8_3_1c

1
Toledo Refinery Site Technical Practices EP 8-3-1C Packaged Watertube Boilers Inspection Checklist (Future Release) August 2007 Revision 0.0 Page 1 of 1 Maintained by E 2 G – Shaker Heights, OH PROJECT PROJECT NO. INQUIRY NO. LOCATION UNIT EQUIPMENT ID JOB NO. DOCUMENT NO. DATA ISSUED FOR IN-HOUSE REVIEW TOLEDO REFINERY APPROVAL QUOTATION PURCHASE CONSTRUCTION THIS SHEET IS A RECORD OF EACH ISSUE OR REVISION TO THE SUBJECT DATA. EACH TIME THE DATA IS CHANGED ONLY THE NEW OR REVISED DATA SHEETS NEED TO BE ISSUED. THE EXACT SHEETS CHANGED AND THE NATURE OF THE CHANGE SHOULD BE NOTED UNDER REMARKS. THESE REMARKS ARE NOT A PART OF THE DATA. THE REVISED DATA SHEET(S) BECOME PART OF THE ORIGINAL DATA AND SHALL BE COMPLIED WITH IN THEIR ENTIRETY. ALL DATA SHEETS ATTACHED REVISED DATA SHEET(S) ONLY ATTACHED REV. DATE BY CHECK APPROVALS REMARKS SECTION PROJECT TOLEDO REFINERY

Upload: esganfia

Post on 12-Apr-2016

218 views

Category:

Documents


4 download

DESCRIPTION

from

TRANSCRIPT

Page 1: 8_3_1C

Toledo Refinery

Site Technical Practices EP 8-3-1C

Packaged Watertube Boilers Inspection Checklist (Future Release)

August 2007 Revision 0.0

Page 1 of 1

Maintained by E2G – Shaker Heights, OH

PROJECT

PROJECT NO.

INQUIRY NO.

LOCATION

UNIT

EQUIPMENT ID

JOB NO.

DOCUMENT NO.

DATA ISSUED FOR

IN-HOUSE REVIEW

TOLEDO REFINERY APPROVAL

QUOTATION

PURCHASE

CONSTRUCTION

THIS SHEET IS A RECORD OF EACH ISSUE OR REVISION TO THE SUBJECT DATA. EACH TIME THE DATA IS CHANGED ONLY THE NEW OR REVISED DATA SHEETS NEED TO BE ISSUED. THE EXACT SHEETS CHANGED AND THE NATURE OF THE CHANGE SHOULD BE NOTED UNDER REMARKS. THESE REMARKS ARE NOT A PART OF THE DATA. THE REVISED DATA SHEET(S) BECOME PART OF THE ORIGINAL DATA AND SHALL BE COMPLIED WITH IN THEIR ENTIRETY.

ALL DATA SHEETS ATTACHED

REVISED DATA SHEET(S) ONLY ATTACHED

REV. DATE BY CHECK APPROVALS REMARKS

SECTION PROJECT TOLEDO REFINERY