September Progress Report September Progress Report September Progress Report September Progress Report 9.31.2016 9.31.2016 9.31.2016 9.31.2016 September Progress Report September Progress Report September Progress Report September Progress Report September Progress Report September Progress Report September Progress Report September Progress Report September Progress Report September Progress Report September Progress Report September Progress Report 9.31.2016 9.31.2016 9.31.2016 9.31.2016 9.31.2016 9.31.2016 9.31.2016 9.31.2016 9.31.2016 9.31.2016 9.31.2016 9.31.2016 Monthly Overview Monthly Overview Monthly Overview Monthly Overview Monthly Overview Monthly Overview Monthly Overview Monthly Overview Monthly Overview Monthly Overview Monthly Overview Monthly Overview Cont. interior wall framing & wall layout Cont. MEP install Started window installation Cont. installing brick masonry Cont. rough in and install of dormers Began install of roof insulation and ice & water shield Began flat roofing Finishing up weather barrier Cont. underground utility connection Monthly Progress Report Monthly Progress Report Monthly Progress Report Monthly Progress Report OSU Spears School OSU Spears School OSU Spears School OSU Spears School of Business Building of Business Building of Business Building of Business Building Oklahoma State University Oklahoma State University Oklahoma State University Oklahoma State University ISSUE NO.18 PROGRESS REPORT: PROGRESS REPORT: PROGRESS REPORT: PROGRESS REPORT: This September, interior wall layout and framing has shot up on all floors and is coming to completion on the fourth floor. Brick Masonry is continuing all around different parts of the building, The Exterior northeast side is nearing completion while we are also making head way on the interior south and south end cap. With roof decking completed roof insulation, nailer board, and ice and water shield are being laid quickly across the sloped roof. Dormer installation continues on exterior south side with windows already in place in all interior south dormers. As the brick is washed off, windows are being installed right behind them with 3rd and 2nd floor windows installed on the interior south walls. MEP rough-in is underway and continuing floor by floor working downward. As construction continues, Manhattan will issue monthly progress reports throughout the construction process. Typically, these reports are generated and transmitted on the last day of each month. These reports are meant to serve as a tool for OSU Long Range Facilities Planning to document production and keep interested parties updated with progress whom would not otherwise be involved on a daily basis. Manhattan is proud to partner with OSU Long Range Facilities Planning, Spears School of Business, and Elliot and Associates on this project.

Upload: others

Post on 18-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 9.31.20169.31.2016 OSU Spears School of Business Building · 9.31.20169.31.2016 September Progress Report September Progress Report 9.31.20169.31.20169.31.2016 Monthly OverviewMonthly

September Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress Report9.31.20169.31.20169.31.20169.31.2016

September Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress Report 9.31.20169.31.20169.31.20169.31.20169.31.20169.31.20169.31.20169.31.20169.31.20169.31.20169.31.20169.31.2016

Monthly OverviewMonthly OverviewMonthly OverviewMonthly OverviewMonthly OverviewMonthly OverviewMonthly OverviewMonthly OverviewMonthly OverviewMonthly OverviewMonthly OverviewMonthly Overview

♦ Cont. interior wall framing & wall layout

♦ Cont. MEP install

♦ Started window installation

♦ Cont. installing brick masonry

♦ Cont. rough in and install of dormers

♦ Began install of roof insulation and ice & water shield

♦ Began flat roofing

♦ Finishing up weather barrier

♦ Cont. underground utility connection

Monthly Progress ReportMonthly Progress ReportMonthly Progress ReportMonthly Progress Report

OSU Spears School OSU Spears School OSU Spears School OSU Spears School

of Business Buildingof Business Buildingof Business Buildingof Business Building Oklahoma State UniversityOklahoma State UniversityOklahoma State UniversityOklahoma State University

ISSUE NO.18

PROGRESS REPORT: PROGRESS REPORT: PROGRESS REPORT: PROGRESS REPORT: This September, interior wall layout and framing has shot up on all

floors and is coming to completion on the fourth floor. Brick Masonry is continuing all

around different parts of the building, The Exterior northeast side is nearing completion

while we are also making head way on the interior south and south end cap. With roof decking

completed roof insulation, nailer board, and ice and water shield are being laid quickly

across the sloped roof. Dormer installation continues on exterior south side with windows

already in place in all interior south dormers. As the brick is washed off, windows are being

installed right behind them with 3rd and 2nd floor windows installed on the interior south

walls. MEP rough-in is underway and continuing floor by floor working downward.

As construction continues, Manhattan will issue monthly progress reports throughout the

construction process. Typically, these reports are generated and transmitted on the last

day of each month. These reports are meant to serve as a tool for OSU Long Range Facilities

Planning to document production and keep interested parties updated with progress whom

would not otherwise be involved on a daily basis.

Manhattan is proud to partner with OSU Long Range Facilities Planning, Spears School of

Business, and Elliot and Associates on this project.

Page 2: 9.31.20169.31.2016 OSU Spears School of Business Building · 9.31.20169.31.2016 September Progress Report September Progress Report 9.31.20169.31.20169.31.2016 Monthly OverviewMonthly

September Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress Report9.31.20169.31.20169.31.20169.31.2016

dormer Install & Roofingdormer Install & Roofingdormer Install & Roofingdormer Install & Roofing

Page 2Page 2Page 2Page 2

Pictured Above & Pictured Above & Pictured Above & Pictured Above &

below:below:below:below:

dormers are installed At

The South Interior Radius

Pictured Left: Pictured Left: Pictured Left: Pictured Left:

Flat roof Installation

Page 3: 9.31.20169.31.2016 OSU Spears School of Business Building · 9.31.20169.31.2016 September Progress Report September Progress Report 9.31.20169.31.20169.31.2016 Monthly OverviewMonthly

September Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress Report9.31.20169.31.20169.31.20169.31.2016

Brick MasonryBrick MasonryBrick MasonryBrick Masonry

Page 3Page 3Page 3Page 3

Pictured Above:Pictured Above:Pictured Above:Pictured Above:

South exterior brick masonry

Pictured Right:Pictured Right:Pictured Right:Pictured Right:

South end cap brick masonry

Pictured Below: Pictured Below: Pictured Below: Pictured Below:

Northeast exterior brick masonry

to the 2nd floor

Page 4: 9.31.20169.31.2016 OSU Spears School of Business Building · 9.31.20169.31.2016 September Progress Report September Progress Report 9.31.20169.31.20169.31.2016 Monthly OverviewMonthly

September Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress Report9.31.20169.31.20169.31.20169.31.2016

Window InstallationWindow InstallationWindow InstallationWindow Installation

Page 4Page 4Page 4Page 4

Pictured Above:Pictured Above:Pictured Above:Pictured Above:

South interior 3rd floor

windows installed

Pictured Right:Pictured Right:Pictured Right:Pictured Right:

South Dormer Windows

installation

Pictured Below:Pictured Below:Pictured Below:Pictured Below:

Third floor window prep

Page 5: 9.31.20169.31.2016 OSU Spears School of Business Building · 9.31.20169.31.2016 September Progress Report September Progress Report 9.31.20169.31.20169.31.2016 Monthly OverviewMonthly

September Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress Report9.31.20169.31.20169.31.20169.31.2016

Interior framingInterior framingInterior framingInterior framing

Page 5Page 5Page 5Page 5

Pictured Above:Pictured Above:Pictured Above:Pictured Above:

2nd floor north framing

Pictured Left: Pictured Left: Pictured Left: Pictured Left:

Basement skylight framing

Pictured Left: Pictured Left: Pictured Left: Pictured Left:

4th floor office framing

Page 6: 9.31.20169.31.2016 OSU Spears School of Business Building · 9.31.20169.31.2016 September Progress Report September Progress Report 9.31.20169.31.20169.31.2016 Monthly OverviewMonthly

September Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress Report9.31.20169.31.20169.31.20169.31.2016

MEP Install & Utility ConnectionMEP Install & Utility ConnectionMEP Install & Utility ConnectionMEP Install & Utility Connection

Page 6Page 6Page 6Page 6

Pictured Above:Pictured Above:Pictured Above:Pictured Above:

4th floor HVAC and

Plumbing vent pipe

Pictured Right and Pictured Right and Pictured Right and Pictured Right and

Below:Below:Below:Below:

Underground electric

Duct Bank Installation

Page 7: 9.31.20169.31.2016 OSU Spears School of Business Building · 9.31.20169.31.2016 September Progress Report September Progress Report 9.31.20169.31.20169.31.2016 Monthly OverviewMonthly

September Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress Report9.31.20169.31.20169.31.20169.31.2016

Aerial PhotoAerial PhotoAerial PhotoAerial Photo

August 2016August 2016August 2016August 2016

April 2015April 2015April 2015April 2015 May 2015May 2015May 2015May 2015 June 2015June 2015June 2015June 2015

July 2015July 2015July 2015July 2015 August 2015August 2015August 2015August 2015 September 2015September 2015September 2015September 2015

Page 7Page 7Page 7Page 7

October 2015October 2015October 2015October 2015 November 2015November 2015November 2015November 2015 December 2015December 2015December 2015December 2015

Page 8: 9.31.20169.31.2016 OSU Spears School of Business Building · 9.31.20169.31.2016 September Progress Report September Progress Report 9.31.20169.31.20169.31.2016 Monthly OverviewMonthly

September Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress Report9.31.20169.31.20169.31.20169.31.2016 Page 8Page 8Page 8Page 8

January 2016January 2016January 2016January 2016 February 2016February 2016February 2016February 2016 March 2016March 2016March 2016March 2016

April 2016April 2016April 2016April 2016 May 2016May 2016May 2016May 2016 June 2016June 2016June 2016June 2016

July 2016July 2016July 2016July 2016 August 2016August 2016August 2016August 2016 September 2016September 2016September 2016September 2016

October 2016October 2016October 2016October 2016 November 2016November 2016November 2016November 2016 December 2016December 2016December 2016December 2016

January 2017January 2017January 2017January 2017 February 2017February 2017February 2017February 2017 March 2017March 2017March 2017March 2017

aerial photoaerial photoaerial photoaerial photo

Page 9: 9.31.20169.31.2016 OSU Spears School of Business Building · 9.31.20169.31.2016 September Progress Report September Progress Report 9.31.20169.31.20169.31.2016 Monthly OverviewMonthly

September Progress ReportSeptember Progress ReportSeptember Progress ReportSeptember Progress Report9.31.20169.31.20169.31.20169.31.2016

“The only thing be�er than

recognizing a quality

product is building one.”

www.manhattanconstruction.com

Upcoming Activities For OctoberUpcoming Activities For OctoberUpcoming Activities For OctoberUpcoming Activities For October

• Cont. basement, 4th floor & 3rd floor MEP

• Cont. installation of windows

• Cont. laying roof shingles

• Complete electrical rooms

• Cont. brick masonry

• Cont. dormer Installation

• Begin installation of loggia Glass

• Cont. laying out/Framing of basement, 2nd, 3rd, and

4th floor walls

• Begin curtainwall installation

For a live feed of the Project, Visit: For a live feed of the Project, Visit: For a live feed of the Project, Visit: For a live feed of the Project, Visit:

http://spears.okstate.edu/building/live/http://spears.okstate.edu/building/live/http://spears.okstate.edu/building/live/http://spears.okstate.edu/building/live/

http://spears.okstate.edu/building/http://spears.okstate.edu/building/http://spears.okstate.edu/building/http://spears.okstate.edu/building/

L R F P Oklahoma State University,

Long Range Facilities Planning,

Page 9Page 9Page 9Page 9