UTRAN Optimisation Process
-
8/14/2019 89025817 Huawei Optimisation Process
2/40
AgendaAgenda
l Introduction and Objectives
l Optimisation Phases Overview
l Single Site Verification
l RF Optimisation
l Services Testing & Parameters Optimisation
l Regular Reference Routes & Stats Analysis
l Summary
-
8/14/2019 89025817 Huawei Optimisation Process
3/40
l To provide an overview of the overall optimisation
process
l To introduce the different optimisation phases of a 3G
Radio Network
l To prepare for more in-depth discussions of various
optimisation topics
Introduction & ObjectivesIntroduction & Objectives
-
8/14/2019 89025817 Huawei Optimisation Process
4/40
AgendaAgenda
l Introduction and Objectives
l Optimisation Phases Overview
l Single Site Verification
l RF Optimisation
l Services Testing & Parameters Optimisation
l Regular Reference Routes & Stats Analysis
l Summary
-
8/14/2019 89025817 Huawei Optimisation Process
5/40
[1] Single Site Verification:
v Every new site is tested and verified to be functioning properly
v Any installation or parameter errors must be rectified.
[2] RF Optimisation:
v Once clusters of sites are ready, RF Optimisation can be
started in order to optimise coverage and minimise interference
and pilot pollution.
v All RF-related failures or drop calls must be resolved.
Optimisation Approach Overview (1/3)Optimisation Approach Overview (1/3)
-
8/14/2019 89025817 Huawei Optimisation Process
6/40
[3] Services Testing & Parameter Optimisation:
v Comprehensive services testing should be carried out in areas
of good coverage to determine system performance
v Causes of any failures must be identified and whenever
necessary relevant parameters should be optimised.
[4] Regular Reference Routes & Stats Analysis:
v Regular testing & stats analysis will be needed to identify and
resolve any new issues as a result of (e.g. increased traffic).
Optimisation Approach Overview (2/3)Optimisation Approach Overview (2/3)
-
8/14/2019 89025817 Huawei Optimisation Process
7/40
Optimisation Approach Overview (3/3)Optimisation Approach Overview (3/3)
Cluster of sites
ready?
No
Re-optimisation
Needed?
NoYes
New Sites Integrated
Single Site Verification
Services Testing &Parameter Optimisation
Regular Reference RouteTesting & Stats Analysis
RF Optimisation
Yes
-
8/14/2019 89025817 Huawei Optimisation Process
8/40
AgendaAgenda
l
Introduction and Objectivesl Optimisation Phases Overview
l Single Site Verification
l RF Optimisation
l Services Testing & Parameters Optimisation
l Regular Reference Routes & Stats Analysis
l Summary
-
8/14/2019 89025817 Huawei Optimisation Process
9/40
Single Site Verification (1/3)Single Site Verification (1/3)
Cluster of sites
ready?
New Sites Integrated
Re-optimisation
Needed?
No
NoYes
RF Optimisation
Single Site Verification
Services Testing &Parameter Optimisation
Regular Reference RouteTesting & Stats Analysis
Yes
-
8/14/2019 89025817 Huawei Optimisation Process
10/40
Single Site Verifications (2/3)Single Site Verifications (2/3)
l Objectives:
1. Verify Coverage (RSCP & Ec/Io) 2. Verify scrambling codes
3. Verify no installation faults
4. Make test calls
l Tools:
Scanner + UE
l Process:
A detailed check list of various tests must be conducted.
Tests will include: call setups, reselection, handover, LA/RA
update, PS attach & detach, PDP activation, etc.
If unusual low signal strength should check wrong feeder
connection (Tx/Rx main antenna, Rx diversity antenna), etc.
-
8/14/2019 89025817 Huawei Optimisation Process
11/40
Single Site Verifications (3/3)Single Site Verifications (3/3)
l An example Check list
25 Overall performance and coverage area as expected by a brief drive test
Notes: If the item is OK, mark the '!' on the ''; If the item is not OK, mark the '"' on the ''; If the item is not checked, mark the '#' on the ''.
RemarksNew Expansion Migration Others
Site Expanded from:Site Migrated from RNC:
o:o RNC:
Site Connected to RNC:
IdleMode
Site Migration: Others:
New Site: Site Expansion:
Mapinfo UpdateData Base Update
Reminder
Site Checklist
24 Installed antenna is of the planned type
21 Soft handover for VP service to and from the 3G cells checked O20
23 Inter-systemhandover for voice service to the 2G cells checked OK22 Soft handover for PS service to and from the 3G cells checked O
Soft handover for voice service to and from the 3G cells checked O19 RA update proceduce is checked 18 The PS service quality is good by the engineer feeling
15 PS attach is checked
17 PS PDP activation and deactivation is checked
14 The VP service quality is good by the engineer feeling
Mobile terminating calls and mobile originating calls for voice service is che
13 Mobile terminating calls and mobile originating calls for VP service is check
7 Cell reselection from2G to 3G is checked 8 MO-SMS and MT-SMS
The LAC/RACis correctly defined ( SIB 1 )
6 Cell reselection from3G to 2G is checked5 LA update proceduce is checked
4 The neighbor list and parameters are as planned ( SIB 11 )
Site Name:
Frequency and Scrambling Code correctly defined
Site ID:
No. Activity/Process
CPICH_RSCP > -85 dBm near site
ConnectionMod 9
2 Cell selection and reselection parameters are as planned ( SIB 3 )1
3
12 The voice service quality is good by the engineer feeling11
10 CPICH_EcIo > -8 dB near site
2-Name/Designation: Signature: Data:
Checked by:
1-Name/Designation: Signature: Data:
PS
Remarks (Further comments):
Handover
26 Antenna Swapping TestGen
16 PS detach is checked
-
8/14/2019 89025817 Huawei Optimisation Process
12/40
AgendaAgenda
l Introduction and Objectives
l Optimisation Phases Overview
l Single Site Verification
l RF Optimisation
l Services Testing & Parameters Optimisation
l Regular Reference Routes & Stats Analysis
l Summary
-
8/14/2019 89025817 Huawei Optimisation Process
13/40
RF OptimisationRF Optimisation
Cluster of sites
ready?
New Sites Integrated
Re-optimisation
Needed?
No
NoYes
RF Optimisation
Single Site Verification
Services Testing &Parameter Optimisation
Regular Reference RouteTesting & Stats Analysis
Yes
-
8/14/2019 89025817 Huawei Optimisation Process
14/40
RF OptimisationIntro (1/2)RF OptimisationIntro (1/2)
l Objectives:
1. Optimize CPICH and service coverage & cell dominance
2. Minimize interference & pilot pollution
3. Optimize neighbor list
4. Resolve any RF-related drop calls
l Tools:
Scanner + UE with logging tool
l Process:
Drive survey with a UE initially in a continuous AMR call.
Drop calls should be analyzed to determine if the causes are
RF related.
l Solutions:
Neighbor list modification
Antenna tilt and/or azimuth changes.
-
8/14/2019 89025817 Huawei Optimisation Process
15/40
Data
Analysis
RF OptimisationIntro (2/2)RF OptimisationIntro (2/2)
l Process Flow:Start
Identify any
RF Issues
Identify candidate
cells for changes
Determine amount of
change
Identify nature ofrequired changes
Implement changes
Repeat Drive Test
Yes
End
Problem
Resolved?No
Drive Test
-
8/14/2019 89025817 Huawei Optimisation Process
16/40
RF OptimisationAnalysis (1/8)RF OptimisationAnalysis (1/8)
l Analysis Approach: Various plots from UE and
scanner need to be analysed:
Cell Dominance (best serving cell plots)
Down Link Coverage (CPICH RSCP & Ec/Io plots)
Uplink Coverage (UE Tx power plots) Pilot Pollution (Pilot pollution table & Estimated Active set size)
Neighbour list verification
SHO Performance
Drop Calls
-
8/14/2019 89025817 Huawei Optimisation Process
17/40
RF OptimisationAnalysis (2/8)RF OptimisationAnalysis (2/8)
l Analysis of Cell Dominance:
To identify:
l Cells with no or poor
dominance
l Cells with excessive
dominance
l Best server differences
between scanner & UE
Scrambling Code plot of best serving cells
-
8/14/2019 89025817 Huawei Optimisation Process
18/40
RF OptimisationAnalysis (3/8)RF OptimisationAnalysis (3/8)
l Analysis of DL CPICH Coverage:
To identify:
l Areas of poor coverage (i.e. poor RSCP & Ec/Io)
l Areas of high interference (i.e. high RSCP but low Ec/Io)
CPICH RSCP Plot
CPICH Ec/Io Plot
-
8/14/2019 89025817 Huawei Optimisation Process
19/40
RF OptimisationAnalysis (4/8)RF OptimisationAnalysis (4/8)
l Analysis of UL Coverage:
To identify:
l Uplink coverage limitation (i.e.
UE reaching max Tx power)
UE Tx power.
-
8/14/2019 89025817 Huawei Optimisation Process
20/40
RF OptimisationAnalysis (5/8)RF OptimisationAnalysis (5/8)
To identify:
l Cells causing pilot
pollution
l Locations where there
are too many soft
handoff candidates
Estimated active set size from scanner data.
SC Count % in Pollution Set
8 206 12.9%
9 165 10.3%
10 157 9.8%
11 156 9.7%
12 148 9.2%
13 135 8.4%
16 95 5.9%
17 94 5.9%
18 76 4.7%
19 74 4.6%
20 73 4.6%
21 56 3.5%
32 54 3.4%35 39 2.4%
37 33 2.1%
43 19 1.2%
48 8 0.5%
53 7 0.4%
67 3 0.2%
80 2 0.1%
130 2 0.1%
l Analysis of Pilot Pollution:
Pilot pollution
results
-
8/14/2019 89025817 Huawei Optimisation Process
21/40
RF OptimisationAnalysis (6/8)RF OptimisationAnalysis (6/8)
To identify:
l Any missing neighbours
though analysis scanner
data & RNC neighbour
list
l Any missing neighbours
causing drop calls
l Any unnecessary
neighbours.
Neighbour list verification.
l Analysis of Neighbour List:
009 576 Retain 018 82 14.2%
Retain 010 46 8.0%
Retain 016 31 5.4%
Retain 032 20 3.5%
Retain 011 18 3.1%
Add 130 17 3.0%
Retain 021 17 3.0%
Retain 008 12 2.1%
Retain 020 6 1.0%
Retain 012 5 0.9%
Retain 017 2 0.3%Remove 053 0 0.0%
Remove 019 0 0.0%
Remove 034 0 0.0%
Remove 037 0 0.0%
Remove 013 0 0.0%
Remove 051 0 0.0%
70548 Ajman Central 25.41204 55.447
Nbr SCSample
Count%Lati tude Longitude
Sample
CountActionSC Cell Site
-
8/14/2019 89025817 Huawei Optimisation Process
22/40
RF OptimisationAnalysis (7/8)RF OptimisationAnalysis (7/8)
l Analysis of SHO Performance:
To determine soft hand off
success rate.
Scrambling Code plot of best serving cells
um er o ct ve e t p ates
Event Count
Event 1a - 328
Event 1b - 306
Event 1c - 64
um er o ct ve et p ate omp etes
Event CountEvent 1a - 326
Event 1b - 305
Event 1c - 62
o t- an over uccess ate
Event Rate
Event 1a - 99.4
Event 1b - 99.7
Event 1c - 96.9
-
8/14/2019 89025817 Huawei Optimisation Process
23/40
RF OptimisationAnalysis (8/8)RF OptimisationAnalysis (8/8)
l Analysis of Drop Calls:
To identify:
l Exact cause of the drop calls
Drop calls
-
8/14/2019 89025817 Huawei Optimisation Process
24/40
RF OptimisationSolutionsRF OptimisationSolutions
l Antenna Optimisation: (in order of priority)
Antenna tilt
Antenna azimuth
Antenna location
Antenna height
Antenna type
Site location
New site
l Neighbour List Optimisation: (in order of priority)
Add missing neighbors Remove unnecessary neighbors
-
8/14/2019 89025817 Huawei Optimisation Process
25/40
Neighbour List
tuning
Antenna & Site
Optimisation
RF OptimisationProcess SummaryRF OptimisationProcess Summary
Drive test data
(scanner + UE)
Neighbour list
Thresholds &
KPIs
AnalysisDominance
Best server
scrambling code
CPICH CoverageCPICH RSCP
& Ec/Io
DL Interference CPICH Ec/Io
UL Coverage UE Tx power
Neighbour ListScanner vs. RNC
neighbours
Pilot PollutionScanner active
set size
Drop calls Causes analysis
-
8/14/2019 89025817 Huawei Optimisation Process
26/40
AgendaAgenda
l Introduction and Objectives
l Optimisation Phases Overview
l Single Site Verification
l RF Optimisation
l Services Testing & Parameters Optimisation
l Regular Reference Routes & Stats Analysis
l Summary
-
8/14/2019 89025817 Huawei Optimisation Process
27/40
Services Testing & Parameter Optimisation (1/6)Services Testing & Parameter Optimisation (1/6)
Cluster of sites
ready?
New Sites Integrated
Re-optimisation
Needed?
No
NoYes
RF Optimisation
Single Site Verification
Services Testing &
Parameter Optimisation
Regular Reference Route
Testing & Stats Analysis
Yes
-
8/14/2019 89025817 Huawei Optimisation Process
28/40
Services Testing & Parameter Optimisation (2/6)Services Testing & Parameter Optimisation (2/6)
l Once RF optimisation is completed detailed testing of
CS and PS services should be completed
l During testing, end-to-end logs should be collected (i.e.
UE as well as RAN & when necessary CN)
l Any failures (e.g. call set-up, drop calls, etc) MUST be
analysed to determine exact causes
l Any system defects must be raised to Technical
Support for resolution
l Appropriate parameters should be identified for
possible optimisation to resolve failures or to reduceimpact of any system defects
-
8/14/2019 89025817 Huawei Optimisation Process
29/40
Services Testing & Parameter Optimisation (4/6)Services Testing & Parameter Optimisation (4/6)
Determine (Non-RF)
Failure Causes
Services Testing
No
Improve viaParameters?
Optimise Parameters
Yes
No
No
System
Defect?Raise Defect
Yes
100 %
Success Rate?
End
Yes
-
8/14/2019 89025817 Huawei Optimisation Process
30/40
Services Testing & Parameter Optimisation (4/6)Services Testing & Parameter Optimisation (4/6)
l Basic Parameters Optimisation Steps:
Identify candidate parameters
Identify various trade-offs
Decide on suitable metrics for analysis of results
Decide on parameter ranges to be tested
Define test cases and drive routes including various
environments & clutter
Execute tests
Perform detailed analysis (logs as well as network stats)
Conclude parameters values that provide optimum trade-offs
-
8/14/2019 89025817 Huawei Optimisation Process
31/40
Services Testing & Parameter Optimisation (5/6)Services Testing & Parameter Optimisation (5/6)
Define Test Cases &
select drive routes
Perform Tests
Data Analysis &
Conclusions
Candidate
Parameters
Clutter &
Environment
factors
Parameters
Ranges
Trade OffsAnalysis
Metrics
-
8/14/2019 89025817 Huawei Optimisation Process
32/40
Services Testing & Parameter Optimisation (6/6)Services Testing & Parameter Optimisation (6/6)
l Potential Parameter Optimisation Candidates:
Reselection parameters
Handover parameters
Power control parameters
Admission and congestion control
Common control channel powers
Etc.
AA d
-
8/14/2019 89025817 Huawei Optimisation Process
33/40
AgendaAgenda
l Introduction and Objectives
l Optimisation Phases Overview
l Single Site Verification
l RF Optimisation
l Services Testing & Parameters Optimisation
l Regular Reference Routes & Stats Analysis
l Summary
R l T ti & St t A l i (1/4)R l T ti & St t A l i (1/4)
-
8/14/2019 89025817 Huawei Optimisation Process
34/40
Regular Testing & Stats Analysis (1/4)Regular Testing & Stats Analysis (1/4)
Cluster of sites
ready?
New Sites Integrated
Re-optimisation
Needed?
No
NoYes
RF Optimisation
Single Site Verification
Services Testing &
Parameter Optimisation
Regular Reference Route
Testing & Stats Analysis
Yes
R l T ti & St t A l i (2/4)R l T ti & St t A l i (2/4)
-
8/14/2019 89025817 Huawei Optimisation Process
35/40
Regular Testing & Stats Analysis (2/4)Regular Testing & Stats Analysis (2/4)
l Optimisation is an on-going activity and as a result:
Regular drive tests of designated routes should be carried out
(e.g. on monthly basis)
Routine analysis of network stats to identify any reduction in
network performance
Regular Testing & Stats Analysis (3/4)Regular Testing & Stats Analysis (3/4)
-
8/14/2019 89025817 Huawei Optimisation Process
36/40
Regular Testing & Stats Analysis (3/4)Regular Testing & Stats Analysis (3/4)
l Regular Drive Testing- Objectives:
To benchmark network performance and user experience (e.g.
call setup SR, call drop rate, PS throughputs, etc)
To identify any degradation in coverage and/or increase in
interference as a result of increased traffic or changes in
environment To assess impact of newly introduced RAN features.
To monitor the progress of on-going optimisation activities.
Regular Testing & Stats Analysis (4/4)Regular Testing & Stats Analysis (4/4)
-
8/14/2019 89025817 Huawei Optimisation Process
37/40
Regular Testing & Stats Analysis (4/4)Regular Testing & Stats Analysis (4/4)
l Routine Network Stats analysis - Objectives:
To benchmark network performance, particularly during the
busy hour.
To monitor traffic volumes and patterns as well as traffic profiles
(i.e. mix of services).
To assess impact of parameter changes as part of parameter
optimisation exercises.
To identify poorly performing cells that need investigation to
establish underlying cause of poor performance.
To provide triggers for network upgrade decisions.
AgendaAgenda
-
8/14/2019 89025817 Huawei Optimisation Process
38/40
AgendaAgenda
l Introduction and Objectives
l Optimisation Phases Overview
l Single Site Verification
l RF Optimisation
l Services Testing & Parameters Optimisation
l Regular Reference Routes & Stats Analysis
l Summary
Optimisation Approach OverviewOptimisation Approach Overview
-
8/14/2019 89025817 Huawei Optimisation Process
39/40
Optimisation Approach OverviewOptimisation Approach Overview
Cluster of sites
ready?
New Sites Integrated
Re-optimisation
Needed?
No
NoYes
RF Optimisation
Single Site Verification
Services Testing &Parameter Optimisation
Regular Reference Route
Testing & Stats Analysis
Yes
-
8/14/2019 89025817 Huawei Optimisation Process
40/40
Thank you!