![Page 1: A NEW Level of Realism: Verify/Optimise demolition plan Reduce cost from accidents Multiple perspectives of the planned demolition Anticipated footprint](https://reader038.vdocuments.net/reader038/viewer/2022110206/56649ceb5503460f949b6722/html5/thumbnails/1.jpg)
Security Measures Adopted for Brazilian
Implosions: pre-demolition simulation and
analysis, protective nylon screens against flying debris
and isolation of the area
![Page 2: A NEW Level of Realism: Verify/Optimise demolition plan Reduce cost from accidents Multiple perspectives of the planned demolition Anticipated footprint](https://reader038.vdocuments.net/reader038/viewer/2022110206/56649ceb5503460f949b6722/html5/thumbnails/2.jpg)
ASI Demolition Analysis
A NEW Level of Realism:• Verify/Optimise demolition plan• Reduce cost from accidents• Multiple perspectives of the planned demolition• Anticipated footprint of collapsed structure• Accurate perimeters to protect neighboring
structures• Deconstruction stress analysis• Wind analysis of weakened structure prior to
demolition• Seismic vibration analysis of falling debris• 3D Graphics generated for presentations to client,
government & public.
• Increase Safety
![Page 3: A NEW Level of Realism: Verify/Optimise demolition plan Reduce cost from accidents Multiple perspectives of the planned demolition Anticipated footprint](https://reader038.vdocuments.net/reader038/viewer/2022110206/56649ceb5503460f949b6722/html5/thumbnails/3.jpg)
ASI Demolition Simulation
Post-Demolition
Pre-Demolition Analysis
Forensic Analysis
Side-by-Side Comparison
Plan Evaluation:• Implosion• Pulling
• Wrecking Ball• Deconstruction
Hazard Assessment:• Seismic• Wind (Weakened Structures)• Surrounding Structures
![Page 4: A NEW Level of Realism: Verify/Optimise demolition plan Reduce cost from accidents Multiple perspectives of the planned demolition Anticipated footprint](https://reader038.vdocuments.net/reader038/viewer/2022110206/56649ceb5503460f949b6722/html5/thumbnails/4.jpg)
Pre-Demolition Analysis Process
Site Assessment
Create 3D Model
Apply Weakening
Run Analysis
Recommendations
Seismic Vibration Analysis
Wind Analysis
Weakening Plan
Demolition Plan
Apply Demolition Scenario
Submit Final Results
Demolition
![Page 5: A NEW Level of Realism: Verify/Optimise demolition plan Reduce cost from accidents Multiple perspectives of the planned demolition Anticipated footprint](https://reader038.vdocuments.net/reader038/viewer/2022110206/56649ceb5503460f949b6722/html5/thumbnails/5.jpg)
Santa Cruz Buildings
![Page 6: A NEW Level of Realism: Verify/Optimise demolition plan Reduce cost from accidents Multiple perspectives of the planned demolition Anticipated footprint](https://reader038.vdocuments.net/reader038/viewer/2022110206/56649ceb5503460f949b6722/html5/thumbnails/6.jpg)
Santa Cruz Buildings
![Page 7: A NEW Level of Realism: Verify/Optimise demolition plan Reduce cost from accidents Multiple perspectives of the planned demolition Anticipated footprint](https://reader038.vdocuments.net/reader038/viewer/2022110206/56649ceb5503460f949b6722/html5/thumbnails/7.jpg)
Real vs. Simulation
![Page 8: A NEW Level of Realism: Verify/Optimise demolition plan Reduce cost from accidents Multiple perspectives of the planned demolition Anticipated footprint](https://reader038.vdocuments.net/reader038/viewer/2022110206/56649ceb5503460f949b6722/html5/thumbnails/8.jpg)
Hélio Gomes Prison
![Page 9: A NEW Level of Realism: Verify/Optimise demolition plan Reduce cost from accidents Multiple perspectives of the planned demolition Anticipated footprint](https://reader038.vdocuments.net/reader038/viewer/2022110206/56649ceb5503460f949b6722/html5/thumbnails/9.jpg)
First simulation
4.04 Sec
5.92 Sec
2.31 Sec
Danger: Columns falling towards other structure
![Page 10: A NEW Level of Realism: Verify/Optimise demolition plan Reduce cost from accidents Multiple perspectives of the planned demolition Anticipated footprint](https://reader038.vdocuments.net/reader038/viewer/2022110206/56649ceb5503460f949b6722/html5/thumbnails/10.jpg)
First simulation
1.62 Sec
Danger: To ensure structure doesn’t squat, a good portion of the bays should show failure within the bay.
![Page 11: A NEW Level of Realism: Verify/Optimise demolition plan Reduce cost from accidents Multiple perspectives of the planned demolition Anticipated footprint](https://reader038.vdocuments.net/reader038/viewer/2022110206/56649ceb5503460f949b6722/html5/thumbnails/11.jpg)
Final simulation
![Page 12: A NEW Level of Realism: Verify/Optimise demolition plan Reduce cost from accidents Multiple perspectives of the planned demolition Anticipated footprint](https://reader038.vdocuments.net/reader038/viewer/2022110206/56649ceb5503460f949b6722/html5/thumbnails/12.jpg)
Nylon screens
![Page 13: A NEW Level of Realism: Verify/Optimise demolition plan Reduce cost from accidents Multiple perspectives of the planned demolition Anticipated footprint](https://reader038.vdocuments.net/reader038/viewer/2022110206/56649ceb5503460f949b6722/html5/thumbnails/13.jpg)
Technical specifications
Technical fabric consisting of monofilament High Density polyethylene-shaped meshes
Meshes of 1,5 x 1,5 mm ou 1,5 x 2,5 mm Density of 3,2 x 2,8 wires / cm Tensile strength longitudinal of 476 kg/m Tensile strength transverse of 410 kg/m
![Page 14: A NEW Level of Realism: Verify/Optimise demolition plan Reduce cost from accidents Multiple perspectives of the planned demolition Anticipated footprint](https://reader038.vdocuments.net/reader038/viewer/2022110206/56649ceb5503460f949b6722/html5/thumbnails/14.jpg)
Frei Caneca Implosion
![Page 15: A NEW Level of Realism: Verify/Optimise demolition plan Reduce cost from accidents Multiple perspectives of the planned demolition Anticipated footprint](https://reader038.vdocuments.net/reader038/viewer/2022110206/56649ceb5503460f949b6722/html5/thumbnails/15.jpg)
Area of isolation
![Page 16: A NEW Level of Realism: Verify/Optimise demolition plan Reduce cost from accidents Multiple perspectives of the planned demolition Anticipated footprint](https://reader038.vdocuments.net/reader038/viewer/2022110206/56649ceb5503460f949b6722/html5/thumbnails/16.jpg)
Brazilian slum (favela)
![Page 17: A NEW Level of Realism: Verify/Optimise demolition plan Reduce cost from accidents Multiple perspectives of the planned demolition Anticipated footprint](https://reader038.vdocuments.net/reader038/viewer/2022110206/56649ceb5503460f949b6722/html5/thumbnails/17.jpg)
Pamphlet reporting the population
![Page 18: A NEW Level of Realism: Verify/Optimise demolition plan Reduce cost from accidents Multiple perspectives of the planned demolition Anticipated footprint](https://reader038.vdocuments.net/reader038/viewer/2022110206/56649ceb5503460f949b6722/html5/thumbnails/18.jpg)
Video of Frei Caneca Implosion
![Page 19: A NEW Level of Realism: Verify/Optimise demolition plan Reduce cost from accidents Multiple perspectives of the planned demolition Anticipated footprint](https://reader038.vdocuments.net/reader038/viewer/2022110206/56649ceb5503460f949b6722/html5/thumbnails/19.jpg)
THANK YOU!!!