AC SWITCHBOARD TESTRESULTS DOCUMENT NUMBER
Project Check Sheet
Client Location
Created on 15/10/2013PAGE: 1 OF 3
Standard: AS:3000 Fed From:
Manufacturer: Serial number:
NOTE: Where automated relay test equipment is used, the test results obtained may take priority over or supplement theinformation recorded on this check sheet. In this case, a reference will be made to an attached result sheet.
ABIDE BY SAFETY AND ISOLATION PROCEDURES IN SWMS6
1 VERIFY INSTALLATION
Tests Required (Minimum)Schematics
Green-lined/Updated
Operation(Pass/Fail)
AcceptedBy
(signature)
Verify board installation method
Verify board design and labelling as per schematic notes
Verify clearances, terminal shrouding/pole blanks are installed and labelled
Verify operation of all handles/locks N/A
Verify door seals N/A
Ensure all penetrations are filled/blanked N/A
2 VERIFY CIRCUIT BREAKER/FUSE/LINK/RELAY TYPES AND RATINGS
Tests Required (Minimum)Schematics
Green-lined/Updated
Operation(Pass/Fail)
AcceptedBy
(signature)
Verify circuit breaker/fuse and link type and ratings
Verify relay types and ratings
3 VERIFY EARTHING
Tests Required (Minimum)Schematics
Green-lined/Updated
Operation(Pass/Fail)
AcceptedBy
(signature)
Verify M.E.N. is installed with correct rating and clearly stamped
Verify earthing to each cubicle section/gland plate/escutcheon plate/door
Verify R.C.D. earthing (same numbered terminal as C/B pole)
Verify cable screen earthing
Verify spare cores are earthed
Test earth resistance to earth grid/stakeSwitchboard Earth bar to grid/stake
Acceptance 0.5
Test MEN resistance to earth gridMEN bar to grid connection
Acceptance 20
Test MEN resistance to switchboard
MEN bar to switchboardconnection Acceptance 20
-
7/27/2019 AC Switchboard Checksheet
2/3
AC SWITCHBOARD TESTRESULTS DOCUMENT NUMBER
Project Check Sheet
Client Location
Created on 15/10/2013PAGE: 2 OF 3
4 VERIFY CABLE INSTALLATION
Tests Required (Minimum)Schematics
Green-lined/Updated
Operation(Pass/Fail)
AcceptedBy
(signature)
Verify cable types as per schematics
Verify cable glanding N/A
Ensure single core cables do not penetrate continuous ferrous material N/A
Verify cable bending radius(12x diameter for multi-core, 15x diameter for single-core)
N/A
Verify segregation N/A
Verify ducting/cable ties
Verify internal and external labelling
Verify ferruling as per schematicsVerify termination lugs for correct size/type N/A
Verify terminal tightness N/A
5 TEST INSULATION RESISTANCE
Tests Required (Minimum)Schematics
Green-lined/Updated
Operation(Pass/Fail)
AcceptedBy
(signature)
Verify switchboard insulation resistance N/A
Test at 1kV for 1 MinuteA B+C+N+E B A+C+N+E C A+B+N+E N A+B+C+E Acceptance
100M (New), 1M (Aged)M M M M
6 TEST INCOMMING SUPPLIES
Tests Required (Minimum)Schematics
Green-lined/Updated
Operation(Pass/Fail)
AcceptedBy
(signature)
Verify incoming supply polarity and phasing N/A
Verify -N continuity. Confirm similar between phases(Max 10% tolerance)
N/A
7 RECORD VOLTAGES
Tests Required (Minimum)Schematics
Green-lined/Updated
Operation
(Pass/Fail)
AcceptedBy
(signature)
Record switchboard voltages N/A
A-B A-C B-C A-N B-N C-N A-E B-E C-E
8 TEST RCDs
Tests Required (Minimum)Schematics
Green-lined/Updated
Operation(Pass/Fail)
AcceptedBy
(signature)
Verify operation of RCDs with test trip button N/A
Test each RCD and fill out logbook N/A
-
7/27/2019 AC Switchboard Checksheet
3/3
AC SWITCHBOARD TESTRESULTS DOCUMENT NUMBER
Project Check Sheet
Client Location
Created on 15/10/2013PAGE: 3 OF 3
TEST PHASE ROTATION
Tests Required (Minimum)Schematics
Green-lined/Updated
Operation(Pass/Fail)
AcceptedBy
(signature)
Verify phase rotation of switchboard and attached outlets N/A
Remarks:
The associated system has been tested and proved to operate successfully as per the design information provided. Please refer to the DefectReport list and Testing Equipment Details.
Commissioning Officer: Signed: Date:
The test results have been reviewed, are within tolerance and are consistent with the design information provided.
Commissioning Engineer(RPEQ): Signed: Date:
Test equipment Description Serial Number