1. Careful point on the safety
1.1 warning display
Order to prevent harm to the using people or the other people and damage to the property, please
be sure to comply.
■ On the next table, the explanations sort the extent of damages or injuries if someone ignores what
appears on any improper using way.
Dangerous When space with this indication shows the contents assumed
the dangers like a fire, or a man receives any serious injury to a
dead ball.
Warning When space with this indication shows the contents assumed
the warnings like a fire, or a man receives any serious injury to
a dead ball.
Attention When space with this indication shows the contents assumed
attentions to the harms on man, or the damages on property.
■ On the next table, the explanations sort the kind of contents which should be protected.
Contents Symbol Meanings
attentions
Indicate the general attentions or warnings which are not
specified.
Forbidden acts
Indicate the general forbidden acts which are not specified.
Compulsory acts
Indicate the general user’s acts which are not specified.
3
1.2 Precautions for use
■ In general
Dangerous
Do not finger any temporary power, terminal and operational switch by wet hand.
※It caused shocking when don't protect.
When abnormalities be found, first suspend the driving immediately, then investigate the
cause and dispose it appropriately. But the repairing by customers is dangerous, never
do it, please.
※It caused fire or shocking when don't protect.
When doing the wire connection, maintenance, check and etc., please be sure to go
after the temporary power be cut.
※It caused shocking when don't protect.
■ On using
Attentions
Do not put the switch lever on neutral while operating the short switch.
Please be sure put it on the driving side (the underside) or the stop side (the upper side).
※If not, a strong wind comes and causes the wings on free running (no load running)
to over rotation. So operate the switch promptly to the driving gear or the stopping gear,
one of them over two.
Be careful when opening and shutting the door of the BOX in the field, the door may
swing suddenly with strong wind with risk of finger pinching at the edge of the BOX.
※If not, the accidents, like finger pinching, easily occur.
After finished open the door of the BOX in the field, close the door securely and take the
key.
※If not, rainwater may enter to the BOX, people other than officials may touch the
contents.
■ Maintenance and inspection
Dangerous
Please stay away from the wind turbine itself while driving. For the wind turbine may
turned by wind to unexpected directions.
※If not, there are dangerous of bump and fall. Ask the specialty contractors stop the
wind turbine first, then do the other things.
Doing the high place works, like Inspection operating, when wind gentle.
It is prohibited to work at more than 8 m / s wind speed.
※If not, may be blown down by strong wind, falls and fall risk. Keep wearing the safety
belt always.
4
2. Operating explanation
This chapter explains the operation of the wind turbine and the controller.
2.1 Operation of the wind turbine …drive, stop
To drive and stop the wind turbine, operate the dynamic braking switch in the BOX attached at
the root of the tower.
There are three units from No. 1 to No. 3. Operate the corresponding wind turbine switch.
During the driving mode, the lever is on "under side". If go stopping, change the lever to "upper side",
then the generator is short-circuited on braking.
Attentions: Do not keep the dynamic braking switch on the intermediate position.
The blade may free run and be damaged.
And push the lever firmly.
Inside the BOX
Dynamic Braking Switch BOX Bottom of Tower
Windward
5
3. Description of the controller
3.1 About each parts
Attentions: When inspecting the wind turbine, turn OFF the circuit breaker ⑦ and do the
work.
No. Name of parts Part No. Number Remarks
① Power conditioner CEPT-W1XA4P5 3
② Brake unit RW-BRK-01 3
③ Transformers NTPS-5K 5kVA 3
④ Inductor 195G50 3
⑤ Latch relay SLD-N35CX 3
⑥ Circuit breaker BOX S12-2535 1
⑦ 75A Circuit breaker NC53C 75A 1
⑧ 30A Circuit breaker NC-53C 30A 3
①
⑤
②
④ ③
⑥ ⑦
⑧
6
3.2 About connector
Attentions: When inserting / removing the SD card or the LAN cable which recording the data
of each wind turbine (wind speed, power generation, etc.), turn off the circuit breaker ⑦ and
do the work.
No. Inscription Usage
① INTERNET Not using
② USB Using when recording on a USB card
③ SD CARD Using when recording on a SD card
④ PCS Using for communication with PCS (connecting to
CN2 of PCS)
⑤ RS458 Using when connecting brake units in parallel
⑥ RS458 Using when connecting brake units in parallel
⑦ MENTENANCE ONLY Not using
① ② ③
④ ⑤ ⑥ ⑦
7
4. Maintenance
4.1 Maintenance
*General Foundation Japan Small Wind Power Generation Association provides guidance on
maintenance of small wind turbines with the following contents.
General operational problems
Operational problems phenomenon Explanation Prevention measures
1 Secular change Increase in noise Replenish grease to rotating parts
Increase vibration Balance adjustment of rotor
Peeling of paint Repair in regular maintenance
2 Change in the tower Rust generation Repair at periodic maintenance
3 Strong wind Noise increase ・vibration increase ・
damage
Rotational control during strong wind
4 Electrical change Contact failure · Wire disconnection · Rust of
the terminal part
Repairing the terminal part and
checking the resistance value
5 Icing and snow
coverage
Functional loss of protection system Monitor protection system
Inspection items
item Everyday 3rd month Every 6 months Every year Every three years
1 Visual inspection ○ ○
2 Check storage battery ○ ○ ○
3 Wiring check ○ ○
4 Retrofitting of each part ◎ ○
5 Lubricating oil painting・injection ○ ○ ○
6 Measure insulation resistance ○ ○
7 Data confirmation ○ ○ ○
8 Confirm control operation ○ ○
9 Check indicator light ○ ○ ○
10 Abnormal sound confirmation ○ ○
11 Inspection by manufacturer ○ △
◎:Especially important
○:important
△:Important as necessary
*For maintenance checks Please also contact below if any abnormalities occur.
Riamwind Co., Ltd. 092 - 501 – 8578
8
4.2 Daily Inspection
Please check following item routinely. When malfunction occurs, stop driving immediately, turn off
the power and contact the manufacturer.
(1)Abnormal noise from the wind turbines
Generally, the wind turbines start to generate when a wind speed reaches 3-4 m/s. Normal
noises, such as a wind noise made by high speed rotary blades, controlling noise from electric
generator, noise from control equipment, have no problem. However, if an abnormal noise was
observed, some kind of damage might be included. Such a damage may be caused by Typhoon
and aging degradation.
① Blade・・Blades might be damaged by Typhoon, object striking, aging degradation, etc.
Sometimes, a damaged blade makes abnormal noise. Visual inspection should be performed
using magnifying glass.
② Electric generator・・A noise from electric generator is made by a control failure and internal
damage of the generator. If the noise is caused by internal damage, a decline of power
generation performance or stopping action of the rotor may be observed simultaneously.
③ Yaw control system・・A noise from yaw control system is made by a damage of a steel ball
of internal bearing. An unordinary rotational motion of diffusers with the noise may indicate a
damage of yaw control system.
④ Diffuser・・Diffusers might be damaged by Typhoon, object striking, aging degradation, etc.
Sometimes the damage of diffusers causes an interference with blades. If the interference
occurs, severe abnormal noise will be made. Diffuser damage is relatively easy to find by a
visual inspection.
② Electric generator
① Blade
③ Yaw control system
④ Diffuser
9
(2)Abnormal Vibration of the wind turbines
Diffuser occasionally has a little vibration and sympathetic vibration by change of blade
rotation speed. A little vibration is still under normal condition however looseness of bolt and
nut and abnormal condition of generator and blade could occur in the case of thumping
vibration and sympathetic vibration.
(3)Condition Display on Control Board
When the wind turbines is under abnormal condition, the wind turbines will stop operating,
lump will light up in condition display on control board and alarm will be raised. At that time,
please confirm abnormal information displayed on control board.
(4)Continuous Generation under normal condition
Instant power generation amount and blade rotation speed, etc. are shown timely on control
board during operation.
When past operation condition is checked, the data can be pulled from monitoring
system (※Option). That data such as wind speed, blade rotation speed, power generation
amount and controlling parameter, etc. is recorded in 1 – 3 seconds.
(5)Abnormal Items in Apparent Condition
① Surface Condition of Iron Material
Occasionally, pole of the wind turbines and bolt & nut will be corroded by surrounding
condition and damage before & after installation, etc.
② Plastic Material
Diffuser and blade are made by GFPR material and CFRP material respectively.
However, surface coating color would be changed due to aged deterioration.
② Generator
10
4.3 Periodical Inspection
Regarding periodical inspection, the following items are inspected periodically. Timing is
referred to「Inspection Items」in 3.3.1 Maintenance.
(1)Re-Tightening in each Part
Tightened conditions of bolts such as bottom bolt in connection part of blade, terminal
block part, bolt of tower foundation, bolt in connection part of main part of wind turbine and
bolt of controlling part are confirmed.
(2)Abnormal Condition of Electrical Wiring and Plug
A little heat (warm degree normally) in power cable between wind turbine and controlling
board occurs according to operation condition of the wind turbines however this heat is under
normal condition.
Whether visible cable damage, smoke by abnormal heating and abnormal smells, etc.
occur or not is checked. Additionally, twist condition at end of each cable is checked as well.
(3)Confirmation of Inside Condition and Operation Condition of Controlling Board
① Water Exposure
Possibly, water comes into inside of controlling board in case of leaking at control building
although controlling broad is installed into inside of control building. Please take a care of
electrification and damage of base material in case of leaking. ※Please inspected by
qualificator having an electrical engineering work in case of inspection of inside condition of
controlling board.
② Operation Condition of Controlling Board
Operation conditions of protection functions, which the wind turbines stops operating
according to controlling procedures, are confirmed.
(4)Surface Coating Condition
Whether corrosion at surface of iron material and damage at coating part occur or not
are confirmed.
(5)Application of Grease and fueling
Maintenance for bearing of shaft of generator is free basically because the bearing is
sealed type of grease.
(6)Measurement of Insulation Resistance
Insulation resistance of generator is measured periodically because it reduces according
to performance deterioration.
Insulation resistance reduces temporally due to high humidity at surrounding condition.
However, in this case, it is recommended to re-measure it after generator dries.
11
4.4 Brief Distinguishing Way for Trouble Causes
Brief Distinguishing Way for trouble causes between wind turbine and controlling
device
Most inquiries from the market are related to moving of blade.
Blade rotation stops temporarily under special condition such as strong wind. However there
might be a trouble in an electrical facility or wind turbine when its stop continues for a long
period. In this case, please set the manual switch (refer to the below figure) for electrical short
circuit in box located at bottom of tower in the middle point and there might be a trouble in an
electrical facility when wind turbine rotates swiftly.
In the case of the multi-type of the wind turbines, there are 3 units of wind generators.
Therefore all the switches (3 units) are set likely as previously described.
※Please return to the base position immediately after finishing this confirmation. Generator
can start operating when switch moves to the bottom side and be at the short circuit condition
when switch moves to the upper side.
Manual Switch for
Electrical Short Circuit
Single Diagram
12
Date: ,20
※If The Judgment in not Applicable, Fill in Diagonal Lines.
1
No,1
No,2
No,3
2 No,1
No,2
No,3
3 No,1
No,2
No,3
4 No,1
No,2
No,3
5 No,1
No,2
No,3
7 No,1
No,2
No,3
8
9
10
11
12 Tower
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33 Insulation No,1
Resistance No,2
No,3
36
37
Checklist for Inspection of 3 Months Later
Date of Inspection
Distributor Name
User Name
Model Number
Inspection Company Name
Remarks
The Exterior of Center Body and Arm Visual Inspection -Main Partof WindTurbine
Inspector Name
Part Inspection Item Inspection Method Evaluation StandardJudgment※
(OK,NG)
Visual Inspection Confirm The Exterior and Gap betweenThe Tip of Blade and Wind Corrector
Retightening of Connection of CenterBody and Arm
Retightening -
Retightening -Retightening of Connection Part ofBlade
Rotational State, Allophone andVibration of Blade and Generator
Visual Inspection Presence of Large Allophone andVibration at Steady State
Confirm at Rotation
Visual Inspection -The Exterior of Spinner (ResinoidCover) and Connection
Retightening -Retightening of Connection Part ofGenerator Unit
Rotational State of Yaw PartVisual InspectionAuscultation No Allophone and Smooth Free Yaw
Retightening of Tower Connection Retightening -
Oil Supply to Bearing of Generator Grease Gun - Not Apply to Grease Seal Type
Oil Supply to Bearing of Pinna Grease Gun - Not Apply to Grease Seal Type
The Exterior of Steel Pole Tower Visual Inspection -
The Exterior and Retightening of Foundation AnchorBolt
Visual InspectionRetightening -
Retightening of Connection of Middle Tower toUnder Tower
Visual InspectionRetightening -
The Exterior of Guy (Oil, Scar and Rust) Visual Inspection -Apply Grease Depending on SurfaceCondition (Red Grease)
Tension of GuyVisual InspectionRetightening
Is there loose Guy?Is The Tension of Four Guys Equalty?Is There No Inclination in The Tower?
Tightening Torque of Turn Buckle:about 120Nm (Reference)In Some Cases Confirm TheInclination with a Level Gauge
The Exterior of Gusset Plate and Retightening Visual InspectionRetightening -
Mounting Condition and The Exterior of The Unit Visual Inspection -
Hearting and Odor inside The UnitVisual InspectionOder -
Confirmation of Display Status, Trouble Indicationand Alert Visual Inspection -
Confirmation of Protective Function Visual Inspection Control Operation
Retightening of Terminal Block Retightening -
Mounting Condition and The exterior of The Box Visual Inspection -
Hearting and Odor inside The BoxVisual InspectionOder -
Retightening of Terminal Block Retightening -
The Exterior of Storage Box Visual Inspection -
The Exterior, Liquid Spill and Bulge Visual Inspection -
Voltage Measurement of The BatteryCircit TesterMeasurement Voltage:1.8V/Cell or More
Retightening of Terminal Block Retightening -
-
Winding Part of Generator500V Insulation-resistance Tester
3MΩ or More
The Exterior of Control Unit to Tower andProtecting Tube Visual Inspection -
The Exterior of Short Circit Brake Box to Towerand Protecting Tube Visual Inspection -
Other:
(In The Case of a Multi-Wind Turbine, The Cell Number is No.1 From The Left As Seen From The Windward Side.)
Retightening
Auscultation
The Exterior of Blade and WindCollector
BatteryCheck
ElectricWiring
Shortcircit Box
ControlUnit
DataCommunication
Generated Output, Voltage, Current and Wind Speedetc. Data Comfirmation - Cllect Data on a Regular Basis
Pathway Part 3MΩ or More
The Exterior of Wind Turbine to Short Circit BrakeBox and Protecting Tube Visual Inspection