    UTRAN Optimisation Process

  • 8/14/2019 89025817 Huawei Optimisation Process

    2/40

    AgendaAgenda

    l Introduction and Objectives

    l Optimisation Phases Overview

    l Single Site Verification

    l RF Optimisation

    l Services Testing & Parameters Optimisation

    l Regular Reference Routes & Stats Analysis

    l Summary

  • 8/14/2019 89025817 Huawei Optimisation Process

    3/40

    l To provide an overview of the overall optimisation

    process

    l To introduce the different optimisation phases of a 3G

    Radio Network

    l To prepare for more in-depth discussions of various

    optimisation topics

    Introduction & ObjectivesIntroduction & Objectives

  • 8/14/2019 89025817 Huawei Optimisation Process

    4/40

    AgendaAgenda

    l Introduction and Objectives

    l Optimisation Phases Overview

    l Single Site Verification

    l RF Optimisation

    l Services Testing & Parameters Optimisation

    l Regular Reference Routes & Stats Analysis

    l Summary

  • 8/14/2019 89025817 Huawei Optimisation Process

    5/40

    [1] Single Site Verification:

    v Every new site is tested and verified to be functioning properly

    v Any installation or parameter errors must be rectified.

    [2] RF Optimisation:

    v Once clusters of sites are ready, RF Optimisation can be

    started in order to optimise coverage and minimise interference

    and pilot pollution.

    v All RF-related failures or drop calls must be resolved.

    Optimisation Approach Overview (1/3)Optimisation Approach Overview (1/3)

  • 8/14/2019 89025817 Huawei Optimisation Process

    6/40

    [3] Services Testing & Parameter Optimisation:

    v Comprehensive services testing should be carried out in areas

    of good coverage to determine system performance

    v Causes of any failures must be identified and whenever

    necessary relevant parameters should be optimised.

    [4] Regular Reference Routes & Stats Analysis:

    v Regular testing & stats analysis will be needed to identify and

    resolve any new issues as a result of (e.g. increased traffic).

    Optimisation Approach Overview (2/3)Optimisation Approach Overview (2/3)

  • 8/14/2019 89025817 Huawei Optimisation Process

    7/40

    Optimisation Approach Overview (3/3)Optimisation Approach Overview (3/3)

    Cluster of sites

    ready?

    No

    Re-optimisation

    Needed?

    NoYes

    New Sites Integrated

    Single Site Verification

    Services Testing &Parameter Optimisation

    Regular Reference RouteTesting & Stats Analysis

    RF Optimisation

    Yes

  • 8/14/2019 89025817 Huawei Optimisation Process

    8/40

    AgendaAgenda

    l

    Introduction and Objectivesl Optimisation Phases Overview

    l Single Site Verification

    l RF Optimisation

    l Services Testing & Parameters Optimisation

    l Regular Reference Routes & Stats Analysis

    l Summary

  • 8/14/2019 89025817 Huawei Optimisation Process

    9/40

    Single Site Verification (1/3)Single Site Verification (1/3)

    Cluster of sites

    ready?

    New Sites Integrated

    Re-optimisation

    Needed?

    No

    NoYes

    RF Optimisation

    Single Site Verification

    Services Testing &Parameter Optimisation

    Regular Reference RouteTesting & Stats Analysis

    Yes

  • 8/14/2019 89025817 Huawei Optimisation Process

    10/40

    Single Site Verifications (2/3)Single Site Verifications (2/3)

    l Objectives:

    1. Verify Coverage (RSCP & Ec/Io) 2. Verify scrambling codes

    3. Verify no installation faults

    4. Make test calls

    l Tools:

    Scanner + UE

    l Process:

    A detailed check list of various tests must be conducted.

    Tests will include: call setups, reselection, handover, LA/RA

    update, PS attach & detach, PDP activation, etc.

    If unusual low signal strength should check wrong feeder

    connection (Tx/Rx main antenna, Rx diversity antenna), etc.

  • 8/14/2019 89025817 Huawei Optimisation Process

    11/40

    Single Site Verifications (3/3)Single Site Verifications (3/3)

    l An example Check list

    25 Overall performance and coverage area as expected by a brief drive test

    Notes: If the item is OK, mark the '!' on the ''; If the item is not OK, mark the '"' on the ''; If the item is not checked, mark the '#' on the ''.

    RemarksNew Expansion Migration Others

    Site Expanded from:Site Migrated from RNC:

    o:o RNC:

    Site Connected to RNC:

    IdleMode

    Site Migration: Others:

    New Site: Site Expansion:

    Mapinfo UpdateData Base Update

    Reminder

    Site Checklist

    24 Installed antenna is of the planned type

    21 Soft handover for VP service to and from the 3G cells checked O20

    23 Inter-systemhandover for voice service to the 2G cells checked OK22 Soft handover for PS service to and from the 3G cells checked O

    Soft handover for voice service to and from the 3G cells checked O19 RA update proceduce is checked 18 The PS service quality is good by the engineer feeling

    15 PS attach is checked

    17 PS PDP activation and deactivation is checked

    14 The VP service quality is good by the engineer feeling

    Mobile terminating calls and mobile originating calls for voice service is che

    13 Mobile terminating calls and mobile originating calls for VP service is check

    7 Cell reselection from2G to 3G is checked 8 MO-SMS and MT-SMS

    The LAC/RACis correctly defined ( SIB 1 )

    6 Cell reselection from3G to 2G is checked5 LA update proceduce is checked

    4 The neighbor list and parameters are as planned ( SIB 11 )

    Site Name:

    Frequency and Scrambling Code correctly defined

    Site ID:

    No. Activity/Process

    CPICH_RSCP > -85 dBm near site

    ConnectionMod 9

    2 Cell selection and reselection parameters are as planned ( SIB 3 )1

    3

    12 The voice service quality is good by the engineer feeling11

    10 CPICH_EcIo > -8 dB near site

    2-Name/Designation: Signature: Data:

    Checked by:

    1-Name/Designation: Signature: Data:

    PS

    Remarks (Further comments):

    Handover

    26 Antenna Swapping TestGen

    16 PS detach is checked

  • 8/14/2019 89025817 Huawei Optimisation Process

    12/40

    AgendaAgenda

    l Introduction and Objectives

    l Optimisation Phases Overview

    l Single Site Verification

    l RF Optimisation

    l Services Testing & Parameters Optimisation

    l Regular Reference Routes & Stats Analysis

    l Summary

  • 8/14/2019 89025817 Huawei Optimisation Process

    13/40

    RF OptimisationRF Optimisation

    Cluster of sites

    ready?

    New Sites Integrated

    Re-optimisation

    Needed?

    No

    NoYes

    RF Optimisation

    Single Site Verification

    Services Testing &Parameter Optimisation

    Regular Reference RouteTesting & Stats Analysis

    Yes

  • 8/14/2019 89025817 Huawei Optimisation Process

    14/40

    RF OptimisationIntro (1/2)RF OptimisationIntro (1/2)

    l Objectives:

    1. Optimize CPICH and service coverage & cell dominance

    2. Minimize interference & pilot pollution

    3. Optimize neighbor list

    4. Resolve any RF-related drop calls

    l Tools:

    Scanner + UE with logging tool

    l Process:

    Drive survey with a UE initially in a continuous AMR call.

    Drop calls should be analyzed to determine if the causes are

    RF related.

    l Solutions:

    Neighbor list modification

    Antenna tilt and/or azimuth changes.

  • 8/14/2019 89025817 Huawei Optimisation Process

    15/40

    Data

    Analysis

    RF OptimisationIntro (2/2)RF OptimisationIntro (2/2)

    l Process Flow:Start

    Identify any

    RF Issues

    Identify candidate

    cells for changes

    Determine amount of

    change

    Identify nature ofrequired changes

    Implement changes

    Repeat Drive Test

    Yes

    End

    Problem

    Resolved?No

    Drive Test

  • 8/14/2019 89025817 Huawei Optimisation Process

    16/40

    RF OptimisationAnalysis (1/8)RF OptimisationAnalysis (1/8)

    l Analysis Approach: Various plots from UE and

    scanner need to be analysed:

    Cell Dominance (best serving cell plots)

    Down Link Coverage (CPICH RSCP & Ec/Io plots)

    Uplink Coverage (UE Tx power plots) Pilot Pollution (Pilot pollution table & Estimated Active set size)

    Neighbour list verification

    SHO Performance

    Drop Calls

  • 8/14/2019 89025817 Huawei Optimisation Process

    17/40

    RF OptimisationAnalysis (2/8)RF OptimisationAnalysis (2/8)

    l Analysis of Cell Dominance:

    To identify:

    l Cells with no or poor

    dominance

    l Cells with excessive

    dominance

    l Best server differences

    between scanner & UE

    Scrambling Code plot of best serving cells

  • 8/14/2019 89025817 Huawei Optimisation Process

    18/40

    RF OptimisationAnalysis (3/8)RF OptimisationAnalysis (3/8)

    l Analysis of DL CPICH Coverage:

    To identify:

    l Areas of poor coverage (i.e. poor RSCP & Ec/Io)

    l Areas of high interference (i.e. high RSCP but low Ec/Io)

    CPICH RSCP Plot

    CPICH Ec/Io Plot

  • 8/14/2019 89025817 Huawei Optimisation Process

    19/40

    RF OptimisationAnalysis (4/8)RF OptimisationAnalysis (4/8)

    l Analysis of UL Coverage:

    To identify:

    l Uplink coverage limitation (i.e.

    UE reaching max Tx power)

    UE Tx power.

  • 8/14/2019 89025817 Huawei Optimisation Process

    20/40

    RF OptimisationAnalysis (5/8)RF OptimisationAnalysis (5/8)

    To identify:

    l Cells causing pilot

    pollution

    l Locations where there

    are too many soft

    handoff candidates

    Estimated active set size from scanner data.

    SC Count % in Pollution Set

    8 206 12.9%

    9 165 10.3%

    10 157 9.8%

    11 156 9.7%

    12 148 9.2%

    13 135 8.4%

    16 95 5.9%

    17 94 5.9%

    18 76 4.7%

    19 74 4.6%

    20 73 4.6%

    21 56 3.5%

    32 54 3.4%35 39 2.4%

    37 33 2.1%

    43 19 1.2%

    48 8 0.5%

    53 7 0.4%

    67 3 0.2%

    80 2 0.1%

    130 2 0.1%

    l Analysis of Pilot Pollution:

    Pilot pollution

    results

  • 8/14/2019 89025817 Huawei Optimisation Process

    21/40

    RF OptimisationAnalysis (6/8)RF OptimisationAnalysis (6/8)

    To identify:

    l Any missing neighbours

    though analysis scanner

    data & RNC neighbour

    list

    l Any missing neighbours

    causing drop calls

    l Any unnecessary

    neighbours.

    Neighbour list verification.

    l Analysis of Neighbour List:

    009 576 Retain 018 82 14.2%

    Retain 010 46 8.0%

    Retain 016 31 5.4%

    Retain 032 20 3.5%

    Retain 011 18 3.1%

    Add 130 17 3.0%

    Retain 021 17 3.0%

    Retain 008 12 2.1%

    Retain 020 6 1.0%

    Retain 012 5 0.9%

    Retain 017 2 0.3%Remove 053 0 0.0%

    Remove 019 0 0.0%

    Remove 034 0 0.0%

    Remove 037 0 0.0%

    Remove 013 0 0.0%

    Remove 051 0 0.0%

    70548 Ajman Central 25.41204 55.447

    Nbr SCSample

    Count%Lati tude Longitude

    Sample

    CountActionSC Cell Site

  • 8/14/2019 89025817 Huawei Optimisation Process

    22/40

    RF OptimisationAnalysis (7/8)RF OptimisationAnalysis (7/8)

    l Analysis of SHO Performance:

    To determine soft hand off

    success rate.

    Scrambling Code plot of best serving cells

    um er o ct ve e t p ates

    Event Count

    Event 1a - 328

    Event 1b - 306

    Event 1c - 64

    um er o ct ve et p ate omp etes

    Event CountEvent 1a - 326

    Event 1b - 305

    Event 1c - 62

    o t- an over uccess ate

    Event Rate

    Event 1a - 99.4

    Event 1b - 99.7

    Event 1c - 96.9

  • 8/14/2019 89025817 Huawei Optimisation Process

    23/40

    RF OptimisationAnalysis (8/8)RF OptimisationAnalysis (8/8)

    l Analysis of Drop Calls:

    To identify:

    l Exact cause of the drop calls

    Drop calls

  • 8/14/2019 89025817 Huawei Optimisation Process

    24/40

    RF OptimisationSolutionsRF OptimisationSolutions

    l Antenna Optimisation: (in order of priority)

    Antenna tilt

    Antenna azimuth

    Antenna location

    Antenna height

    Antenna type

    Site location

    New site

    l Neighbour List Optimisation: (in order of priority)

    Add missing neighbors Remove unnecessary neighbors

  • 8/14/2019 89025817 Huawei Optimisation Process

    25/40

    Neighbour List

    tuning

    Antenna & Site

    Optimisation

    RF OptimisationProcess SummaryRF OptimisationProcess Summary

    Drive test data

    (scanner + UE)

    Neighbour list

    Thresholds &

    KPIs

    AnalysisDominance

    Best server

    scrambling code

    CPICH CoverageCPICH RSCP

    & Ec/Io

    DL Interference CPICH Ec/Io

    UL Coverage UE Tx power

    Neighbour ListScanner vs. RNC

    neighbours

    Pilot PollutionScanner active

    set size

    Drop calls Causes analysis

  • 8/14/2019 89025817 Huawei Optimisation Process

    26/40

    AgendaAgenda

    l Introduction and Objectives

    l Optimisation Phases Overview

    l Single Site Verification

    l RF Optimisation

    l Services Testing & Parameters Optimisation

    l Regular Reference Routes & Stats Analysis

    l Summary

  • 8/14/2019 89025817 Huawei Optimisation Process

    27/40

    Services Testing & Parameter Optimisation (1/6)Services Testing & Parameter Optimisation (1/6)

    Cluster of sites

    ready?

    New Sites Integrated

    Re-optimisation

    Needed?

    No

    NoYes

    RF Optimisation

    Single Site Verification

    Services Testing &

    Parameter Optimisation

    Regular Reference Route

    Testing & Stats Analysis

    Yes

  • 8/14/2019 89025817 Huawei Optimisation Process

    28/40

    Services Testing & Parameter Optimisation (2/6)Services Testing & Parameter Optimisation (2/6)

    l Once RF optimisation is completed detailed testing of

    CS and PS services should be completed

    l During testing, end-to-end logs should be collected (i.e.

    UE as well as RAN & when necessary CN)

    l Any failures (e.g. call set-up, drop calls, etc) MUST be

    analysed to determine exact causes

    l Any system defects must be raised to Technical

    Support for resolution

    l Appropriate parameters should be identified for

    possible optimisation to resolve failures or to reduceimpact of any system defects

  • 8/14/2019 89025817 Huawei Optimisation Process

    29/40

    Services Testing & Parameter Optimisation (4/6)Services Testing & Parameter Optimisation (4/6)

    Determine (Non-RF)

    Failure Causes

    Services Testing

    No

    Improve viaParameters?

    Optimise Parameters

    Yes

    No

    No

    System

    Defect?Raise Defect

    Yes

    100 %

    Success Rate?

    End

    Yes

  • 8/14/2019 89025817 Huawei Optimisation Process

    30/40

    Services Testing & Parameter Optimisation (4/6)Services Testing & Parameter Optimisation (4/6)

    l Basic Parameters Optimisation Steps:

    Identify candidate parameters

    Identify various trade-offs

    Decide on suitable metrics for analysis of results

    Decide on parameter ranges to be tested

    Define test cases and drive routes including various

    environments & clutter

    Execute tests

    Perform detailed analysis (logs as well as network stats)

    Conclude parameters values that provide optimum trade-offs

  • 8/14/2019 89025817 Huawei Optimisation Process

    31/40

    Services Testing & Parameter Optimisation (5/6)Services Testing & Parameter Optimisation (5/6)

    Define Test Cases &

    select drive routes

    Perform Tests

    Data Analysis &

    Conclusions

    Candidate

    Parameters

    Clutter &

    Environment

    factors

    Parameters

    Ranges

    Trade OffsAnalysis

    Metrics

  • 8/14/2019 89025817 Huawei Optimisation Process

    32/40

    Services Testing & Parameter Optimisation (6/6)Services Testing & Parameter Optimisation (6/6)

    l Potential Parameter Optimisation Candidates:

    Reselection parameters

    Handover parameters

    Power control parameters

    Admission and congestion control

    Common control channel powers

    Etc.

    AA d

  • 8/14/2019 89025817 Huawei Optimisation Process

    33/40

    AgendaAgenda

    l Introduction and Objectives

    l Optimisation Phases Overview

    l Single Site Verification

    l RF Optimisation

    l Services Testing & Parameters Optimisation

    l Regular Reference Routes & Stats Analysis

    l Summary

    R l T ti & St t A l i (1/4)R l T ti & St t A l i (1/4)

  • 8/14/2019 89025817 Huawei Optimisation Process

    34/40

    Regular Testing & Stats Analysis (1/4)Regular Testing & Stats Analysis (1/4)

    Cluster of sites

    ready?

    New Sites Integrated

    Re-optimisation

    Needed?

    No

    NoYes

    RF Optimisation

    Single Site Verification

    Services Testing &

    Parameter Optimisation

    Regular Reference Route

    Testing & Stats Analysis

    Yes

    R l T ti & St t A l i (2/4)R l T ti & St t A l i (2/4)

  • 8/14/2019 89025817 Huawei Optimisation Process

    35/40

    Regular Testing & Stats Analysis (2/4)Regular Testing & Stats Analysis (2/4)

    l Optimisation is an on-going activity and as a result:

    Regular drive tests of designated routes should be carried out

    (e.g. on monthly basis)

    Routine analysis of network stats to identify any reduction in

    network performance

    Regular Testing & Stats Analysis (3/4)Regular Testing & Stats Analysis (3/4)

  • 8/14/2019 89025817 Huawei Optimisation Process

    36/40

    Regular Testing & Stats Analysis (3/4)Regular Testing & Stats Analysis (3/4)

    l Regular Drive Testing- Objectives:

    To benchmark network performance and user experience (e.g.

    call setup SR, call drop rate, PS throughputs, etc)

    To identify any degradation in coverage and/or increase in

    interference as a result of increased traffic or changes in

    environment To assess impact of newly introduced RAN features.

    To monitor the progress of on-going optimisation activities.

    Regular Testing & Stats Analysis (4/4)Regular Testing & Stats Analysis (4/4)

  • 8/14/2019 89025817 Huawei Optimisation Process

    37/40

    Regular Testing & Stats Analysis (4/4)Regular Testing & Stats Analysis (4/4)

    l Routine Network Stats analysis - Objectives:

    To benchmark network performance, particularly during the

    busy hour.

    To monitor traffic volumes and patterns as well as traffic profiles

    (i.e. mix of services).

    To assess impact of parameter changes as part of parameter

    optimisation exercises.

    To identify poorly performing cells that need investigation to

    establish underlying cause of poor performance.

    To provide triggers for network upgrade decisions.

    AgendaAgenda

  • 8/14/2019 89025817 Huawei Optimisation Process

    38/40

    AgendaAgenda

    l Introduction and Objectives

    l Optimisation Phases Overview

    l Single Site Verification

    l RF Optimisation

    l Services Testing & Parameters Optimisation

    l Regular Reference Routes & Stats Analysis

    l Summary

    Optimisation Approach OverviewOptimisation Approach Overview

  • 8/14/2019 89025817 Huawei Optimisation Process

    39/40

    Optimisation Approach OverviewOptimisation Approach Overview

    Cluster of sites

    ready?

    New Sites Integrated

    Re-optimisation

    Needed?

    No

    NoYes

    RF Optimisation

    Single Site Verification

    Services Testing &Parameter Optimisation

    Regular Reference Route

    Testing & Stats Analysis

    Yes

  • 8/14/2019 89025817 Huawei Optimisation Process

    40/40

    Thank you!