PLANT PRODUCTIONABT DAILY MEETING 2008/09
CHAIRMAN:M Nadzri Othman
DATE:6th February 2009
TIME:9.30 – 10.00 am
LOCATION:CCR Meeting Room
SCRIBER:Muhamad Fauzi Ahmad
PRODUCTION Ammonia Methanol Urea UF
Plant load (%) 95.33 % shutdown 95.10% 79.76 %
Production day (MT) 1143.97 shutdown 1997.16 13.56
TL No Equipment IssueWHO Planned Action Log
AdditionalRemarks
ENG OPS Date Status
HSE
●1 Weekly PTW
Audit Status12/11: Try to avoidexpected PTW expirydate on Sunday,
normally will behanded back on thefollowing Monday,
before the weeklyPTW audit on Sundayitself (minor NC).
22/12: The PTWform should be filledup completely. There
should not be anysection left empty.
20/01: PTW shall bepulled back (stop
work order) if thereany violation to thePTW requirement atsite. To keep remindfield operator toensure PTWcompliance at site.
02/02: All NCfindings must bereviewed and
approved ShiftManager prior torelease the report.
04/02: to ensure
All HOS
All HOS
Eng
SSE
SSE
SSE
25/0102/0208/02
19/01 ~ 25/01
Area NC
NH3 6 % out of 50
Utility 12.5 % out of 56
26/01 ~ 01/02
Area NCNH3 19% (4) out of 21
Utility 13.5% (5) out of
37
NC findings:NH3: One PTW issued formany activities/workscope i.e: C2202 columnrepair works.
Utility: Insufficient PPEwhile working at F-51-05A i.e: rubber glove
Audit review on weeklybasis. Tracking daily
8/7/2019 ABT MOM 06 Feb 2009
http://slidepdf.com/reader/full/abt-mom-06-feb-2009 2/3
TL No Equipment Issue Who Planned Action Log Additional Remarks
ENG OPS Date Status
Page 2 of 3
●2 Foam Pump Foam system/foam
pump is not tested.MJAG IT
Nasrul/
Azamee
12/1128/11
02/1222/1214/0122/0129/0102/02
06/02
12/11: To study andrecommend the test plan.
28/11: To follow up onnext Tuesday (2/12).
2/12: Next meeting is on22/12 and to come up
with checklist from eachdiscipline.
22/12: The checklist hasbeen emailed to eachdiscipline. The foam test
will be conducted on the2nd week of January.
20/01: awaiting foam
pump repair completionat workshop.
22/01: pump seal worn
out. No spare available.
29/01: To hold due toJBA problem – raw waterlevel 80%
06/02: to conduct thefoam test. To blind at 3
discharge lines prior totest.
●
3 UF solutionoverflow
Incident UF day tankoverfilled @ 0800H.
All SSE Urea 06/02 05/02: UF overflow at UFday tank this morning.
Diverted to guard pond B.waiting lab test result on
PH, COD & UF.1) Night sample
05/02 ( 9 pm)WWTP:COD = 155 ppmUF = 37.23 ppm
PH = 7.33
L4:
COD = 132.2 ppmUF = 36.61 ppmPH = 7.26
2) morning 06/02
Investigation teamwill brief ABT#1 on
the incident onceinvestigation
completed.
8/7/2019 ABT MOM 06 Feb 2009
http://slidepdf.com/reader/full/abt-mom-06-feb-2009 3/3
TL No Equipment IssueWho Planned Action Log Additional Remarks
ENG OPS Date Status
Progress Code Traffic Light Risk Based Decision Making Matrix
● Item Completed
● Item in Progress, Meeting Dateline
● Item facing Problems; Help Needed
●Issue Closed, Pending Deletion from MOM
E1 (Extremely Unlikely, Minor Impact)
Page 3 of 3