of TGac in the Bay Area, California on May 3-5, 2011 to advance the TGac draft prior to the May IEEE 802 Wireless Interim.

Adrian Stephens, Intel CorporationSlide 36from slide 5/6 of 11/0463r1 by Osama Aboul-Magd (Samsung)

March2011

Page 37: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 37

Conference Call Times

• March 31 , April 14 , April 28 , – 20:00 – 22:00 ET

• April 7 , April 21 – 10:00 – 12:00 ET

from slide 6/6 of 11/0463r1 by Osama Aboul-Magd (Samsung)

March2011

Page 38: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 38

TGad March 2011 Closing ReportDate: 2011-03-17

Name Company Address Phone email Eldad Perahia Intel

Corporation

2111 NE 25th Ave Hillsboro, OR 97124

503-712-8081 [email protected]

Authors:

from slide 1/5 of 11/0331r0 by Eldad Perahia, Intel Corporation

March2011

Page 39: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 39

Abstract

This document is the closing report for TGad for the March 2011 session.

from slide 2/5 of 11/0331r0 by Eldad Perahia, Intel Corporation

March2011

Page 40: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

Work Completed

• Resolved all comments on LB 168 this week

• TG and WG approved motion for recirculation letter ballot on D2.0– D2.0 is in the members area

• Provided comments to WG on 802.15 PSC PAR & 5C’s

Adrian Stephens, Intel CorporationSlide 40from slide 3/5 of 11/0331r0 by Eldad Perahia, Intel Corporation

March2011

Page 41: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

Goals for May 2011

• Comment resolution on D2.0

Adrian Stephens, Intel CorporationSlide 41from slide 4/5 of 11/0331r0 by Eldad Perahia, Intel Corporation

March2011

Page 42: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

Conference call times

• Previously approved conference calls– Mar 31, Apr 14

• 10:00 – 12:00 ET

– Mar 24, Apr 7• 20:00-22:00 ET

• New conference calls– Not overlap with TGac

– Apr 28, May 5, May 26, Jun 9• 10:00 – 12:00 ET

– Apr 21, May 19, Jun 2, Jun 16• 20:00-22:00 ET

Adrian Stephens, Intel CorporationSlide 42from slide 5/5 of 11/0331r0 by Eldad Perahia, Intel Corporation

March2011

Page 43: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 43

TGae Closing Report – March 2011Date: 2011-03-17

Name Affiliations Address Phone email Michael Montemurro Research in Motion 4701 Tahoe Blvd.

Mississauga, ON. Canada. L4W 0B4

+1-905-629-4746 [email protected]

Authors:

from slide 1/5 of 11/0466r0 by Michael Montemurro, Research In Motion

March2011

Page 44: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 44

Abstract

This document is the closing report for the TGae Task Group for the March 2011 session.

from slide 2/5 of 11/0466r0 by Michael Montemurro, Research In Motion

March2011

Page 45: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 45

Work Completed• Matthew Fischer has agreed to become TG Secretary.• Completed Comment Resolution for LB 172

– https://mentor.ieee.org/802.11/dcn/11/11-11-0255-03-00ae-tgae-lb-172-comment-resolutions.xls

• Motion to approve recirculation LB • Teleconferences:

– Wednesday Apr 20, 27 and May 4, at 11am ET for 1 hour.

from slide 3/5 of 11/0466r0 by Michael Montemurro, Research In Motion

March2011

Page 46: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 46

TGae Timeline – March 2011

• Initial Working Group Letter Ballot: September ‘10

• Re-circulation Working Group Letter Ballot: January ‘11

• Form Sponsor Ballot Pool: May ’11

• Mandatory Editorial Check: May ’11

• Initial Sponsor Ballot: July ’11

• Sponsor Ballot Recirculation: Sep ‘11

• Final WG/EC Approval: Nov ‘11

• RevCom/Standards Board Approval: March ‘12

from slide 4/5 of 11/0466r0 by Michael Montemurro, Research In Motion

March2011

Page 47: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 47

May 2011 Goals• Find Secretary for TGae• Resolve comments from recirculation LB on D3.0• Prepare for recirculation letter ballot

from slide 5/5 of 11/0466r0 by Michael Montemurro, Research In Motion

March2011

Page 48: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 48

IEEE 802.11 TGafSingapore Closing Report

Date: 2011-03-18

Name Affiliations Address Phone email Rich Kennedy Research In

Motion 7305 Napier Trail Austin, TX 78729

+1-972-207-3554 [email protected]

Peter Ecclesine Cisco Systems 170 W. Tasman Dr., San Jose, CA 95134

+1-408-527-0815 [email protected]

Authors:

from slide 1/7 of 11/0455r1 by Rich Kennedy, Research In Motion

March2011

Page 49: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 49

AbstractThis presentation is the closing report for the ninth face-

to-face meeting of IEEE 802.11 TGaf taking place the week of March 14, 2011 at the IEEE 802 Plenary in Singapore.

from slide 2/7 of 11/0455r1 by Rich Kennedy, Research In Motion

March2011

Page 50: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

Agenda

• Review the results of LB171

• Approve the LB171 comment spreadsheet in 11-11/277r3

• Review FCC database administrators workshop presentation in https://mentor.ieee.org/802.18/dcn/11/18-11-0029-00-0000-fcc-tv-bands-administrator-workshop.pdf

• Review Andy Gowans presentation on D1.0 and the Ofcom DD plan

• Comment resolution

• Plan for May meeting, including an ad hoc the week prior, and teleconferences

Adrian Stephens, Intel CorporationSlide 50from slide 3/7 of 11/0455r1 by Rich Kennedy, Research In Motion

March2011

Page 51: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

TGaf Accomplishments • Reviewed results of LB 171

• Began Comment resolution

• Planned for May ad hoc, and extended weekly teleconferences to 3 hours– Still begin Tuesdays at 22:00 ET

Adrian Stephens, Intel CorporationSlide 51from slide 4/7 of 11/0455r1 by Rich Kennedy, Research In Motion

March2011

Page 52: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 52

TGaf Timeline – Updated March 2011

• New

• Initial Working Group Letter Ballot: January 2011

• Second Working Group Letter Ballot: May 2011

• Recirculation Letter Ballot: July 2011

• Form Sponsor Ballot Pool: February 2012

• Initial Sponsor Ballot: March 2012

• Recirculate Sponsor Ballot: May 2012

• Final WG/EC Approval: July 2012

• RevCom/Standards Board Approval: September 2012

from slide 5/7 of 11/0455r1 by Rich Kennedy, Research In Motion

March2011

Page 53: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

Plans for May

• Ad hoc May 4 - 6 in the Bay Area• Continue comment resolution

Adrian Stephens, Intel CorporationSlide 53from slide 6/7 of 11/0455r1 by Rich Kennedy, Research In Motion

March2011

Page 54: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

Teleconferences

• Weekly on Tuesdays:

• Time: 22:00 ET for 180 minutes

Adrian Stephens, Intel CorporationSlide 54from slide 7/7 of 11/0455r1 by Rich Kennedy, Research In Motion

March2011

Page 55: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 55

IEEE 802.11ah Closing Report forMarch 2011

Date: 2011-3-17

Name Affiliations Address Phone email David Halasz Aclara 2315 W. 9th Street

Austin, TX 78703 330-283-2715 dave.halasz@oaktreewirel

ess.com

Authors:

from slide 1/4 of 11/0460r0 by David Halasz, OakTree Wireless

March2011

Page 56: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

Activity in TGah

• Adopted 11/239r2 as TGah Selection Procedure– Use Case, Channel Model, Requirements and Specification

framework documents are required

• Use Case and Channel model submissions made

• Adopted initial Use Cases document, see 11/457

• Update timeline, see 11/285r0

• Additional leadership roles– Minho Cheong to Chair Ad Hoc Requirements Group

– Minyoung Park To Chair Ad Hoc Specification Framework Group

Adrian Stephens, Intel CorporationSlide 56from slide 2/4 of 11/0460r0 by David Halasz, OakTree Wireless

March2011

Page 57: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

Going forward

•Start on requirements and specification framework documents

•Follow up on required guiding documents

Adrian Stephens, Intel CorporationSlide 57from slide 3/4 of 11/0460r0 by David Halasz, OakTree Wireless

March2011

Page 58: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

Teleconferences

• March 28, 21:30 US ET, 1.5 hours

• April 4, 21:30 US ET, 1.5 hours

• April 11, 21:30 US ET, 1.5 hours

• April 18, 21:30 US ET, 1.5 hours

• April 25, 21:30 US ET, 1.5 hours

• May 2, 21:30 US ET, 1.5 hours

Adrian Stephens, Intel CorporationSlide 58from slide 4/4 of 11/0460r0 by David Halasz, OakTree Wireless

March2011

Page 59: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 59

IEEE 802.11TGaiClosing Report

Date: 2011-03-17

Authors:

Name Company Address Phone email

Hiroshi MANO ROOT Inc. 8F TOC2 Bldg. 7-21-11 Nishi-Gotanda, Shinagawa-ku, Tokyo 141-0031 JAPAN

+81-3-5719-7630 [email protected]

Marc Emmelmann Fraunhofer FOKUS

Fraunhofer FOKUSKaiserin-Augusta-Alle 3110589 BerlinGermany

+49-30-3463 7268

[email protected]

from slide 1/13 of 11/0464r0 by Hiroshi Mano (Root Inc.)

March2011

Page 60: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 60

AbstractThis presentation is the closing report for the Singapore

meeting of the IEEE 802.11 TGai.

from slide 2/13 of 11/0464r0 by Hiroshi Mano (Root Inc.)

March2011

Page 61: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

Agenda for this weekMarch 2011, Singapore

• Official agenda of WG – Monday PM1

– Tuesday PM1, EVE

– Wednesday AM1,AM2

– Thursday PM1

• Goals for the Meeting:– Review and Approve the Los Angels and Teleconference

meeting minutes

– Presentation of submissions• Draft use case scenario documentation

– TIME line of task group

– Plan for May & Teleconference

February

Adrian Stephens, Intel CorporationSlide 61from slide 3/13 of 11/0464r0 by Hiroshi Mano , Root Inc

March2011

Page 62: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

Accomplishments TGai 1/3• Submission of Presentation

– 0357/00 A focused path forwad Tgai D1.0

– 0334/00 TGai scope discussion (A. Yamada/ NTT Docomo)

– 0326/00 Use-Case-Reference-List-doc discussion (Tom Siep / CSR)

– 0148/06 Use cases for TGai Lee Armstrong (US DoT)

– 0281/00 Proposed Dynamic Mobility Use Cases for TGai (Carl Kain / Nobils)

– 0333/00 TGai possible use cases (A. Yamada/ NTT Docomo)

– 0337/00 discussion-points-on-portal-locations (Dwight Smith ,Motorola Mobility)

– 0356/01 Selection Procedure for TGai (Y. Nagai Mitsubishi Electric)

Adrian Stephens, Intel CorporationSlide 62from slide 4/13 of 11/0464r0 by Hiroshi Mano (Root Inc.)

March2011

Page 63: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

Accomplishments TGai 2/3

• Submission of Presentation – 0343/00 Pedestrian model (Hitoshi Morioka, Root Inc.)

– 0408/00 Use Case Characteristics discussion (Tom Siep / CSR)

– 0238/04 Use Case Documentation (Tom Siep /CSR)

– 0435/00 Definition of terminology from 802.11.2 (Marc Emmelman /Fokus)

– 0408/01 Use Case Characteristics discussion (Tom Siep / CSR)

– 0441/00 Self growing use cases requiring fast link set up (Marc Emmelman Fokus)

– 0238/05 Use Case Documentation (Tom Siep /CSR)

March 2011

Adrian Stephens, Intel CorporationSlide 63from slide 5/13 of 11/0464r0 by Hiroshi Mano (Root Inc.)

March2011

Page 64: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

Accomplishments 3/3 TGai

• Reviewed and Approved the Los Angels and Teleconference meeting minutes

• Drafting Use Case Scenario documentation– Approve the terms and definitions in 11-11/0408r2 as official TGai

terminology.– Approve the values of high/medium/low given for each definition as

in the 11-11/0408r2.

• Approved Weekly Teleconference schedule• Approved Plan for May

– Finish the use case scenario– Finish the functional requirement – Finish the technical requirement

Adrian Stephens, Intel CorporationSlide 64from slide 6/13 of 11/0464r0 by Hiroshi Mano (Root Inc.)

March2011

Page 65: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 65

Motion:

• Motion: Approve the terms and definitions in 11-11/0408r2 as official TGai terminology.

• Moved :Tom Siep (CSR)

• Second: Lee Armstrong (US DOT)

• Result 14-0-1

• Passed

from slide 7/13 of 11/0464r0 by Tom Siep, CSR

March2011

Page 66: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 66

Motion:

• Motion: Approve the values of high/medium/low given for each definition as in the 11-11/0408r2.

• Moved :Tom Siep (CSR)

• Second: Lee Armstrong (US DOT)

• Result 10-0-3

• Passed

from slide 8/13 of 11/0464r0 by Tom Siep, CSR

March2011

Page 67: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

Teleconference Schedule

• Motion: – Approve the following schedule of weekly teleconferences.

– Tuesdays 08:00 EST (NY Time) continue until 29th Mar.

– Tuesdays 09:00 EST (NY Time) start from 5th Apr.

– Duration 1Hour

– Using WEB-EX that will be provided by Task Group Chair

• Moved: Marc Emmelmann ( Fokus ), Seconded: Dwight Smith (Motorola Mobility)• Result: 14-0-3 • Motion passed

March 2011

Adrian Stephens, Intel CorporationSlide 67from slide 9/13 of 11/0464r0 by Hiroshi Mano (Root Inc.)

March2011

Page 68: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

Time line of TGai to draft 1.0

• Use case scenario finished May 2011

• Functional Requirement May 2011

• Technical Requirement finished May 2011

• Call for Proposal start May 2011

• Proposal submission close Jul 2011

• Evaluation and down selection proposal, Jul11 to Sep 11

March 2011

Adrian Stephens, Intel CorporationSlide 68from slide 10/13 of 11/0464r0 by Hiroshi Mano (Root Inc.)

March2011

Page 69: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

Time line of TGai

– WG Letter Ballots Initial / Recirc Sep 11 / Jan 12

– Form Sponsor Ballot Pool / Reform Jul 12

– MEC Done Jul 12

– IEEE-SA Sponsor Ballots Initial / Recirc Sep 12 / Dec 12

– Final 802.11 WG Approval Jul 13

– Final or Conditional 802 EC Approval Jul 13

– RevCom & Standards Board Final or Continuous Process Approval Sep 13

– ANSI Approved N/A

Adrian Stephens, Intel CorporationSlide 69from slide 11/13 of 11/0464r0 by Hiroshi Mano (Root Inc.)

March2011

Page 70: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

Documents

• Approved Minutes– 11-11-0115-01-00ai-tgai-meeting-minutes-for-the-ieee-802-11-

january-2011-interim.doc

– 11-11-0213-06-00ai-january-march-teleconference-minutes.doc

Adrian Stephens, Intel CorporationSlide 70from slide 12/13 of 11/0464r0 by Hiroshi Mano (Root Inc.)

March2011

Page 71: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

Thanks to all who participated!

Adrian Stephens, Intel CorporationSlide 71from slide 13/13 of 11/0464r0 by Hiroshi Mano (Root Inc.)

March2011

Page 72: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 72

JTC1 ad hoc closing report (March 11)Date: 2011-3-11

Name Company Address Phone email

Andrew Myles Cisco [email protected]

Authors:

from slide 1/9 of 11/0467r0 by Andrew Myles, Cisco

March2011

Page 73: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 73

Abstract

Closing report for JTC1 ad hocfor March 2011, Singapore

from slide 2/9 of 11/0467r0 by Andrew Myles, Cisco

March2011

Page 74: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 74

JTC1 ad hoc generated a number of liaisons in Mar 2011

• Progress in Singapore (March 2011)– Review extended goals

• The ad hoc is now responsible for 802 matters

– Review status of liaisons previously sent to SC6• No comments on any Sponsor Ballot drafts

– Discuss identifier conflict liaison previously sent to SC6• Considered responses from Chinese and Swiss NBs

• Developed liaison offering a new IE and two new status codes

– Update on status of ISO/IEC 8802-11:2005• Likely to be reconfirmed based on ballot

– Update on status of ISO/IEC 8802-3:2000• Likely to withdrawn based on liaison from IEEE 802.3

from slide 3/9 of 11/0467r0 by Andrew Myles, Cisco

March2011

Page 75: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 75

JTC1 ad hoc generated a number of liaisons in Mar 2011

• Progress in Singapore (March 2011)– Update on WAPI progress

• Late breaking news: IEEE 802 comments objecting to claims that IEEE 802.11i is insecure have been rejected as irrelevant in proposed comment disposition submission. Similar comments from US NB also rejected.

– Discuss a proposed 802.1X/AE related liaison• Developed liaison inviting SC6 members to attend 802.1 WG in July,

and included analysis on proposed NP for replacement of .1X/AE

• Was discussed in 802.1 closing plenary

– Approve delegation for next SC6 meeting• Recommended Bruce Kraemer be appointed head of delegation

• Bruce authorised to select other candidates

from slide 4/9 of 11/0467r0 by Andrew Myles, Cisco

March2011

Page 76: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

JTC1 ad hoc will prepare for more liaisons out of Singapore meeting

• Plans for Palm Springs (May 2011)– Prepare ppt versions of recent liaisons to SC6

– Develop liaison on proposed .11 replacement NP

– Possibly develop liaison on proposed .16 security replacement NP

– Review latest response to liaison related to security of IEEE 802.11i

– Confirm delegation to SC6• Likely to include 802.11, 802.1 and maybe 802.16 members

Adrian Stephens, Intel CorporationSlide 76from slide 5/9 of 11/0467r0 by Andrew Myles, Cisco

March2011

Page 77: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

Motion to appoint HoD to SC6 meeting

• The JTC1 ad hoc unanimously approved a motion to appoint HoD to SC6 meeting– The IEEE 802 JTC1 ad hoc recommends to IEEE 802 ExCom that

Bruce Kraemer be appointed Head of Delegation of the IEEE 802 delegation to the SC6 meeting in San Diego in June 2011. The ad hoc also recommends that as Head of Delegation that he have the authority to add other interested parties to the delegation

• IEEE 802.11 WG should consider an equivalent motion– The IEEE 802.11 WG recommends to IEEE 802 ExCom that Bruce

Kraemer be appointed Head of Delegation of the IEEE 802 delegation to the SC6 meeting in San Diego in June 2011. The WG also recommends that as Head of Delegation that he have the authority to add other interested parties to the delegation

Adrian Stephens, Intel CorporationSlide 77from slide 6/9 of 11/0467r0 by Andrew Myles, Cisco

March2011

Page 78: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

Motion to allocate an IE identifier and two status codes

• The JTC1 ad hoc unanimously approved a motion to allocate an IE identifier and two status codes– The IEEE 802 JTC1 ad hoc recommends to the IEEE 802.11 ANA

that two status codes and an IE identifier be allocated for use by ISO/IEC JTC1/SC6/WG1 in the proposed WAPI standard

• IEEE 802.11 WG should consider an equivalent motion– The IEEE 802.11 WG approves the IEEE 802.11 ANA allocating

two status codes and an IE identifier for use by ISO/IEC JTC1/SC6/WG1 in the proposed WAPI standard

Adrian Stephens, Intel CorporationSlide 78from slide 7/9 of 11/0467r0 by Andrew Myles, Cisco

March2011

Page 79: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

Motion for identifier conflict liaison to SC6 • The JTC1 ad hoc unanimously approved a motion for a liaison to

SC6 in relation to the identifier conflict issue– The IEEE 802 JTC1 ad hoc recommends to the IEEE 802.11 WG, IEEE 802

ExCom and IEEE International ad hoc that:• The content of 11-11-404r0 be sent to ISO/IEC JTC1/SC6 with an appropriate cover

letter

• Bruce Kraemer be given authority to make editorial changes, including the insertion of allocated ANA values

• IEEE 802.11 WG should consider an equivalent motion– IEEE 802.11 WG recommends to IEEE 802 ExCom and IEEE International ad

hoc that:• The content of 11-11-404r0 be sent to ISO/IEC JTC1/SC6 with an appropriate cover

letter

• Bruce Kraemer be given authority to make editorial changes, including the insertion of allocated ANA values

Adrian Stephens, Intel CorporationSlide 79from slide 8/9 of 11/0467r0 by Andrew Myles, Cisco

March2011

Page 80: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

Motion for 1X/1AE liaison to SC6

• The JTC1 ad hoc unanimously approved a motion for a liaison to SC6 in relation to 1X/1AE– The IEEE 802 JTC1 ad hoc recommends to the IEEE 802.11 WG, IEEE

802 ExCom and IEEE International ad hoc that:• The content of 11-11-442r1 be sent to ISO/IEC JTC1/SC6 with an

appropriate cover letter• Paul Nikolich be given authority to make editorial changes

• IEEE 802.11 WG should consider an equivalent motion– The IEEE 802.11 WG recommends to IEEE 802 ExCom and IEEE

International ad hoc that:• The content of 11-11-442r1 be sent to ISO/IEC JTC1/SC6 with an

appropriate cover letter• Paul Nikolich be given authority to make editorial changes

Adrian Stephens, Intel CorporationSlide 80from slide 9/9 of 11/0467r0 by Andrew Myles, Cisco

March2011

Page 81: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 81

IEEE 802.11Regulatory Ad Hoc Committee

Closing ReportDate: 2011-03-18

Name Affiliations Address Phone email Rich Kennedy Research In

Motion 7305 Napier Trail Austin, TX 78729

+1-972-207-3554 [email protected]

Authors:

from slide 1/4 of 11/0456r0 by Rich Kennedy, Research In Motion

March2011

Page 82: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 82

AbstractThis presentation is the closing report for the Singapore

2011 meeting of the IEEE 802.11 Regulatory Ad Hoc Committee.

from slide 2/4 of 11/0456r0 by Rich Kennedy, Research In Motion

March2011

Page 83: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

Agenda

• The regulatory summaries• Regulatory issues status

– The end of FCC 10-174

– FCC 5 GHz rules changes update

• Critical issues actions– Coming regulations for mobile hoptspots

Slide 83 Adrian Stephens, Intel Corporationfrom slide 3/4 of 11/0456r0 by Rich Kennedy, Research In Motion

March2011

Page 84: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report

Regulatory AHC Activities

• Discussed regulatory summaries from North America and the EU– FCC 10-174 is now the final rules for the TVWS untill

a new rulemaking

• Reviewed Ofcom document about TVWS issues in the UK and EU

Adrian Stephens, Intel CorporationSlide 84from slide 4/4 of 11/0456r0 by Rich Kennedy, Research In Motion

March2011

Page 85: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 85

Smart Grid ad hoc – March 2011

Date: 15 March 2011

Name Company Address Phone emailBruce Kraemer Marvell 5488 Marvell Lane,

Santa Clara, CA, 95054

+1-321-751-3988 [email protected]

from slide 1/3 of 11/0469r0 by Bruce Kraemer, Marvell

March2011

Page 86: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 86

Smart Grid – March 2011

Tuesday & Thursday topics

• UK Consultation

• Update of activities in P2030

• IEEE Smart Grid

• FERC

• Australian Smart Metering RFI

• Revision NIST Smart Grid PAP#2 Report plan

• Open SG

• ITU-R paper - WP1A document

from slide 2/3 of 11/0469r0 by Bruce Kraemer, Marvell

March2011

Page 87: 802.11 March 2011 Closing Plenary Reports

doc.: IEEE 802.11-11/0471r1

Report Adrian Stephens, Intel CorporationSlide 87

DeliverablesPaper & Matrix1. Identify and fully define all necessary terminology (mesh, etc.)2. Come up with sane metric definitions for Section 43. Come up with guidelines for filling out the wireless technologies matrix

to make sure entries are comparable across technologies– This includes a selection of high priority, fully described “operating

points” representing deployment scenarios4. Come up with dates for submissions for column entries for the matrix

and appoint coordinators for each technology represented in the matrix5. Submit results to the PAP2 reflector and announce a comment period6. Directly solicit SDO participation and schedule SDO calls to discuss

submissions and comments on all of the above – Bluetooth, 7. Discuss & adjust the deliverables content using OpenSG as the venue and

a proxy for the utility industry8. Completion target: July? December?9. Assessment of industry practices in deployment

from slide 3/3 of 11/0469r0 by Bruce Kraemer, Marvell

March2011