ADDITIONS, ALTERATIONS AND RENOVATIONS (PHASE 1) AT … PROJECTS/NORTHERN BURLINGTO… · addendum no. 3 to contract documents for additions, alterations and renovations (phase 1)
6
ADDENDUM NO. 3 to CONTRACT DOCUMENTS for ADDITIONS, ALTERATIONS AND RENOVATIONS (PHASE 1) AT THE NORTHERN BURLINGTON COUNTY REGIONAL HIGH SCHOOL 160 Mansfield Road East, Columbus, NJ 08022 for the NORTHERN BURLINGTON COUNTY REGIONAL SCHOOL DISTRICT COLUMBUS, BURLINGTON COUNTY, NEW JERSEY Issued: September 6, 2019 FVHD PROJECT #5086.3A / NBC Bid #19-010 / NJDOE #3690-050-17-1000 FRAYTAK VEISZ HOPKINS DUTHIE, P.C. Architects/Planners 1515 Lower Ferry Road, Trenton, NJ 08618 William D. Hopkins III, AIA, LEED AP No. 21AI01706000 VAN CLEEF ENGINEERING ASSOCIATES Consulting Civil Engineers 4 AAA Drive, Suite 103, Hamilton, NJ 08691 HARRISON - HAMNETT, PC Consulting Structural Engineers 40 Knowles St., Pennington, NJ 08534 SHARPE ENGINEERING, INC. Consulting MEP Engineers 555 Second Avenue, Collegeville, PA 19426 INTENT: This Document supersedes all conflicting and contrary information in said Contract Documents. Said documents are hereby amended in certain particulars as described herein after. Unless specifically noted or specified hereinafter all work shall conform to the applicable provisions of the Contract Documents. Bidders shall acknowledge receiving this document and previously issued Addenda No’s. 1 and 2 on the Bid Proposal Form. This Addendum includes two (2) pages and the following: 1. MEPFP Addendum No. 1, as prepared by Sharpe Engineering, Inc., Dated September 6, 2019 (1-page). 2. Revised Drawings: E301, E502, E601. FVHD-5086.3A ADDENDUM NO. 3 - 1
SHARPE ENGINEERING, INC.Consulting MEP Engineers555 Second Avenue, Collegeville, PA 19426
INTENT: This Document supersedes all conflicting and contrary information in said ContractDocuments. Said documents are hereby amended in certain particulars as described herein after. Unless specifically noted or specified hereinafter all work shall conform to the applicable provisionsof the Contract Documents. Bidders shall acknowledge receiving this document and previously issuedAddenda No’s. 1 and 2 on the Bid Proposal Form.
This Addendum includes two (2) pages and the following:
1. MEPFP Addendum No. 1, as prepared by Sharpe Engineering, Inc., Dated September 6, 2019(1-page).
2. Revised Drawings: E301, E502, E601.
FVHD-5086.3A ADDENDUM NO. 3 - 1
REFER TO DRAWINGS
The following Drawings are attached to this Addendum:
DRAWING NO. TITLE
E301 ELECTRICAL NEW WORK - POWER
E502 ELECTRICAL DETAILS
E601 ELECTRICAL SCHEDULES
The following Drawings to be revised or corrected as follows:
DRAWING NO. CHANGES AND CORRECTIONS
E301 Delete drawing E301 in its entirety and substitute with revised drawing E301,attached to this Addendum.
E502 Delete drawing E502 in its entirety and substitute with revised drawing E502,attached to this Addendum.
E601 Delete drawing E601 in its entirety and substitute with revised drawing E601,attached to this Addendum.
END OF ADDENDUM NO. 3
FVHD-5086.3A ADDENDUM NO. 3 - 2
MEPFP Addendum No. 1 Page 1 of 1
MEPFP ADDENDUM NO. 1
DATE: SEPTEMBER 6, 2019
PROJECT: ADDITIONS, ALTERATIONS AND RENOVATIONS AT NORTHERN
BURLINGTON COUNTY REGIONAL HIGH SCHOOL – PHASE 1
OWNER: NORTHERN BURLINGTON COUNTY REGIONAL SCHOOL DISTRICT
CONSULTING
ENGINEER:
SHARPE ENGINEERING
130 FUTURA DRIVE
SUITE 200
LIMERICK TOWNSHIP, PA 19464
PROJECT NO.: FVHD# 5086.3A SHARPE ENG. #18237-3
The following changes are hereby incorporated into the construction documents dated July 12, 2019, for
the above project:
Part 1 - Plumbing Drawings
A. NONE
Part 2 - Mechanical Drawings
A. NONE
Part 3 - Electrical Drawings
A. Sheet E301
1. Revise branch circuit for RAC-3 from Panel ‘HP3’ to Panel ‘HPH2’.
B. Sheet E502
1. Revise feeder for ‘HP3’ from a 400A breaker to a 70A breaker. The panelboard shall still
have a 400A bus, but will temporarily be fed at 70A.
C. Sheet E601
1. Move RAC-3 from Panel ‘HP3’ to existing spare breaker in Panel ‘HPH2’.
Part 4 - Fire Protection Drawings
A. NONE
- END OF MEPFP ADDENDUM NO. 1 -
CLASSROOM 309A105
STORAGEA109
VEST.A108
MEN'SFAC. TOIL
A127
WOMEN'SFAC. TOIL.
A128PASSA112
TEAMA113
COACHLOCKER
A115TOIL.A116
PASS.A114
OFFICEA117
BOYS'LOCKER 313
A111
CLOS.A129
CLOS.A131
HEALTHCLASSROOM 302
A167
A104
CLASSROOMHEALTH 308
A103
CLASSROOMHEALTH 307
A102CORRIDOR 300
A101CORRIDOR
A175JROTC 306
A174OFFICE
A173STOR.
A172
ELECT/JROTCSTORAGE 305
A171STORAGE
A169CORRIDOR
A168CLASSROOM 303
A178JROTC
A177
WORLD LANG. CLASSROOM
A176CORRIDOR
GUIDOFF G6GUID
OFF G10GUID
OFF G7GUID
OFF G8GUID
OFF G9
TOIL.STORAGE
A137STORAGE
JANA132
PIPING
STORAGEA155
D148TOIL.
D147STOR.
D146TOIL.
D149TOIL.D145
UTILITY
D144
TRAINERS' OFFICE
D143PASSAGE
D142WHIRLPOOL
D139
ICE MACHINEROOM
D138
FITNESSCENTER
D137
CO
RRID
OR
D141
TRAININGSUITE
D155A. D. OFF.
D152SRO OFFICE
D154SECT.
D153ELEC.
D151PREP.
SIM
E301
ELECTRICAL NEWWORK - POWER
RDF
DFW
AS NOTED
SCALE: 1/8" = 1'-0"
ELECTRICAL - NEW WORK - BLOCK 'A' POWER1
E301
SCALE: 1/8" = 1'-0"
ELECTRICAL - NEW WORK - FITNESS CENTER POWER2
E301
Key PlanScale: N.T.S.
ENGINEERING, INCSHARPE
MEP Consulting Engineers
7/12/2019
N.J. Cert. of Auth.No. 24GA28124500
JOHN R. SHARPE, P.E. N.J. Lic. No. 24GE04625500
Sharpe Engineering, Inc.130 Futura Drive | Suite 200 | Limerick Twp, PA 19464
tel 610.489.8212 | fax 610.489.8213 | www.sharpe-eng.comSE Project #18237-3
Additions, Alterationsand Renovations atNorthern BurlingtonCounty Regional HighSchool - Phase 1
160 Mansfield Rd. East,Columbus, NJ 08022
Architect
D
ate
F V
H D
P C
. C
O M
JOHN
J. V
EISZ,
AIA,
CSB
ANJ
- 21
AI00
8669
00 |
PA
- RA0
1081
9B
WILL
IAM
D. H
OPK
INS I
II, AI
A, LE
ED A
PNJ
- 21
AI01
7060
00 |
PA
- RA0
1252
0X
GEO
RGE
R. D
UTHI
E JR
., AI
A, P
PNJ
- 21
AI01
2992
00
Northern BurlingtonCounty RegionalSchool District
Cor
pora
te:
1515
Low
er F
erry
Roa
d -
Tren
ton
- New
Jer
sey
0862
8Pe
nnsy
lvan
ia:
140
Whi
take
r Ave
- M
ont C
lare
- Pe
nnsy
lvan
ia 1
9453
5086.3A
07.12.2019
7/12/19
SCALE: 1/16" = 1'-0"
ELECTRICAL - ROOF PLAN3
E301
AutoCAD SHX Text
1
AutoCAD SHX Text
FC
AutoCAD SHX Text
3
AutoCAD SHX Text
FC
AutoCAD SHX Text
2
AutoCAD SHX Text
ERUV
AutoCAD SHX Text
3
AutoCAD SHX Text
ERUV
AutoCAD SHX Text
1
AutoCAD SHX Text
CUH
AutoCAD SHX Text
1
AutoCAD SHX Text
ERUV
AutoCAD SHX Text
2
AutoCAD SHX Text
FC
AutoCAD SHX Text
4
AutoCAD SHX Text
FC
AutoCAD SHX Text
HP3
AutoCAD SHX Text
26,28,30
AutoCAD SHX Text
HP3
AutoCAD SHX Text
31,33,35
AutoCAD SHX Text
32,34,36
AutoCAD SHX Text
HP3
AutoCAD SHX Text
27
AutoCAD SHX Text
PP3
AutoCAD SHX Text
(E)'LP3-2'
AutoCAD SHX Text
(E)'PP3 (SECT 2)'
AutoCAD SHX Text
(E)'PP3 (SECT 1)'
AutoCAD SHX Text
(E)'PP3-0'
AutoCAD SHX Text
(E)'CP300' (SECT. 1 & 2)
AutoCAD SHX Text
M
AutoCAD SHX Text
M
AutoCAD SHX Text
M
AutoCAD SHX Text
M
AutoCAD SHX Text
10
AutoCAD SHX Text
CP-300
AutoCAD SHX Text
12
AutoCAD SHX Text
CP-300
AutoCAD SHX Text
+
AutoCAD SHX Text
+
AutoCAD SHX Text
50
AutoCAD SHX Text
CP-300
AutoCAD SHX Text
52
AutoCAD SHX Text
CP-300
AutoCAD SHX Text
J
AutoCAD SHX Text
J
AutoCAD SHX Text
16
AutoCAD SHX Text
CP-300
AutoCAD SHX Text
(N)'HP3'
AutoCAD SHX Text
S
AutoCAD SHX Text
16
AutoCAD SHX Text
CP-300
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
64
AutoCAD SHX Text
PP3
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
64
AutoCAD SHX Text
PP3
AutoCAD SHX Text
J
AutoCAD SHX Text
J
AutoCAD SHX Text
EP1
AutoCAD SHX Text
19
AutoCAD SHX Text
64
AutoCAD SHX Text
PP3
AutoCAD SHX Text
64
AutoCAD SHX Text
PP3
AutoCAD SHX Text
S
AutoCAD SHX Text
2
AutoCAD SHX Text
CP
AutoCAD SHX Text
S
AutoCAD SHX Text
J
AutoCAD SHX Text
1
AutoCAD SHX Text
CP
AutoCAD SHX Text
S
AutoCAD SHX Text
J
AutoCAD SHX Text
2
AutoCAD SHX Text
CP
AutoCAD SHX Text
S
AutoCAD SHX Text
J
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
C
AutoCAD SHX Text
(E)
AutoCAD SHX Text
(E)
AutoCAD SHX Text
(E)
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
C
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
KEY NOTES
AutoCAD SHX Text
RECEPTACLE AND VIDEO OUTLET FOR CEILING MOUNTED TV/MONITOR. COORDINATE MOUNTING HEIGHT AND LOCATION WITH MOUNTING HEIGHT AND LOCATION OF CEILING MOUNTED TV/MONITOR. FOR VIDEO OUTLET, PROVIDE EMPTY BACK BOX AND 1-1/2" CONDUIT WITH PULL STRING UP TO ACCESSIBLE CONCEALED SPACE ABOVE CEILING.
AutoCAD SHX Text
POWER AND DATA FOR SMART BOARD. IN AREAS OF EXISTING CMU CONSTRUCTION, MOUNT RECEPTACLE AND EMPTY 2-GANG BACK BOX BENEATH SMART BOARD; COORDINATE MOUNTING HEIGHTS WITH MOUNTING HEIGHTS OF SMART BOARDS. IN AREAS OF NEW CONSTRUCTION AND EXISTING DRYWALL CONSTRUCTION, PROVIDE RECEPTACLE AND (2) EMPTY BOXES IN A RECESSED IN-WALL MEDIA BOX; BASIS OF DESIGN: HUBBELL #NSAV124M. PROVIDE EMPTY 2-GANG BACK BOX AT TEACHER'S DESK. PROVIDE ONE 1" CONDUIT AND ONE 1-1/2" CONDUIT WITH PULL STRINGS FROM EMPTY BACK BOX(ES) AT SMART BOARD TO EMPTY BACK BOX AT TEACHER'S DESK OR OTHER INDICATED LOCATION.
AutoCAD SHX Text
RECEPTACLE FOR RELOCATED ICE MAKER. PROVIDE NEMA 14-20R RECEPTACLE MOUNTED AT 72" AFF. CONFIRM NEMA RECEPTACLE TYPE PRIOR TO PURCHASE. PROVIDE 3#12 WITH 1#12 GROUND IN 3/4" CONDUIT BACK TO POWER SOURCE.
AutoCAD SHX Text
RECEPTACLE FOR CLOTHES DRYER. PROVIDE NEMA 14-30R RECEPTACLE. PROVIDE 3#10 WITH 1#10 GROUND IN 3/4" CONDUIT BACK TO POWER SOURCE.
AutoCAD SHX Text
RECEPTACLE FOR REFRIGERATOR. COORDINATE MOUNTING HEIGHT AND LOCATION WITH REFRIGERATOR LOCATION AND OUTLET REQUIREMENTS.
AutoCAD SHX Text
POWER FOR HAND DRYER.
AutoCAD SHX Text
PROVIDE DISCONNECT SWITCH AND HARD-WIRED CONNECTION TO CONDENSATE PUMP. COORDINATE LOCATION AND MOUNTING HEIGHT OF SWITCH WITH LOCATION AND MOUNTING HEIGHT OF CONDENSATE PUMP.
AutoCAD SHX Text
POWER FOR FUTURE RADON VENT FAN. PROVIDE SWITCH AND JUNCTION BOX IN CONCEALED, ACCESSIBLE SPACE ABOVE CEILING.
AutoCAD SHX Text
POWER FOR DOOR LOCKS. PROVIDE 120V CIRCUIT TO JUNCTION BOX IN CONCEALED, ACCESSIBLE SPACE ABOVE CEILING AT DOOR.
AutoCAD SHX Text
FACTORY MOUNTED DISCONNECT.
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
9
AutoCAD SHX Text
10
AutoCAD SHX Text
V
AutoCAD SHX Text
V
AutoCAD SHX Text
V
AutoCAD SHX Text
V
AutoCAD SHX Text
V
AutoCAD SHX Text
V
AutoCAD SHX Text
V
AutoCAD SHX Text
+
AutoCAD SHX Text
+
AutoCAD SHX Text
+
AutoCAD SHX Text
+
AutoCAD SHX Text
+
AutoCAD SHX Text
TP1
AutoCAD SHX Text
1
AutoCAD SHX Text
TP1
AutoCAD SHX Text
7
AutoCAD SHX Text
TP1
AutoCAD SHX Text
8
AutoCAD SHX Text
TP1
AutoCAD SHX Text
9
AutoCAD SHX Text
TP1
AutoCAD SHX Text
10
AutoCAD SHX Text
TP1
AutoCAD SHX Text
11
AutoCAD SHX Text
TP1
AutoCAD SHX Text
12
AutoCAD SHX Text
WP
AutoCAD SHX Text
TP1
AutoCAD SHX Text
14
AutoCAD SHX Text
TP1
AutoCAD SHX Text
13,15
AutoCAD SHX Text
TP1
AutoCAD SHX Text
17
AutoCAD SHX Text
TP1
AutoCAD SHX Text
18
AutoCAD SHX Text
TP1
AutoCAD SHX Text
19
AutoCAD SHX Text
TP1
AutoCAD SHX Text
20
AutoCAD SHX Text
TP1
AutoCAD SHX Text
22
AutoCAD SHX Text
TP1
AutoCAD SHX Text
21
AutoCAD SHX Text
(N)'TP1'
AutoCAD SHX Text
TP1
AutoCAD SHX Text
23
AutoCAD SHX Text
TP1
AutoCAD SHX Text
24,26
AutoCAD SHX Text
TP1
AutoCAD SHX Text
25
AutoCAD SHX Text
TP1
AutoCAD SHX Text
27
AutoCAD SHX Text
2
AutoCAD SHX Text
EF
AutoCAD SHX Text
TP1
AutoCAD SHX Text
30
AutoCAD SHX Text
TP1
AutoCAD SHX Text
10
AutoCAD SHX Text
TP1
AutoCAD SHX Text
10
AutoCAD SHX Text
V
AutoCAD SHX Text
V
AutoCAD SHX Text
TP1
AutoCAD SHX Text
2
AutoCAD SHX Text
TP1
AutoCAD SHX Text
3
AutoCAD SHX Text
TP1
AutoCAD SHX Text
4
AutoCAD SHX Text
TP1
AutoCAD SHX Text
5
AutoCAD SHX Text
TP1
AutoCAD SHX Text
9
AutoCAD SHX Text
TP1
AutoCAD SHX Text
9
AutoCAD SHX Text
TP1
AutoCAD SHX Text
6
AutoCAD SHX Text
WP
AutoCAD SHX Text
TP1
AutoCAD SHX Text
16
AutoCAD SHX Text
TP1
AutoCAD SHX Text
9
AutoCAD SHX Text
(E)'EP1'
AutoCAD SHX Text
(E)'PP1-1'
AutoCAD SHX Text
(E)'PP1-2'
AutoCAD SHX Text
(E)'RP1'
AutoCAD SHX Text
(E)'LP1'
AutoCAD SHX Text
(E)'LCP-3'
AutoCAD SHX Text
S
AutoCAD SHX Text
J
AutoCAD SHX Text
31
AutoCAD SHX Text
TP1
AutoCAD SHX Text
J
AutoCAD SHX Text
TP1
AutoCAD SHX Text
J
AutoCAD SHX Text
TP1
AutoCAD SHX Text
J
AutoCAD SHX Text
TP1
AutoCAD SHX Text
32
AutoCAD SHX Text
33
AutoCAD SHX Text
34
AutoCAD SHX Text
J
AutoCAD SHX Text
EP1
AutoCAD SHX Text
19
AutoCAD SHX Text
J
AutoCAD SHX Text
J
AutoCAD SHX Text
EP1
AutoCAD SHX Text
19
AutoCAD SHX Text
J
AutoCAD SHX Text
EP1
AutoCAD SHX Text
19
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
C
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
2
AutoCAD SHX Text
CU
AutoCAD SHX Text
1
AutoCAD SHX Text
CU
AutoCAD SHX Text
3
AutoCAD SHX Text
CU
AutoCAD SHX Text
3
AutoCAD SHX Text
RAC
AutoCAD SHX Text
4
AutoCAD SHX Text
CU
AutoCAD SHX Text
1
AutoCAD SHX Text
RAC
AutoCAD SHX Text
2
AutoCAD SHX Text
RAC
AutoCAD SHX Text
3
AutoCAD SHX Text
RTU
AutoCAD SHX Text
4
AutoCAD SHX Text
RTU
AutoCAD SHX Text
1
AutoCAD SHX Text
EF
AutoCAD SHX Text
WP
AutoCAD SHX Text
WP
AutoCAD SHX Text
WP
AutoCAD SHX Text
HP3
AutoCAD SHX Text
25,27,29
AutoCAD SHX Text
HP3
AutoCAD SHX Text
37,39,41
AutoCAD SHX Text
HPH2
AutoCAD SHX Text
14,16,18
AutoCAD SHX Text
WP
AutoCAD SHX Text
WP
AutoCAD SHX Text
WP
AutoCAD SHX Text
PP3
AutoCAD SHX Text
26
AutoCAD SHX Text
PP3
AutoCAD SHX Text
51,53
AutoCAD SHX Text
30A/2P 20A FU, 250V, NEMA 3R
AutoCAD SHX Text
PP3
AutoCAD SHX Text
43,45
AutoCAD SHX Text
30A/2P 20A FU, 250V, NEMA 3R
AutoCAD SHX Text
PP3
AutoCAD SHX Text
47,49
AutoCAD SHX Text
60/2P 40A FU, 250V, NEMA 3R
AutoCAD SHX Text
PP1-2
AutoCAD SHX Text
37,39,41
AutoCAD SHX Text
30A/2P 20A FU, 250V, NEMA 3R
AutoCAD SHX Text
55,57
AutoCAD SHX Text
PP3
AutoCAD SHX Text
PP1-2
AutoCAD SHX Text
38,40,42
AutoCAD SHX Text
TP1
AutoCAD SHX Text
29
AutoCAD SHX Text
WP
AutoCAD SHX Text
TP1
AutoCAD SHX Text
28
AutoCAD SHX Text
1
AutoCAD SHX Text
1
E502
ELECTRICALDETAILS
RDF
RDF
AS NOTED
SCALE: NONE
NORMAL/EMERGENCY LIGHTING CONTROL DIAGRAM4
E502
SCALE: NONE
LIGHTING CONTROL DIAGRAM - DIMMING, OCC. SENSOR2
E502
SCALE: NONE
LIGHTING CONTROL DIAGRAM - DIMMING, OCC. SENSOR, DAYLIGHT HARVESTING3
E502
SCALE: NONE
NORMAL/EMERGENCY EXTERIOR LIGHTING CONTROL DIAGRAM6
E502
ENGINEERING, INCSHARPE
MEP Consulting Engineers
7/12/2019
N.J. Cert. of Auth.No. 24GA28124500
JOHN R. SHARPE, P.E. N.J. Lic. No. 24GE04625500
Sharpe Engineering, Inc.130 Futura Drive | Suite 200 | Limerick Twp, PA 19464
tel 610.489.8212 | fax 610.489.8213 | www.sharpe-eng.comSE Project #18237-3
* = CONFIRM FINISH WITH ARCHITECT, ALLOW FOR CUSTOM COLOR
AutoCAD SHX Text
EXIT SIGN - UNIVERSAL MOUNTING LED TYPE WITH BATTERY BACKUP
AutoCAD SHX Text
LITHONIA LQM-S-W-3-R-120/277-ELN
AutoCAD SHX Text
120V/ 277V
AutoCAD SHX Text
LED
AutoCAD SHX Text
LED
AutoCAD SHX Text
SURFACE
AutoCAD SHX Text
1W
AutoCAD SHX Text
PANELBOARD KEY NOTES: 1. REUSE EXISTING SPARE CIRCUIT BREAKER FOR NEW CIRCUIT. REUSE EXISTING SPARE CIRCUIT BREAKER FOR NEW CIRCUIT. 2. PROVIDE NEW CIRCUIT BREAKER IN EXISTING PANEL. REFER TO PANEL SCHEDULE PROVIDE NEW CIRCUIT BREAKER IN EXISTING PANEL. REFER TO PANEL SCHEDULE TITLE FOR PANELBOARD MANUFACTURER AND MODEL. 3. PROVIDE 400A BUS.PROVIDE 400A BUS.