Activity Model: Ship Repair and Conversion Y. Tina Lee Charles R. McLean Swee Leong U.S. DEPARTMENT OF COMMERCE Technology Administration Manufacturing Systems Integration Division National Institute of Standards and Technology Gaithersburg, MD 20899 QC 100 U56 NO. 6533 2000 NIST National Institute of Standards and Technology Technology Administration U.S. Department of Commerce

Upload: others

Post on 17-Jan-2022

11 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Activity model: ship repair and conversion

Activity Model: Ship

Repair and Conversion

Y. Tina LeeCharles R. McLeanSwee Leong

U.S. DEPARTMENT OF COMMERCETechnology Administration

Manufacturing Systems Integration

Division

National Institute of Standards

and Technology

Gaithersburg, MD 20899

QC

100

U56

NO. 6533

2000

NISTNational Institute of

Standards and Technology

Technology Administration

U.S. Department of Commerce

Page 2: Activity model: ship repair and conversion
Page 3: Activity model: ship repair and conversion

Activity Model: Ship

Repair and Conversion

Y. Tina LeeCharles R. McLeanSwee Leong

U.S. DEPARTMENT OF COMMERCETechnology Administration

Manufacturing Systems Integration

Division

National Institute of Standards

and Technology

Gaithersburg, MD 20899

June 2000

Cttl OF c0.

U.S. DEPARTMENT OF COMMERCEWilliam M. Daley, Secretary

TECHNOLOGY ADMINISTRATIONDr. Cheryl L. Shavers, Under Secretary

of Commerce for Technology

NATIONAL INSTITUTE OF STANDARDSAND TECHNOLOGYRaymond G. Kammer, Director

Page 4: Activity model: ship repair and conversion
Page 5: Activity model: ship repair and conversion

Activity Model: Ship Repair and Conversion

Y. Tina Lee

Charles R. McLean

Swee Leong

Manufacturing Systems Integration Division

National Institute of Standards and Technology

Gaithersburg, MD 20899-0001

Preface“Knowledge Based Modular Repair: Advanced Technology Applications for Ship Repair and

Conversion” is one of the National Shipbuilding Research Program1(NSRP) projects. NSRP, a

collaboration of the U.S. shipbuilding industry and government agencies, was established in 1998.

The goals of the program are:

1. assist the U.S. shipbuilding industry in capturing a significantly increased share of the

commercial market,

2. warship affordability for the Navy by reducing both acquisition and lifecycle cost, and

3. preserve the U.S. shipbuilding infrastructure by maintaining the capability to respond to

the future demands of military and commercial consumers.

The Knowledge Based Modular Repair project is performed by the Atlantic Marine Holding

Company (AMHC) and the National Institute of Standards and Technology (NIST). The goal of

this project is to reduce cycle times, reduce costs, and improve the precision and overall quality of

repair and conversion processes conducted by American ship repair yards. The project is being

conducted in conjunction with repair and conversion operations at AMHC 2, in its two repair yards,

as the sites to implement an array of best manufacturing practices that demonstrate how project

goals can be accomplished.

The project is applying precision metrology techniques, manufacturing equipment and process

characterization methodologies, and modeling and simulation technologies to AMHC repair and

conversion operations that involve the fabrication of piping system and steel products. The intent

of the project is to develop and implement at Atlantic Marine, Inc. (AMI), in Mobile a system that:

1. allows measurement data to be lifted from ships accurately and efficiently,

2. efficiently translates measurement data into production information, and

3. produces parts and assemblies with a high enough degree of confidence that they will fit

on the ship without scrap or rework.

The project is also providing the ability for AMI Mobile to improve its planning and estimating

processes by incorporating the capabilities of modeling and simulation into AMI systems.

1

Maritech Advanced Shipbuilding Enterprise, “National Shipbuilding Research Program,” http://www.nsrp.org .

2The Atlantic Marine Holding Company has two repair yards: Atlantic Marine, Inc., in Mobile, Alabama, and Atlantic

Dry Dock Corp., in Jacksonville, Florida.

i

Page 6: Activity model: ship repair and conversion

In order to accomplish the project’s objective, it is important to understand the practices that are

commonly used by the industry. This document presents an activity model that identifies the

functions involved in the ship repair and conversion industry, and the information flows required to

perform those functions. The model presented in this report has been developed primarily based on

information gathered during visits to both ship repairs and conversion facilities of AMHC, in

Mobile, Alabama, and Jacksonville, Florida. Although the model describes all types of

repairs/conversions, it puts special emphasis on those processes associated with steel systems, pipe

systems, and paint. The document also includes two appendices: a node tree that describes

functional hierarchy, and a glossary that provides definitions of all terms, including activity names

and data/objects, used in the activity model.

The activity model presented in this document uses the IDEFO3methodology. In the IDEFO

diagrams, activities/functions are represented by “boxes,” data/objects, such as inputs, controls,

outputs, and mechanisms (Icom), are represented by “arrows,” tunneling is represented by a tunnel

(a pair of parentheses, or sign “()”) around the arrow’s head or arrow’s tail, and boxes and arrows

are labeled. Tunneling an arrow implies that the arrow does not appear on a child or parent

diagram. When a tunnel appears around the arrow’s head, there is no corresponding Icom

connected to the parent box. Similarly, when a tunnel appears on the arrow’s tail, no

corresponding Icom connected to the child box. IDEFO does not model the timing of activities, nor

does the ordering of the activities by label-number imply time of precedence.

ACKNOWLEDGEMENTThe authors wish to acknowledge technical contributions to this report from Andy Hobbs, Derek

Parker, Dolly Moccia, Rick Harrell, Bob McDermott, and Bob Hubbard of Atlantic Marine, Inc.,

Mobile, Alabama.

DISCLAIMERCertain commercial equipment, instruments, or materials are identified in this paper in order to

facilitate understanding. Such identification does not imply recommendation or endorsement by

the National Institute of Standards and Technology, nor does it imply that the materials or

equipment identified are necessarily the best available for the purpose.

3Federal Information Processing Standards Publication 183, “Integrated Definition for Functional Modeling (IDEFO),”

National Institute of Standards and Technology, December, 1993.

ii

Page 7: Activity model: ship repair and conversion

Cl.

OH

O —I

ea

a,<u

P4l_

-23T3os-a<uco03

pa

1)00

O "T3CD <D

*

I sE- W

HUm'—i

oPiCI-

Os

SO

cn

CN

00WHO2

cCD

EQ.'=3

crLJJ

CoQ. p'l.oCOCD o-o £"O CD

C .

_ ^CD CO

E~ZJ

•ac

CD Q. .2C CO «a CD CDo? 3>- as

czzs

£EoO

oas

cas

CDD>o

>coo~ocas

Q.

T3

cas

co as~ Q.CD

<D CD

CDCOOQ.S

3Q.

Easas

czCD

ECDO)ascas

E

c‘oCL$as

>

cdtuDP

2D2

OCOa:LU>2o0

<CLLUDC

CO

CL

1CO

LUI-=)oLUXLU

Page 8: Activity model: ship repair and conversion

>w

c3Cl£>

Ois-c3

*3

osT3Dtoc3

PQ<t>

&0<U T3(U <U

2 o.5 cH ^HUw*—

»

OOSOh

On

VO

CM

onWHOz

H<QWooZ>

0Eoi—coooEo

COco3o'coEEO

CM CO

CM

cu

O-

1E

03a<u

Ci

w

o<

Page 9: Activity model: ship repair and conversion

eg

Cu<D

osUieg

33O

-a<u00eg

CQ0)ao

<U T3<u <o

| gH W

OS HO Q£“

b o5 ^< cu

VO

<N

00wHO2

mCu

o<D

'o’—a.co

eg

a.4J

X>2CO

w

wQO2

Page 10: Activity model: ship repair and conversion

u ..

^ >< Vio a

03a.(U

cdu*03

3•aosT3<U0/3

03

CQ<ubo

<D 'O<u u

I g

HUw—

5

oOSOh

Ov

VO

<N

WHO2

"3- —O .2

oo5

Eoa>coccx:a&_3CL

coroo

'o<do.COi_CD

Cl

<D>Uo3Q.<D

"OC03

0/3

C_o

c3

Ou'o’

o-

E•—

£<U

Oh

CN<

Page 11: Activity model: ship repair and conversion

HXtuH2OU

<Q

CU

CQ

Q<W04

QMQZW

oo

o

tu ..

£ >< WQ 04

c3

a.<u

04

eg

3*T3

O

•a<u

eg

m<ubJD

<D ~00) <U

eg o.S cH W

E-Utu•“5

o04Oh

©a\

oo

\0

>n

•'t

mCN

oz

H<Qtuco

ccos-O

o

dz

1—u>oc

coo3-aoQ.

Eu..O

UCu

CM<

wQOZ

Page 12: Activity model: ship repair and conversion

£-

XuaH2OU

Q<WPi

O22&o£

£<aO

oo

^ ©O —

'

w ..

^ >< wo a

ao.03

ai-

JH3"3OS"O<D<Z)

3PQ0)bfl

<D *oCD _03

%o

J33

HUPJ

OPiP*

H<

c/3

D

oON

GO

r-

NO

un

co

(N

sHO2

O cs

EE3C/3

uo<:

VO

CP

NODE.

A22

TITLE.

Develop

work

summary

NUMBER:

Page 13: Activity model: ship repair and conversion

HXBJE-Zou

<Q

Q<UQDi

O2

oo

< WQ 06

030,

<D

06S-

—3T3O

-o0)&o3CQUbO

<U T30) 0>

S o.£ cE—1

HU

K gH o06a,

<

coD

o

o\

00

t"

\o

w>

CO

CN

COWHO2

CL,

03O

•aeCS

00C_o

re_N‘E3O£3re

04UhO£OJ

3x>

73C03

£2cd«<uca>

a

(N<

Page 14: Activity model: ship repair and conversion

HUm»—»

OPiOh

h >< UJQ Pi

eg

a,<D

•h.

eg

3"QOsT3O<*>

eg

P30)60

<D "O<o a)

« *S gP t*l

ON

oo

r-~

NO

NO

Tf

co

co

66

eoz

CM -1-

O O oo

eC

CM NODE.

A24

TITLE.

Develop

and

submit

schedule

NUMBER:

Page 15: Activity model: ship repair and conversion

I

HXwHZou

op

o —

g >< ppQ oi

aCl,<D

Pit-ca

3-ao

T3<UCO03

03<uOO

O T3<o <u

$2 o.5 eE-i WHUP3—1

oPiPu,

oOs

00

r—

SO

-"3-

op

CN

OP

BOz

E-<QWopD

W J-0 O Os

cu

COp*:COea

03>

TJC03

03>'Ec3

1

<D—CL

4)coCO0)>

s.0

<L>

Oh

w>CNJ

<

ppQOz

Page 16: Activity model: ship repair and conversion

LU

£ou

READER

DATE

WORKING

DRAFT

RECOMMENDED

PUBLICATION

X

oo

O —I

m ..

£ >< mQ Qi

03

Q.4>

C£u.03

3•ao

T30)co3

ffl

4)tuO

4> "O0) 4)

a §H W

oON

oo

r-

NO

m•3-

ro

CM

HU

£ Kb o5 ^< Oh

00

Oz

H<Qw00D CO

NODE.

A3

TITLE.

Perform

crafts

activities

NUMBER:

P.

10

Page 17: Activity model: ship repair and conversion

cOa<D

DCs->

—3•OOsT3U3CD<0CUD

<D T3<D <U

®3 o.5 cH W

C\

VO

HUwocu

00wHOz

C\]

O

PCwCQ

SDZ

<0Q.

‘a.

ac(0

"5u

X>CO

ClCO<

Page 18: Activity model: ship repair and conversion

C3a,<L>

oCs-

—3•aoST3<L>C/5

03

CQ0)00

<U T3<D <D

s gH WHUw1—5

oOSOh

Os

oo

SO

tT

co

CN

00UJHOz

(N

cu

mro<

Page 19: Activity model: ship repair and conversion

X

oo

I/Oo

w ..

£ >< ffl

Q D£

S3

Oa0)

DS!

t-

-2313OsoCD&oc3

CQCDM

<D 13(D CD

gl

©Os

00

!"•

SO

mit

cn

<N

HUW>—s

oC*Oh

00wHOz

H<QW00D

m’-H

0)

cd

O-

130)

cdo*nX)cd

Ph

<Ncncn<

XQO2

Page 20: Activity model: ship repair and conversion

H

B<Q

OSaQ<PJOS

oz

oo

W ..

< mQ OS

03

CL<D

C*S

l*

—3"3O

-o<UC/5

309<0oo

o XIoj a>

.1 §E- W

PS

O33H90<

HUPJ—

>

O0SCL

H<Qtuon90

I OD

QWQZwSSouPJOS

zoH<U(—

H

J00900-

oOn

oo

r-~

VO

<n

•'fr

mCN

ooWHOz

cn

JD3oOS<L>

CL

'o.

o"Cjo«PL

'3-

mm<

Page 21: Activity model: ship repair and conversion

Q<wPS

oz

x

oo

oo

WH<Q

3a<u

—-23-ao

T3<D

cS

ffl

<UU>

U "O<u <u

« *

I §E-h WHUW•nOosOh

H<QWoo

D

I

oON

oo

t"

NO

>n

^r

to

C4

00WHOz

CNJ

NO

cu

-X

5£L."«Cl<uL.

E—£<3CL,

wJHP

m<

MQOZ

Page 22: Activity model: ship repair and conversion

tP

3333oso<u

3ffl

3 O.5 C

o yg st o5< Oh

3CL<D

04

On

<D&0

<U 3D0) <D

J “vo

«n

<N

00UJHO2

VO

cl

Oil

BJCQ

sDZ

cn“u _0)

Ti-en<

c/3 3CL3

3DOC

4—

»

3tLi

w

33DOEW-2£oo.o

CD<D

CO

3CLo04

3-CT>

<

Page 23: Activity model: ship repair and conversion

w ..

^ >< wQ DC

03

Q,<L>

06u.ja3T3OST3<DooC3

CQ<utuO

0) T3<U <U

I SE-1 W

'O

HUwODCO,

00WHO2

c-~

cC

DCWCQ

s2>

2

o£<uo.

03Q.<D

DC

<N^3-m<

Page 24: Activity model: ship repair and conversion

H|X

1 D°OU

,

& >< wQ ^

c3

0,ops—CO

"3

-aos•ao>73CO

CQucuo

a> ~o0) u

si

Huw(=5

oOSCL,

On

oo

r-~

VO

>n

CO

CN

00

Boz

oCM

oor—

H

cu

pswra

SDZ

u*O5:

ooe

C3

CL

€ua,

w

MH

co

co<

WQOz

Page 25: Activity model: ship repair and conversion

rP

m ..

< wQ d

Cl<d

Pi

23T3Os-a<uc/3

MPQ<uoc

<U "3<U ID

s §H «HUW1—

i

OaCL,

o->

CM

00tuHOZ

H<QWooP

OO.Q0)

o

3x >»<u>•—

o 3<4-*

s-<D

Oh

CO

<N

"O >Nco

3 03 CL CO

c- 03QJ

oo"5 xs

o oso

OOX)

> o c<D X CL SiQ o 3 J—

<

o 3 oe £

oCO

CO

c pn-CO

f:

_C d <

o 03o

CO>>

<u

Qo co

Os

Cl,

X)o

aCLd>'53

ouPi

<n

ro<

Page 26: Activity model: ship repair and conversion

[P

>tuPC

C3D*<U

PCs-

_2

"Oo

aa>c/3

<3

CQa>txO

(D T3O IU

C gH WHUm—iooCd*

ON

NO

CN

COWHOz

H<QWonD

o<N

CL3

i

JCo3O*-*

'5b_c

3oO

wHH

3"co3-co<

UJQOZ

Page 27: Activity model: ship repair and conversion

O —

'

w ..

£ >< wQ PC

03C-<U

PClx

T3o

TJ1)

c/2

c3

m<u60

<u "Oa> u

«!

HUwoPCPh

as

oo

t"

vo

in

tj-

co

CM

00WHo2

E-i

<QuooD

CN

eu

PCaCQ

2D2

CC3Q.DT3

13

«ClD

-acCS

ocW>

i/5

'3'

<

Page 28: Activity model: ship repair and conversion

Appendix 1: Node Tree/Functional Hierarchy

The IDEFO activity model can be represented as a tree of activities, with all inputs, controls,

outputs, and mechanisms omitted. Such a representation is called a node tree. The following

presents the node tree of the activity model, “ Execute Ship’s Repair/Conversion.”

[AO] Repair/conversion ship

[Al] Establish repair/conversion project

[All] Analyze specification and/or perform shipcheck

[A12] Estimate material/equipment/labor requirements

[A13] Estimate project cost and time

[A 14] Prepare and submit bid

[A15] Negotiate contract terms

[A2] Perform project team functions and prepare vessel arrive

[A21] Perform production turnover

[A211] Identify project management team

[A212] Download estimate from estimating

[A213] Distribute specification

[A22] Develop work summary

[A221] Identify yard item numbers and lead craft

[A222] Identify task items of un-priced extras, unsettled priced extras,

and settled extra

[A223] Generate and distribute work summary sheets

[A23] Generate and distribute work authorizations and production releases

[A231] Identify sub-tasks for each task

[A232] Identify requirements for each task

22

Page 29: Activity model: ship repair and conversion

[A233] Identify owner furnished material for each task

[A234] Issue production releases to crafts

[A24] Develop and submit schedule

[A241] Develop master schedule

[A242] Revise schedule for growth/cancellation/delays

[A243] Update schedule to show progress

[A244] Archive schedule

[A245] Submit schedule to vessel owner, crafts, and project team

[A25] Perform vessel pre-arrival and arrival tasks

[A251] Hold pre-arrival meeting with vessel owner

[A252] Arrange vessel arrival and docking

[A253] Survey for ship inspection and measurements

[A254] Identify growth work items

[A26] Order material

[A3] Perform crafts activities

[A31] Initiate work orders

[A32] Assign production resources

[A33] Fabricate steel and pipes

[A331] Process steel measurements

[A3311] Lift measurements from vessel

[A3312] Convert measurements to CAD file

[A3313] Convert CAD file to equipment friendly language

[A332] Fabricate steel plates

Page 30: Activity model: ship repair and conversion

[A3321] Mark and layout plates

[A3322] Cut plate parts

[A3323] Bend and roll plates

[A3324] Weld parts to plate

[A3325] Allow heat relief

[A3326] Test/inspect steel block/module

[A333] Sub-assemble steel blocks/module

[A334] Fabricate pipe modules

[A3341] Cut pipe

[A3342] Bend pipe

[A3343] Weld pipe

[A3344] Test/inspect pipe module

[A34] Perform repair work

[A341] Repair steel work

[A3411] Remove damaged steel work

[A3412] Transport steel module to/from vessel

[A3413] Fit-up steel module

[A3414] Weld steel module

[A3415] Test/inspect steel work

[A342] Repair pipe work

[A3421] Remove damaged pipe work

[A3422] Transport pipe module to/from vessel

[A3423] Fit-up pipe module

Page 31: Activity model: ship repair and conversion

[A3424] Weld pipe module

[A3425] Test/inspect pipe work

[A343] Perform painting work

[A3431] Receive paint job

[A34311] Receive job specification, work authorizations and

production releases

[A34312] Develop notebook and duplicate a working copy

[A34313] Determine coating system

[A34314] Locate product data sheets and material safety data

sheets

[A34315] Perform hull survey

[A34316] Adjust specification to accommodate changes

based on survey

[A3432] Setup/examine/improve surface preparation

[A3433] Arrange and setup equipment and hoses

[A3434] Perform coating/touch-ups

[A34341] Do painting

[A34342] Allow paint to be dried

[A34343] Inspect subsequent coat

[A3435] Inspect final coat

[A3436] Remove equipment from dock and clean dry dock

[A344] Perform other work items such as machinery, electrical works

[A35] Dispose waste and clean areas

[A4] Sign off and prepare vessel depart

25

Page 32: Activity model: ship repair and conversion

[A41] Develop test and inspection procedures

[A42] Perform inspection

[A43] Sign off contract

[A44] Issue invoice and collect payments

[A45] Depart vessel

Page 33: Activity model: ship repair and conversion

Appendix 2: Glossary

The following terms are used in the activity model, “Execute Ship’s Repair/Conversion.” Terms

included in this glossary are the activity names and data/objects that may be inputs, controls,

outputs, or mechanisms (Icom). (An input is a data/object that is transferred by an activity. Acontrol is a data/object that determines how or when an activity occurs, but is not transformed by it.

An output is a data/object that is produced by or results from an activity. A mechanism is a person,

facility, machine, or other agency that performs the activity.)

Adjust specification to accommodate changes based on survey (Activity A34316)

The act of modifying the specification to accommodate the changes based on the result of a survey.

Allow heat relief (Activity A3325)

The act of applying heat to promote stress relief and to reduce buckles on a steel plate due to the

welding process.

Allow paint to be dried (Activity A34342)

Sufficient time to be allowed for paint to be dried before application of subsequent coat or if

submersion of vessel.

Analysis result (Icom)

Result of analyzing the customer's specification. The analysis of the specification is performed to

determine if the customer's requirements are feasible and to determine the cost to satisfy all

requirements.

Analyze specification and/or perform shipcheck (Activity All)

The analysis of the customer's specification is performed to determine if the customer's

specification for the repair/conversion is feasible, and if it is feasible, then at what cost to the

customer. Ship check is an actual survey performed by the project team to determine the repair

requirements.

Archive schedule (Activity A244)

The act of recording all of the information about schedule including original and updated

schedules.

Arrange and setup equipment and hoses (Activity A3433)

The act of setting up equipment on dock for painting purposes.

Arrange vessel arrival and docking (Activity A252)

The act of preparing equipment (e.g. bilge blocks and crane) and scheduling manpower prior to

ship arrival for dry docking.

Assign production resources (Activity A32)

The act of assigning material and qualified individuals to a particular location, equipment, or work

item.

27

Page 34: Activity model: ship repair and conversion

Assigned labor and equipment (Icom)

Individuals to be assigned to particular locations, equipment, or work items.

Bend and roll plates (Activity A3323)

The act of bending and rolling steel plates to a desired geometric shape.

Bend pipe (Activity A3342)

The act of making a bend of pipe.

Bid (Icom)

An offer that describes price quotations and corporation’s capabilities.

CAD drawings (Icom)

The ship design drawing that is generated by the CAD systems.

Communications from customer (Icom)

Communication from the customer regarding the repair/conversion project.

Condition reports (Icom)

Reports prepared by the crafts and submitted to the project team describing issues and problems.

Contract terms (Icom)

Mutually agreed, between the corporation and the customer, terms and conditions dealing with

crafting, resources, inspection, payments, cost, and time of the project.

Convert CAD file to equipment friendly language (Activity A3313)

The act of converting steel measurements in the CAD file to an equipment friendly language file,

such as NC machine codes, on disc.

Convert measurements to CAD file (Activity A3312)

The act of converting steel measurements to a CAD file for generating a CAD drawing.

Corporate Guidelines (Icom)

Guidelines provided by the corporation for operating procedures, performance, safety, testing and

inspection, etc.

Customer general requirements (Icom)

Requirements of the customer related to craft repair practice, safety, quality, cost extra, etc.

Cut pipe (Activity A3341)The act of cutting pipe into a desired dimensional length and geometric shape.

Cut plate parts (Activity A3322)

The act of cutting steel plate into desired geometric parts.

28

Page 35: Activity model: ship repair and conversion

Depart vessel (Activity A45)

The supporting activity for preparing the vessel’s departure from the shipyard.

Determine coating system (Activity A34313)

The act of determining the desired coating system for a particular paint job.

Develop and submit schedule (Activity A24)

The act of development and distribution of the schedule to all crafts, the project team and the

owner. The development consists of developing the original schedule, revising the schedule (for

growth, cancellations, weather delays and other impacts), and updating the schedule (for progress

status.)

Develop master schedule (Activity A241)

The act of developing the original schedule. The schedule is to identify work calendars,

manpower, start time, and end time for accomplishing the job.

Develop notebook and duplicate a working copy (Activity A34312)

The act of generating a notebook to include all paint work items.

Develop test and inspection procedures (Activity A41)

The act of developing necessary operations to perform a vessel’s test and inspection for ensuring

that the vessel is fully operational and the customer’s requirements are met.

Dispose waste and clean areas (Activity A35)

The act of cleaning and removing waste from working areas.

Develop work summary (Activity A22)

The act of identifying yard item numbers, lead crafts, and generating work summary sheets.

Distribute specification (Activity A213)

The act of distributing the specification to the project team.

Do painting (Activity A34341)

The act of performing the painting job.

Download estimate from estimating (Activity A211)

The act of retrieving the project estimate from the estimating department.

Drawings/NC machine code (Icom)

Manual drawings, CAD drawings, or NC machine code of the repair parts.

Equipment (Icom)

Equipment used for performing the task. The equipment may be available at the facility, or it can

be rented.

29

Page 36: Activity model: ship repair and conversion

Equipment requirement (Icom)

Equipment required for performing the job.

Establish repair/ conversion project (Activity Al)

The act of pursuing a new repair/conversion project consists of five stages: 1). receive and analyze

the customer’s specification, 2). estimate the requirements of material, equipment, and labor for

completing the job, 3). estimate the total time and cost requirements, 4). develop and submit the

proposal, and 5). negotiate contract terms with the customer.

Estimate material/ equipment/ labor requirements (Activity A12)

The act of estimating material, manufacturing resources, skilled labor, and equipment required to

accomplish the project. Levels of detail in this estimation are based on the information provided in

the customer’s specification.

Estimate project cost and time (Activity A13)

The act of estimating the total time and total cost required to perform the project. This estimation is

based on the amount of material needed, the manufacturing resources and skilled labor used, and

the requirements of the customer.

Fabricate pipe modules (Activity A334)

The act of fabricating the pipe modules at the shop.

Fabricate steel and pipes (Activity A33)

The act of fabricating steel plate and pipes modules at the shop.

Fabricate steel plates(Activity A332)

The act of fabricating steel plates at the shop.

Fit-up pipe module (Activity A3423)

The act of fitting-up a pipe module.

Fit-up steel module (Activity A3413)

The act of fitting-up a steel plate module.

Generate and distribute work summary sheets (Activity A223)

The act of generating and distributing the work summary sheets. These sheets are generated based

on the estimating function project. The sheets list the work items that are specified in the owner

specification and the work items that are growth extras.

Generate and distribute work authorizations and production releases (Activity A23)

The act of generating and distributing work authorizations and production releases to crafts.

Growth extras and estimates (Icom)

Growth work items with estimates. The growth work items, which are not presented in the original

customer’s specification, may be encountered while performing repair work or performing pre-

arrival surveys.

30

Page 37: Activity model: ship repair and conversion

Hold pre-arrival meeting with vessel owner (Activity A251)The act of holding a vessel pre-arrival meeting to discuss the schedule and other issues and

concerns relating to the project.

Identify growth work items (Activity A254)The act of identifying growth work items.

Identify owner furnished material for each task (Activity A233)The act of identifying material furnished by the customer.

Identify project management team (Activity A212)The act of identifying the project management team that may include a project manager,

coordinators, sub-contracting coordinator, and scheduler/planner.

Identify requirements for each task item (Activity A232)The act of identifying a set of task requirements from the crafts based on the owner specification

and estimate. The requirements include material, manufacturing resources, skilled labor, and

equipment.

Identify sub-tasks for each task (Activity A231)

The act of identifying the operations’ (sub-tasks’) sequence for each task item.

Identify task items of un-priced extras, unsettled priced extras, and settled extras (Activity

A222)

The act of identifying growth work items that have not been settled with the customer.

Identify yard item numbers and lead craft extras (Activity A221)

The act of assigning and matching yard item numbers to the original owner item numbers for the

accounting system to track the job.

Initiate work orders (Activity A31)

The act of issuing a production notification to the customer and production orders to crafts.

Inspect final coat (Activity A3435)

The act of performing the final inspection of coatings.

Inspect subsequent coat (Activity A34343)

The act of performing an inspection after each paint coating. For a hull’s paint work, the attending

superintendent or customer's appointed representatives may be required to examine each coat

applied prior to application of subsequent coat.

Inspection reports (Icom)

Reports describing the inspection results.

31

Page 38: Activity model: ship repair and conversion

Invoices/payments (Icom)

Invoices of itemized charges for the customer and payments received from the customer.

Issue production releases to crafts (Activity A234)

The act of distribution of the production release to the craft level.

Issue invoice and collect payments (Activity A44)

The act of issuing the invoice to the customer and collecting payments from the custome?.

Job performance status (Icom)

The status of the job progress.

Labor requirement (Icom)

The crafts required for performing the job. The crafts may include painters, steelworkers, pipe-

fitters, welders, machinists, electricians, riggers, carpenters, etc. Subcontractors may be required

on specialty instances.

Laws/rules/standards/regulations (Icom)

Laws, mles, and standards that govern various aspects of the enterprise’s operations.

Lift measurements from vessel (Activity A3311)

The act of processing a steel measurement. Actual measurements are lifted, usually with a tape

measure, after the vessel arrives.

List of sub-tasks of the task item (Icom)

A set of operations required to accomplish the task requirements.

Locate product data sheets and material safety data sheets (Activity A34314)

The act of adding Product Data Sheets and Material Safety Data Sheets in the paint job notebook.

Management team (Icom)

A team to manage the project or portions of the project. The team may consist of a project

manager, project coordinators, a sub-contracting coordinator, and a scheduler/planner.

Manual drawings (Icom)

The ship design drawing that is generated manually.

Mark and layout plates (Activity A3321)

The act of marking and laying-out steel plates.

Material requirement (Icom)

Material required for performing the job.

Minutes (Icom)

A report resulting from the ship’s pre-arrival meeting.

32

Page 39: Activity model: ship repair and conversion

Negotiate contract terms (Activity A15)

The act of agreeing to the terms and conditions of the contract as negotiated by the shipyard and the

customer.

NC machine code (Icom)

NC machine code in an equipment friendly language.

Notebook (Icom)

Notebook that records all paint work items.

Order material (Activity A26)The act of procuring the required material for production in accordance with the process plan and

the schedule.

Owner furnished material (Icom)

Material furnished by the customer for the project.

Owner furnished material for the task (Icom)

Material furnished by the customer for a particular task.

Owner work items (Icom)

Work items specified in the owner specification.

Owner specification (Icom)

Documentation specifying the customer’s service requirements.

Perform coating/ touch-ups (Activity A3434)

The act of performing painting.

Perform crafts activities (Activity A3)

The act of performing repair/conversion, the stage after the planning and scheduling.

Perform hull survey (Activity A34315)

The act of conducting a hull survey with the ship’s owner and a paint manufacture representative

after the ship arrives and docks.

Perform inspection (Activity A42)

The act of performing the vessel inspection using the test and inspection procedures.

Perform other work items such as machinery, electrical works (Activity A344)

The act of performing production work items that are not steel jobs, pipe jobs, or paint jobs.

Perform painting work (Activity A343)

The act of performing the painting of work items.

33

Page 40: Activity model: ship repair and conversion

Perforin production turnover (Activity A21)

The act of presenting all project information from the estimating department to an assigned project

manager when the bid is accepted.

Perform project team functions and prepare vessel arrive (Activity A2)

The act of assembling a project team, performing a production turnover, and identifying task items

etc.

Perform repair work (Activity A34)

The act of performing all repair tasks identified in the project.

Perform vessel pre-arrival and arrival tasks (Activity A25)

The act of preparing for vessel arrival. The survey includes the first examination when the vessel

arrives and the dock is pumped dry, as well as subsequent surveys as per repair specification.

Personnel (Icom)

A facility’s personnel.

Pipe modules (Icom)

Pipe modules prepared for pipe repair.

Pipe parts (Icom)

Pipe parts prepared for making steel plates.

Plate stock (Icom)

Plate stock prepared for making steel blocks/modules.

Plates (Icom)

Plates that are prepared for plate repair.

Preliminary estimated cost (Icom)

Cost estimated to perform the project. It is estimated by analyzing the customer's specification, and

it is used to prepare a bid.

Preliminary estimated time (Icom)

The time required for performing the project. It is estimated by analyzing the customer's

specification, and it is used to prepare a bid.

Prepare and submit bid (Activity A14)

The formulation of a specific plan for the development and submittal of a proposal for the

repair/conversion project. The development of the plan is based primarily on the customer's

specification and the nature of the type of repair/conversion.

34

Page 41: Activity model: ship repair and conversion

Process plan/work authorizations (Icom)

Documentation describing the sequence of operations that make up each task of the project, the

necessary labor, material, and equipment to accomplish each task, and material furnished by the

customer for each task.

Process steel measurements (Activity A331)

The act of processing steel measurements after the vessel arrives.

Production notification to owner (Icom)

A message, such as a schedule, issued to the customer about the start of repair/conversion process.

Production Release (Icom)

Work orders issued to crafts about the production job.

Purchased material (Icom)

Material purchased for the project.

Receive job specification, work authorizations and production releases (Activity A34311)

The act of receiving a job order from the project team. Information received includes the job

specification, work authorizations and production releases.

Receive paint job (Activity A3431)The act of receiving a painting job.

Remove damaged pipe work (Activity A3421)

The act of removing damaged pipes.

Remove damaged steel work (Activity A3411)

The act of removing damaged steel plates/modules.

Remove equipment from dock and clean dry dock (Activity A3436)The act of removing equipment from the dock and cleaning the dry dock after painting work is

complete.

Repair pipe work (Activity A342)

The act of performing pipe repair.

Repair steel work (Activity A341)

The act of performing steel plate repair.

Repair/ conversion ship (Activity AO)The act of operating a ship repair/conversion project.

Requirements of labor/ material/equipment (Icom)

Labor, material, and equipment required for performing each task.

35

Page 42: Activity model: ship repair and conversion

Revise schedule for growth/ cancellation/ delays (Activity A242)

The act of updating the schedule to include growth work items, cancellation work, or work delay

due to weather or other impacts.

Schedule (Icom)

The plan describing work calendars, manpower, start time, end time, and shifts for each task.

Setup/examine/improve surface preparation (Activity A3432)

This activity is about surface preparation. It includes the preparation of the surface, examination of

the surface preparation by the customer, and improvement of the grade of surface preparation. The

surface preparation is required to meet the customer’s requirement.

Sign off and prepare vessel depart (Activity A4)

The act of finalizing the project. This stage comes after all repairs have been completed, and the

activities include perform inspection, sign off, and depart vessel.

Sign off contract (Activity A43)

The act of performing the project’s sign-off.

Signed-off contract (Icom)

The contract that is signed off by the customer. Once all contract terms and conditions are met, the

contract is ready for signing off.

Steel blocks/modules (Icom)

Steel blocks/modules ready for the steel repair.

Sub-assemble steel blocks/modules (Activity A333)The act of sub-assembling the steel blocks/modules.

Submit schedule to vessel owner, crafts, and project team (Activity A245)

The act of distributing the project schedule from the planner/scheduler to all crafts, the project

team, and the owner.

Survey for ship inspection and measurements (Activity A253)The act of conducting ship surveys after the ship arrives and docks. The survey includes the first

examination when the vessel arrives and docks, as well as subsequent surveys, as per repair

specification, for gathering actual measurements.

Survey report (Icom)

The report resulting from the vessel’s survey.

Systems (Icom)

Systems that are available at the facility.

36

Page 43: Activity model: ship repair and conversion

Test and inspection procedures (Icom)

The plan for performing tests and inspection.

Test/inspect pipe module (Activity A3344)

The act of performing testing or inspection of the pipe module.

Test/inspect pipe work (Activity A3425)

The act of performing testing or inspection of the pipe repair work.

Test/inspect steel block/module (Activity A3326)The act of performing testing or inspection of the steel block/module.

Test/inspect steel work (Activity A3415)

The act of performing testing or inspection of the steel repair work.

Transport pipe module to/from vessel (Activity A3422)

The act of transporting the pipe module to or from the vessel.

Transport steel module to/from vessel (Activity A3412)

The act of transporting the steel module to or from the vessel.

Update schedule to show progress (Activity A243)

The act of updating the schedule to show the project progress.

Vessel (Icom)

The ship for repair/conversion.

Waste (Icom)

All debris resulting from the project.

Weld parts to plate (Activity A3324)

The act of welding steel parts.

Weld pipe (Activity A3343)The act of welding pipe sections.

Weld pipe module (Activity A3424)

The act of welding a pipe module.

Weld steel module (Activity A3414)

The act of welding a steel module.

Work summary (Icom)

Work summary that is a set of sheets for specifying a work item number and a brief description for

each task item in the project.

37

Page 44: Activity model: ship repair and conversion

Yard items (Icom)

Yard item numbers that are assigned for the accounting system for tracking the job.