Activity

INDUSTRY OILEXTRACTION

CONSTRUCTIONINDUSTRY

ENVIRONMENTALPROTECTION ENERGY

SCOPE OF SERVICES

1

ENGINEREENG

DESIGN

PROJECT MANAGEMENT

EXECUTION OF ELECTRICAL & CONTROL SYSTEMS

PREFABRICATION OF DISTRIBUTION BOARDS / PLC CABINETS

COMMISSIONING

SERVICE

What we do?

SCO

PE O

F O

PERA

TIO

NS

2

Electrical installations

C&I

ELECTRICAL INSTALLATIONSDEPARTMENT

3

Electrical installations

ELECTRICAL & CONTROL SYSTEMS

We construct ’turnkey’ energetic systems.

Our employees have the required qualifications.

The company is equipped with proper tools, transport resources and connectivity vital for providing services.

Rigorous checking procedures at every stage of project execution ensure a high level of performance.

4

Electrical installations

ORGANIZATION OF THE DEPARTMENTVarious works – specialized employees

Managers Engineers Workers for:

MV systems LV panels systems control systems cabling cable connections measuring works earth works installation

of cable trays

5

Service & engineering team

6

24/7 – Service in Poland 24/7 – On-call logistic In four working days anywhere in Europe People with necessary permissions and trainings to work offshore:

Olf Card HUET - Helicopter Underwater Escape Training BOSIET - Basic Offshore Safety Induction & Emergency Training

C&I Projects – general scope

Scope

Management • Project Management / Site Management• supervision

Designing • concept of the structure for automation system• Technical documentation

Software Engineering • PLC programming, • SCADA - visualization, reporting, trends, data archiving

Delivery • engineering / operation stations, synoptic boards, servers, • software license• PLC cabinet with I/O cards, interfaces, cross box• process Instrumentation with all necessary equipment• cable trays, cable ducts • fiber optic networks, communication networks• signal / power supply cables• pneumatic equipment

Installation • installation all delivery equipment • installation packages equipment if necessary• connections

Commissioning • instrumentation adjusting• loop testing, • participation in „hot” commissioning• participation in process optimizations

7

Site organization chart

CLIENT REPRESENTATIVEPROJECT MANAGER

MANAGING DIRECTOR OF DEPARTMENT

ELECTRICAL SITE FOREMAN

HEALTH & SAFETY MANAGER

DESIGNER ( ENGINEER )

PRODUCTION PREPARATION

QUALITY CONTROL

PURCHASING & DELIVERY

CONTROLING

ON - SITE WAREHOUSE

PRESIDENT OF THE BOARD

CONSTRUCTION ENGENEER 1 CONSTRUCTION ENGINEER 2

WORK TEAM NO 1

START UP AND MAITNANCE TEAM

WORK TEAM NO 2

5

5

4

PERMANENT ON SITE SERVICES

WORK TEAM NO 1

WORK TEAM NO 3

WORK TEAM NO 2

5

5

5

PERMANENT ON SITE SERVICES

CONTROL AND AUTOMATICS SITE FOREMAN

SITE MANAGER

WORK TEAM NO 3 5

SERVICE TEAM

WORK TEAM NO 1

WORK TEAM NO 3

WORK TEAM NO 2

5

5

5

ON-DEMAND WORK TEAMS

That`s the way we work:

9

Average annually installation of:

Cable trays – 50 km Cables – 300 km Busbars – 6 km

Cable trays installations:

5 km – average length on each Project

That`s the way we work:

60 cubicles – average annually installation of Main LV Panels

10

LV Panels& Distribution boards installations

That`s the way we work:

11

MV Transformer Stations:

15 MVA – annually 30 Middle Voltage cubilces

12

Comprehensive project implementation

BIOETHANOL PRODUCTION FACILITYGoświnowice

WIND FARMŁęki Dukielskie

28 technological installations over an area of 11 haInstalled power 12,8 MVADelivery and assembly: 8x1,6 MVA transformers MV 8HD10 switchgear LV 3200A distribution boards from LV1 to LV7

Installed power 10 MWInstallation of 15 kV internal connectionsInstallation of 5 transformer stationsConnection to National Grid

13

Comprehensive project implementation

Design and modernizationPower station equipped with: Two boilers 17,5 MVA/6,3 kV generator LV switchgears 22 cubicles, 2 ATSE, 2500 A Main MV switchgear

THERMAL-ELECTRIC POWER PLANT at PCC ROKITABrzeg Dolny

NGK CERAMICSGliwice

Installation of five 3150 kVA transformers with Siemens 5000 A busbars

Installation of four 2500 kVA transformers with Siemens 4000 A busbars

Installation of one 1600 kVA transformers with Siemens 2500 A busbars

Delivery and installation of SIMOSEC 24kV, 630 A

Prefabrication and delivery of eight units of LV Sivacon 5000 A

14

Comprehensive project implementation

Installation of two 2500 kVA transformers with Siemens 4000A busbars

Installation of five1600 kVA transformers with Siemens 2500A busbars

Delivery and installation of SIMOSEC 24kV, 630 A

Prefabrication and delivery of eight units of LV Sivacon 5000 A

KIRCHHOFF Polska Ltd. ASSEMBLY, GliwicePlant No. 1, 2, 3 and power suplly

Toyota Foundry with accompanying ACCUROMM and NTK facilities, Jelcz Laskowice

Installation of six 2000 kVA transformers with Siemens 5000A busbars

Delivery and installation of SIMOSEC 24kV, 630 A

Prefabrication and delivery of eight units of LV Sivacon 5000 A