action item list – ipb 2013/2014 ipb ii madrid · 6 action item list – ipb 2012/2013 p&p:...

11
Trimestriel - ISSN 1216 T 85788 - Abonnement 187 € - Prix au numéro 58 € VOLUME 15 / NUMÉRO 1 / MARS 2018 D E N T I M P L A N T & P A R O D O N T E TI TANE Technique du socket shield Phillip Roe 11 Le digital workflow en chirurgie implantaire Karim Dada 25 Préservation alvéolaire et reconstruction osseuse Benjamin Cortasse 45 Digital Smile Design® et réhabilitation esthétique Marie Clément 63 1/18

Upload: others

Post on 09-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Action Item list – IPB 2013/2014 IPB II Madrid · 6 Action Item list – IPB 2012/2013 P&P: STP should be Bi-SC agreed on 20 Jan 14. RA is SHAPE ACOS J2. The identification of possible

1

Action Item list – IPB 2013/2014

IPB II Madrid

Page 2: Action Item list – IPB 2013/2014 IPB II Madrid · 6 Action Item list – IPB 2012/2013 P&P: STP should be Bi-SC agreed on 20 Jan 14. RA is SHAPE ACOS J2. The identification of possible

2

Action Item list – IPB 2012/2013

Page 3: Action Item list – IPB 2013/2014 IPB II Madrid · 6 Action Item list – IPB 2012/2013 P&P: STP should be Bi-SC agreed on 20 Jan 14. RA is SHAPE ACOS J2. The identification of possible

3

Action Item list – IPB 2012/2013

Page 4: Action Item list – IPB 2013/2014 IPB II Madrid · 6 Action Item list – IPB 2012/2013 P&P: STP should be Bi-SC agreed on 20 Jan 14. RA is SHAPE ACOS J2. The identification of possible

4

Action Item list – IPB 2012/2013

Page 5: Action Item list – IPB 2013/2014 IPB II Madrid · 6 Action Item list – IPB 2012/2013 P&P: STP should be Bi-SC agreed on 20 Jan 14. RA is SHAPE ACOS J2. The identification of possible

5

Action Item list – IPB 2012/2013

Maj Viallard

Page 6: Action Item list – IPB 2013/2014 IPB II Madrid · 6 Action Item list – IPB 2012/2013 P&P: STP should be Bi-SC agreed on 20 Jan 14. RA is SHAPE ACOS J2. The identification of possible

6

Action Item list – IPB 2012/2013

P&P: STP should be Bi-SC agreed on 20 Jan 14. RA is SHAPE ACOS J2. The identification of possible DHs will be done in cooperation with SHAPE. According to draft MC 458/3, the final decision needs prior approval of the MC.

Page 7: Action Item list – IPB 2013/2014 IPB II Madrid · 6 Action Item list – IPB 2012/2013 P&P: STP should be Bi-SC agreed on 20 Jan 14. RA is SHAPE ACOS J2. The identification of possible

7

Action Item list – IPB 2012/2013

Page 8: Action Item list – IPB 2013/2014 IPB II Madrid · 6 Action Item list – IPB 2012/2013 P&P: STP should be Bi-SC agreed on 20 Jan 14. RA is SHAPE ACOS J2. The identification of possible

Item   Topic   Advise   Lead   Support   Due  

1

IPB II

2013

SHAPE not invited to e-ITEP UAT (User acceptance Testing) – record dis-satisfaction.

ACT, E&IT

Branch – TMS

Section.

NATO  UNCLASSIFIED    /    Releasable  to  PfP/MD/ICI/PATG  4/10/14   8  

Ac*on  Item  list  –  IPB  2013/2014  

Page 9: Action Item list – IPB 2013/2014 IPB II Madrid · 6 Action Item list – IPB 2012/2013 P&P: STP should be Bi-SC agreed on 20 Jan 14. RA is SHAPE ACOS J2. The identification of possible

Item   Topic   Advise   Lead   Support   Due  

2

IPB II

2013

Any CoE who seek to or are developing e-Learning should join the NATO and national community, both events and part of the peer network.

ACT

E&IT Branch - Technolo

gy Section.

NATO  UNCLASSIFIED    /    Releasable  to  PfP/MD/ICI/PATG  4/10/14   9  

Action Item list – IPB 2013/2014

Page 10: Action Item list – IPB 2013/2014 IPB II Madrid · 6 Action Item list – IPB 2012/2013 P&P: STP should be Bi-SC agreed on 20 Jan 14. RA is SHAPE ACOS J2. The identification of possible

Item   Topic   Advise   Lead   Support   Due  

3

IPB II

2013

LINE e-learning study to be briefed to JFT and then at NITEC (TSC), a side bar meeting of NETF’s will be planned to discuss the final agreed way forward.

ACT

E&IT Branch -

Technology Section

NATO  UNCLASSIFIED    /    Releasable  to  PfP/MD/ICI/PATG  4/10/14   10  

Action Item list – IPB 2013/2014

Page 11: Action Item list – IPB 2013/2014 IPB II Madrid · 6 Action Item list – IPB 2012/2013 P&P: STP should be Bi-SC agreed on 20 Jan 14. RA is SHAPE ACOS J2. The identification of possible

Item   Topic   Advise   Lead   Support   Due  

4

IPB II

2013

NMIOTC applied for DH status for MIO – not received any response.

ACT, Policy Branch.

NATO  UNCLASSIFIED    /    Releasable  to  PfP/MD/ICI/PATG  4/10/14   11  

Action Item list – IPB 2013/2014

P&P:  NMIOTC  leBer  dated  11  Mar  13  offering  the  centre  as  DH  for  MariMme  Security  received  an  answer  by  JFT  on  23  Apr  13.  The  nominaMon  of  DH  will  depend  on  the  STP  MariMme.  As  it  looks  now,  there  will  be  only  1  DH  for  MariMme,  so  no  sub-­‐disciplines  with  separate  DHs  will  be  needed.  

Page 12: Action Item list – IPB 2013/2014 IPB II Madrid · 6 Action Item list – IPB 2012/2013 P&P: STP should be Bi-SC agreed on 20 Jan 14. RA is SHAPE ACOS J2. The identification of possible

Item   Topic   Advise   Lead   Support   Due  

5

IPB II

2013

Harmonise/agree discipline RA/DH list between ACT/ACO (including an Update of the taxonomy for Discipline/Sub

Discipline). The agreed discipline status should be added to the agenda of the

TSC/FOGO.

ACT, Policy

Branch & ACO J7

NATO  UNCLASSIFIED    /    Releasable  to  PfP/MD/ICI/PATG  4/10/14   12  

Action Item list – IPB 2013/2014

P&P:  Agree.  Although  the  discipline  list  was  aligned  between  HQ  SACT  and  SHAPE  at  working  level,  it  needs  consolidaMon.  Work  to  come  up  with  an  official  consolidated  list  has  begun.  Taxonomy  will  be  refined.  However,  HQ  SACT  and  SHAPE  are  not  ready  yet  to  discuss  the  topic  at  the  TSC.  

Page 13: Action Item list – IPB 2013/2014 IPB II Madrid · 6 Action Item list – IPB 2012/2013 P&P: STP should be Bi-SC agreed on 20 Jan 14. RA is SHAPE ACOS J2. The identification of possible

Item   Topic   Advise   Lead   Support   Due  

6

IPB II

2013

EOD COE applied for DH status – not received any response.

ACT, Policy Branch.

NATO  UNCLASSIFIED    /    Releasable  to  PfP/MD/ICI/PATG  4/10/14   13  

Action Item list – IPB 2013/2014

P&P:  So  far  there  is  work  ongoing  on  a  MilEng  STP,  which  is  supposed  to  cover  EOD.  Since  there  is  the  intent  to  limit  the  number  of  DHs  to  the  necessary  minimum,  the  appointment  of  a  DH  for  EOD  is  not  sure.    

Page 14: Action Item list – IPB 2013/2014 IPB II Madrid · 6 Action Item list – IPB 2012/2013 P&P: STP should be Bi-SC agreed on 20 Jan 14. RA is SHAPE ACOS J2. The identification of possible

Item   Topic   Advise   Lead   Support   Due  

7

IPB II

2013

HUMINT COE applied for DH status – not received any response.

ACT, Policy Branch.

NATO  UNCLASSIFIED    /    Releasable  to  PfP/MD/ICI/PATG  4/10/14   14  

Action Item list – IPB 2013/2014

P&P:  STP  should  be  Bi-­‐SC  agreed  on  20  Jan  14.  RA  is  SHAPE  ACOS  J2.  HUMINT  COE  is  the  preferred  DH  for  the  subdiscipline.    

Page 15: Action Item list – IPB 2013/2014 IPB II Madrid · 6 Action Item list – IPB 2012/2013 P&P: STP should be Bi-SC agreed on 20 Jan 14. RA is SHAPE ACOS J2. The identification of possible

Item   Topic   Advise   Lead   Support   Due  

8

IPB II

2013

Investigate individual/collective training links for future activity – reflect in policy documentation.

Investigate individual/collective training links for future activity – reflect in policy documentation.

ACT, Policy Branch.

NATO  UNCLASSIFIED    /    Releasable  to  PfP/MD/ICI/PATG  4/10/14   15  

Action Item list – IPB 2013/2014

P&P:  The  link  between  individual  and  collecMve  training  is  done  through  the  SAGE.  This  link  will  be  enhanced  as  the  E&T  framework  is  developed.  

Page 16: Action Item list – IPB 2013/2014 IPB II Madrid · 6 Action Item list – IPB 2012/2013 P&P: STP should be Bi-SC agreed on 20 Jan 14. RA is SHAPE ACOS J2. The identification of possible

Item   Topic   Advise   Lead   Support   Due  

9

IPB II

2013

CIMIC submitted course for comment (following TNA

process) – awaiting feedback/acknowledgement.

ACT, E&IT Branch - SAT Section.

NATO  UNCLASSIFIED    /    Releasable  to  PfP/MD/ICI/PATG  4/10/14   16  

Action Item list – IPB 2013/2014

Page 17: Action Item list – IPB 2013/2014 IPB II Madrid · 6 Action Item list – IPB 2012/2013 P&P: STP should be Bi-SC agreed on 20 Jan 14. RA is SHAPE ACOS J2. The identification of possible

Item   Topic   Advise   Lead   Support   Due  

10

IPB II

2013

Update I-TIP for presentation at NITEC (TSC). Needs discussion/agreement with JETE and SHAPE ACOS J7 prior to delivery.

ACT, E&IT

Branch - TMS

Section.

NATO  UNCLASSIFIED    /    Releasable  to  PfP/MD/ICI/PATG  4/10/14   17  

Action Item list – IPB 2013/2014

Page 18: Action Item list – IPB 2013/2014 IPB II Madrid · 6 Action Item list – IPB 2012/2013 P&P: STP should be Bi-SC agreed on 20 Jan 14. RA is SHAPE ACOS J2. The identification of possible

Item   Topic   Advise   Lead   Support   Due  

11

IPB II

2013

CIMIC ADC report submitted in Jun 13 – no feedback received.

Draft ADC report to be circulated to membership for

comment/feedback.

ACT, Policy Branch.

NATO  UNCLASSIFIED    /    Releasable  to  PfP/MD/ICI/PATG  4/10/14   18  

Action Item list – IPB 2013/2014

P&P:  The  CIMIC  report  did  not  get  to  the  P&P  Branch  (Ref?).  There  is  a  proposal  template  for  the  report  (the  Discipline  AcMon  Plan  –  DAP)  with  the  branch.    Remark:  The  DH  is  not  officially  appointed  yet.  

Page 19: Action Item list – IPB 2013/2014 IPB II Madrid · 6 Action Item list – IPB 2012/2013 P&P: STP should be Bi-SC agreed on 20 Jan 14. RA is SHAPE ACOS J2. The identification of possible

Item   Topic   Advise   Lead   Support   Due  

12

IPB II

2013

Once FOC is achieved for ETOC, how will participants register for courses, thru ETOC or still thru NSO website?

ACT, E&IT

Branch -TMS

Section

NATO  UNCLASSIFIED    /    Releasable  to  PfP/MD/ICI/PATG  4/10/14   19  

Action Item list – IPB 2013/2014

Page 20: Action Item list – IPB 2013/2014 IPB II Madrid · 6 Action Item list – IPB 2012/2013 P&P: STP should be Bi-SC agreed on 20 Jan 14. RA is SHAPE ACOS J2. The identification of possible

Item   Topic   Advise   Lead   Support   Due  

13

IPB II

2013

The relationship between System ‘unconditional

accreditation’ and that with individual course accreditation

(and its use in ePRIME) requires clarification in Bi-SC

Documentation

ACT, Policy

Branch.

NATO  UNCLASSIFIED    /    Releasable  to  PfP/MD/ICI/PATG  4/10/14   20  

Action Item list – IPB 2013/2014

P&P:  Agree.  The  BiSC  documents  should  have  to  explain  both  opMons  as  follow:    1.  If  UncondiMonal  accreditaMon  was  approved  to  E&T  insMtuMon  who  isn’t  appointed  as  DH  

then  uncondiMonal  accreditaMon  gives  to  that  E&T  insMtuMon  courseware  an  approval  of  quality  IAW  NATO  standards.  Another  side  of  the  coin  (content)  should  be  approved  by  appointed  DH  (without  appointed  DH,  ACT/JFT  will  be  responsible  to  idenMfy  is  that  content  is  valid  or  not).  Then  these  courses  are  NATO  approved  and  ready  to  upload  it  to  the  NATO  TMS.  

2.  If  UncondiMonal  accreditaMon  was  approved  to  E&T  insMtuMon  who  is  appointed  as  DH  then  that  E&T  insMtuMon  has  both  approvals  for  their  courseware-­‐  quality  IAW  NATO  standards  and  content.  Then  theses  courses  are  NATO  approved  and  ready  to  upload  it  to  the  NATO  TMS.  

Page 21: Action Item list – IPB 2013/2014 IPB II Madrid · 6 Action Item list – IPB 2012/2013 P&P: STP should be Bi-SC agreed on 20 Jan 14. RA is SHAPE ACOS J2. The identification of possible

Item   Topic   Advise   Lead   Support   Due  

14

IPB II

2013

There was support from the attendee’s for a separate DH forum to be conducted in 2014.

ACT, Policy

Branch.

NATO  UNCLASSIFIED    /    Releasable  to  PfP/MD/ICI/PATG  4/10/14   21  

Action Item list – IPB 2013/2014

P&P:  Proposal  is  considered.  What  are  the  DHs  expecMng  from  such  a  meeMng?  Moreover,  so  far  there  are  only  two  DH  which  have  been  formally  appointed.  

Page 22: Action Item list – IPB 2013/2014 IPB II Madrid · 6 Action Item list – IPB 2012/2013 P&P: STP should be Bi-SC agreed on 20 Jan 14. RA is SHAPE ACOS J2. The identification of possible

Item   Topic   Advise   Lead   Support   Due  

XX

IPB II

2013

NATO  UNCLASSIFIED    /    Releasable  to  PfP/MD/ICI/PATG  4/10/14   22  

Action Item list – IPB 2013/2014