a global multidisciplinary network on housing research and learning subnetwork meeting 1 wp3...

20
A global multidisciplinary network on housing research and learning Subnetwork meeting 1 WP3 Community Participation Subnetwork meeting Leandro Madrazo, La Salle School of Architecture, Barcelona, Spain Rimini, 27 June 2014 Subnetwork meeting 2

Upload: noah-jordan

Post on 16-Dec-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

A global multidisciplinary network onhousing research and learning

Subnetwork meeting 1

WP3 Community Participation Subnetwork meeting

Leandro Madrazo, La Salle School of Architecture, Barcelona, Spain

Rimini, 27 June 2014 Subnetwork meeting 2

Subnetwork meeting 2

ACTION LIST (SUBNETWORK MEETING 1)

ACTION LIST (FIRT SUBNETWORK MEETING 1) Barcelona, February 7, 2014

Action Responsible Recipient Date StatusUploading completed presentation in meeting folder

All La Salle (FUNITEC) asap Done

Preparing a proposal of the participatory action in Rimini

Roberto/Simona WP3 partners Middle of March

Done-it will be discussed in the meeting in Rimini

Preparing a proposal of the participatory action in Bratislava

Marek WP3 partners Middle of March

Not received yet- it will be presented in the meeting in Rimini

Proposing partners to replace CAC-Bulgaria

All La Salle (FUNITEC) End of February It was solved with the partner from Bosnia, but the EACEA has rejected it. We need to search a new partner quickly. It will be discussed in the meeting in Rimini.

Producing a mock-up of the video of participatory action in Barcelona

La Salle/SostreCívic WP3 partners Middle of March

It has been completed (voice recording is missing). It will be presented in the meeting.

Deciding dates of next meeting in Rimini

Roberto/Simona WP3 partners End of February Done

Deciding role of NOVA in the project

Hans-Christian/Viggo

La Salle (FUNITEC) asap Done. It is now member of subnetwork WP2 Research, and it has participated in the last meeting.

Changes in the budget distribution of WP3 resulting from NOVA withdrawal

Leandro WP3 partners End of February Done. Changes have been accepted by the EACEA.

Subnetwork meeting 2

ACTION LIST (SUBNETWORK MEETING 1)

OTHER ACTIONS (not included in action list)

Action Responsible Recipient Date Status Report on the participatory activity “Civic Housing”

Leandro / Angel WP3 partners June A report has been completed and sent to WP3 partners. It will be discussed in the meeting.

Videolecture on the work of “Civic Housing”

Leandro / Angel UKIM partners March 6, 2014 Other participants:

Subnetwork meeting 2

DELIVERABLES WP·3

Deliverable 3.1 - Participatory actions (m8, 20, 32): one action has been carried out along with the Civic Housing seminar by La Salle/SostreCívic, Barcelona, Fall 2014.

Deliverable 3.2 - Video production (m12, 24, 36): one video of the Civic Housing participatory action is about to be finished.

Deliverable 3.3- Reports on participatory actions (m36). Final report of the creating reports of the participatory actions. A report of the Civic Housing participatory action has been produced.

Deliverable 3.4- Subnetwork meetings (m4, 10, 16, 22, 28). Two meetings have taken place (Barcelona, Rimini)

Subnetwork meeting 2

PARTNERS WP·3

P1 FUNITEC Leandro Madrazo WP Coordinator

P1 FUNITEC Angel Martin School of Architecture

P10 UKIM Ognen Marina School of Architecture

P10 UKIM Mihajlo Zinoski School of Architecture

P11 OAPPCR Monica Calliari Chamber of Architects

P21 SOSTRECIVIC Raül Robert Housing Cooperative

P22 ABRASEVIC Vladimir Ćorić Youth Association

P23 HERISCAPE Simona Rotteglia Consulting association

P23 HERISCAPE Filippo Boschi Consulting association

P24 BRATISLAVA Monika Šmiralová Municipality

P24 BRATISLAVA Silvia Jančová Municipality

P24 BRATISLAVA Marek Dinka Municipality

P32 FAU Viviana Fernández School of Architecture

6 partners, plus 1 partner from third countries

Subnetwork meeting 2

DELIVERABLE 3.2 CIVIC HOUSING PARTICIPATORY ACTION

Subnetwork meeting 2

DELIVERABLE 3.3 CIVIC HOUSING PARTICIPATORY ACTION

Subnetwork meeting 2

PROJECT SCOPE

Subnetwork meeting 2

RELATIONS TO OTHER WORK PACKAGES

Links between WP3 and WP2

- There are some overlapping: community participation is one of the topics in the research matrix.

- The difference between WP2 and WP3 is that the second is involved with the design and implementation of participatory actions.

Subnetwork meeting 2

RELATIONS TO OTHER WORK PACKAGES

Links between WP3 and WP2

Subnetwork meeting 2

RELATIONS TO OTHER WORK PACKAGES

Links between WP3 and WP4

- Deliverable 3.1 “Learning activities integrated in the community”. A participatory action can be integrated with a learning activity, as in the “Civic Housing” seminar. The integration can be done in multiple ways, depending on each case.

Subnetwork meeting 2

RELATIONS TO OTHER WORK PACKAGES

Links between WP3 and WP7

- Deliverable 7.1 – Network conference. One partner will make a presentation in the Barcelona conference: UKIM

- Deliverable 7.2 – Social web. The videos produced in Deliverable 3.2 can be disseminate through Google +, Facebook.

-Deliverable 7.3 – Local media. Dissemination of the participatory activities through will be disseminated through different local media : press agencies, printed and digital newspapers, television and radio broadcasting.

Subnetwork meeting 2

RELATIONS TO OTHER WORK PACKAGES

Links between WP3 and WP7

-Deliverable 7.4 – Journal and conferences. Joint work involving partners in different WPs could be presented in papers and articles. Each subnetwork should produce at least one publication by the end of the project.

- Deliverable 7.5 – Exhibitions. Displaying the work carried out in th participatory activities.

- Deliverable 7.6 – Newsletters. Including a summary of the participatory actions in the regular newsletter; especial issue reporting about some activities.

- Deliverable 7.7 – The OIKOnet Reader (the Book) will include chapters on the work done in WP3 Community Participation.

Subnetwork meeting 2

DELIVERABLE 1.1 QUALITY MANAGEMENT PLAN

Subnetwork meeting 2

PROJECT DEVELOPMENT REPORT

Subnetwork meeting 2

ADMINISTRATIVE ISSUES

- Signed Consortium Agreement has been signed by WP3 members.

- Please check Article 5 of Consortium Agreement for the procedure to get reimbursed: there are four payment periods per year; claim costs forms need to be submitted properly filled in; copies of invoices to be submitted along with the claim costs (the originals remain at your administration).

- Please check whether your institution recovers the VAT. Only if your institution is unable to recover the VAT can it be included in the claimed costs (page 31 Project Handbook). Otherwise, claimed costs should be without VAT.

Subnetwork meeting 2

- Please be aware of the Project Handbook, p:36: “The maximum number of days that can be claimed is the number of working days + 1. A full day normally includes an overnight stay. In duly substantiated cases, a full day’s allowance without an overnight stay may be allowed with a pro rata reduction for accommodation (costs limited to 50% of the maximum rate). A corresponding reduction must be applied if accommodation, meals and local travel costs are provided for by a third party.

ADMINISTRATIVE ISSUES

Subnetwork meeting 2

- Next meeting: Plenary session, Barcelona conference, 25 September 2014

- Next subnetwork meeting: Bratislava (date?)

- Collaborations among WP·3 partners

- Collaborations between WP·3 partners and other WPs

- Action list

FUTURE WORK

Subnetwork meeting 2

- Finish matrix (one week).- Work plans for Rimini and Bratislava (July 15th Rimini, August 15th Bratislava)- SostreCívic: create a model based on their experience (5 pages) (end of July)- UKIM will seek with La Salle possible collaborations in Fall semester.- Bratislava will propose a deadline for the next meeting (possibly in February 2015).- SostreCívic to publish news about the project in their website

ACTION LIST

This project is funded with support from the European Commission (Project number 539369-LLP1-2013-1-ES-ERASMUS). This publication reflects the views only of the authors, and the Commission cannot be held responsible for any use which may be made of the information contained therein.

If you would like more information about the content of this presentation please contact:

[email protected]