Data Centre WorksCDCTP Certification helped me challenge and highlight 5 areas for change within the University Data Centre’s.
Data Centre Airflow
Access
Moves, Adds, Changes
Earthing & Bonding
Cabling Infrastructure Refresh
![Page 3: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/3.jpg)
Data Centre: Airflow
1/5
Create an efficient data centre.
![Page 4: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/4.jpg)
Data Centre AirflowIt is estimated that 50-80% of valuable conditioned (cooled) air does not reach the intake of IT equipment due to unsealed floors and openings.
Before After• Hot/Cold Aisle Containment• Fill Air Voids• Floor Tile Alignment• Cable Management• Server Fan Direction
![Page 5: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/5.jpg)
Data Centre Airflow40% Annual Energy Savings in AS3 Data Centre, with more savings attainable.
Ambient temperature drop from 24 °C to 16°C
Change of 8 degrees
Lowered Air Conditioning demand to raise temperature back to 24°C
Estimated 40% Annual Energy Saving
Further 2°C change estimated!
Savings paying for HPC Chiller!
![Page 6: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/6.jpg)
Data Centre AirflowAS3 Temperature Sensor Report
Maximum Temperature Minimum Temperature Average Temperature
Aug-14 30.8 18.5 24.2
Sep-14 29.7 18.3 21.6
Oct-14 29.7 18.1 22.6
Nov-14 30.3 19.2 20.0
Dec-14 28.7 17.1 19.9
Jan-15 28.2 17.2 20.2
Feb-15 27.8 18.5 19.9
Mar-15 27.8 18.2 23.9
Apr-15 26.6 14.1 19.8
May-15 24.3 14.1 18.3
Jun-15 23.2 13.7 18.0
Jul-15 21.8 13.4 16.0
![Page 7: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/7.jpg)
Data Centre Airflow3 Tonnes, and counting ….
![Page 8: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/8.jpg)
Data Centre AirflowCable Management….
Before After
![Page 9: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/9.jpg)
Data Centre AirflowAir Void Solutions
Before After
![Page 10: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/10.jpg)
Data Centre: Access
2/5
Audit Visitor Access : Who, What, Why?
![Page 11: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/11.jpg)
Data Centre AccessNovember 2015 - New Access Policy ImplementedFully audited trail for Data Centre Visitors
![Page 12: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/12.jpg)
Data Centre AccessJanuary 2015 - Draft copy of Data Centre Out Of Hours Access form.
![Page 13: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/13.jpg)
Data Centre: Moves, Adds, Changes (MAC’s)
3/5
Audit and increase visibility for changes within the data centre.
![Page 14: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/14.jpg)
Data Centre MAC’s2015 - New Policy Created
![Page 15: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/15.jpg)
Data Centre: Safety
4/5
Ensure a safe working environment.
![Page 16: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/16.jpg)
Earthing & BondingA server rack with 8 servers generates 10 mA-20 mA leakage currents – 50 mA is enough to kill.
Organised the appropriate earthing and bonding of each rack in AS3 DC.
Liaised with external Electricians
Organised access
Ensured job was completed without downtime
Each network rack now has the appropriate earthing ensuring a safe environment.
![Page 17: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/17.jpg)
Data Centre: Cabling Refresh
5/5
Rework the way data cabling is connected.
![Page 18: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/18.jpg)
Cabling Refresh“The decision to place network data and power cabling into overheadcable trays can lower cooling fan and pump power consumption by 24%.” Schneider Electric
Under-floor cabling contributes to energy losses in three ways:
• Blockage of air due to cables
• Bypass air from rack cable cut-outs
• Bypass air from (PDU) cut-outs
Liaised with external contractors
Organised access
Ensured job was completed without downtime
Each rack now has 24 port copper and fibre patch panels back to one central location.
![Page 19: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/19.jpg)
Data Centre: Miscellaneous
![Page 20: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/20.jpg)
Managed PDU RolloutFully managed Power Distribution Unit (PDU) solution
Rollout of managed PDU’s.
Liaised with equipment owners
Document Ownership
Plan Suitable Downtime
Label Commando Sockets / PDU / Fuse
Each network rack now has at least two fully manageable PDU’s.
![Page 21: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/21.jpg)
LightingEfficient lighting system installed
Organised the install of new lights and emergency lighting in AS3 DC.
Liaised with external Electricians
Organised access
Ensured job was completed without downtime
PIR System implemented
20 minute no presence timeout.
![Page 22: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/22.jpg)
DoorProactive over Reactive
Before After
![Page 23: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/23.jpg)
Structural IssuesFloor Tile Arrangement
Problems such as rocking panels and gaps can cause permanent damage to a floor system, personal injuries and damage to equipment.
![Page 24: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/24.jpg)
Data Centre Information ManagementDCIM
Research DCIM Solutions
Implement/Trial openDCIM
Organised On Site Demonstrations
5
![Page 25: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/25.jpg)
High Performance Compute (HPC)
![Page 26: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/26.jpg)
HPCUniversity invested £2M+ in owning a High Performance Compute facility
Preparation
Rigorous room planning and preparation for new contained area to accommodated HPC equipment.
Installation
Organised work and ensure contractors adhered to our standards working within a live environment.
Implementation
Worked with all parties to sign off project and assist in the handover to the HPC Viper team.
![Page 27: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/27.jpg)
HPCInstallation
Before
After
![Page 28: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/28.jpg)
Disaster Recovery (DR) Room
![Page 29: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/29.jpg)
Backup DR SiteConvert an old computer room into a data backup site to house 300k worth of hardware.
Preparation
Room required clearing of old equipment, furniture & general mess.
Air Temperature
Old Air Condition unit was running insufficiently and would not cope with increased load in room.
Power
Source, order, install & configure UPS
![Page 30: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/30.jpg)
Backup DR SiteProactive over Reactive
![Page 31: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/31.jpg)
Uninterruptable Power Supply (UPS)
![Page 32: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/32.jpg)
UPS ReplacementReplace old UPS with new more efficient system
Preparation & Planning
Planning for space, power and cooling efficiency
Installation
Organised work and ensure contractors adhered to our standards working within a live environment.
Commission
Worked with all parties to sign off project and assist in the commission of the new UPS.
![Page 33: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/33.jpg)
UPSInstallation
Before
After
![Page 34: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/34.jpg)
Top Of Rack (ToR) Migration
![Page 35: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/35.jpg)
ToR MigrationCreate a central repository for the 6 Top of Rack switches.
Preparation
Rack Moves, Overhead Cabling, Equipment
Planning
Major Downtime Required
Implementation
Installation & Implementation
![Page 36: Aaron Barwick Data Centre Portfolio](https://reader033.vdocuments.net/reader033/viewer/2022051720/58ed21481a28ab31568b4713/html5/thumbnails/36.jpg)
ToR MigrationCentral Location for ToR Switches