    A2 Applied ICT Major Project

    Culcheth High School

    Re-Branding for the Future

    In year 13 you have to undergo a major project that will cover two of the

    three units you will be studying, which are Unit 8 Managing a Project

    and Unit 10 Multimedia Software Products. Full copies of the Unit

    specifications can be found in the appendix.

    Produced: Mr Bolton July 2007-Amended: Mr Nolan July 2010

  • 8/3/2019 A2 Applied ICT Major Project Booklet

    2/18

    Introduction

    Culcheth high school is currently in the process of undertaking a full re-

    branding initiative that will ultimately result in the design and

    construction of a new school building. As part of this initiative they arelooking to design and create an effective and up to date Web Site that

    will encompass these changes as well as provide their target audience

    with a broad picture of the school as a whole. The Web Site is due to be

    launched on 1st April 2011 and they need the project completed by Friday

    4th March 2011 to allow time to upload the whole presentations.

    The Web Site you have been asked to help design will include the

    following information:

    Home Page with an introduction form the Head

    School Prospectus (PDF document of original)

    Calendar of Events

    School Shop

    Job Vacancies

    Subjects (Profiles of teachers / syllabuses / extra curricular

    activities / trips / interviews with students)

    Links (external educational Web Sites subject specific)

    Students Section (revision guides and general information) Parents (specific information about subjects and important dates /

    events)

    Governors (reports and notes from meetings)

    Current News

    The project Manager, Mrs Stevens, has asked if you could help with the

    Subjects section of the Web Site. This will involve designing a

    presentation that makes good use of multimedia software to attract

    potential students and parents to the school as well as provide existingparents and students with all the information they will need to know

    about the subjects they are studying. It should:

    Have a style and format consistent with the new school image

    Be interactive

    Have a modern / futuristic appeal

    Suitable for both adults and students to use

    2

  • 8/3/2019 A2 Applied ICT Major Project Booklet

    3/18

    Project Personnel

    Below is a list of the people who will be involved with your project. You

    will have to liaise with throughout its duration and record your

    conversations / communications as best you can.

    Personnel Initials Role

    Peer reviewers ??? 3 fellow students who will help

    review and evaluate your progress

    Mr Bolton NB Senior Manager in charge of ICT

    developments at CHS

    Mr Mullens CM Web Site manager CHS

    Mrs Stevens AJS Re-branding Project ManagerHead of Department /

    Faculty

    ??? Provide details about the

    department / faculty

    User People who will be using / viewing

    the presentation live

    Yourself ??? You are the person in charge of

    this section of the project

    3

    Task

    As part of your Project Proposal you will need to use the above personnel

    details to outline the following people, their roles and the part they will play

    in your project.

    Senior Management

    Customer / Client

    UserProject Manager

    Team Member

    Peer Reviewer

    Supplier

  • 8/3/2019 A2 Applied ICT Major Project Booklet

    4/18

    Project Phases & Planning

    To begin with you will need to outline a progress chart that identifies the

    key features of your project as well as the dates you intend to complete

    them by. A calendar is provided in the appendix to help you.

    Project Phases

    You will also have to plan the progress of your project and monitor your

    progress throughout. The plan should include:

    Analysis (Client needs and Project Proposals)

    Initial Design (refers to all the features of the software you will

    be creating) Prototyping and Formative Testing (specific features of the

    project similar to the above)

    Summative Testing

    Documentation (design features and user guides etc)

    Hand over to customer

    Project Planning

    Your plan above should also include:

    Activities to be carried out at each phase

    Start and end date for each activity

    Dependencies (what is each section relying on)

    Resources required for each section

    Dates for Key Milestones (see below)

    Potential Risks

    Key Milestones

    Throughout the project you will need to arrange interviews and

    discussions with key personnel to help your project run smoothly.

    Initial meeting with Client

    Initial meeting with supplier

    Prototype testing / feedback

    Interim meetings to check progress of your designs

    Testing deadlines and times

    4

  • 8/3/2019 A2 Applied ICT Major Project Booklet

    5/18

    Handover dates

    Project Proposal

    Once you have established your client needs the proposal needs to be

    addressed. Some of the issues may have been mentioned in the Client

    Needs but more detail is needed. It should include:

    A description of the project and what it will include. (This may

    have been addresses in the client needs so just make reference to it)

    What the project will deliver (describe what it will solve and

    how it will solve your problem)

    Benefits (list the advantages successful completion will bring)

    Risks (what problems may be brought about with the completion

    of the project?)

    Impact on personnel( who will be in charge of monitoring andamending the presentation if necessary?)

    Impact on practices (How will the inclusion of the presentation

    affect the way the web site is run / up dated / technicians time)

    Functional Requirements (what does the system have to do?

    This may have been covered in the client needs, if so make reference to

    it)

    Who will use the product (end users need to be described in

    detail)

    Time scale (how long do you think it will take / have you beengiven)

    Hardware & Software required (list the items needed to create

    and operate the system)

    Planning the Design (on paper)

    5

  • 8/3/2019 A2 Applied ICT Major Project Booklet

    6/18

    Once you have all your written documentation for your plan together you

    need to start on the initial design stages. This is a series of drawings

    that will help to map out the structure and features of your presentation.

    It should include:

    Map of the structure of the presentation to show how it will all

    link together

    Hand drawn designs that indicate:

    Graphics to be used (imported and original)

    Interactivity (buttons and links)

    User Interface features (background / font details)

    Multimedia components (Animation / video / sounds)

    Master slides (basic layout of similar pages)

    Detailed testing plan (Indicates how each of the above feature

    you have described will be tested as well as the expected outcome.

    See page 8 for more details of what to include)

    Prototyping

    This section should also include some images of what you think your

    presentation will look like. This does not have to be done in Flash just

    make sure that it is clear what the layout of different pages in yourpresentations will look like.

    Client Approval

    Once you have completed your initial proposal you need to present it to

    your client to gain their approval of your plans.

    You will need to prepare the following documents:

    Agenda for the meeting

    Minutes of the issues that were discussed and the actions that

    now need to be taken

    Approval form signed by your client to show they accept your

    proposals and have agreed to you designing the presentation for

    them.

    Communication

    6

  • 8/3/2019 A2 Applied ICT Major Project Booklet

    7/18

    Throughout the course of the project you will need to communicate with

    most of the people mentioned in the personnel section. You will need to

    use and document the following types of communications:

    Formal Meetings (minutes / agendas)

    Informal Meetings (notes)

    Questionnaires (record responses)

    Email (evidence of contacts and attachments)

    Conversations (recorded evidence of interviews)

    Memos (saved copies of those sent and received)

    Scope of the Problem

    Once you have received approval for your project ideas you need to

    identify scope of the project. It includes:

    Reasons for undertaking the project (relate to client needs)

    Benefits to the organisation (in relation to the web site and your

    presentation)

    Objectives (measurable targets - qualitative and quantitative)

    Success criteria (how will you know you have achieved the

    objectives) Constraints (what do you have to consider about what you cannot

    do in your presentation eg. Students photos / data protection)

    Areas of risk (complexity of software / time constraints / end user

    ability)

    Roadmap (make links to your plans here)

    Resource requirements (materials / people / time reference to

    plans)

    Interim review points (reference to plans)

    Testing

    7

  • 8/3/2019 A2 Applied ICT Major Project Booklet

    8/18

    You should have designed Testing Plan at the start of the project.

    You also need to make sure that the project is tested throughout its

    implementation. You need evidence of:

    Formative Testing

    Evidence that the presentation has been tested by yourself

    and the end user at regular intervals before the final test plan

    is completed.

    Summative Testing

    This is conducted at the end of the project in 2 sections.

    ALPHA TESTING This is done by you and must address the following

    issues:

    Does the product meet all the requirements listed in the

    Functional Specification

    Do all the Interactive features work correctly Do all the links take the user to the correct place

    Is there a way for the end user to disrupt the program

    Is the product user friendly

    Are there enough instructions

    Also at this stage it would be useful to involve other students (min

    of 3) to get their opinions and thoughts about the quality of your

    work.

    BETA TESTING - This is where your client will test the productto make sure that it meets all of their needs identified at the

    start of the project.

    The above will need to be conducted in the END OF PROJECT

    REVIEW MEETING with your client. It needs to be documented in

    the appropriate way and can use a variety of documents to collect

    the test data such as: Questionnaire / Test Data / Test

    Instructions

    Evaluation

    8

  • 8/3/2019 A2 Applied ICT Major Project Booklet

    9/18

    Once the testing is complete you need to evaluate your project as a

    whole. The evaluation needs to be in 2 sections.

    Evaluation of the Product

    This is where you evaluate the success of your presentation against

    your original specifications and includes:

    How well does it meet the client needs?

    Any shortcomings (flaws) in the project

    The effectiveness of the solution (how well does it work / look)

    Suggestions for enhancements if you had more time / skill (what

    would you like to add or have done)

    A description of your current skill level and the effect this hadon your presentation

    Documented feedback from other students

    Description of how your work could be improved using this

    feedback

    Evaluation of the Plan

    Once you have conducted your End of Project Review Meeting you

    need to comment on the following making reference to the informationgained in the aforementioned meeting:

    Success of the project measured against the original objectives

    (should be covered in the above evaluation)

    The effectiveness of the Project Management methods used

    (how well did your plan work / was it thorough)

    Explain the key lessons that you learned from the experience

    Justifying the actions and decisions you made

    Identifying the strengths and weaknesses of your performanceas a project manager

    Identify areas for improvement based on your own and other

    opinions of your performance as a project manager

    9

  • 8/3/2019 A2 Applied ICT Major Project Booklet

    10/18

    Project Activity Check List

    Unit 8 Folder

    Proposal Folder

    Project ProposalThis section may overlap with the Client Needs in some places. If

    this is the case make sure you include a heading and a link to the

    necessary information.

    Describe what the project is about

    Explain what it will deliver

    Describe the benefits to the organisation from a successful

    completion

    Describe the potential risks involved with the projectExplain how the project will impact on Personnel in the

    organisation

    Explain how the project will impact on practices in the

    organisation

    List the functional requirements of the project (what must it

    be able to do / objectives)

    Explain time lengths

    Describe Hardware and Software needed to complete the

    projectDescribe who else will be involved in the project

    List the ways you could tackle the project

    Make recommendations about why you are doing it in a specific

    way

    Create a Structure diagram to show how a user will navigate

    through the presentation (mind map)

    10

  • 8/3/2019 A2 Applied ICT Major Project Booklet

    11/18

    Plan Folder

    Project Planning & PhasesProduce an Initial Plan that covers in detail the phases mentioned

    below and breaks them into smaller sections

    AnalysisInitial designs

    Prototyping

    Formative testing (see testing on p8)

    Summative Testing

    Documentation User Guides as well as plans to show how your

    design was developed

    Handover Date

    Review Documents

    Review Point 1 change on plan and comments on changes that

    occurred

    Review Point 2 change on plan and comments on changes that

    occurred

    Review Point 3 change on plan and comments on changes that

    occurred

    Review Point 4 change on plan and comments on changes that

    occurred

    Final review point with completed plan/timeline of project andcomments on changes that occurred

    Communication FolderA main page that has a table outlining the following communication

    both formally and informally

    Initial ideas meeting with Stakeholders

    Design Meeting with Stakeholders

    Initial product review meeting

    First completion of product meetingAlpha & Beta testing completion meeting

    Final Handover meeting

    A range of memos\emails communicating with head of

    department setting up meetings\sharing information etc

    Evidence of you acting upon comments and feedback given by

    head of department.

    11

  • 8/3/2019 A2 Applied ICT Major Project Booklet

    12/18

    Product Folder

    For unit 8 you just need a link to your product within unit 10

    folder on your e-portfolio homepage.

    Project Evaluation Folder

    Project EvaluationSuccess of the project measured against the original

    objectives (should be covered in the above evaluation)

    The effectiveness of the Project Management methods used

    (how well did your plan work / was it thorough)

    Explain the key lessons that you learned from the experience

    Justifying the actions and decisions you made

    Identifying the strengths and weaknesses of yourperformance as a project manager

    Identify areas for improvement based on your own and other

    opinions of your performance as a project manager

    12

  • 8/3/2019 A2 Applied ICT Major Project Booklet

    13/18

    Project Activity Check List

    Unit 10 Folder

    Functional Specification Folder

    Identifying the Clients NeedsIdentify the whole problem that you have been asked to solve

    and then the specific section you will be working on

    Include the dates for the project completion

    Provide background details of the company and the Clients

    Describe the reasons why your client wants you to complete

    the project for them

    Describe the content of the Web Site that they want to

    construct / developDescribe the specific task you have been asked to do

    Provide a list of measurable objectives that you have been set

    by the client

    Identifying the StakeholdersFor each of the following identify the person(s) you will be

    communicating with, their role in the organization and their role in

    your project

    Senior managementCustomer / Client

    User(s)

    Project manager

    Team member

    Peer reviewer(s)

    Supplier

    13

  • 8/3/2019 A2 Applied ICT Major Project Booklet

    14/18

    Design Folder

    Produce hand drawn designs that show

    Graphics to be used (custom / digital / imported)

    Interaction (buttons / navigation)

    User Interface (background / font / styles / layout)Media components (sound / animation / video clips)

    Produce a prototype design for the presentation including all

    of the above features (it does not have to be animated)

    Agenda for your Initial meeting with your Client

    Minutes from the initial meeting with your client

    Agreement form signed by the client authorizing you to

    proceed with the project

    Prototyping

    You need to create a page that shows all the ideas you came up withduring the planning and creation of your product to show how you

    ended up with the final version.

    Even if you did use them but did consider them put them into the

    table, try to include:

    Ideas for background images

    Ideas for buttons

    Ideas for video clips

    Ideas for pictures

    Ideas for sound clips

    Evidence of feedback sought from head of department and the

    decisions that they took on the ones to use.

    14

  • 8/3/2019 A2 Applied ICT Major Project Booklet

    15/18

    Product Folder

    Implementing the DesignYour completed presentation must include the following features of

    Multimedia software

    Navigation linear / hierarchicalGraphical designs :

    User Interface

    Effective use of colour

    Effective impact of your design

    Effective use of Fonts

    Consideration of presentation method

    Consistency throughout

    Corporate image has also been considered

    Interactive Design:

    Buttons / Hot Spots / Text Links / Roll over / menus

    User response- text boxes / list boxes / check boxes

    Image capture and manipulation

    Capture ready made images paper based and digital

    Create original images digital camera / graphic software

    Manipulate images

    Video

    Capture ready made clipsRecord original video clips

    Edit video clips

    Select and use appropriate file formats

    Sound

    Record live sound

    Select and import pre-recorded sound

    Manipulate sound Cut & edit / speed up / slow down

    Assign sound to an action / event

    Select and use appropriate file formatsAnimation

    Include Stop Frame animation

    Create and use Motion Tweening

    Include an Animated GIF

    User InterfaceUsed a consistent layout

    Used graphics to illustrate a message

    Prompts have been used to help users navigate your

    15

  • 8/3/2019 A2 Applied ICT Major Project Booklet

    16/18

    presentation

    Interactive features used to initiate certain features

    Implementation Report

    A detailed report on how you created your product and the

    different elements you included.

    User Guide

    How to install the product on a computer/website

    How to use the product

    Testing Folder

    TestingProduce a detailed Testing Plan that covers the following criteriaAre all the functional specifications met

    Do all interactive features work

    Do all the links work

    Is the presentation robust

    Can it be used without help

    Feedback from other sources (min 3) including the Final

    Project Review Meeting

    16

  • 8/3/2019 A2 Applied ICT Major Project Booklet

    17/18

    Product Evaluation Folder

    Product EvaluationHow well does it meet the client needs?

    Any shortcomings (flaws) in the project

    The effectiveness of the solution (how well does it work /look)

    Suggestions for enhancements if you had more time / skill

    (what would you like to add or have done)

    A description of your current skill level and the effect this

    had on your presentation

    Documented feedback from other students

    Description of how your work could be improved using this

    feedback

    How well does it meet the client needs?Any shortcomings (flaws) in the project

    The effectiveness of the solution (how well does it work /

    look)

    Suggestions for enhancements if you had more time / skill

    A description of your current skill level and the effect this

    had on your presentation

    17

  • 8/3/2019 A2 Applied ICT Major Project Booklet

    18/18

    Key Dates for Handing in Work

    Each section although created for an E-Portfolio will be required to be

    printed out and handed in for marking and improvement suggestions.

    ActivityDate

    DueProject Proposal 10/9/10

    Plan & Plan Home Page 17/9/10

    Communications page setup and initial meeting 24/9/10

    Client Needs and Stakeholders 1/10/10

    Hand Drawn Designs for Backgrounds + Buttons 8/10/10

    Hand drawn designs for each page15/10/10

    Prototyping + Second Client Meeting + 1st Plan Review29/10/10

    Flash Home Page 19/11/10

    Flash 2nd page26/11/10

    Flash 3rd Page 3/12/10

    Flash 4th Page10/11/10

    Complete initial Flash document + third client meeting + 2ndplan review

    17/12/10

    Alpha Testing 8/1/11

    Beta Testing 15/1/11

    Improvements to Flash File 22/1/112nd Beta Testing + test meeting with client 29/1/11

    Implementation Guide 5/2/11

    User and installation Guide 11/2/11

    Product Evaluation 25/2/11

    Project Evaluation + Final Client Meeting 4/3/11

    Initial Hand in 4/3/11

    Final Hand in25/3/1