Department of Facilities and Transportation Services Office of Design and Construction Services 8115 Gatehouse Road, Suite 3500 Falls Church, Virginia 22042-1203 ADDENDUM #1 Date: September 9, 2019 Project: Poe Middle School Roof Replacement Project (Bid # 20-002) THIS ADDENDUM IS SUPPLEMENTARY TO THE PLANS AND SPECIFICATIONS FOR THE PROJECT. ALL CHANGES, ADDITIONS AND DELETIONS SHALL BECOME PART OF THE CONTRACT AS IF ORIGINALLY CALLED FOR IN THE SPECIFICATIONS. PRE-BID CONFERENCE AGENDA Pre-Bid Conference Agenda Poe Middle School 9-9-19 Bid Date- 9/18/19 Start Date 12/21/19 Work Winter Break 12/21/19-1/14/20 (Mandatory) Work on Saturdays after Winter Break is permitted but not mandatory. Work Spring Break (4/4/20 -4/11/20) is mandatory. Work on Saturdays after Spring Break is not mandatory but is permitted. All Saturday work must be approved by FCPS and should be requested no later than the end of business day on Thursday prior to the Saturday being requested. Substantial Completion Date 8/23/19 (all hot work completed) No work first week of school metal work can continue with noise restrictions. Final Completion Date 9/27/19 (punch list complete and accepted by owner) Only roof areas shown on the roof plan provided are to be replaced. Verify canopies shown on roof plan to be replaced. This replacement project is a total roof replacement type 1. Power vacuuming is required per the specifications. Specification section 07510 and 07530 are the roof replacement types. Manufacturers are Firestone, GAF, Soprema and Johns Manville. Refer to 07510 and 07530 for guidelines with these manufacturers. Roof warranty is a 20 year NDL warranty (FCPS details and specifications can exceed those specifications).

Upload: others

Post on 21-Jan-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ADDENDUM #1 - fcps.edu · Addendum #1 \(20-002\)\rPage 1 of 5. Liquid flashing is detailed at drains, gravel stop edges and scuppers – no roof cement (paint all installations)

Department of Facilities and Transportation Services

Office of Design and Construction Services

8115 Gatehouse Road, Suite 3500

Falls Church, Virginia 22042-1203

ADDENDUM #1 Date: September 9, 2019 Project: Poe Middle School Roof Replacement Project (Bid # 20-002) THIS ADDENDUM IS SUPPLEMENTARY TO THE PLANS AND SPECIFICATIONS FOR THE PROJECT. ALL CHANGES, ADDITIONS AND DELETIONS SHALL BECOME PART OF THE CONTRACT AS IF ORIGINALLY CALLED FOR IN THE SPECIFICATIONS.

PRE-BID CONFERENCE AGENDA

Pre-Bid Conference Agenda – Poe Middle School 9-9-19 Bid Date- 9/18/19 Start Date – 12/21/19 Work Winter Break 12/21/19-1/14/20 (Mandatory) Work on Saturdays after Winter Break is permitted but not mandatory. Work Spring Break (4/4/20 -4/11/20) is mandatory. Work on Saturdays after Spring Break is not mandatory but is permitted. All Saturday work must be approved by FCPS and should be requested no later than the end of business day on Thursday prior to the Saturday being requested. Substantial Completion Date – 8/23/19 (all hot work completed) No work first week of school – metal work can continue with noise restrictions. Final Completion Date – 9/27/19 (punch list complete and accepted by owner) Only roof areas shown on the roof plan provided are to be replaced. Verify canopies shown on roof plan to be replaced. This replacement project is a total roof replacement type 1. Power vacuuming is required per the specifications. Specification section 07510 and 07530 are the roof replacement types. Manufacturers are Firestone, GAF, Soprema and Johns Manville. Refer to 07510 and 07530 for guidelines with these manufacturers. Roof warranty is a 20 year NDL warranty (FCPS details and specifications can exceed those specifications).

bjcaridi
Text Box
bjcaridi
Text Box
Addendum #1 (20-002) Page 1 of 5
Page 2: ADDENDUM #1 - fcps.edu · Addendum #1 \(20-002\)\rPage 1 of 5. Liquid flashing is detailed at drains, gravel stop edges and scuppers – no roof cement (paint all installations)

Liquid flashing is detailed at drains, gravel stop edges and scuppers – no roof cement (paint all installations). Paint all liquid flashings, roof cemented areas, lead flashings, asphalt or torched bleed out area, and drain strainers using manufacturer’s coatings. Allowance for project is $25,000.00 – do not forget to add this to your bid. Work at the school prior to school ending is by FCPS approval only. Metal work:

Replace all metal unless directed by FCPS (verify at pre bid meeting).

Check the roof plan closely – verify all details you are responsible for.

Any questions ask before you install. All other terms and conditions remain the same.

QUESTIONS/ANSWERS/STATEMENTS FROM BIDDERS Question 1: What are we doing with the overflow drains? Answer 1: All overflow drains are to be removed and a pipe stubbed up through the

finished roof. Question 2: What is being done with the area where the gravel stop transitions into

coping? Answer 2: Areas are to be typical wood cant detail and tapered edge insulation used to

feather out any offset in the transitions. Question 3: Are we installing coping on the block wall alongside the loading dock? Answer 3: Yes, to be added to the contract. See note #3 on attached revised roof plan. Question 4: The canopy observed during walkthrough is not on original drawing. Are we

replacing the roof on this canopy? Answer 4: Yes, to be added to the contract. See note #4 on attached revised roof plan. Question 5: The upper section on front of school was noted and a question was asked as

to whether the section could be deleted from the contract? Answer 5: Yes, it will be deleted from the contract. See note #5 on attached revised roof

plan.

Subhash Gambhir, Architect Office of Design and Construction

Attachments: Pre-Bid Attendees List Plan Holders List Revised Roof Plan cc: Contract File

bjcaridi
Text Box
Addendum #1 (20-002) Page 2 of 5
Page 3: ADDENDUM #1 - fcps.edu · Addendum #1 \(20-002\)\rPage 1 of 5. Liquid flashing is detailed at drains, gravel stop edges and scuppers – no roof cement (paint all installations)
bjcaridi
Text Box
Addendum #1 (20-002) Page 3 of 5
Page 4: ADDENDUM #1 - fcps.edu · Addendum #1 \(20-002\)\rPage 1 of 5. Liquid flashing is detailed at drains, gravel stop edges and scuppers – no roof cement (paint all installations)
bjcaridi
Text Box
Addendum #1 (20-002) Page 1 of 5
bjcaridi
Text Box
Addendum #1 (20-002) Page 4 of 5
Page 5: ADDENDUM #1 - fcps.edu · Addendum #1 \(20-002\)\rPage 1 of 5. Liquid flashing is detailed at drains, gravel stop edges and scuppers – no roof cement (paint all installations)

# 4.

NIC

New roof and insulation system as perSpec. section 07530.

New S lock metal panels over Ice and watershield with 2 piece reciever and counter flashing.

xxxx

New roof and insulation systemas per spec. section 07510. TYPE 1(complete tear off of all existing roofing)

Existing Roof:4 PlyBUR and gravel over 4" fiberglassinsulation over metal deck.

NIC

XXX XXXX

XXXXXXXXXXXXXX

XXXXXXX

XXXXXXX

XXX

XXX XXXXXXX X

X

XXXX XXXXX X

XX

XX

X X XXX

X XX XXX

XXXXXXXXXXXXXXXXX

XXXXXXXXXXX

XXXXXXXXXXX

NIC NIC

NIC

NICNIC NIC NIC

NIC

NIC

NIC

NOTE:

1.) Provide new overflow pipe in place of overflow drain.

2.) All roof drains to be replaced with large drain bowlsand new deck pans.

# 3.

NIC

NIC

# 5.

This area removed from contract.

Add to contract:Install coping on block wall.

Canopy: Add to contract

addendum # 1

addendum # 1

addendum # 1

REVISED ROOF PLANADDENDUM # 1 (SEPTEMBER 9, 2019)