Addendum No. 1 DWM Sewer Improvement – Various Locations P-2017-05 SPECIFICATION NO. 306235 For which bids will be opened in the office of the Department of Procurement Services, Room 103, Chicago, Illinois, 60602 on December 21, 2017 at 11:00 A.M. Central Time: BIDDERS WILL ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THE SPACE PROVIDED ON THE PROPOSAL PAGE NOTICE OF ADDENDUM OF CONTRACT DOCUMENTS ADDENDUM NUMBER 1 SECTION I: NOTICE OF REVISIONS/CHANGES Change No. 1: Contract Plans, replace the following plan sheets: Summary of Quantities Sheet, revises quantity for Item Nos. 42, 103, 106 and 107 Sheet 6 of 47 for PN 6498A Sheet 23of 47 for PN 6498A Sheet 36 of 51 for PN 6902 Sheet 6 of 71 for PN 7012 Sheet 15 of 71 for PN 7012 Sheet 24 of 71 for PN 7012 Sheet 1 of 31 for PN 7174 Sheet 10 of 31 for PN 7174 Change No. 2: Contract Specification Book 2, replace pages 19 through 28. This revision revises the approximate quantity Item Nos. 42, 103, 106 and 107 on the Schedule of Prices. Change No. 3: Contract Specification Book 3, replace pages DS-76 through DS-82 End of Addendum #1

Upload: others

Post on 25-May-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Addendum 1 - P-2017-05 Spec-306235 20171205 (2) - Chicago · room 103, chicago, illinois, 60602 on december 21, 2017 ... 15-duct 6-mtd 4-duct with fire alarm ... restoration should

Addendum No. 1DWM Sewer Improvement – Various Locations

P-2017-05SPECIFICATION NO. 306235

For which bids will be opened in the office of the Department of Procurement Services,Room 103, Chicago, Illinois, 60602 on December 21, 2017

at 11:00 A.M. Central Time:

BIDDERS WILL ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THESPACE PROVIDED ON THE PROPOSAL PAGE

NOTICE OF ADDENDUM OF CONTRACT DOCUMENTS

ADDENDUM NUMBER 1

SECTION I: NOTICE OF REVISIONS/CHANGES

Change No. 1: Contract Plans, replace the following plan sheets: Summary of Quantities Sheet, revises quantity for Item Nos. 42, 103, 106 and 107 Sheet 6 of 47 for PN 6498A Sheet 23of 47 for PN 6498A Sheet 36 of 51 for PN 6902 Sheet 6 of 71 for PN 7012 Sheet 15 of 71 for PN 7012 Sheet 24 of 71 for PN 7012 Sheet 1 of 31 for PN 7174 Sheet 10 of 31 for PN 7174

Change No. 2: Contract Specification Book 2, replace pages 19 through 28.This revision revises the approximate quantity Item Nos. 42, 103, 106 and 107 on theSchedule of Prices.

Change No. 3: Contract Specification Book 3, replace pages DS-76 through DS-82

End of Addendum #1

Page 2: Addendum 1 - P-2017-05 Spec-306235 20171205 (2) - Chicago · room 103, chicago, illinois, 60602 on december 21, 2017 ... 15-duct 6-mtd 4-duct with fire alarm ... restoration should

SUMMARY OF QUANTITIES

SUMMARY OF QUANTITIES

1

1 ADDENDUM NO. 1 12/5/17

1

1

12/4/2017

PERCENT COMPLETE DATE

100

90

75

60

30

X:\

1010

0s\10

146.3

0\

P-2017-05\

Bid

Package

Docu

me

nts\

P-2017-05-S

HT-S

OQ.d

gn

ARH

ALG

WLS

DRAWN:

DESIGNED:

CHECKED:

REVIEWED:

CITY OF CHICAGODEPARTMENT OF WATER MANAGEMENT

BUREAU OF ENGINEERING SERVICES

P-2017-058/24/17

P-2017-05-SHT-SOQ.dgn 12/4/2017 2:02:03 PM

Page 3: Addendum 1 - P-2017-05 Spec-306235 20171205 (2) - Chicago · room 103, chicago, illinois, 60602 on december 21, 2017 ... 15-duct 6-mtd 4-duct with fire alarm ... restoration should

Ew ww

T

w

E

w

6" 15" 14"

14" 13" 11" 14" 11" 13"

12"4-4"CE

HORIZONTAL SCALE

VERTICAL SCALE0

1 inch = 20 ft.

0

5 10 205

20 10 20 40 80

2.5

1 inch = 5 ft.

X:\

1010

0s\10

146.3

0\

Eng

Docs\

Road

way\

CD

WM

6498

A-S

HT-P

LN

PR

F02.d

gn

12/4/2017

OF

PN

PERCENT COMPLETE DATE

100

90

75

60

30 BUREAU OF ENGINEERING SERVICES

DEPARTMENT OF WATER MANAGEMENT

CITY OF CHICAGODRAWN:

DESIGNED:

CHECKED:

REVIEWED:

ALG

ALG

WLS

WLS

47

6498A

5/15/15

9/21/15

4/28/16OUC #2016-70861

12/19/16

8/1/17

5+00

6+00

7+00

8+00

9+00

10.3 ORDINANCE ELEVATION

IE = -3.00

IE = -2.90

IE = -2.9|

10

+00

IE = -3.2|

IE = -2.6|

7+09

IE = -2.89

IE = -4.89

IE = -4.90

IE = -2.87

24" RCP PIPE @ 0.0018 SLOPE

18" DIP PIPE THROUGH BOX

7+17.9

5

EXISTING PAVEMENT

IE = -3.34

IE = -2.66

GAS ST

36" MP CATCH BASIN

ACCESS MANHOLE

24" RCP SEWER (STORM ONLY) @ 0.0018 SLOPECL III (STORM ONLY)

4'X12' BOX @ 0.0010 SLOPEEXISTING 24" RCP SEWERTO REMAIN

EXISTING 18" SEWER EXISTING 18" SEWER

ACCESS MANHOLE

CONCRETE SIDEWALK

CONCRETE SIDEWALK

EXISTING 15" SEWER

EXISTING 18" SEWER

EXISTING 18" SEWER

PROPERTY LINE

PROPERTY LINE

PROPERTY LINE

PROPERTY LINE

BASE LINE

6

EXISTING CONDITIONS

PROPOSED PLAN

PROPOSED PROFILE

+10

+5

0

-5

-10

-15

EXISTING 18" SEWER

EXISTING 18" SEWER

EXISTING 18" SEWER

EXISTING 15" SEWER

NN

10.3

ST MP

CI MP

SE

E

SH

EE

T

NO.

5

MA

TC

HLIN

E

ST

A.

5+00

SE

E

SH

EE

T

NO.

7

MA

TC

HLIN

E

ST

A.

10

+00

EXISTING 18" SEWER

EXISTING 15" SEWER

EXISTING 18" SEWER

15-DUCT

6-MTD

4-DUCT WITH FIRE ALARM

OUTSIDE NEAT LINES OF PROPOSED SEWER

18' TRENCH SHIELD WIDTH

OUTSIDE NEAT LINES OF PROPOSED SEWER

EXISTING 15" SEWER

45'

+00

+27

55'

DI

100'

64'

+75

PLUG OUTFALL

EXISTING 18" SEWER

EXISTING 18" SEWER

E 95TH ST

E 95TH ST

E 95TH STREET

PLAN AND PROFILE

7' TRENCH SHIELD WIDTH

ACCESS MANHOLE

CONC

~ OF BOX

EXISTING 12" SEWER

BEND

+94 15°

TO BE RELOCATED RELOCATED LINE

16'

MANHOLE TO INTERCEPT EXISTING CONDUIT

5'

36" IMH

8" BOV PT

E

SEE NOTE 1

SEE NOTE 1

SEE NOTE 1

EXISTING 24" BRICK SEWER

EXISTING 21" BRICK SEWER

EXISTING 24" BRICK SEWER

EXISTING 21" BRICK SEWER

4'

12-DUCT

SEE SHEET 8

FOR PLAN AND PROFILE

SEE SHEET 8

FOR PLAN AND PROFILE

(BY OTHERS)

BRIDGE SUPPORT

(BY OTHERS)

24" CILP TO BE RELOCATED

EXISTING 18" SEWERTO BE ABANDONED

BITUMINOUS PAVEMENT

SEE SHEETS 28-30

JUNCTION STRUCTURE

SEWER TO REMAINEXISTING 24" RCP2.

AND LIDBOLT-DOWN FRAMELID WITH WATERTIGHTEXISTING FRAME ANDREMOVE AND REPLACE1.

NOTES:

SEE NOTE 2

SEE SHEETS 28-30

JUNCTION STRUCTURE

STRUCTURE

JUNCTION 4'X12' BOX

4'X12' BOX

ACCESS MANHOLE

12/5/171 ADDENDUM NO. 1

1

1

1

10 009 008 007 006 005 005 00 10 00

Page 4: Addendum 1 - P-2017-05 Spec-306235 20171205 (2) - Chicago · room 103, chicago, illinois, 60602 on december 21, 2017 ... 15-duct 6-mtd 4-duct with fire alarm ... restoration should

NN

EXISTING ELEVATIONS / REMOVAL PLAN

PROPOSED RESTORATION PLAN

RESTORATION SHOULD BE VERIFIED WITH DESIGN SECTION BEFORE CONSTRUCTION.

IN THE STREET TO BE DETERMINED IN THE FIELD DURING CONSTRUCTION. ANY CHANGE IN PARTIAL OR FULL

5. ROADWAY GRADES AND CROSS SLOPES TO PROMOTE ADEQUATE DRAINAGE AND MITIGATE WATER PONDING

4. ADJUST ROADWAY CENTERLINE ELEVATION TO ACHIEVE COMPLIANT CROSS SLOPES.

3. SEE CHICAGO DEPARTMENT OF TRANSPORTATION ADA CONSTRUCTION STANDARDS FOR ADA RAMP DESIGN.

DEPARTMENT OF TRANSPORTATION AND AS ORDERED BY THE COMMISSIONER.

MUST CONFORM TO THE LATEST REGULATIONS FOR OPENINGS, CONSTRUCTION, AND REPAIR OF THE CHICAGO

2. CONSTRUCTION OF NEW PAVEMENTS, CONCRETE SIDEWALKS, CURBS, GUTTERS, ALLEY RETURNS, AND DRIVEWAYS

DIRECTED BY THE COMMISSIONER.

1. THE EXTENT OF PAVEMENT RESTORATION MUST NOT EXCEED THE LIMITS SHOWN IN THIS DRAWING OR AS

NOTES:

ADA RAMP NOTES

INSTALL ADA RAMP TILE

EXISTING RAMP PASSES - DO NOT REMOVE

SPECIAL DESIGN

STANDARD DESIGN

3.46

4.

3.

2.

1.

ADA RAMP NOTE 2

ADA RAMP NOTE 2

ADA RAMP NOTE 3ADA RAMP NOTE 3

LEGEND

BITUMINOUS RESURFACING

SIDEWALK/DRIVEWAY REMOVAL

FULL DEPTH PAVEMENT REMOVAL FULL DEPTH PAVEMENT RECONSTRUCTION

DRIVEWAY / ALLEY RECONSTRUCTION

SIDEWALK REPLACEMENTCURB AND GUTTER REMOVAL

CURB AND GUTTER REPLACEMENT

SURFACE COURSE REMOVAL

CALL OUTSPROPOSEDREMOVAL

3.3334+

3.83

3.97

A A

A

3.583.76

3.433.93

4.204.70

1.952.45

3.934.52

3.113.61

CONCRETE PAVEMENT

LIMITS OF EXISTING

CONCRETE PAVEMENT

LIMITS OF EXISTING

23

SE

E

SH

EE

T

NO.

24

MA

TC

HLIN

E

ST

A.

5+00

CONCRETE PAVEMENT

LIMITS OF EXISTING

E 95TH STREET

PAVEMENT RESTORATION

0.8960+

1.39

22+ 0.8464+

1.34

EXISTING, STA 4+61

SAWCUT, MATCHA

E 95TH ST

S COTTAGE GROVE AV (SOUTH LEG)

E 95TH ST

S COTTAGE GROVE AV (SOUTH LEG)

S COTTAGE GROVE AV (NORTH LEG)

S COTTAGE GROVE AV (NORTH LEG)

4.37

4.6210-

3.94

4.1915+

+52

+36

+62

2.7369+

2.98

+85

(NE CORNER ONLY)

ADA RAMP NOTE 2

(SE CORNER ONLY)

ADA RAMP NOTE 2

A

5.63

5.38

5.64

5.30

5.68

STRUCTURE TO BE REMOVED

A

PROPOSED TOP OF CURB ELEV.

PROPOSED GUTTER ELEV.

EXISTING ELEVATION

EXISTING TOP OF CURB ELEV.

EXISTING GUTTER ELEV.

PROPOSED CATCH BASIN

DIRECTION OF FLOW

SUMMIT

ADJUST FRAME & LID

PROPOSED FRAME & LID

3.84

4.099+

+17

STRUCTURAL SLAB SEE SHEETS 31-32

1 ADDENDUM NO. 1 12/5/17

1

1

1

1

1

1

HORIZONTAL SCALE 1 inch = 20 ft.

020 10 20 40 80

X:\

1010

0s\10

146.3

0\

Eng

Docs\

Road

way\

CD

WM

6498

A-S

HT-

RES

TO

RE01.dgn

12/4/2017

OF

PN

PERCENT COMPLETE DATE

100

90

75

60

30 BUREAU OF ENGINEERING SERVICES

DEPARTMENT OF WATER MANAGEMENT

CITY OF CHICAGODRAWN:

DESIGNED:

CHECKED:

REVIEWED:

ALG

ALG

WLS

WLS

47

6498A

5/15/15

9/21/15

4/28/16OUC #2016-70861

12/19/16

8/1/17

4.525.03

4.274.77 4.01

4.123.693.72

4.084.76

3.934.52

3.754.30

3.533.96

3.333.79 2.79

3.422.503.30

2.142.21

1.893.09

1.552.96

1.272.90

1.032.85

1.092.81

1.172.80

1.102.78

1.062.82

0.962.89

0.692.79

3.853.97

3.854.34

3.594.30

3.334.47

2.883.99

2.583.75

2.313.63

2.033.54

1.763.36

1.393.12

0.932.80

1.032.76

1.052.75 0.93

2.80

0.922.77

0.932.79

0.842.69

1.301.48

2.102.22

2.863.42

0.982.30

3.233.19

2.803.42

3.383.54 2.10

2.63

2.362.82 2.59

3.153.233.87

3.844.30

2.0

2

2.5

5

5.235.14 4.59 4.35 3.82

3.46 3.19 2.55 2.20 1.91

4.754.66 4.39 4.22

4.26

3.96

4.43

4.66

3.81 3.51

4.314.534.72

4.85 2.89 1.33

1.10

1.42

4.76

4.69

4.51

4.12 3.92 3.74

3.383.15 2.87

2.22 1.77 1.65

1.481.751.91

3.12 2.84 2.36

2.13 2.57

3.99 1.273.85

1.383.88

1.353.81

1.242.78

1.252.78

1.202.751.15

1.24

1.202.82

1.202.74

1.333.92

1.17

1.17

1.21

1.353.97

1.333.76

3.79

1.172.78

1.263.77

3.93

4.84

3.86

2.582.73

2.99

1.68 1.47

0.89

0.88

1.49 1.30

2.88

1.08

0.89 0.77

1.87

0.84

2.50

2.481.67 1.89

3.684.65

4.60

4.74

3.430.76

3.464.01

3.583.76

3.38

4.094.614.21

4.63

4.144.61

4.374.87

4.274.58

3.22

3.54

7.73

4.87

3.60

3.49

3.67

3.23

2.191.58

2.18

3.40

G

w

G

E

T

G

E

E

G G

GG E

G

E

w

EG

T

E

G

CE

CE

w

CE

CE

G

w

G

E

T

G

E

E

G G

GG E

G

E

w

EG

T

E

G

CE

CE

w

CE

CE

E

5 005 004 003 002 000 00 1 00

Page 5: Addendum 1 - P-2017-05 Spec-306235 20171205 (2) - Chicago · room 103, chicago, illinois, 60602 on december 21, 2017 ... 15-duct 6-mtd 4-duct with fire alarm ... restoration should

12/1/2

017

PERCENT COMPLETE DATE

BULLETIN

100

90

75

60

30

CITY OF CHICAGODEPARTMENT OF WATER MANAGEMENT

BUREAU OF ENGINEERING SERVICES

P:\5868 - C

DW

M\5

868-0

1-0

03 (

EN

G) -

CD

WM T

OR #

16-0

5\E

ngineering\P

N 6

902\4

00 D

esig

n\4

02 C

AD

D S

heets\C

DW

M6902-s

ht-se

werd

et-ju

nction-structural.dgn

9/22/15

11/25/15

2/25/16

JRD

JDW

MBL

6902

5136 OF

PN

DRAWN:

DESIGNED:

CHECKED:

REVIEWED:

OUC # 2016-69988

6/22/16

11/17/16

SECTION C-C

7'-

8"

ELEVATION D-D

7'-

8"

8'-

4"

14"

6'-

0"

14"

4'-

0"

14"

N

SECTION A-A

14"

8'-

4"

14"

72"

DI

A.

SECTION B-B

HORIZONTAL & VERTICAL SCALE2 0 1 2 4 8

6'-0"

8'-4"

14" 14" 2" MUD COAT

FRAME & LID

CHICAGO STANDARD MANHOLE

12"

16'-0"

12"14'-0"2" MUD COAT

14"

72"

DI

A.

14"

8'-

4"

8'-4" 6'-2"

4'-0"14"6'-0"14" 13" 13"

2" MUD COAT

2" MUD COAT

PLAN SECTIONAL PLAN

PIPE SEWER

REINF. CONC.

48" DIA. PROP.

16'-

0"

11'-

0"

5'-

0"

30°

6'-2"

8'-4"

8'-4"

C

A

C

B

B

A

D

D

14"

14"

6'-

0"

30°

1 - #5 HOOP

1- #5 HOOP

#5 @ 12" CTS.

#5 @ 12" CTS.

#5 @ 12" CTS.

#5 @ 12" CTS.

2 - #6 HOOPS

#5 @ 12" CTS.

(TYP. O.F.)

#5 @ 12" CTS. (TYP. I.F.)

#5 @ 12" CTS.

#5 @ 12" CTS.

#5 @ 12" CTS.

#5 @ 12" CTS.

#5 @ 12" CTS.

#5 @ 12" CTS.

#5 @ 12" CTS.

3 - ADDL #7 BARS

#5 @ 12" CTS.

#5 @ 12" CTS.

2 - ADDITIONAL #6 BARS

#6 BAR

#6 @ 12" CTS.

#5 @ 12" CTS.

SL

AB

BO

TT.

OF

TO

P

5 -

#8

HOOPS

2- #6

5 @ #8 BARS

5- #5 BARS

2 - #6 HOOPS2 - #6 HOOPS

2 - #6 HOOPS

(TYP. O.F.)

#5 @ 12" CTS.

(TYP. O.F.)

#5 @ 12" CTS.

(TYP. I.F.)

#5 @ 12" CTS.

(TOP & BOTT. SLABS)

#5 @ 12" CTS. (T. & BOT.)

T. & BOT. SLABS)

(T. & BOT. OF

#5 @ 12" CTS.

(T

OP

&

BOTT. SL

ABS)

#5

@ 12"

CTS. (T.

&

BOTT.)

(C

UT

AS

RE

Q'

D)

AT

OP

ENI

NG

BO

T.

OF

TO

P

SL

AB

#5

@ 1

2"

CT

S.

BO

TT.

OF

TO

P

SL

AB

3-

AD

DI

TI

ON

AL

#7

BA

RS

HOOPS

2- #6

BO

T.

OF

TO

P

SL

AB

#6

@

12"

CT

S.

BO

TT.

OF

TO

P

SL

AB

2-

AD

DI

TI

ON

AL

#6

BA

RS

BO

TT.

OF

TO

P

SL

AB

2-

AD

DI

TI

ON

AL

#6

BA

RS

#5

@

12"

CT

S. (

BO

T.

OF

BO

TT.

SL

AB)

#6

@

12"

CT

S. (

TO

P

OF

BO

TT.

SL

AB

#5

@

12"

CT

S. (

TO

P

OF

TO

P

SL

AB)

(TYP. 4 SIDES)

(T. & BOTT. OF T. SLAB)

2-ADDITIONAL #5 BARS

(BOTTOM OF SLAB)

2 - ADDL #6 BARS

CTS.

12"

#5 @

2'-

6"

8"

REINF. CONC. PIPE DC

72" DIA.

REINF. CONC. PIPE DC

72" DIA.

1/2" = 1'-0"

S COTTAGE GROVE AV

AT E 92ND PL &

CONNECTION STRUCTURE

REINFORCEMENT FOR

ADDENDUM NO. 11 12/5/17

1

Page 6: Addendum 1 - P-2017-05 Spec-306235 20171205 (2) - Chicago · room 103, chicago, illinois, 60602 on december 21, 2017 ... 15-duct 6-mtd 4-duct with fire alarm ... restoration should

Y:\

chic

ago\10

100

S\10

146.19\

Eng_

Docs\

Road

way\

CD

WM

7012-S

HT-

DE

TAIL

01.dgn

12/5/2017

OF

PN

PERCENT COMPLETE DATE

90

75

60

30 BUREAU OF ENGINEERING SERVICES

DEPARTMENT OF WATER MANAGEMENT

CITY OF CHICAGODRAWN:

DESIGNED:

CHECKED:

REVIEWED:

ALG

ALG

WLS

WLS

71

7012

5/27/15

7/28/15

9/1/15

9/1/16

100 8/1/17

EL

EV

ATIO

N

+15

+10

0

-5

+5

-10

EL

EV

ATIO

N

+15

+10

0

-5

+5

-10

5'-

8"

3'-4" SUMP

1%

1%

PAVEMENT

EXISTING PAVEMENT

EXISTING

PROPOSED GROUNDLINE

FLOW SURFACEDRY WEATHER

IE

SEWER

EXISTING

CB

INLET

BOTTOM OF CHANNEL

PROPOSED GROUNDLINE FOR DRAINAGE FROM CURB CUTS

24" RCP

0.44%12" ESVCP

0.4%

PR

OP

ER

TY

LIN

E

PR

OP

ER

TY

LIN

E

31'-8.75"

60" TUMBLING BASIN

1%1%

VAR

OF TANK INSIDE

STORAGE TOP

UNDERGROUND

1%

EXISTING GROUNDLINE

TO 17:

1VAR 45:1

3.6" DROP

FLAP GATE VALVE

BOTTOM OF 4'X4' SUMP

(NO SUMP)

60" TUMBLING BASIN

W/ 12" FLAP GATE

12" DIP @ 0.0044 SLOPE

STORAGE TANK ACCESS (SEE DETAIL A)

STORAGE TANK ACCESS (SEE DETAIL A)

(SEE DETAIL ON SHEET 27)

SEE NOTE 4

SEE NOTE 5

6

SECTION B-B

NOTES:

TYPICAL STORAGE TANK SYSTEM CROSS-SECTION

(SEE PLAN AND PROFILE SHEETS FOR INFORMATION SPECIFIC TO EACH TANK)

S WOODLAWN AV

S AVALON AV TO

E 97TH STREET

STORAGE TANK TYPICAL

& LID

MANHOLE FRAME

CHICAGO STANDARD

RINGS

PRECAST MANHOLE

3'-0"

DIA. TOP OF STORAGE TANK

SEE STANDARD DETAIL A.20

INSIDE STORAGE TANK ONLY

RECTANGULAR LADDER RUNG

SEE STANDARD DETAIL A.20

THRU MANHOLE RISER

TYPE X LADDER RUNG

DETAIL A

1.0% SLOPE TOWARDS CHANNEL.

ON TANK FLOOR AS NEED TO PROVIDE

NON-SHRINK GROUT SHALL BE PLACED5.

DIRECTION SHOWN.

BE ORIENTED PARALLEL TO FLOW

SUPPORTS ARE ALLOWED, BUT MUST

STRUCTURAL MEMBERS. INTERMEDIATE

BLOCKAGE FROM INTERMEDIATE

TOWARDS THE CHANNEL WITHOUT

TANK FLOOR SHALL FLOW FREELY4.

31,540| CF FOR TANK 5

38,250| CF FOR TANKS 1-4

TANK STORAGE VOLUMES TO BE3.

GRADING PLANS.

THRU 20, FOR RIM ELEVATIONS AND

SEE INDIVIDUAL PLANS, SHEETS 162.

ELEVATIONS OF STRUCTURES.

OF TANKS, SHEETS 7 THRU 11, FOR

SEE INDIVIDUAL PLAN AND PROFILES1.

1

1 ADDENDUM NO. 1 12/5/17

1

1

CDWM7012-SHT-DETAIL01.dgn 12/5/2017 1:01:07 PM

Page 7: Addendum 1 - P-2017-05 Spec-306235 20171205 (2) - Chicago · room 103, chicago, illinois, 60602 on december 21, 2017 ... 15-duct 6-mtd 4-duct with fire alarm ... restoration should

A A

B

B

C

C

(SEE DETAIL A)

COLLECTION CHANNEL IN CONCRETE PAD

12" DIP OUTLET

4'X4' SUMP

PLAN VIEW

9-2"

1'-

6"

12" DIP OUTLET

4'X4' SUMP

SECTION A-A

2' 8'-2"23'-6ƒ"

1.0% 1.0%1'-

6"

SECTION B-B

1'-

6"

1'-

6"

1'0"1'-0"

4'

MA

X

4' MAX

#5 @ 6" O.C.

#5 @ 6" O.C.

1•" CLEAR (TYP)

1•" CLR

3" CLR

SECTION C-C

SUMP-PIT DETAIL

DETAIL B

TOP OF FOUNDATION

DETAIL ATRENCH SIZING BASED ON TANK DRAWINGS

2' 1'-0"1'-0"

1'-

6"

1.0%1.0%

1'-

6"

0.0' TO 0.6'X:\

1010

0s\10

146.19\

Eng_

Docs\

Road

way\

CD

WM

7012-S

HT-

Tank

Detail01.dgn

12/5/2017

OF

PN

PERCENT COMPLETE DATE

90

75

60

30 BUREAU OF ENGINEERING SERVICES

DEPARTMENT OF WATER MANAGEMENT

CITY OF CHICAGO

DRAWN:

DESIGNED:

CHECKED:

REVIEWED:

4'X4' SUMP

12" DIP OUTLET

SEE PLAN AND PROFILE OF EACH TANK FOR INVERTS

SEE PLAN AND PROFILE OF EACH TANK FOR COLLECTION CHANNEL SLOPES

TOP OF FOUNDATION (TYP)

#5 @ 12" O.C.

#5 @ 12" O.C.

5'-8"

1.0%

5'-8"STORAGE TANK

STORAGE TANK

1'-0"

1'-

6"

STORAGE TANK FOUNDATION

CONCRETE JOINT SEAL

JOINT SEAL DETAIL

SEE JOINT SEAL DETAIL (TYP)

TO BE PLACED AROUND THE PERIMETER OF THE STORAGE TANK

12" DIP OUTLETNON-SHRINK GROUT

24

100 STRUCTURES

FOR STORAGE

CONCRETE PAD DETAILS

SEE PLAN AND PROFILE OF EACH TANK FOR ELEVATIONS AND OVERALL DIMENSIONS

#5 @ 6" O.C.

#5 @ 6" O.C.

1•" CLR

3" CLR

#5 @ 12" O.C.

#5 @ 12" O.C.

WALL OF STORAGE TANKWALL OF STORAGE TANK

SLAB THICKNESS: 18"

1.0%

1.0%

AND DIP PIPEINVERT CHANNEL

PAD EL. PAD EL.

(SEE DETAIL A)COLLECTION CHANNEL

(SEE DETAIL A)COLLECTION CHANNEL

ALL DIMENSIONS OF PAD AND MODULAR STORAGE UNITS TO BE REVIEWED AND APPROVED BY THE COMMISSIONER.7.

DIMENSION OF FOUNDATION MUST HAVE 1'-0" OVERHANG BEYOND EXTERNAL FACE OF UNITS TO PROVIDE PERIMETER SEAL.6.

REBAR: ASTM A-706, GRADE 60, EPOXY BAR.4.

4"+/- GRANULAR PAD SHALL BE PROVIDED FOR LEVEL WORKING SURFACE.3.

NET ALLOWABLE SOIL PRESSURE GREATER THAN OR EQUAL TO 3000 PSF. SOIL CONDITIONS TO BE REVIEWED AND APPROVED BY THE COMMISSIONER.2.

CONCRETE STRENGTH @ 28 DAYS, 5%-8% ENTRAINED AIR, 4" MAX. SLUMP.1.

NOTES:

NON-SHRINK GROUT TO DRAIN TO CHANNELAFTER MODULAR UNITS PLACED ADD

IS 0.15'+/- HIGHER - SEE SECTION B-B)

PAD EL. (GROUT TO DRAIN TO CHANNEL

IS 0.15'+/- HIGHER - SEE SECTION B-B)

PAD EL. (GROUT TO DRAIN TO CHANNEL

1'X1' CONCRETE JOINT SEAL

PIPE CONCRETE JOINT SEAL DETAIL

DETAILJOINT SEALCONCRETESEE PIPE

1

1 ADDENDUM NO. 1 12/5/17

1

1

PN

71

7012

5/27/15

7/28/15

9/1/15

9/1/16

8/1/17

CDWM7012-SHT-TankDetail01.dgn 12/5/2017 8:01:57 AM

Page 8: Addendum 1 - P-2017-05 Spec-306235 20171205 (2) - Chicago · room 103, chicago, illinois, 60602 on december 21, 2017 ... 15-duct 6-mtd 4-duct with fire alarm ... restoration should

Y:\

chic

ago\10

100

S\10

146.19\

Eng_

Docs\

Road

way\

CD

WM

7012-S

HT-

TY

P01.dgn

12/5/2017

OF

PN

PERCENT COMPLETE DATE

90

75

60

30 BUREAU OF ENGINEERING SERVICES

DEPARTMENT OF WATER MANAGEMENT

CITY OF CHICAGODRAWN:

DESIGNED:

CHECKED:

REVIEWED:

ALG

ALG

WLS

WLS

71

7012

5/27/15

7/28/15

9/1/15

9/1/16

100 8/1/17

(TYP.)

PR

OP

ER

TY

LIN

E

PR

OP

ER

TY

LIN

E

66' ROW

NOTED ON PLAN (TYP.)

TO REMAIN, UNLESS OTHERWISE

COMBINATION CURB AND GUTTER

INTO EXISTING BASE, 30" C/C AS REQUIRED (TYP.)

#5 TIE BARS, 18" LONG, DRILLED AND GROUTED

SUB-BASE GRANULAR MATERIAL, TYPE B, 6"

P.C. CONCRETE BASE COURSE, 7" (NOTE 2)

PROPOSED SEWER

3.6% MAX. (TYP.)

1.4% MIN. TO

PROPOSED PARTIAL PAVEMENT RESTORATION CROSS SECTION

NOTE 1

HOT MIX ASPHALT SURFACE COURSE, MIX "D", N30, 2"

N.T.S.

E. 96TH ST. FROM S. AVALON AV. TO S. WOODLAWN AV.

S. AVALON AV. FROM S. 97TH ST. TO E. 96TH ST.

29'| FOC-FOC (S. AVALON AV.), 28'| FOC-FOC (E. 96TH ST.)

1.0'

= O.D. + 3'

MAXIMUM PAY WIDTH

TRENCH WIDTH= O.D. + 5'

OF RESTORATION

ASSUMED-MAXIMUM WIDTH

PLANS (TYP.)

UNLESS NOTED ON RESTORATION

EXISTING SIDEWALK TO REMAIN

PR

OP

ER

TY

LIN

E

140' ROW

1'

30" C/C

DEFORMED TIE BARS 30" LONG,

CONSTRUCTION JOINT, •" DIA.

(TYP.)

N.T.S.

PROPOSED FULL PAVEMENT RESTORATION CROSS SECTION

SUB-BASE GRANULAR MATERIAL, TYPE B, 6"

P.C. CONCRETE BASE COURSE, 7" (NOTE 2)

HOT MIX ASPHALT BINDER COURSE, 2‚"

PROPOSED SEWER

30" C/C, EPOXY COATED (TYP.)

#5 ROUND TIE BARS 30" LONG,

3.6% MAX. (TYP.)

1.4% MIN. TO

19'| FOC-FOC

PR

OP

ER

TY

LIN

E

NOTED ON PLAN (TYP.)

TO REMAIN, UNLESS OTHERWISE

COMBINATION CURB AND GUTTER

64'| FOC-FOC

HOT MIX ASPHALT SURFACE COURSE, MIX "D", N30, 1•"

E. 97TH ST. EASTBOUND LANE FROM S. DOBSON AV. TO S. ELLIS AV.

E. 97TH ST. EASTBOUND LANE FROM S. GREENWOOD AV. TO S. DOBSON AV.

E. 97TH ST. EASTBOUND LANE FROM S. UNIVERSITY AV. TO S. GREENWOOD AV.

E. 97TH ST. EASTBOUND LANE FROM S. WOODLAWN AV. TO S. UNIVERSITY AV.

E. 97TH ST. EASTBOUND LANE FROM S. AVALON AV. TO S. WOODLAWN AV.

FOR CURB CUTS

SEE DETAIL ON SHEET 26

TYPE B-V.12; 3" HEIGHT (TYP.)

COMBINATION CURB AND GUTTER,

TYPE B-V.12; 3" HEIGHT (TYP.)

COMBINATION CURB AND GUTTER,

AT TOP OF 3" CURB

PROPOSED PROFILE SHOWN

= O.D. + 3'

MAXIMUM PAY WIDTH

TRENCH WIDTH

15TYPICAL SECTIONS

STREETS.

RESIDENTIAL STREETS, AND 9" MIN. FOR ARTERIAL

2. USE P.C. CONCRETE BASE COURSE, 7" MIN. FOR

TO ACHIEVE COMPLIANT CROSS SLOPES

1. ADJUST ROADWAY CENTERLINE ELEVATION

CROSS SECTION NOTES:

1 ADDENDUM NO. 1 12/5/17

1

CDWM7012-SHT-TYP01.dgn 12/5/2017 8:04:15 AM

Page 9: Addendum 1 - P-2017-05 Spec-306235 20171205 (2) - Chicago · room 103, chicago, illinois, 60602 on december 21, 2017 ... 15-duct 6-mtd 4-duct with fire alarm ... restoration should

N.T.S.

PROJECT LOCATION

LOCATION MAP

ST

AT

E

LIN

E

BR

AN

DO

N

YA

TES

ST

ON

Y IS

CO

TT

AG

E

GR

ST

AT

E

HA

LS

TE

D

AS

HL

AN

D

WES

TE

RN

KE

DZIE

PU

LA

SKI

CIC

ER

O

CE

NT

RA

L

NA

RR

AG

AN

SE

TT

HA

RL

EM

PA

CIFIC

EA

ST

RIV

ER

RD 13500 S

12700 S

11900 S

11100 S

10300 S

9500 S

8700 S

7900 S

7100 S

6300 S

5500 S

4700 S

3900 S

3100 S

2200 S

1200 S

0

800 N

1600 N

2400 N

3200 N

4000 N

4800 N

5600 N

6400 N

7200 N

7800 N

13800 S

BASE LINE

BA

SE

LIN

E

4100

E

3200

E

2400

E

1600

E

800

E0

800

W

1600

W

2400

W

3200

W

4000

W

4800

W

5600

W

6400

W

7200

W

8000

W

8800

W

ON INDEX MAP

AREA SHOWN

Airport

International

O'Hare

135 TH

127 TH

119 TH

111 TH

103 RD

95 TH

87 TH

79 TH

71 ST

63 RD

55 TH

47 TH

PERSHING

31 ST

CERMAK

ROOSEVELT

MADISON

CHICAGO

NORTH

FULLERTON

BELMONT

IRVING PARK

LAWRENCE

BRYN MAWR

DEVON

TOUHY

HOWARD

138 TH

N

1LOCATION/INDEX MAP -

GENERAL/SPECIAL

INDEX MAP

42"42"36"36"

30"24"

STANDARD SYMBOLS

PARKING METER

"L" COLUMN

MAIL BOX

CUT CROSS IN CONCRETE

DRY WEATHER WATER SURFACE

w

WATER SERVICE VALVE

PAY & DISPLAY PARKING METER BOX

WATER BUFFALO BOX

GAS BUFFALO BOX

GAS METER

ELEC. METER

GAS SERVICE VALVE

CITY ELEC MH

COMED MH

GAS MH

TELECOM MH

TELECOM VAULT

CITY ELEC. VAULT

COMED VAULT

GAS VAULT

THRUST BLOCK

ADA DETECTABLE TILE

WATER VAULT

WATER METER

WATER MAIN SUPPORT TYPE I, A or B, (BY OTHERS)

WATER MAIN SUPPORT, TYPE II, (BY OTHERS)

WATER MAIN SUPPORT, TYPE III, (BY OTHERS)

w

G

E

G

P

W

G

E

CE

G

T

T

CE

G

E

SEWER MANHOLE (TYPE A)

SEWER MANHOLE (TYPE B)

SEWER MANHOLE TUMBLING BASIN

INLET

ORDINANCE GRADE

SIGN

BUSH

TREE

FIRE HYDRANT

CITY LIGHT POLE

TRAFFIC SIGNAL ON CITY LIGHT POLE

UTILITY POLE

TRAFFIC SIGNAL

CONTROLLER BOX

EVERGREEN TREE

XX"

UTILITY VAULT

12"

GB GUTTER BOX

SEWER MANHOLE (TYPE B) MODIFIED

SEWER MANHOLE (TYPE B) REVERSED

D.C. - DRAIN CONNECTION-EX CB

SEWER MANHOLE (TYPE C-SINGLE DROP)

SEWER MANHOLE (TYPE C-DOUBLE DROP)

STRUCTURE REMOVAL

SOIL BORING

D.C. - DRAIN CONNECTION-PR CB

BR=BRICK), Y-(F= FILL)

MANHOLE XX- (CO=CONCRETE, LI=LINED,

BR=BRICK), Y-(F= FILL)

CATCH BASIN XX- (CO=CONCRETE, LI=LINED,

EX PR

STANDARD SYMBOLS

XX-Y

XX-Y

12.5

EX PR

DIRECTION OF FLOW

SUMMIT

MAIN QUALITY PIPED.C. - DRAIN CONNECTION-WATER

WATER MAIN CUT & CAP (BY OTHERS)

GENERAL NOTES

STANDARD LINE TYPES

EXISTING GAS

EXISTING WATER

EXISTING AERIAL

EXISTING BURIED CABLE

EXISTING CABLE TV

EXISTING CITY ELECTRIC

EXISTING COMED

EXISTING FIBER OPTICS

EXISTING FIRE AND POLICE

EXISTING OIL

EXISTING TELEPHONE

EXISTING SEWER

PROPOSED SEWER

10" SEWER ABANDONED SEWER

EXISTING BUILDING LINE

FENCE

BURIED RAILROAD TRACKS

EXISTING ROW LINE

BASE LINE54 00

LEGEND

TO BE BUILT UNDER THIS CONTRACT

PRINCIPAL EXISTING CITY SEWER

TOTAL LENGTH = 2373 L.F.

MAIN LINE LENGTH = 2233 L.F.

AUXILLARY LENGTH = 140 L.F.

15"

NOTES, LEGEND

HFF

PMS

EPC

LE

12"

12"

15"

12"

12"

12"

12"

12"

12"

11'X

11'

MW

RD

SE

WE

R

18"

15"

10"

15"

12"

SPECIAL NOTES - FOR CONTRACTORS

FOR FINAL PAYMENT ARE INDICATED ON THE TYPICAL CROSS SECTION DETAILS.

SHEETS ARE FOR OUC REVIEW PURPOSES ONLY. TRENCH WIDTHS

5. PROPOSED TRENCH WIDTHS SHOWN ON THE PLAN AND PROFILE

INCIDENTAL TO THE CONTRACT.

SHOWN ON THE PLANS. THE COST OF THIS WORK WILL BE CONSIDERED

TO THE COMMISSIONER ANY OMISSIONS AND DIFFERENCES FROM THE LOCATIONS

THAT MAY INTERFERE WITH CONSTRUCTION OPERATIONS, AND SHALL REPORT

4. THE CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF ALL UTILITIES

OR AGENT HAS WITNESSED OR OTHERWISE REFERENCED THEIR LOCATION.

MARKERS AND MONUMENTS UNTIL THE ENGINEER, AN AUTHORIZED SURVEYOR,

THE CONTRACTOR SHALL PROTECT AND CAREFULLY PRESERVE ALL PROPERTY

COMMISSIONER SHALL BE NOTIFIED BEFORE SUCH MONUMENTS ARE REMOVED.

WHERE SECTION OR SUBSECTION MONUMENTS ARE ENCOUNTERED, THE

BENCH MONUMENT DAMAGED OR DESTROYED DURING CONSTRUCTION.

3. THE CONTRACTOR IS RESPONSIBLE FOR THE COST OF REPLACEMENT OF ANY

ACCORDANCE WITH DWM STANDARDS.

CATCH BASINS WITHIN THE PROJECT LIMITS (AREA OF PAVEMENT RESURFACING) IN

2. THE CONTRACTOR MUST INSTALL FLOW RESTRICTORS IN ALL EXISTING/PROPOSED

INCONVENIENCE TO LOCAL BUSINESSES.

COORDINATE WORK THROUGH THE RESIDENT ENGINEER TO AVOID ANY UNDUE

WHICH MAY AFFECT THEIR DAILY SCHEDULES. THE CONTRACTOR SHALL

SHALL BE NOTIFIED 72 HOURS IN ADVANCE OF CONSTRUCTION OPERATIONS

THE CONSTRUCTION OR REMOVAL OPERATIONS. BUSINESS PROPERTY OWNERS

1. THE CONTRACTOR SHALL MAINTAIN ACCESS TO PRIVATE PROPERTIES DURING

FROM THE CATCH BASIN TO A POINT 10 FEET BEYOND THE EDGE OF THE WATER FACILITY.

IRON/WATER MAIN QUALITY PIPE SHALL BE DUCTILE IRON/WATER MAIN QUALITY PIPE

OUTSIDE EDGE OF THE WATER FACILITY. SEWER LATERALS THAT REQUIRE DUCTILE

OF DUCTILE IRON/WATER MAIN QUALITY PIPE FOR 10 FEET ON EITHER SIDE OF THE

LEAST 18 INCHES ABOVE THE WATER FACILITY AND THE SEWER FACILITY MUST MADE OUT

PERPENDICULARLY ABOVE A WATER FACILITY, THEN THE SEWER FACILITY SHALL BE AT

OUTSIDE EDGE OF THE WATER FACILITY. IF ANY SEWER FACILITY CROSSES

OF DUCTILE IRON/WATER MAIN QUALITY PIPE FOR 10 FEET ON EITHER SIDE OF THE

WATER FACILITIES WITH LESS THAN 18 INCHES VERTICAL SEPARATION MUST BE MADE OUT

FACILITY. ADDITIONALLY, ALL SEWER FACILITIES THAT CROSS PERPENDICULARLY BELOW

MAIN QUALITY PIPE FOR 10 FEET ON EITHER SIDE OF THE OUTSIDE EDGE OF THE WATER

THE OUTSIDE EDGE OF THE WATER FACILITY MUST BE MADE OUT OF DUCTILE IRON/WATER

THE WATER FACILITY AND HAVE LESS THAN 10 FEET OF HORIZONTAL SEPARATION FROM

(COLLECTIVELY KNOWN AS "WATER FACILITIES") THAT ARE LESS THAN 18 INCHES BELOW

FACILITIES") THAT ARE PARALLEL TO WATER MAINS, SERVICES OR FIRE HYDRANT LEADS

BASINS/INLETS, SEWER MAINS, AND PRIVATE DRAINS (COLLECTIVELY KNOWN AS "SEWER

AND SEWER PIPES. ALL PROPOSED/REPLACED SEWER LATERALS FROM CATCH

13. ALL SEWER INSTALLATIONS MUST MEET IEPA SEPARATION REQUIREMENTS FOR WATER

TRANSPORTATION, PERMIT DIVISION AT 312-744-4652.

12. ALL WORK IN THE PUBLIC WAY REQUIRES A PERMIT FROM THE DEPARTMENT OF

312-744-4652.

CLOSURE INCLUDING DETOUR PLANS MUST BE REVIEWED AND APPROVED BY CDOT AT

MAKING ANY CHANGES IN THE TRAFFIC PATTERN & DETAILS OF ANY LANE OR ROADWAY

11. SEVEN (7) DAYS NOTICE MUST BE GIVEN TO CDOT PRIOR TO STARTING ANY WORK OR

312-743-7394.

BE REVIEWED AND APPROVED BY THE OEMC TRAFFIC MANAGEMENT TASK FORCE. CONTACT

PATTERNS. DETAILS OF ANY LANE OR ROADWAY CLOSURE INCLUDING DETOUR PLANS MUST

FORCE PRIOR TO STARTING ANY WORK OR MAKING ANY CHANGES TO EXISTING TRAFFIC

10. SEVEN (7) DAYS NOTICE MUST BE GIVEN TO THE OEMC TRAFFIC MANAGEMENT TASK

EXISTING UNDERGROUND UTILITIES STAKED.

(CHICAGO UTILITY ALERT NETWORK) AT 312-744-7000 TO HAVE THE LOCATION OF

9. 48 HOURS BEFORE STARTING EXCAVATION, THE CONTRACTOR SHALL CALL DIGGER

ALLOWED WITHOUT PRIOR APPROVAL OF THE COMMISSIONER.

NOT SHOWN OR NOTED. THE INTERRUPTION OF WATER SERVICE LINES SHALL NOT BE

8. ALL KNOWN WATER PIPE SERVICES OVER 2" ARE SHOWN BUT THOSE 2" AND UNDER ARE

PROFILE SHEETS.

WITHIN 20 FEET OF THE CENTERLINE OF THE SEWER ARE SHOWN ON THE PLAN AND

7. ANY OVERHEAD 911 OR COMED FACILITIES WHICH CROSS THE SEWER TRENCH OR ARE

BE FIELD VERIFIED.

TO BE CORRECT. HORIZONTAL AND VERTICAL LOCATION OF ALL EXISTING UTILITIES SHALL

SOURCES AND THE INFORMATION IS BELIEVED TO BE CORRECT BUT IS NOT GUARANTEED

PROFILES HAVE BEEN OBTAINED FROM DRAWINGS AND DATA RECEIVED FROM VARIOUS

CONDUITS, LINES AND OTHER UNDERGROUND STRUCTURES SHOWN ON THE PLANS AND

6. THE LOCATION AND ELEVATIONS OF EXISTING UTILITIES, WATER PIPES, SEWER,

PERMITS AND INSPECTION OF THE CITY OF CHICAGO, DEPARTMENT OF WATER MANAGEMENT.

OBTAINED BY AND THE WORK MUST BE PERFORMED BY A LICENSED DRAIN LAYER UNDER

STRUCTURES AND REMOVAL/REPLACEMENT OF FRAMES AND LIDS. THE PERMIT MUST BE

MANAGEMENT FOR ANY UNDERGROUND SEWER WORK INCLUDING ADJUSTMENT OF SEWER

5. A PERMIT MUST BE OBTAINED FROM THE CITY OF CHICAGO, DEPARTMENT OF WATER

EXCEEDING 12 FEET DEEP.

4. SEE OUC SUBMITTAL FOR GEOTECHNICAL INFORMATION AND TRENCHING EXCAVATION

3. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL EXISTING PRIVATE DRAINS.

2. RECONNECT ALL LIVE DRAINS TO NEW SEWER.

LIDS MUST BE PLACED ON ALL SEWER MANHOLES, EXCEPT AT STREET INTERSECTIONS.

1. UNLESS OTHERWISE SHOWN ON THE PLANS, OR ORDERED BY THE COMMISSIONER, SOLID

1.ADDENDUM NO. 1 12-05-17

1.

PERCENT COMPLETE DATE

100

90

75

60

30

OF 31

BUREAU OF ENGINEERING SERVICES

DEPARTMENT OF WATER MANAGEMENT

CITY OF CHICAGO

PN 7174

10-21-16

11-22-16

11-28-16FIL

E

NA

ME

$D

AT

E$

PL

OT

DA

TE:

$U

SE

R$

US

ER

NA

ME

=

$FIL

EL$

$D

AT

E$

$FIL

E$

09-06-16

DRAWN:

DESIGNED:

CHECKED:

REVIEWED:

OUC #2016-73622

12-01-16

E. 94TH ST.

S.

PR

AIRIE

AV.

S.

WA

BA

SH

AV.

S.

ST

AT

E

ST.

S.

MIC

HIG

AN

AV.

S. IN

DIA

NA

AV.

S.

FO

RE

ST

AV.

S.

CA

LU

ME

T

AV.

S.

MA

RTIN

LU

TH

ER

KIN

G

DR.

CDWM7174_01.dgn 12/01/17 9:19:36 AM

Page 10: Addendum 1 - P-2017-05 Spec-306235 20171205 (2) - Chicago · room 103, chicago, illinois, 60602 on december 21, 2017 ... 15-duct 6-mtd 4-duct with fire alarm ... restoration should

10

N.T.S.

PROPOSED PARTIAL PAVEMENT RESTORATION CROSS SECTION

E 94TH ST FROM S MARTIN LUTHER KING DR TO S WABASH AV

HFF

PMS

EPC

LE

TYPICAL SECTION

PR

OP

ER

TY

LIN

E

PR

OP

ER

TY

LIN

E

66' ROW

1'

TRENCH WIDTH

30'| FOC-FOC

(TYP.)

3.6% MAX. (TYP.)

1.4% MIN. TO

SUB-BASE GRANULAR MATERIAL, TYPE B, 6"

INTO EXISTING BASE, 30" C/C AS REQUIRED (TYP.)

#5 TIE BARS, 18" LONG, DRILLED AND GROUTED

PROPOSED SEWER

NOTED ON PLAN (TYP.)

TO REMAIN, UNLESS OTHERWISE

COMBINATION CURB AND GUTTER

= O.D. + 3 FEET

MAXIMUM PAY WIDTH

N.T.S.

PROPOSED PARTIAL PAVEMENT RESTORATION CROSS SECTION

PR

OP

ER

TY

LIN

E

PR

OP

ER

TY

LIN

E

66' ROW

1'

TRENCH WIDTH

40'| FOC-FOC

(TYP.)

3.6% MAX. (TYP.)

1.4% MIN. TO

SUB-BASE GRANULAR MATERIAL, TYPE B, 6"

INTO EXISTING BASE, 30" C/C AS REQUIRED (TYP.)

#5 TIE BARS, 18" LONG, DRILLED AND GROUTED

PROPOSED SEWER

NOTED ON PLAN (TYP.)

TO REMAIN, UNLESS OTHERWISE

COMBINATION CURB AND GUTTER

= O.D. + 3 FEET

MAXIMUM PAY WIDTH

S MARTIN LUTHER KING DR AT E 94TH ST

HOT-MIX ASPHALT SURFACE COURSE, 2" (MIX D, N 70)

HOT-MIX ASPHALT SURFACE COURSE, 2" (IL-9.5 MIX C, N 30)

P.C. CONCRETE BASE COURSE, 8"

NOTE 1

NOTE 1

P.C. CONCRETE BASE COURSE, HES, 10"

RESTORATION PLANS (TYP)

REMAIN UNLESS NOTED ON

EXISTING SIDEWALK TO

RESTORATION PLANS (TYP)

REMAIN UNLESS NOTED ON

EXISTING SIDEWALK TO

= O.D. + 5 FEET

OF RESTORATION

MAXIMUM PAY WIDTH

= O.D. + 5 FEET

OF RESTORATION

MAXIMUM PAY WIDTH

TO ACHIEVE COMPLIANT CROSS SLOPES

1. ADJUST ROADWAY CENTERLINE ELEVATION

CROSS SECTION NOTES:

1.

1.

1.

1.

1.ADDENDUM NO. 1 12-05-17

PERCENT COMPLETE DATE

100

90

75

60

30

OF 31

BUREAU OF ENGINEERING SERVICES

DEPARTMENT OF WATER MANAGEMENT

CITY OF CHICAGO

PN 7174

10-21-16

11-22-16

11-28-16FIL

E

NA

ME

$D

AT

E$

PL

OT

DA

TE:

$U

SE

R$

US

ER

NA

ME

=

$FIL

EL$

$D

AT

E$

$FIL

E$

09-06-16

DRAWN:

DESIGNED:

CHECKED:

REVIEWED:

OUC #2016-73622

12-01-16

CDWM7174_10.dgn 12/01/17 9:14:37 AM

Page 11: Addendum 1 - P-2017-05 Spec-306235 20171205 (2) - Chicago · room 103, chicago, illinois, 60602 on december 21, 2017 ... 15-duct 6-mtd 4-duct with fire alarm ... restoration should

IEPA Funded Instructions and Execution Documents (Rev. July 2016) 19

SCHEDULE OF PRICES

Addendum No. 1

Page 12: Addendum 1 - P-2017-05 Spec-306235 20171205 (2) - Chicago · room 103, chicago, illinois, 60602 on december 21, 2017 ... 15-duct 6-mtd 4-duct with fire alarm ... restoration should

SCHEDULE OF PRICES DWM PROJECT NUMBERS 6498A, 6902, 7012 and 7174

P-2017-05

ITEM NO.

DESCRIPTION UNIT APPROX.QUANT.

UNIT PRICE

TOTAL PRICE (APPROX.

QTY. x UNIT PRICE)

IEPA Funded Instructions and Execution Documents (Rev. July 2016) 20

1  TREE REMOVAL (6 TO 15 UNITS DIAMETER)  UNIT  127 

2  EARTH EXCAVATION  CU YD  2338 

3  SPECIAL SOIL WASTE REMOVAL AND DISPOSAL  CU YD  12561 

4  WASTE CHARACTERIZATION ANALYSIS  EACH  21 

5  SOIL BORING  EACH  5 

6  TRENCH BACKFILL  CU YD  22712 

7  TOPSOIL FURNISH AND PLACE, 3"  SQ YD  10020 

8  SEEDING, CLASS 2A  ACRE  2 

9  NITROGEN FERTILIZER NUTRIENT  POUND  172 

10  PHOSPHOROUS FERTILIZER NUTRIENT  POUND  172 

11  POTASSIUM FERTILIZER NUTRIENT  POUND  172 

12  EROSION CONTROL BLANKET  SQ YD  9270 

13  SODDING, SALT TOLERANT  SQ YD  3015 

14  SUBBASE GRANULAR MATERIAL, TYPE B 4"  SQ YD  560 

15  SUBBASE GRANULAR MATERIAL, TYPE B 6"  SQ YD  24006 

16  SUBBASE GRANULAR MATERIAL, TYPE B 8"  SQ YD  187 

17  PORTLAND CEMENT CONCRETE BASE COURSE, VARIABLE DEPTH  CU YD  10752 

18  PORTLAND CEMENT CONCRETE BASE COURSE, HES, VARIABLE DEPTH  CU YD  93 

19  TEMPORARY COLD PATCH  TON  400 

20  TEMPORARY STONE  TON  400 

21  STABILIZATION STONE  TON  200 

22  BITUMINOUS MATERIALS (TACK COAT)  POUND  7637 

Addendum No. 1

Page 13: Addendum 1 - P-2017-05 Spec-306235 20171205 (2) - Chicago · room 103, chicago, illinois, 60602 on december 21, 2017 ... 15-duct 6-mtd 4-duct with fire alarm ... restoration should

SCHEDULE OF PRICES DWM PROJECT NUMBERS 6498A, 6902, 7012 and 7174

P-2017-05

ITEM NO.

DESCRIPTION UNIT APPROX.QUANT.

UNIT PRICE

TOTAL PRICE (APPROX.

QTY. x UNIT PRICE)

IEPA Funded Instructions and Execution Documents (Rev. July 2016) 21

23  LEVELING BINDER (MACHINE METHOD), N30  TON  345 

24  LEVELING BINDER (MACHINE METHOD), N70  TON  77 

25  HOT‐MIX ASPHALT BINDER COURSE, IL‐19.0L, N30  TON  422 

26  HOT‐MIX ASPHALT SURFACE COURSE, IL‐9.5L, MIX "C", N30  TON  4306 

27  HOT‐MIX ASPHALT SURFACE COURSE, MIX "D", N50  TON  125 

28  HOT‐MIX ASPHALT BINDER COURSE, MIX "D", N50  TON  125 

29  HOT‐MIX ASPHALT SURFACE COURSE, MIX "D", N70  TON  764 

30  POLYMERIZED HOT‐MIX ASPHALT SURFACE COURSE, MIX "E", N70  TON  36 

31  HMA SPEED HUMPS  SQ YD  80 

32  PORTLAND CEMENT CONCRETE PAVEMENT 10"  SQ YD  2466 

33  PORTLAND CEMENT CONCRETE ALLEY/DRIVEWAY PAVEMENT, 8 INCH  SQ YD  200 

34  BUS PAD, 10"  SQ YD  187 

35  PROTECTIVE CONCRETE COAT  SQ YD  5076 

36  SIDEWALK/DRIVEWAY, SPECIAL  SQ FT  47 

37  PORTLAND CEMENT CONCRETE SIDEWALK, 5 INCH  SQ FT  6360 

38  PORTLAND CEMENT CONCRETE SIDEWALK, 8 INCH  SQ FT  1910 

39  PORTLAND CEMENT CONCRETE ADA RAMP, 5 INCH  SQ FT  6987 

40  PORTLAND CEMENT CONCRETE ADA RAMP, 8 INCH  SQ FT  641 

41  DETECTABLE WARNING TILES, LINEAR (CAST IRON)  SQ FT  1210 

42  PAVEMENT SURFACE REMOVAL, 2" AND LESS  SQ YD  25898 

43  PAVEMENT REMOVAL  SQ YD  5521 

44  DRIVEWAY/ALLEY PAVEMENT REMOVAL  SQ YD  204 

45  CURB REMOVAL  FOOT  148 

Addendum No. 1

Page 14: Addendum 1 - P-2017-05 Spec-306235 20171205 (2) - Chicago · room 103, chicago, illinois, 60602 on december 21, 2017 ... 15-duct 6-mtd 4-duct with fire alarm ... restoration should

SCHEDULE OF PRICES DWM PROJECT NUMBERS 6498A, 6902, 7012 and 7174

P-2017-05

ITEM NO.

DESCRIPTION UNIT APPROX.QUANT.

UNIT PRICE

TOTAL PRICE (APPROX.

QTY. x UNIT PRICE)

IEPA Funded Instructions and Execution Documents (Rev. July 2016) 22

46  COMBINATION CURB AND GUTTER REMOVAL  FOOT  6268 

47  SIDEWALK REMOVAL  SQ FT  13515 

48  CONCRETE STRUCTURES  CU YD  15 

49  REINFORCEMENT BARS, EPOXY COATED  POUND  13561 

50  CONCRETE COLLAR  CU YD  200 

51  SEWER, 48", CLASS III, REINFORCED CONCRETE PIPE, IN OPEN CUT  FOOT  623 

52  SEWER, 42", CLASS III, REINFORCED CONCRETE PIPE, IN OPEN CUT  FOOT  665 

53  SEWER, 36", CLASS IV, REINFORCED CONCRETE PIPE, IN OPEN CUT  FOOT  5 

54  SEWER, 36", CLASS III, REINFORCED CONCRETE PIPE, IN OPEN CUT  FOOT  1623 

55  SEWER, 30", CLASS III, REINFORCED CONCRETE PIPE, IN OPEN CUT  FOOT  1677 

56  SEWER, 30", CLASS III, REINFORCED CONCRETE ARCH PIPE, IN OPEN CUT  FOOT  7 

57  SEWER, 24", CLASS III, REINFORCED CONCRETE PIPE, IN OPEN CUT  FOOT  3671 

58  SEWER, 18", VITRIFIED CLAY PIPE, IN OPEN CUT  FOOT  48 

59  SEWER, 12", VITRIFIED CLAY PIPE, IN OPEN CUT  FOOT  114 

60  SEWER, 36", DUCTILE IRON PIPE, IN OPEN CUT  FOOT  21 

61  SEWER, 24", DUCTILE IRON PIPE, IN OPEN CUT  FOOT  41 

62  SEWER, 18", DUCTILE IRON PIPE, IN OPEN CUT  FOOT  70 

63  SEWER, 10", DUCTILE IRON PIPE, IN OPEN CUT  FOOT  40 

64 TUMBLING BASIN, 60‐INCH DIAMETER BETWEEN S AVALON AV AND S WOODLAWN AV, PRECAST CONCRETE  LSUM  1 

65 TUMBLING BASIN, 60‐INCH DIAMETER BETWEEN S WOODLAWN AV AND S UNIVERSITY AV, PRECAST CONCRETE  LSUM  1 

Addendum No. 1

Page 15: Addendum 1 - P-2017-05 Spec-306235 20171205 (2) - Chicago · room 103, chicago, illinois, 60602 on december 21, 2017 ... 15-duct 6-mtd 4-duct with fire alarm ... restoration should

SCHEDULE OF PRICES DWM PROJECT NUMBERS 6498A, 6902, 7012 and 7174

P-2017-05

ITEM NO.

DESCRIPTION UNIT APPROX.QUANT.

UNIT PRICE

TOTAL PRICE (APPROX.

QTY. x UNIT PRICE)

IEPA Funded Instructions and Execution Documents (Rev. July 2016) 23

66 TUMBLING BASIN, 60‐INCH DIAMETER BETWEEN S UNIVERSITY AV AND S GREENWOOD AV, PRECAST CONCRETE  LSUM  1 

67 TUMBLING BASIN, 60‐INCH DIAMETER BETWEEN S GREENWOOD AV AND S DOBSON AV, PRECAST CONCRETE  LSUM  1 

68 TUMBLING BASIN, 60‐INCH DIAMETER BETWEEN S DOBSON AV AND S ELLIS AV, PRECAST CONCRETE  LSUM  1 

69 TUMBLING BASIN, 60‐INCH DIAMETER BETWEEN S AVALON AV AND S WOODLAWN AV IN MEDIAN, PRECAST CONCRETE  LSUM  1 

70 TUMBLING BASIN, 60‐INCH DIAMETER BETWEEN S WOODLAWN AV AND S UNIVERSITY AV IN MEDIAN, PRECAST CONCRETE  LSUM  1 

71 TUMBLING BASIN, 60‐INCH DIAMETER BETWEEN S UNIVERSITY AV AND S GREENWOOD AV IN MEDIAN, PRECAST CONCRETE  LSUM  1 

72 TUMBLING BASIN, 60‐INCH DIAMETER BETWEEN S GREENWOOD AV AND S DOBSON AV IN MEDIAN, PRECAST CONCRETE  LSUM  1 

73 TUMBLING BASIN, 60‐INCH DIAMETER BETWEEN S DOBSON AV AND S ELLIS AV IN MEDIAN, PRECAST CONCRETE  LSUM  1 

74 CONNECTION STRUCTURE AT E 92ND PL AND S COTTAGE GROVE AV, CAST‐IN‐PLACE CONCRETE  LSUM  1 

75  JUNCTION STRUCTURE ON E 95TH ST  LSUM  1 

76  UNDERGROUND STORAGE STRUCTURE ON E 95TH ST  FOOT  582 

77 UNDERGROUND STORAGE STRUCTURE NO. 1 BETWEEN S AVALON AV AND S WOODLAWN AV  LSUM  1 

78 UNDERGROUND STORAGE STRUCTURE NO. 2 BETWEEN S WOODLAWN AV AND S UNIVERSITY AV  LSUM  1 

79 UNDERGROUND STORAGE STRUCTURE NO. 3 BETWEEN S UNIVERSITY AV AND S GREENWOOD AV  LSUM  1 

Addendum No. 1

Page 16: Addendum 1 - P-2017-05 Spec-306235 20171205 (2) - Chicago · room 103, chicago, illinois, 60602 on december 21, 2017 ... 15-duct 6-mtd 4-duct with fire alarm ... restoration should

SCHEDULE OF PRICES DWM PROJECT NUMBERS 6498A, 6902, 7012 and 7174

P-2017-05

ITEM NO.

DESCRIPTION UNIT APPROX.QUANT.

UNIT PRICE

TOTAL PRICE (APPROX.

QTY. x UNIT PRICE)

IEPA Funded Instructions and Execution Documents (Rev. July 2016) 24

80 UNDERGROUND STORAGE STRUCTURE NO. 4 BETWEEN S GREENWOOD AV AND S DOBSON AV  LSUM  1 

81 UNDERGROUND STORAGE STRUCTURE NO. 5 BETWEEN S DOBSON AV AND S ELLIS AV  LSUM  1 

82  DRAIN CONNECTION, 72", REINFORCED CONCRETE PIPE  FOOT  8 

83  DRAIN CONNECTION, 30", REINFORCED CONCRETE PIPE  FOOT  91 

84  DRAIN CONNECTION, 21", VITRIFIED CLAY PIPE  FOOT  7 

85  DRAIN CONNECTION, 18", VITRIFIED CLAY PIPE  FOOT  8 

86  DRAIN CONNECTION, 15", VITRIFIED CLAY PIPE  FOOT  103 

87  DRAIN CONNECTION, 12", VITRIFIED CLAY PIPE  FOOT  194 

88  DRAIN CONNECTION, 10", VITRIFIED CLAY PIPE  FOOT  65 

89  DRAIN CONNECTION, 8", VITRIFIED CLAY PIPE  FOOT  793 

90  DRAIN CONNECTION, 6", VITRIFIED CLAY PIPE  FOOT  775 

91  DRAIN CONNECTION, 12", DUCTILE IRON PIPE  FOOT  20 

92  DRAIN CONNECTION, 10", DUCTILE IRON PIPE   FOOT  45 

93  DRAIN CONNECTION, 8", DUCTILE IRON PIPE  FOOT  1240 

94  DRAIN CONNECTION, 6", DUCTILE IRON PIPE   FOOT  105 

95  CATCH BASINS, 4'‐DIAMETER  EACH  98 

96  MANHOLES, TYPE A, 3'‐DIAMETER  EACH  7 

97  MANHOLES, TYPE A, 4'‐DIAMETER  EACH  1 

98  MANHOLES, TYPE B, 3'‐DIAMETER  EACH  23 

99  MANHOLES, TYPE B, 4'‐DIAMETER  EACH  1 

100  MANHOLES, TYPE B MODIFIED, 3'‐DIAMETER  EACH  1 

Addendum No. 1

Page 17: Addendum 1 - P-2017-05 Spec-306235 20171205 (2) - Chicago · room 103, chicago, illinois, 60602 on december 21, 2017 ... 15-duct 6-mtd 4-duct with fire alarm ... restoration should

SCHEDULE OF PRICES DWM PROJECT NUMBERS 6498A, 6902, 7012 and 7174

P-2017-05

ITEM NO.

DESCRIPTION UNIT APPROX.QUANT.

UNIT PRICE

TOTAL PRICE (APPROX.

QTY. x UNIT PRICE)

IEPA Funded Instructions and Execution Documents (Rev. July 2016) 25

101  MANHOLES, TYPE B MODIFIED, 4'‐DIAMETER  EACH  2 

102  MANHOLES, TYPE C DOUBLE‐DROP, 3'‐DIAMETER  EACH  1 

103  PRECAST MANHOLE RISER  VERT FT  84 

104  PRECAST CONCRETE FLAT SLAB TOP  EACH  2 

105  INLETS  EACH  30 

106  CHICAGO STANDARD FRAMES  EACH  192 

107  CHICAGO STANDARD LIDS  EACH  192 

108  GRATES, TYPE 8  EACH  20 

109  CATCH BASINS TO BE CLEANED  EACH  33 

110  MANHOLES TO BE CLEANED  EACH  2 

111  VALVE VAULTS TO BE CLEANED  EACH  1 

112  CATCH BASINS TO BE ADJUSTED  EACH  14 

113  MANHOLES TO BE ADJUSTED  EACH  13 

114  INLETS TO BE ADJUSTED  EACH  1 

115  VALVE VAULTS TO BE ADJUSTED  EACH  22 

116  VALVE BOXES TO BE ADJUSTED  EACH  2 

117  FILLING MANHOLES  EACH  3 

118  FILLING CATCH BASINS  EACH  69 

119  REMOVING INLETS  EACH  21 

120  CONTROLLED LOW‐STRENGTH MATERIAL (CLSM)  CU YD  34 

121  COMBINATION CONCRETE CURB AND GUTTER, TYPE B‐V.12  FOOT  6598 

122  CONCRETE CURB, TYPE B  EACH  1036 

123  FLAP GATE 12"  EACH  5 

Addendum No. 1

Page 18: Addendum 1 - P-2017-05 Spec-306235 20171205 (2) - Chicago · room 103, chicago, illinois, 60602 on december 21, 2017 ... 15-duct 6-mtd 4-duct with fire alarm ... restoration should

SCHEDULE OF PRICES DWM PROJECT NUMBERS 6498A, 6902, 7012 and 7174

P-2017-05

ITEM NO.

DESCRIPTION UNIT APPROX.QUANT.

UNIT PRICE

TOTAL PRICE (APPROX.

QTY. x UNIT PRICE)

IEPA Funded Instructions and Execution Documents (Rev. July 2016) 26

124  ENGINEER'S FIELD OFFICE  CAL MO  17 

125  MOBILIZATION  LSUM  1 

126  TRAFFIC CONTROL AND PROTECTION  CAL DAY  505 

127  PROJECT SIGNS  EACH  5 

128  CHANGEABLE MESSAGE SIGN  CAL DAY  126 

129  DRILL AND GROUT DOWEL/TIE BARS  EACH  7521 

130  TEMPORARY PAVEMENT MARKING ‐ LINE 4"  FOOT  4375 

131  TEMPORARY CONCRETE BARRIER  FOOT  1287 

132  RELOCATE TEMPORARY CONCRETE BARRIER  FOOT  5593 

133  IMPACT ATTENUATORS, TEMPORARY (NON‐REDIRECTIVE), TEST LEVEL 2  EACH  1 

134 IMPACT ATTENUATORS, TEMPORARY (FULLY REDIRECTIVE, NARROW), TEST LEVEL 3  EACH  2 

135  IMPACT ATTENUATORS, RELOCATE (FULLY REDIRECTIVE, NARROW), TEST LEVEL 3  EACH  6 

136  THERMOPLASTIC PAVEMENT MARKING ‐ LETTERS AND SYMBOLS  SQ FT  77 

137  THERMOPLASTIC PAVEMENT MARKING ‐ LINE 4"  FOOT  6296 

138  THERMOPLASTIC PAVEMENT MARKING ‐ LINE 6"  FOOT  1032 

139  THERMOPLASTIC PAVEMENT MARKING ‐ LINE 12"  FOOT  842 

140  THERMOPLASTIC PAVEMENT MARKING ‐ LINE 24"  FOOT  1978 

141  PAVEMENT MARKING REMOVAL  SQ FT  1956 

142  TRENCH AND BACKFILL FOR 2‐4 DUCTS  FOOT  570 

143  ELECTRICAL MANHOLE 3'X4'X4' WITH 30" FRAME AND LID  EACH  2 

144  DRILL EXISTING MANHOLE OR HANDHOLE  EACH  1 

145  CLEAN EXISTING ELECTRICAL MANHOLE OR HANDHOLE  EACH  2 

Addendum No. 1

Page 19: Addendum 1 - P-2017-05 Spec-306235 20171205 (2) - Chicago · room 103, chicago, illinois, 60602 on december 21, 2017 ... 15-duct 6-mtd 4-duct with fire alarm ... restoration should

SCHEDULE OF PRICES DWM PROJECT NUMBERS 6498A, 6902, 7012 and 7174

P-2017-05

ITEM NO.

DESCRIPTION UNIT APPROX.QUANT.

UNIT PRICE

TOTAL PRICE (APPROX.

QTY. x UNIT PRICE)

IEPA Funded Instructions and Execution Documents (Rev. July 2016) 27

146  PVC CONDUIT IN DUCT, CONCRETE ENCASED, 4‐3"  FOOT  570 

147  ROD AND CLEAN DUCT IN EXISTING CONDUIT SYSTEM  FOOT  1380 

148  INTERCEPT EXISTING CONDUIT  EACH  4 

149  PULL AND REINSTALL ELECTRIC CABLE FROM CONDUIT  FOOT  3839 

150  BREAKDOWN MANHOLE IN PAVEMENT  EACH  1 

151  TREE INSTALLATION  EACH  51 

152  MAINTAIN EXISTING LIGHTING SYSTEM  LSUM  1 

153 MAINTAIN EXISTING TRAFFIC SIGNAL, INTERSECTION OF E 95TH ST AND S COTTAGE GROVE AVE (NORTH LEG)  EACH  1 

154 MAINTAIN EXISTING TRAFFIC SIGNAL, INTERSECTION OF E 95TH ST AND S COTTAGE GROVE AVE (SOUTH LEG)  EACH  1 

155  TEMPORARY WATER MAIN SUPPORT STRUCTURE ‐ TYPE III  EACH  15 

156  TEMPORARY WATER MAIN SUPPORT STRUCTURE ‐ TYPE II, 16"  EACH  1 

157 CUT, CAP, AND REPLACE EXISTING WATER MAIN FOR UTILITY INSTALLATION, 6‐INCH  EACH  1 

158 CUT, CAP, AND REPLACE EXISTING WATER MAIN FOR UTILITY INSTALLATION, 8‐INCH  EACH  4 

159 CUT, CAP, AND REPLACE EXISTING WATER MAIN FOR UTILITY INSTALLATION, 12‐INCH  EACH  2 

160  WATER MAIN INSTALLED IN OPEN CUT, 8‐INCH  FOOT  40 

161  WATER MAIN INSTALLED IN OPEN CUT, 12‐INCH  FOOT  20 

162  VALVE INSTALLATION ‐ 8‐INCH  EACH  1 

163  RESILIENT WEDGE VALVE ‐ 8‐INCH  EACH  1 

Addendum No. 1

Page 20: Addendum 1 - P-2017-05 Spec-306235 20171205 (2) - Chicago · room 103, chicago, illinois, 60602 on december 21, 2017 ... 15-duct 6-mtd 4-duct with fire alarm ... restoration should

SCHEDULE OF PRICES DWM PROJECT NUMBERS 6498A, 6902, 7012 and 7174

P-2017-05

ITEM NO.

DESCRIPTION UNIT APPROX.QUANT.

UNIT PRICE

TOTAL PRICE (APPROX.

QTY. x UNIT PRICE)

IEPA Funded Instructions and Execution Documents (Rev. July 2016) 28

164 8‐INCH TO 12‐INCH CONNECTION TO 36‐INCH ‐ 42‐INCH: REMOVE AND REPLACE EXISTING TAPPING CONNECTION SLEEVE  EACH  1 

165  WATER SERVICE TO BE ADJUSTED  EACH  1 

166  CHECK VALVE  EACH  1 

167  SPECIAL FRAME AND LID  EACH  9 

168  RAILROAD TRACK REMOVAL  SQ YD  125 

169  ABANDON MANHOLE  EACH  5 

TOTAL BASE BID 

Addendum No. 1

Page 21: Addendum 1 - P-2017-05 Spec-306235 20171205 (2) - Chicago · room 103, chicago, illinois, 60602 on december 21, 2017 ... 15-duct 6-mtd 4-duct with fire alarm ... restoration should

DS-76 CDWM P-2017-05

ITEM NO. 76 ******** UNDERGROUND STORAGE STRUCTURE ON E 95TH ST

Description This item includes all costs associated with providing material, equipment and labor costs for installing a precast concrete box culvert with inside dimensions of 4’ in height x 12’ in width, as specified herein and detailed on the Contract Plans. Work must include temporary bulkheads, when required. Work Included This underground storage structure must be constructed to the dimensions shown on the Plans and to the lines and grades established by the Commissioner. The structure shall comply with the requirements included in Section 540 and Article 1042.02 of the Standard Specifications. The contractor shall submit shop drawings of the details for the storage system for approval by the Commissioner. Shop drawings for precast concrete box culvert sections which satisfy the standard shapes, reinforcement, and detailing of ASTM C 1577 are not required to be reviewed and approved by the Commissioner, as given in Article 540.06 of the Standard Specifications. Weep holes will not be allowed. The structure shall meet the structural loading requirements for the truck traffic loading and fill height shown on the plans. Shop drawings must be submitted for the precast box culvert details at manhole riser openings, the attachment to the Junction Structure on 95th Street and the closure panel. All items must be structurally connected to the box culvert to prevent differential movement and joints detailed to be watertight. The work includes excavating, removing and disposing of material, both wet and dry; removing and disposing of pavements, sidewalks, curbs, driveways, abandoned utilities and existing sewers and drains within the limits of excavation for underground storage structure; salvaging manhole and catch basin frames, lids and covers, and inlet frames and grates; furnishing, placing and removing sheeting, bracing and timbering; formwork; pumping, fluming and removing water and sewage; furnishing and placing granular bedding, box culvert, including openings for three manhole risers and the closure panel; connection of the box culvert to the Junction Structure on E. 95th Street; backfilling with trench backfill; and all necessary incidental work for the construction of the underground storage structure complete as specified and shown on the Project Plans, all of which various classes of work must be performed as herein specified. The Contractor must include in his construction procedure provisions for keeping all excavation free from standing water at all times. This structure is not intended to convey flows until the entire system is on line, but during heavy rains water may rise rapidly in the existing City sewers. The Contractor must be prepared at all times to safeguard workers and protect the work under this Contract from damage by flooding. All temporary dams, flumes, or bulkheads and debris deposited in the City sewer due to this construction must be removed after completion of the work. The Contractor must install a suitable screen to inhibit debris from entering the sewer system. Any debris deposited in the existing sewers due to this construction must be removed.

Page 22: Addendum 1 - P-2017-05 Spec-306235 20171205 (2) - Chicago · room 103, chicago, illinois, 60602 on december 21, 2017 ... 15-duct 6-mtd 4-duct with fire alarm ... restoration should

DS-77 CDWM P-2017-05

The Contractor shall determine the means and methods for supporting trench excavation for underground storage structure. If the Contractor chooses to install steel sheeting the sheeting shall be interlocking steel sheet piling Type PZ22, or equal, with required bracing to support the trench excavation for the structure. Prior to starting excavation the Contractor must submit, for the Commissioner’s approval, complete design calculations and working drawings of the proposed sheeting and bracing or other type of support proposed, prepared, signed and sealed by a structural engineer registered in the State of Illinois. Sheeting left in place must be cut off, no less than three (3) feet below finished street grade, after the trench is backfilled to that level. In general, sheeting and bracing must be removed as the trench or excavation is backfilled, provided such removal does not cause damage to adjacent structures or property, or to the work performed under this Contract. The Contractor will be compensated for sheeting left in place if ordered by the Commissioner. Inspection and Acceptance The 4’ x 12’ box culvert sections must be inspected by the Department of Water Management prior to the final payment to the Contractor. In conjunction with this inspection, the Contractor must furnish a videotape in DVD format of a televised inspection of the interior of the constructed box culvert. The videotape must be recorded under the supervision of the Commissioner. The cost of producing and furnishing the video tape will be incidental to this item of the contract. Perform videotaping of the box culvert prior to the placement of final wearing surface. The name, phone number, and contact person of the firm which will be performing the videotaping of the sewer must be provided by the Contractor at the pre-construction meeting. Cleaning must be performed prior to videotaping. The final acceptance of the structure shall be based on the sewer videotape. All deficiencies exposed on the videotape must be corrected by the Contractor within 30 calendar days of notification. All costs incurred by the Contractor to make the required repairs are to be borne solely by the Contractor. Pavement removal, if required, must be in full panel sections and pavement anchors will be required for pavement restoration. The Contractor is required to re-videotape the box culvert to verify that the deficiencies noted on any previous videotape have been corrected to the satisfaction of the Chicago Department of Water Management. All costs to re-videotape the box culvert, regardless of the number of times required, will be borne solely by the Contractor. Every effort is to be made by the Contractor to correct all deficiencies prior to the placement of the final wearing surface. If, in the opinion of the Commissioner, the Contractor has delayed in submitting the videotape, the placement of the final wearing surface may be suspended. No time extension will be granted due to this suspension and the Commissioner will be sole judge as to any delays. Include location maps, legends and descriptions on all videotape submittals. Two copies of each submittal are required. Measurement All bypass pumping or dewatering required for the installation of underground storage structures will be paid for under this item.

Page 23: Addendum 1 - P-2017-05 Spec-306235 20171205 (2) - Chicago · room 103, chicago, illinois, 60602 on december 21, 2017 ... 15-duct 6-mtd 4-duct with fire alarm ... restoration should

DS-78 CDWM P-2017-05

Furnishing, placing and compacting trench backfill around underground storage structures, as described in Section 502.10 of the Standard Specifications will be paid for under this item. This includes all granular material that may be placed for bedding or as a construction platform. Manhole risers will not be paid for under this item, but will be paid for under Precast Manhole Risers. Cast iron manhole frames and lids will not be paid for under this item, but will be paid for under Chicago Standard Manhole Frames and Lids. Salvaging manhole frames, lids and covers, and inlet frames and grates will be paid for under this item. Partial removal of a sewer or sewer structure required for installation will be paid under this item. Method of Payment This work will be paid for at the contract unit price per foot of UNDERGROUND STRUCTURE ON E 95TH ST. Excavation, bedding and backfilling and removal of surface features will be paid for under this item. Inlets, catch basins, sewers, pavement, curb and gutter, sidewalks and surface restoration will be paid for separately under the applicable pay items.

Page 24: Addendum 1 - P-2017-05 Spec-306235 20171205 (2) - Chicago · room 103, chicago, illinois, 60602 on december 21, 2017 ... 15-duct 6-mtd 4-duct with fire alarm ... restoration should

DS-79 CDWM P-2017-05

ITEM NO. 77 ******** UNDERGROUND STORAGE STRUCTURE NO. 1 BETWEEN S AVALON AV AND S WOODLAWN AV

ITEM NO. 78 ******** UNDERGROUND STORAGE STRUCTURE NO. 2 BETWEEN S WOODLAWN AV AND S UNIVERISTY AV

ITEM NO. 79 ******** UNDERGROUND STORAGE STRUCTURE NO. 3 BETWEEN S UNIVERSITY AV AND S GREENWOOD AV

ITEM NO. 80 ******** UNDERGROUND STORAGE STRUCTURE NO. 4 BETWEEN S GREENWOOD AV AND S DOBSON AV

ITEM NO. 81 ******** UNDERGROUND STORAGE STRUCTURE NO. 5 BETWEEN S DOBSON AV AND S ELLIS AV

Description This item includes all costs associated with providing material, equipment and labor costs for installing underground storage structures, as specified herein and detailed on the Contract Plans. Work must include temporary bulkheads, when required. Work Included Underground storage structures must be constructed to the dimensions and requirements shown on the Plans and to the lines and grades established by the Commissioner. Storage volumes at each location shall be equal to or greater than the figures given below. The underground storage structures will be constructed using modular concrete units at the approximate dimensions and elevations as given in the plans. The structures shall comply with the applicable portions of Section 1042 of the Standard Specifications and meet Design Loading HL-93 and 2014 AASHTO LRFD Bridge Design Specifications, 7th Edition with 2015 and 2016 Interims. The Contractor shall submit shop drawings of the details for the storage systems, for approval by the Commissioner. The submittal shall be made in accordance with Articles 1042.03(b) and 105.04 of the Standard Specifications. The supplier shall submit complete drawings and design calculations, signed and sealed by an Illinois Licensed Structural Engineer. Alternative means of providing the noted storage volume within the vertical range of elevations for the tanks within the existing greenspace, with the sewer connections to the existing system shown in the plans, with the floor freely draining to the outfall at 1% minimum slope, with a sump and a check valve, and also meeting the loading and structural design requirements as given above, may be submitted for approval by the Commissioner. The work includes excavating, removing and disposing of material, both wet and dry for underground storage structures, including bedding, concrete pads, sumps and collection channels; removing and disposing of pavements, sidewalks, curbs, driveways, abandoned utilities and existing sewers and drains within the limits of excavation for underground storage structures, concrete pads, sumps and collection channels; salvaging manhole and catch basin frames, lids and covers, and inlet frames and grates; furnishing, placing and removing sheeting, bracing and timbering; formwork; pumping, fluming

Page 25: Addendum 1 - P-2017-05 Spec-306235 20171205 (2) - Chicago · room 103, chicago, illinois, 60602 on december 21, 2017 ... 15-duct 6-mtd 4-duct with fire alarm ... restoration should

DS-80 CDWM P-2017-05

and removing water and sewage; furnishing and placing bedding, concrete, reinforcement steel, mortar, brick, granular embedment, fittings, ladder rungs, and pipe connections; backfilling with trench backfill; clearing in accordance with applicable portions of Section 201 of the Standard Specifications; and all necessary incidental work for the construction of the underground storage structures, concrete pads, sumps and collection channels complete as specified and shown on the Project Plans, all of which various classes of work must be performed as herein specified. Underground Storage Structure No. 1 between S Avalon Av and S Woodlawn Av The construction of an underground storage structure in the grassed median along W. 97th Street, between S. Avalon Av. and S. Woodlawn Av., as shown and noted on the Contract Plans. The tank shall be sized to store approximately 38,244 cubic feet. Underground Storage Structure No. 2 between S Woodlawn Av and S University Av The construction of an underground storage structure in the grassed median along W. 97th Street, between S. Woodlawn Av. and S. University Av., as shown and noted on the Contract Plans. The tank shall be sized to store approximately 38,244 cubic feet. Underground Storage Structure No. 3 between S University Av and S Greenwood Av The construction of an underground storage structure in the grassed median along W. 97th Street, between S. University Av. and S. Greenwood Av., as shown and noted on the Contract Plans. The tank shall be sized to store approximately 38,244 cubic feet. Underground Storage Structure No. 4 between S Greenwood Av and S Dobson Av The construction of an underground storage structure in the grassed median along W. 97th Street, between S. Greenwood Av. and S. Dobson Av., as shown and noted on the Contract Plans. The tank shall be sized to store approximately 38,244 cubic feet. Underground Storage Structure No. 5 between S Dobson Av and S Ellis Av The construction of an underground storage structure in the grassed median along W. 97th Street, west of S. Dobson Av., as shown and noted on the Contract Plans. The tank shall be sized to store approximately 31,538 cubic feet. At all proposed connections leading to the underground storage structures, the Contractor must verify the dry-weather water level in the existing sewer at the location proposed for connection for the underground storage structure outfall sewers. If the level is above the invert of the proposed outfall from the underground storage tank, this shall be reported to the Commissioner. This shall be done at the outset of excavation work required for each of the structures. The Contractor must include in his construction procedure provisions for maintaining flows at all times in this sewer, and preventing flooding of the excavation from these sewers. During heavy rains water may rise rapidly in the existing City sewer. The Contractor must be prepared at all times to safeguard workers and protect the work under this Contract from damage by flooding. All temporary dams, flumes, or bulkheads and debris deposited in the City sewer due to this construction must be removed after completion of the work.

Page 26: Addendum 1 - P-2017-05 Spec-306235 20171205 (2) - Chicago · room 103, chicago, illinois, 60602 on december 21, 2017 ... 15-duct 6-mtd 4-duct with fire alarm ... restoration should

DS-81 CDWM P-2017-05

The Contractor must use care to prevent damage to the existing sewer and any damage must be repaired or replaced by the Contractor without cost to the City. Shop drawings must be submitted showing means of internal support/protection of existing sewer facilities. The Contractor must install a suitable screen to inhibit debris from entering the sewer system. Any debris deposited in the existing sewers due to this construction must be removed. The Contractor must include in his construction procedure provisions for keeping all excavation free from standing water at all times. The structures specified must be constructed to the dimensions shown on the Plans and to the lines and grades established by the Commissioner. The Contractor shall determine the means and methods for supporting trench excavation for underground storage structures. If the Contractor chooses to install steel sheeting the sheeting shall be interlocking steel sheet piling Type PZ22, or equal, with required bracing to support the trench excavation for the structure. Prior to starting excavation the Contractor must submit, for the Commissioner’s approval, complete design calculations and working drawings of the proposed sheeting and bracing or other type of support proposed, prepared, signed and sealed by a structural engineer registered in the State of Illinois. Sheeting left in place must be cut off, no lower than three (3) feet below finished street grade, after the trench is backfilled to that level. In general, sheeting and bracing must be removed as the trench or excavation is backfilled, provided such removal does not cause damage to adjacent structures or property, or to the work performed under this Contract. The Contractor will be compensated for sheeting left in place if ordered by the Commissioner. Materials and Workmanship All concrete used in this work must be in accordance with applicable portions of Section 503 and 1020 of the Standard Specifications. All metals used in this work must be in accordance with applicable portions of Article 1006 of the IDOT Standard Specifications. Reinforcement steel bars must be in accordance with “Reinforcement Bars, Epoxy Coated.” All excavation and backfill must be in accordance with applicable portions of Section 502 of the Standard Specifications. Measurement Cast-in-place concrete pad, including bedding, the sump and collection channel at each tank will be paid for under this item. All concrete used in construction of the underground storage structures will be paid for under this item.

Page 27: Addendum 1 - P-2017-05 Spec-306235 20171205 (2) - Chicago · room 103, chicago, illinois, 60602 on december 21, 2017 ... 15-duct 6-mtd 4-duct with fire alarm ... restoration should

DS-82 CDWM P-2017-05

Reinforcement steel used in the construction of any cast-in-place concrete needed for the underground storage structures will be paid for under this item. Granular backfill material placed within the excavation for the underground storage structures will be paid for under this item. All bypass pumping or dewatering required for the installation of underground storage structures will be paid for under this item. Furnishing, placing and compacting trench backfill around underground storage structures, as described in Section 502.10 of the Standard Specifications will be paid for under this item. This includes all granular material that may be placed as a construction platform below the concrete slab and collection channel. This also includes all material below the top of the underground storage structures that will also be used for embedment and cover of the sewers and drain connections installed outside the underground storage structures. All granular material needed for support of the inlets and ductile iron pipe sewer placed above the underground storage structures will be paid for under this item. All unclassified embankment placed on top of the structures to fill up to the bottom of the proposed 6” layer of topsoil placed in the greenspace will be paid for under this item. Ladder rungs for the several access locations with frame and lid will be included and paid for under this item. Cast iron manhole frames and lids will not be paid for under this item, but will be paid for under Chicago Standard Manhole Frames and Lids. Salvaging manhole frames, lids and covers, and inlet frames and grates will be paid for under this item. Partial removal of a sewer or sewer structure required for installation will be paid under this item. Method of Payment This work will be paid for at the contract unit price per lump sum of UNDERGROUND STORAGE STRUCTURE NO. 1 BETWEEN S AVALON AV AND S WOODLAWN AV; UNDERGROUND STORAGE STRUCTURE NO. 2 BETWEEN S WOODLAWN AV AND S UNIVERSITY AVE; UNDERGROUND STORAGE STRUCTURE NO. 3 BETWEEN S UNIVERSITY AV AND S GREENWOOD AVE; UNDERGROUND STORAGE STRUCTURE NO. 4 BETWEEN S GREENWOOD AV AND S DOBSON AV; or UNDERGROUND STORAGE STRUCTURE NO. 5 BETWEEN S DOBSON AV AND S ELLIS AV. Removal of existing surface features, excavation and offsite disposal, bedding, concrete pad, placement of storage units, and backfilling will be paid for under this item. Inlets, catch basins, sewers, pavement, curb and gutter, sidewalks and surface restoration will be paid for separately under the applicable pay items.