A plan for Modularization of Tritium Components Randy Davis Davis Consultants M-TRT-H-00089 Savannah River Nuclear Solutions, LLC April 22, 2014

Upload: phamthien

Post on 28-Mar-2018

214 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: A Plan for Modularization of Tritium Components - Randy...A plan for Modularization of Tritium Components Randy Davis Davis Consultants M-TRT-H-00089 Savannah River Nuclear Solutions,

A plan for Modularization of Tritium Components

Randy Davis

Davis Consultants

M-TRT-H-00089

Savannah River Nuclear Solutions, LLC April 22, 2014

Page 2: A Plan for Modularization of Tritium Components - Randy...A plan for Modularization of Tritium Components Randy Davis Davis Consultants M-TRT-H-00089 Savannah River Nuclear Solutions,

M-TRT-H-00089

Current Approach

• All “tritium wetted components” are located inside a glovebox – Why

• Explosion Prevention – Ar/N2 filled • Fire Prevention - Ar/N2 filled • Tritium Leak/Spill Mitigation • Tritium Leak/Spill Recapture – Strippers

• Provides access to components for maintenance

2

Page 3: A Plan for Modularization of Tritium Components - Randy...A plan for Modularization of Tritium Components Randy Davis Davis Consultants M-TRT-H-00089 Savannah River Nuclear Solutions,

M-TRT-H-00089

Current Approach

3

TEF

249H

ATLA

S

Page 4: A Plan for Modularization of Tritium Components - Randy...A plan for Modularization of Tritium Components Randy Davis Davis Consultants M-TRT-H-00089 Savannah River Nuclear Solutions,

M-TRT-H-00089

Current Approach

• Implications – Large glass surface area – Leads to large number of gloves installed over time – Large equipment replacement difficult

• Usually requires Open Glovebox Maintenance • Preparation very time consuming

– Hut Construction – Fire Suppression Issues

• Compensatory measures required for fire/explosion hazard • Compensatory measures required for worker hazard • Re-establishing confinement time consuming • Overall very time and labor consuming • SRS OGMs run several weeks to several months in duration.

4

Page 5: A Plan for Modularization of Tritium Components - Randy...A plan for Modularization of Tritium Components Randy Davis Davis Consultants M-TRT-H-00089 Savannah River Nuclear Solutions,

M-TRT-H-00089

Current Approach

• Implications (cont’d) – Stripping glovebox atmosphere using catalytic oxidation is not

efficient • Majority of hydrogen loading is from permeation of humidity into the glovebox.

– Gloves – Gaskets

• Typically tritium concentration less than 0.1% tritium, balance protium. • Through-put required for isotope separation to reclaim this tritium has to be

orders of magnitude larger than necessary. – Energy intensive – Space consuming – Increases Operational/Maintenance demand

5

Page 6: A Plan for Modularization of Tritium Components - Randy...A plan for Modularization of Tritium Components Randy Davis Davis Consultants M-TRT-H-00089 Savannah River Nuclear Solutions,

M-TRT-H-00089

Proposed New Approach

6

Typical Hydride Bed, Diffuser, Cat Bed, etc.

Secondary Jacket common w/glovebox

Typical Column/Vessel

Glovebox Boundary Valves, Instruments and Fittings

Electrical Instrument Connector

• Locate components which require periodic replacement in easily removable “modules.”

Page 7: A Plan for Modularization of Tritium Components - Randy...A plan for Modularization of Tritium Components Randy Davis Davis Consultants M-TRT-H-00089 Savannah River Nuclear Solutions,

M-TRT-H-00089

Maintenance Progression

7

Break line

Page 8: A Plan for Modularization of Tritium Components - Randy...A plan for Modularization of Tritium Components Randy Davis Davis Consultants M-TRT-H-00089 Savannah River Nuclear Solutions,

M-TRT-H-00089

Maintenance Progression

8

Apply cap

Page 9: A Plan for Modularization of Tritium Components - Randy...A plan for Modularization of Tritium Components Randy Davis Davis Consultants M-TRT-H-00089 Savannah River Nuclear Solutions,

M-TRT-H-00089

Maintenance Progression

9

Bag item to be removed

Page 10: A Plan for Modularization of Tritium Components - Randy...A plan for Modularization of Tritium Components Randy Davis Davis Consultants M-TRT-H-00089 Savannah River Nuclear Solutions,

M-TRT-H-00089

Maintenance Progression

10

Remove item

Page 11: A Plan for Modularization of Tritium Components - Randy...A plan for Modularization of Tritium Components Randy Davis Davis Consultants M-TRT-H-00089 Savannah River Nuclear Solutions,

M-TRT-H-00089

Maintenance Progression

11

Reverse process for installation

Page 12: A Plan for Modularization of Tritium Components - Randy...A plan for Modularization of Tritium Components Randy Davis Davis Consultants M-TRT-H-00089 Savannah River Nuclear Solutions,

M-TRT-H-00089

Maintenance Progression

12

Reverse process for installation

Page 13: A Plan for Modularization of Tritium Components - Randy...A plan for Modularization of Tritium Components Randy Davis Davis Consultants M-TRT-H-00089 Savannah River Nuclear Solutions,

M-TRT-H-00089

Maintenance Progression

13

Reverse process for installation

Page 14: A Plan for Modularization of Tritium Components - Randy...A plan for Modularization of Tritium Components Randy Davis Davis Consultants M-TRT-H-00089 Savannah River Nuclear Solutions,

M-TRT-H-00089

Modularization Benefits

• Reduces water processing – Significantly reduces glovebox volume/surface area – Reduces glass/gaskets – Reduces gloves – Reduces “water” loading

• Reduces maintenance cost – Complicated Open Glovebox Maintenance eliminated

• OGM can add several hundred thousand dollars to work cost

• Reduces maintenance duration

14

Page 15: A Plan for Modularization of Tritium Components - Randy...A plan for Modularization of Tritium Components Randy Davis Davis Consultants M-TRT-H-00089 Savannah River Nuclear Solutions,

M-TRT-H-00089

Estimated Savings

• Converting from current approach to modularization estimated to result in: – 30% less glovebox volume. – 50% less glass/glove surface area.

• Floor space requirements will be reduced as well. • Estimate large equipment/ limited life component maintenance

cost reduction of 30%. • Study currently being performed for the SRS Tritium Facility

to validate these estimates.

15

Page 16: A Plan for Modularization of Tritium Components - Randy...A plan for Modularization of Tritium Components Randy Davis Davis Consultants M-TRT-H-00089 Savannah River Nuclear Solutions,

M-TRT-H-00089

Questions?