![Page 1: ADDENDUM #1 NWIT-16-08 HVAC Systems Upgrade – … · May 10, 2016 ADDENDUM #1 NWIT-16-08 HVAC Systems Upgrade – Engineering Operations Main Building 901 Fist Street , New Westminster,](https://reader034.vdocuments.net/reader034/viewer/2022051808/6009b6584ba4d67cc0632dff/html5/thumbnails/1.jpg)
May 10, 2016
ADDENDUM #1 NWIT-16-08
HVAC Systems Upgrade – Engineering Operations Main Building 901 Fist Street, New Westminster, BC
This addendum modifies the Invitation to Tender only as noted: SPECIFICATIONS
Hazardous Materials Abatement Section 02 82 13 Paragraphs 1.3.3.3 and 1.3.3.4 (pages 3 and 4) <ADD> Drawings showing Asbestos Bulk Samples Locations and Lead (in Paint) Bulk Sample
Locations (2 pages following) ADDITIONAL INFORMATION
Please refer to Tender Addendum #2 from Jade West Engineering Co. Ltd (2 pages following) Please acknowledge this addendum on page 2 of 3 in the Bid Form. END OF ADDENDUM #1 Yours truly,
Heather M. Rossi Intermediate Buyer
Document #871769
![Page 2: ADDENDUM #1 NWIT-16-08 HVAC Systems Upgrade – … · May 10, 2016 ADDENDUM #1 NWIT-16-08 HVAC Systems Upgrade – Engineering Operations Main Building 901 Fist Street , New Westminster,](https://reader034.vdocuments.net/reader034/viewer/2022051808/6009b6584ba4d67cc0632dff/html5/thumbnails/2.jpg)
![Page 3: ADDENDUM #1 NWIT-16-08 HVAC Systems Upgrade – … · May 10, 2016 ADDENDUM #1 NWIT-16-08 HVAC Systems Upgrade – Engineering Operations Main Building 901 Fist Street , New Westminster,](https://reader034.vdocuments.net/reader034/viewer/2022051808/6009b6584ba4d67cc0632dff/html5/thumbnails/3.jpg)
![Page 4: ADDENDUM #1 NWIT-16-08 HVAC Systems Upgrade – … · May 10, 2016 ADDENDUM #1 NWIT-16-08 HVAC Systems Upgrade – Engineering Operations Main Building 901 Fist Street , New Westminster,](https://reader034.vdocuments.net/reader034/viewer/2022051808/6009b6584ba4d67cc0632dff/html5/thumbnails/4.jpg)
TENDER ADDENDUM
To: City of New Westminster
Email: [email protected]
Attention: Wayne Werbovetski
Project: N.W. Eng/Elec Operations
Heat Pumps Addition
Date: May 09, 2016
Proj #: NEWW-39
Tender Addendum #: 2
2.1 Reference: Drawing M-2
Clarification:
Contractor to provide Control Panel Point accommodation. Refer to Panel Point File
for reference below.
![Page 5: ADDENDUM #1 NWIT-16-08 HVAC Systems Upgrade – … · May 10, 2016 ADDENDUM #1 NWIT-16-08 HVAC Systems Upgrade – Engineering Operations Main Building 901 Fist Street , New Westminster,](https://reader034.vdocuments.net/reader034/viewer/2022051808/6009b6584ba4d67cc0632dff/html5/thumbnails/5.jpg)
Sincerely,
Jade West Engineering Co. Ltd.
Nenad Stojanovic, AScT