aavailablevailable sspeculativepeculative ... · contact mr. arndt siepmann, director of industrial...

9
CONTACT Mr. Arndt Siepmann, Director of Industrial Recruitment City of Auburn Economic Development 144 Tichenor Avenue, Suite 2 Auburn, Alabama 36830 Ph - (334) 501-7279 Fax - (334) 501-7298 Email - [email protected] JULY 2010 AVAILABLE SPECULATIVE MANUFACTURING BUILDING AVAILABLE SPECULATIVE MANUFACTURING BUILDING AUBURN TECHNOLOGY PARK WEST 2458 W. TECH LN AUBURN, ALABAMA 36832 Conveniently located 3.5 miles northwest of Interstate 85, Exit 51, within the city limits of Auburn, AL in the new Auburn Technology Park West. A new interchange (Exit 50) is scheduled for construction in 2010, 1 mile east. PRODUCTION AREA ±55,206 ft 2 (±5,131m 2 ) TOTAL BUILDING AREA ±63,327 ft 2 (±5,885m 2 ) OFFICE AREA (UNFINISHED) ±8,121 ft 2 (±755m 2 ) YEAR BUILT 2009 ZONING Industrial LOT SIZE ±17.53 acres CONCRETE FLOOR 6 in (15cm), 4,000 psi reinforced with steel and synthetic fiber blend OWNER Industrial Development Board - City of Auburn CLEAR HT 22-27 ft (6.07-7.45m) UTILITIES Electric, Natural Gas, Water/Sewer, Fiber (all underground) COMPACTED BUILDING PAD IN PLACE FOR EXPANSION ±156,700 ft 2 (±11,706m 2 )

Upload: others

Post on 24-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AAVAILABLEVAILABLE SSPECULATIVEPECULATIVE ... · CONTACT Mr. Arndt Siepmann, Director of Industrial Recruitment City of Auburn Economic Development 144 Tichenor Avenue, Suite 2 Auburn,

CONTACT

Mr. Arndt Siepmann, Director of Industrial Recruitment City of Auburn Economic Development 144 Tichenor Avenue, Suite 2 Auburn, Alabama 36830

Ph - (334) 501-7279 Fax - (334) 501-7298 Email - [email protected]

JULY 2010

AVAILABLE SPECULATIVE MANUFACTURING BUILDING AVAILABLE SPECULATIVE MANUFACTURING BUILDING

AUBURN TECHNOLOGY PARK WEST 2458 W. TECH LN AUBURN, ALABAMA 36832

Conveniently located 3.5 miles northwest of Interstate 85, Exit 51, within the city limits of Auburn, AL in the new Auburn Technology Park West. A new interchange

(Exit 50) is scheduled for construction in 2010, 1 mile east.

PRODUCTION AREA ±55,206 ft2 (±5,131m

2)

TOTAL BUILDING AREA ±63,327 ft2 (±5,885m

2)

OFFICE AREA (UNFINISHED) ±8,121 ft2 (±755m

2)

YEAR BUILT 2009

ZONING Industrial

LOT SIZE ±17.53 acres

CONCRETE FLOOR 6 in (15cm), 4,000 psi reinforced with steel and synthetic fiber blend

OWNER Industrial Development Board - City of Auburn

CLEAR HT 22-27 ft (6.07-7.45m)

UTILITIES Electric, Natural Gas, Water/Sewer, Fiber (all underground)

COMPACTED BUILDING PAD IN PLACE FOR EXPANSION ±156,700 ft2 (±11,706m

2)

Page 2: AAVAILABLEVAILABLE SSPECULATIVEPECULATIVE ... · CONTACT Mr. Arndt Siepmann, Director of Industrial Recruitment City of Auburn Economic Development 144 Tichenor Avenue, Suite 2 Auburn,

BUILDING LAYOUT

Lake

Amenity

Area

Page 3: AAVAILABLEVAILABLE SSPECULATIVEPECULATIVE ... · CONTACT Mr. Arndt Siepmann, Director of Industrial Recruitment City of Auburn Economic Development 144 Tichenor Avenue, Suite 2 Auburn,

BUILDING LAYOUT

West Tech Ln

Page 4: AAVAILABLEVAILABLE SSPECULATIVEPECULATIVE ... · CONTACT Mr. Arndt Siepmann, Director of Industrial Recruitment City of Auburn Economic Development 144 Tichenor Avenue, Suite 2 Auburn,

FLOOR PLAN

PRODUCTION

55,206 SF

46’

16

4’

182’ 6”

OFFICE

(unfinished)

8,121 SF

51

’ 5”

91’ 3”

30

2’ 6

16X16

Dock Door

9X10

Dock Doors

Ramp

Door

Door

Stairs

Page 5: AAVAILABLEVAILABLE SSPECULATIVEPECULATIVE ... · CONTACT Mr. Arndt Siepmann, Director of Industrial Recruitment City of Auburn Economic Development 144 Tichenor Avenue, Suite 2 Auburn,

FLOOR PLAN

Page 6: AAVAILABLEVAILABLE SSPECULATIVEPECULATIVE ... · CONTACT Mr. Arndt Siepmann, Director of Industrial Recruitment City of Auburn Economic Development 144 Tichenor Avenue, Suite 2 Auburn,

AUBURN TECHNOLOGY PARK WEST - MASTER PLAN

Spec.

Building

Site

Power Substation

Power Substation Spec.

Building

Site

Page 7: AAVAILABLEVAILABLE SSPECULATIVEPECULATIVE ... · CONTACT Mr. Arndt Siepmann, Director of Industrial Recruitment City of Auburn Economic Development 144 Tichenor Avenue, Suite 2 Auburn,

AERIALS

Spec. Building Site

PowerPowerPower SubstationSubstationSubstation

±17.53 acres±17.53 acres

Page 8: AAVAILABLEVAILABLE SSPECULATIVEPECULATIVE ... · CONTACT Mr. Arndt Siepmann, Director of Industrial Recruitment City of Auburn Economic Development 144 Tichenor Avenue, Suite 2 Auburn,

PHOTOS

FRONT VIEW FRONT VIEW

REAR & NORTH SIDE VIEW NORTH SIDE VIEW

REAR & FINISHED PAD VIEW REAR FINISHED PAD & ELECTRIC SUBSTATION VIEW

PRODUCTION AREA VIEW PRODUCTION AREA VIEW

UNFINISHED OFFICE AREA VIEW PRODUCTION AREA & SHIPPING/RECEIVING VIEW

Page 9: AAVAILABLEVAILABLE SSPECULATIVEPECULATIVE ... · CONTACT Mr. Arndt Siepmann, Director of Industrial Recruitment City of Auburn Economic Development 144 Tichenor Avenue, Suite 2 Auburn,

LOCATION MAP

LEGEND

Auburn University

Downtown Auburn

Auburn University Regional Airport

City of Opelika

o