“a civil action”
DESCRIPTION
“A Civil Action”. WELLS G AND H WOBURN, MIDDLESEX COUNTY, MASSACHUSETTS Comprehensive Environmental Response, Compensation and Liability Information System ( CERCLIS ) No. MAD980732168. http://www.geology.sdsu.edu/classes/geol351/woburn.htm. Five sources of TCE : New England Plastics - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/1.jpg)
“A Civil Action”
WELLS G AND H WOBURN, MIDDLESEX COUNTY, MASSACHUSETTS
Comprehensive Environmental Response, Compensation and Liability Information System (CERCLIS) No. MAD980732168
http://www.geology.sdsu.edu/classes/geol351/woburn.htm
![Page 2: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/2.jpg)
![Page 3: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/3.jpg)
Five sources of TCE :• New England Plastics• Wildwood Conservation Trust (Riley Tannery/Beatrice Foods)• Olympia Nominee Trust (Hemingway Trucking)• UniFirst• W.R. Grace (Cryovac)
![Page 4: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/4.jpg)
10 100 1000
Concentration of TCE in micrograms per liter
0 1000 feet
TCE in 1985
W.R.Grace
•
BeatriceFoods
Woburn Site
MunicipalWells G & H
Aberjona River
Geology:buried river valleyof glacial outwash andice contact depositsoverlyingfractured bedrock
The trial took place in 1986.
Did TCE reach the wells before May 1979?
Wells G&H operated from October 1964- May 1979
![Page 5: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/5.jpg)
Common organic contaminants
Source: EPA circular
![Page 6: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/6.jpg)
UniFirst Corportation
• Formerly a dry cleaning facility - Interstate Uniform Service Corporation (IUSC) (1966-1983).
• From 1977-1982, a 5,000-gallon above-ground tank was used to store the dry-cleaning agent tetrachloroethylene.
• In 1988 Ebasco Services Inc. reported the recovery of less a liquid contained 19,000,000 ug/l of tetrachloroethylene.
![Page 7: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/7.jpg)
Cryovac Division of W.R. Grace and Co.
• A food wrapping manufacturer since 1961. W.R. Grace and Co. utilized degreasing agents such as trichloroethylene at its facility. W.R. Grace and Co. made use of a pit behind the plant for waste disposal, and discharged waste into the city's sewer system. In accordance with an EPA Administrative Order, the pit was excavated and six 55-gallon drums of liquid waste and contaminated soil were removed to a Resource Conservation and Recovery Act of 1976 (RCRA)-approved disposal facility in June, 1983.
![Page 8: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/8.jpg)
New England Plastics Corporation
• A manufacturer of solid vinyl siding and various other plastic products.
• Prospect Tool and Die Company is also located within the same building.
• In December 1986, water from an industrial well which tapped the bedrock aquifer was found to be contaminated with various volatile organic compounds (PCE & TCE).
• In 1988, effluent from the New England Plastics Corporation was found to enter the Aberjona River via a drainage ditch.
![Page 9: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/9.jpg)
Olympia Nominee Trust Corp.
• 1970 - 200 to 500 five-gallon containers of arsenic trioxide were discovered on the property.
• The Hemingway Transport Co., which owned the property since 1980, had four underground storage tanks at the trucking terminal facility.
• In May 1983, a 6,280-gallon gasoline tank was found to be leaking, and was removed in July 1983. It is unknown when the tanks were installed and when the gasoline tank began leaking.
![Page 10: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/10.jpg)
Wildwood Conservation Corporation
• John J. Riley sold the land to Beatrice Foods, Inc., in 1978, then repurchased the property in 1983.
• Established the property as the Wildwood Conservation Corporation in 1985. Various trails leading from two neighboring facilities, Whitney Barrel Company and Murphy Waste Oil Company, to the property existed during the period 1966-1983.
• On the property, extensive contamination consisting of sludge, discolored soils, trash, 55-gallon drums, paint cans and debris piles has been documented. John J. Riley Tannery has an industrial water supply well on the property.
![Page 11: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/11.jpg)
Introduction to Environmental Geology
![Page 12: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/12.jpg)
Fundamental Concepts of Environmental Geology
• Population growth• Sustainability• The earth system• Uniformitarianism• Hazardous earth
processes
• Geology as a basic environmental science
![Page 13: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/13.jpg)
Fundamental Concepts-Population Growth
• Population Growth is the #1 environmental problem
• Why?• www.prb.org
![Page 14: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/14.jpg)
Fundamental Concepts-Population Growth
• It is impossible to support exponential population growth with a finite resource base
1) Primary goal of environmental work is to defuse the population bomb1) Pessimistic: the earth will take care of itself through
disease and catastrophes2) Optimistic: find better ways to control population
growth within the limits of our available resources
![Page 15: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/15.jpg)
Fundamental Concepts-Sustainability
• Sustainability is the environmental objective We are currently using most living environmental
resources faster than they can be naturally replenished What would we need for a sustainable global
economy?• Populations of humans in natural harmony with air, water,
and land• Energy policies that do not pollute or cause climatic
perturbations• Utilization plans for renewable resources (Recycling)• Utilization plans for nonrenewable resources
![Page 16: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/16.jpg)
![Page 17: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/17.jpg)
How do we predict the consequences of earth system changes?
Understand the nature of the system
Understand rates of changeConduct input-output analysis
![Page 18: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/18.jpg)
Fundamental Concepts-The earth system The earth system
• Understanding the earth’s systems and their changes is critical to solving environmental problems.
• The earth itself is an open system with respect to energy a closed system with respect to material
![Page 19: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/19.jpg)
Fundamental Concepts-The earth system
• Feedback• A system response where: System
output (something happening) is a new system input
• Positive and negative feedback
• Input-output analysis
![Page 20: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/20.jpg)
Fundamental Concepts-The earth system
1. Positive feedback-- "vicious cycle"a. one action intensifies the next (example: erosion)
2. Negative feedback-- "self-regulating" enables the system to reach a steady state or equilibrium (example: stream morphology).
3. Threshold events -- No apparent changes until threshold levels are reached (Lake Turnover).
![Page 21: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/21.jpg)
Fundamental Concepts-The earth system
Negative Feedback Stream
A. Increase gradient B. Increases the river's velocity, which C. Increases the rate of erosion, which D. Widens and deepens channel, which E. Slows rivers velocity F. promotes deposition G. reduces gradient
![Page 22: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/22.jpg)
Fundamental Concepts-The earth systemExample of threshold event
Lake turnover
![Page 23: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/23.jpg)
Fundamental Concepts- Uniformitarianism James Hutton, 1785
“the present is the key to the past”
Geologic processes modifying our landscape have operated in the past
Human activity is a new geological force Affects the magnitude and frequency of geologic
processes “the present is the key to the future”
![Page 24: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/24.jpg)
Fundamental Concepts-Hazardous Earth Processes
Some geologic hazards are inevitable Planning is important The impacts of hazardous earth processes
are enhanced by spatial concentration of population and resources
Should be considered in cost-benefit analysis
![Page 25: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/25.jpg)
Fundamental Concepts-Geology as a basic environmental science
Geology is a factor in every person’s life:
“Civilization exists by geological consent…subject to change without notice”--Will Durant
![Page 26: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/26.jpg)
Fundamental Concepts-Geology as a basic environmental science
Branches of Environmental Geology: Geomorphology (Geologic Landforms and
Processes) Hydrogeology (Water and soil / rock interactions) Pedology (Soils) Economic geology Engineering geology Classical geology
![Page 27: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/27.jpg)
Fundamental Concepts-Geology as a basic environmental science
Environmental problems are interdisciplinary Physical
Geography, geologic processes, hydrology, rock types, soil types, climate
Biological Plants, animals, biologic conditions, spatial analysis of
biologic information
Human interest/useLand use, economics, aesthetics, environmental law,
hazards, historical/archaeological value
![Page 28: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/28.jpg)
Environmental Geology and Land-Use PlanningThere is a limited supply of landWe strive to plan so that suitable land is
available for specific uses for this generation and those that follow
Comprehensive plan – designed for long-range local development based on and environmental inventory of resources and hazards
![Page 29: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/29.jpg)
Landscape EvaluationLandscape EvaluationEnvironmental geologists provide geologic information
and analysis to assist in planning, design, and construction
Former and Present land usePhysical and chemical properties of earth materials
– Pollutants– Engineering Properties of soil and rock
Natural HazardsGroundwater Characteristics
![Page 30: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/30.jpg)
Site SelectionSite SelectionCost-Benefits Analysis – Assumes all relevant costs
and benefits can be determinedExamples: Building a shopping mall in a flood zone; Drilling oil wells in National Parks?
Physiographic Determination-Applying ecological principals to planning
Considers physical, social, and aesthetic dataLet natural characteristics determine the choice of a site
![Page 31: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/31.jpg)
Environmental Impact AnalysisEnvironmental Impact Analysis1969- National Environmental Policy Act (NEPA)
All major federal actions which could affect the quality of the human environment must be preceded by an evaluation of the project and the potential impact to the environmentEnvironmental Impact Statements
– Discussion of the environmental consequences of the proposed project and of the alternatives
State Environmental Impact LegislationState Environmental Policy Acts (SEPAs)
– California Environmental Quality Act (CEQA)
![Page 32: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/32.jpg)
What do Environmental Geologists do?
Mostly Site Assessments (ESAs) and BrownFields Studies
![Page 33: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/33.jpg)
What are ESAs?
Identify/evaluate:– environmental concerns– Magnitude and extent of contamination– Cleanup goals– Remediation options– Future land use
![Page 34: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/34.jpg)
Phase I ESA
Identify potential environmental concerns All Appropriate Inquiry
– Involves– Records review – Site reconnaissance– Interviews– Report
![Page 35: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/35.jpg)
Phase II ESA
Evaluates potential concerns from Phase I Tailored to site-specific needs
Limited sampling/analysis» Confirm/rule out concerns
Expanded sampling/analysis» Amount and extent of contamination
Recommended cleanup goals/optionsIncr
easi
ng C
osts
![Page 36: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/36.jpg)
Phase III ESA
Corrective actions for environmental concerns
![Page 37: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/37.jpg)
Environmental Concernsat Brownfields
Impaired soil, water, or air conditions from historical use
Land uses:– Waste storage/
disposal– Manufacturing/
industrial– Transportation/
rail– Petroleum– Mining– Agribusiness
Buildings and Improvements– Underground/
aboveground storage tanks
– Process areas/ machinery
– Asbestos– Lead-based paint– Polychlorinated
biphenyls (PCBs)– Fill materials
![Page 38: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/38.jpg)
What are ESAs? – Summary
Land Uses
Contaminants & Related Risk
Site Improvements
Focus on:
Past, Present & Future
![Page 39: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/39.jpg)
Sampling/Analysis –Sampling Methods
Conventional– borings/excavation
– groundwater monitoring wells
– decontamination/plugging/abandonment/waste disposal
– crude field-screening
– off-site analysis
Accelerated– geophysical surveys
– direct-push probes
– field labs/test kits
– off-site analytical confirmation
– electronic data archiving/interpretation
![Page 40: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/40.jpg)
Sampling/Analysis – Sampling Methods
Conventional drilling/sampling technology
![Page 41: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/41.jpg)
Sampling/Analysis – Sampling Methods
Screening/field-based methods - Direct-push methods
![Page 42: “A Civil Action”](https://reader034.vdocuments.net/reader034/viewer/2022051402/56815a88550346895dc7fbf2/html5/thumbnails/42.jpg)
Sampling/Analysis – Sampling Methods
Geophysical MethodsElectromagnetic Conductivity
& Magnetic Surveys
Ground-Penetrating Radar