Variation: Half 3/4 with westbound left at Main
Variation: 3/4 with Pedestrian Crossing
Variation: Pinched TH 13
Variation: 3/4 at Duluth, Roundabout at Arcadia
• Allows for southbound left onto Duluth • Westbound traffic from Duluth is facilitated by making a right on CH 21 and making a “u-turn” at Arcadia roundabout• Traffic calming effect on entry to downtown from West• Gateway feature opportunity within roundabout
• Provides left turns onto southbound Main Ave from CH 21• Cost saving measure - removes need for Pleasant St. extension• Risk of westbound turn lane at Main queueing back into thru lanes
• Additional downtown access - provides left turns onto Main Ave from CH 21• Cost saving measure - removes need for Pleasant St. extension• Requires wider road footprint (north side)• Minimal buffer/streetscape opportunity between pedestrian refuge and travel lanes• Risk of southbound turn lane at Main queueing back into thru lanes• Reduces eastbound left turn lane at TH 13
• Only applicable with A-1 Main Variations allowing for southbound left turn onto Main Ave from CH 21
• Eliminates left turn onto Pleasant St. from northbound TH 13
• Maintains existing alignment with Pleasant St. • Cost Saving measure - eliminates much of the
cost associated with remediating poor soils along TH 13
Duluth Ave
Arcadia Ave
Main Ave
Main Ave
6’ WALK
13’THRU LANE
13’ THRU LANE
13’ THRU LANE
26’MEDIAN
8’ WALK
13’THRU LANE
6’ WALK
10’ BLVD.
10’WALK
24’ 4’
10’ WALK
13’ THRU LANE
13’ TURN LANE
10’CROSS WALK
A-1 Typical Section b (across Main Ave.)A-1 Typical Section a (across CH 21 at Main)
Main Ave. SE
Duluth Ave. SE
Arcadia Ave.
Dakota St. SE
Pleasant St. S
E
Credit River Rd. SE
Evanston Ave. SE
Colorado St. S
E
< Median plantings and banner arms
Streetscaping Opportunities
< Enhanced pedestrian crossing and gateway feature in median between Main and TH 13
> Corner enhancements at signalized intersections
Note: Arcadia Ave. extension to Pleasant St. needed for traffic circulation.
See section a See section b
The Pleasant St. extension would not be
recommended by the Project Management Team due to the high cost associated with
the necessary soil remediation when
there are other viable alternatives.
Duluth Ave Arcadia Ave Main Ave TH 13
A-1 Arcadia with Signal
Note: traffic volumes shown represent expected afternoon peak conditions on side street approaches.
Key Benefits + Lowest property impacts+ Best pedestrian crossing performance+ Driver and pedestrian safety
Key Challenges- Fewer downtown access points- Less efficient traffic operations- Highest project costs
Streetscape Opportunity Score: GoodPedestrian Crossings (across 21): 3Vehicular Crossings (across 21): 2
Preliminary Estimated Cost: $10.2M
N0
20
4000000000000
202002000000
40400000
-
Variation: Pinched TH 13
Variation: Right-in/Right-out with Pedestrian Refuge
Variation: Half 3/4 with westbound left at MainVariation: 3/4 with Pedestrian Crossing
Variation: Right-in/Right-out at Duluth, Signal at Arcadia
• Eliminates southbound left onto Duluth Ave• Variation routes traffic through signal at Arcadia, relying on Colorado St. for westbound and southbound
movements to and from Duluth Ave.• Arcadia already equipped for traffic signal• Variation requires Arcadia extension to Pleasant St. for traffic circulation
• Eliminates northbound left onto Main Ave. This may increase the number of vehicles making “u-turns” at the TH 13 roundabout, if they missed the turnoff Arcadia intersection
• Reduces roadway footprint at Main Ave. • Provides safest pedestrian crossing option with opportunity for enhanced streetscape elements within
median
• Additional downtown access - provides left turns onto northbound and southbound Main Ave from CH 21
• Requires wider road footprint (north side)• Minimal buffer/streetscape opportunity between pedestrian refuge and travel lanes• Risk of westbound turn lane at Main queueing back into thru lanes
• Provides left turn lane onto southbound Main Ave from CH 21• Risk of southbound turn lane at Main queueing back into thru lanes
• Only applicable with A-2 Main Variations allowing for southbound left turn onto Main Ave from CH 21
• Eliminates left turn onto Pleasant St. from northbound TH 13
• Maintains alignment with existing Pleasant St.
Main Ave
Main Ave
Arcadia Ave
Duluth Ave
Pleasant St.
10’WALK
6’ WALK
13’THRU LANE
13’THRU LANE
13’ THRU LANE
8’ MEDIAN
13’ THRU LANE
6’ WALK
7’ BLVD.
24’ 4’ 4’ MEDIAN
14’TURN LANE
A-2 Typical Section c (across CH 21 at Main)
8’88’ WWWALALALKKK
13’THRU LANE
13’TURN LANE
A-2 Typical Section d (across Main Ave.)
Main Ave. SE
Duluth Ave. SE
Arcadia Ave.
Dakota St. SE
Pleasant St. S
E
Credit River Rd. SE
Evanston Ave. SE
Streetscaping Opportunities
> Public Art at Arcadia roundabout
^ Gateway feature in median between Main and TH 13
< Median plantings and banner arms
^ Decorative Pavement
See section cSee section d
Main Ave
Key Benefits + Minimal property impacts+ Most efficient traffic operations+ Best accommodates local and regional trips
Key Challenges - High number of crashes- Risk in funding eligibility- Pedestrian safety
Streetscape Opportunity Score: Very GoodPedestrian Crossings (across 21): 4Vehicular Crossings (across 21): 2
Preliminary Estimated Cost: $7.3M
N0
20
400000
2000002
4404040040444
Duluth Ave Arcadia Ave Main Ave TH 13
A-2 Arcadia with Roundabout
Note: traffic volumes shown represent expected afternoon peak conditions on side street approaches.
-
Variation: Roundabout at Main
Variation: Signal at Duluth
Variation: Right-in/Right-out at Arcadia
• Facilitates full-access movements at Duluth Ave with controlled intersection
• Reduced streetscape improvement opportunities• Potential for higher vehicle speeds entering from the west
• Removes left turn lanes onto north and southbound Arcadia. • Removes a downtown access• Will send more traffic to Duluth and Main to make north or southbound movements• Potentially increased traffic on local streets• Streetscaping opportunity in median - plantings, banner arms, etc.
• Facilitates full-access movements at Main Ave. • Creates tight access to properties just north and south of intersection. • Gateway opportunity within roundabout• May be necessary to limit north/southbound movements within roundabout during
peak hours• Roundabout provides “u-turn” movement for those wishing to travel northbound on
Arcadia from south side of downtown
Main Ave
Arcadia Ave
Duluth Ave
6’ WALK
13’ THRU LANE
12’TURN LANE
11’ THRU LANE
16’MEDIAN
6’ BLVD.
13’THRU LANE
6’ WALK
11’BLVD.
10’TRAIL
13’THRU LANE
B-1 Typical Section e (across CH 21 at Main)
Main Ave. SE
Arcadia Ave.
Dakota St. SE
Pleasant St. S
E
Credit River Rd. SE
Evanston Ave. SE
Duluth Ave. SE Streetscaping Opportunities
< Public art at Duluth roundabout
< Banner arms and decorative pavement in medians
> Corner enhancements at signalized intersections
See section e
Duluth Ave Arcadia Ave Main Ave TH 13
B-1 Main with SignalKey Benefits + Most downtown access points+ Managed traffic movements+ Lowest cost
Key Challenges- Less efficient traffic operations- Longest Main Avenue wait times/ queueing- Highest crash severity
Streetscape Opportunity Score: FairPedestrian Crossings (across 21): 3Vehicular Crossings (across 21): 2
Preliminary Estimated Cost: $7.2 M
N0
20
400000
2000002
4404040040444
Note: traffic volumes shown represent expected afternoon peak conditions on side street approaches.
-
Variation: Signal at Duluth
Variation: Right-in/Right-out at Arcadia
• Facilitates full-access movements at Duluth Ave with controlled intersection
• Reduced streetscape improvement opportunities• Potential for higher vehicle speeds entering from the west
• Removes left turn lanes onto north and southbound Arcadia. • Removes a downtown access• Will send more traffic to Duluth and Main to make north or southbound movements• Potentially increased traffic on local streets• Streetscaping opportunity in median - plantings, banner arms, etc.
Duluth Ave
Arcadia Ave
6’ BLVD.
18’ MEDIAN
15’ THRU LANE
15’THRU LANE
15’THRU LANE
6’ BLVD.
10’ TRAIL
10’ WALK
15’THRU LANE
ROUNDABOUT
B-2 Typical Section f (across CH 21 at Main)
Main Ave. SE
Duluth Ave. SE
Arcadia Ave.
Dakota St. SE
Colorado St. SE
Pleasant St. S
E
Credit River Rd. SE
Evanston Ave. SE
Streetscaping Opportunities
< Public art at Main & Duluth roundabouts
> Gateway Monument in median between Main and TH 13
< Median plantings and banner arms
^ Decorative Pavement
See section f
A roundabout at Main would not be recommended by the Project Management Team due to the high impacts to private property, including access to adjacent businesses, and operational concerns with the two roundabouts in such close proximity.
Key Benefits + Most downtown access points+ Efficient traffic operations+ Best accommodates local and regional trips
Key Challenges- Most property impacts- Highest number of crashes/pedestrian safety concerns- Highest potential for intersection blockages
Streetscape Opportunity Score: Very GoodPedestrian Crossings (across 21): 3Vehicular Crossings (across 21): 2
Preliminary Estimated Cost: $7.35M
N0
20
400000
202200002
404040044
Duluth Ave Arcadia Ave Main Ave TH 13
B-2 Main with Roundabout
Note: traffic volumes shown represent expected afternoon peak conditions on side street approaches.
-
Duluth Ave
Arcadia Ave
Main Ave
Main Ave
Main Ave. SE
Duluth Ave. SE
Arcadia Ave.
Dakota St. SE
Pleasant St. S
E
Credit River Rd. SE
Evanston Ave. SE
Colorado St. S
E
Duluth Ave Arcadia Ave Main Ave TH 13
A Alternative HybridN
0
20
4000000000000
202002000000
40400000