Additions and Renovations - Platt Technical High School - Milford, CT
Addendum No.6 –August 21, 2019 DCS Project No. BI-RT-878 CMR | OSCG&R Project No. 900-0013
Additions and Renovations
Platt Technical High School
Milford, CT
ADDENDUM NO. 6 August 21, 2019
The original Specifications and Drawings dated May 24, 2019, Addendum No.1 dated July 23, 2019, Addendum
No.2 dated July 29, 2019, Addendum No.3 dated August 2, 2019, Addendum No.4 dated August 9, 2019 and
Addendum No.5 dated August 15, 2019 for the above-captioned project are amended as stated in this Addendum.
This Addendum consists of eleven (11) pages, plus the following attachments.
ATTACHMENTS
PROJECT MANUAL
Section 00 52 73 – EXHIBIT C, PROJECT SCHEDULE, “Milestones” portion of the Project Schedule
(included as an Exhibit to the Subcontractor Agreement Form) (1 page)
Section 11 52 14 - LARGE VENUE TENSIONED FRONT PROJECTION SCREEN (5 pages)
ARCHITECTURAL SKETCHES
RA6-01, RA6-02, RA6-03, RA6-04, RA6-05 (5 pages)
STRUCTURAL SKETCHES
RS6-001, RS6-002 (2 pages)
STRUCTURAL DRAWINGS
S1-1-3D, S2-3-1 (2 pages)
AMENDMENTS TO ADDENDUM NO.5
DIVISION 08 – OPENINGS
ADD 6-001 ADDENDUM NO.5, Page 5, ITEM ADD 5-023 – SECTION 08 71 00 – DOOR HARDWARE
DELETE revisions made to Door Hardware Sets 1 through 5 in Addendum No.5 and REPLACE with
Hardware Sets noted within this Addendum.
ADD 6-002 ADDENDUM NO.5, Page 10, ITEM ADD 5-037 – DRAWING A6-3-20 – TRANSLUCENT WALL
PANEL AND LOUVER DETAILS
REPLACE Detail 10 with attached Sketch RA6-01.
Additions and Renovations - Platt Technical High School - Milford, CT
Addendum No.6 –August 21, 2019 DCS Project No. BI-RT-878 CMR | OSCG&R Project No. 900-0013
AMENDMENTS TO PROJECT MANUAL
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
ADD 6-003 SECTION 00 01 10 – TABLE OF CONTENTS
Page 6, Under Division 11, ADD “Section 11 52 14, Large Venue Tensioned Front Projection
Screen.”
ADD 6-004 SECTION 00 41 10 – BID PACKAGE SUBMITTAL REQUIREMENTS
BID PACKAGE No.03, Concrete:
ADD Scope of work item - This bid package subcontractor to provide concrete fill around precast
and grout for all precast and all angles/diaphragm ties required by the contract documents but
not limited to the work shown on the followings drawings: S300, S400 and S500 series drawings
and details within these drawings.
ADD 6-005 SECTION 00 41 10 – BID PACKAGE SUBMITTAL REQUIREMENTS
BID PACKAGE No.05, Structural Steel & Precast:
Scope of work Item No. 48: REVISE TO READ, The site package subcontractor will provide level
“process” crane pad with access on each side of the building
outside the footprint of the building. Cranes will have limited
access to within the building footprint to be coordinated in the
field with Morganti field staff and all other bid package
subcontractors.
Scope of work Item No.51: REVISE TO READ, This bid package subcontractor will provide all
work associated with acoustical decking, EXCEPT they shall furnish
only sound absorbing insulation that will now be INSTALLED BY
THE ROOFING Bid PACKAGE SUBCONTRACTOR. Any cover plates
required by the deck system shall be supplied and installed by Bid
Package No.5.
Scope of work item no. 62: REVISE TO READ, this bid package subcontractor has figured 2
cranes as required to meet the Project Schedule.
Scope of work item No. 69: REVISE TO READ, This bid package shall provide all angles as
shown on ALL of the contract documents but not limited to S400
and S500 drawings series and required by the Structural Steel,
Precast and Miscellaneous Steel. Nuts and bolts for blocking
attachment will be by others.
Scope of work item No. 70: This item is now removed from the structural Steel bid package
subcontractor and shall be provided by Bid Package No. 6, General
Trades subcontractor.
Scope of work item No. 75: Removed from Structural Steel bid package, this work shall be
provided by Bid Package No. 3, Concrete Subcontractor.
ADD 6-006 SECTION 00 41 10 – BID PACKAGE SUBMITTAL REQUIREMENTS
BID PACKAGE No.06, General Trades:
ADD Scope of work item - This bid package subcontractor shall provide all fire rated sealant
and fire safing and joint sealants between precast members and between precast and any other
item. Provide fire rated UL systems in joints of precast with caulk and backer rod where required.
Additions and Renovations - Platt Technical High School - Milford, CT
Addendum No.6 –August 21, 2019 DCS Project No. BI-RT-878 CMR | OSCG&R Project No. 900-0013
ADD 6-007 SECTION 00 41 10 – BID PACKAGE SUBMITTAL REQUIREMENTS
BID PACKAGE No.06, General Trades:
Page 3, ADD Section 11 52 14, Large Venue Tensioned Front Projection Screen
under Division 11, Equipment.
ADD 6-008 SECTION 00 41 10 – BID PACKAGE SUBMITTAL REQUIREMENTS
BID PACKAGE No.07, Roofing:
Added scope of work item - The roofer shall install all work associated with the installation of
sound absorbing insulation furnished by the Structural Steel Bid Package subcontractor.
Added scope of work item - The roofer shall supply and install all fasteners, nuts and bolts
associated with their work. No longer being furnished by Bid Package No. 05.
ADD 6-009 SECTION 00 41 10 – BID PACKAGE SUBMITTAL REQUIREMENTS
BID PACKAGE No.09, Drywall:
ADD Scope of work item - The drywall contractor shall supply and install all fasteners and nuts
and bolts associated with his work. No longer being furnished by Bid Package No. 05.
ADD 6-010 SECTION 00 52 73 – SUBCONTRACT AGREEMENT FORM – EXHIBIT C, PROJECT SCHEDULE
REPLACE from the first page of Exhibit C, Project Schedule, the “Milestone” portion of the Project
Schedule with the attached. Below is a summary of changes made to the Milestones.
The milestone dates of the schedule have been pushed out one month due to the extension
of the bid dates and GMP schedule. The activities in Schedule C has been pushed out a
corresponding one month due to the extension of the bid dates. The logic of the schedule
remains the same.
Start of construction is projected to be 12/2/2019 and completion of Phase 1 to be
12/3/2021. Phase 2 completion date remains the same, 11/15/2022.
DIVISION 03 – CONCRETE
ADD 6-011 SECTION 03 30 04 – CAST-IN-PLACE CONCRETE
Page 3, Article 2.1, DELETE the following Paragraph:
“L. Dampproofing specified on concrete walls …”
ADD 6-012 SECTION 03 30 04 – CAST-IN-PLACE CONCRETE
Page 5, Article 2.3, Paragraph C, DELETE the following Sub-paragraphs:
“4. Water to cement ratio shall be compatible with all requirements of the concrete
moisture vapor reduction admixture manufacturer.
5. Add concrete moisture vapor reduction admixture in strict accordance with
manufacturer's recommendations.”
DIVISION 08 – OPENINGS
ADD 6-013 SECTION 08 45 23 – FIBERGLASS–SANDWICH–PANEL ASSEMBLIES
Page 8, Article 2.6, Paragraph C, REVISE the words “AAMA 2605” to read “AAMA 2604.”
Additions and Renovations - Platt Technical High School - Milford, CT
Addendum No.6 –August 21, 2019 DCS Project No. BI-RT-878 CMR | OSCG&R Project No. 900-0013
ADD 6-014 SECTION 08 71 00 – DOOR HARDWARE
Article 3.8 Door Hardware Sets, DELETE Hardware Sets 1.0, 1.1, 2.0, 2.1, 3.0, 4.0 and 5.0. ADD
the following replacement sets for 1.0 through 5.0:
Set: 1.0
Doors: A131, S3.1
2 Continuous Hinge By Aluminum Assembly Manufacturer, Provide actual hardware that was impacted tested with assembly.
OT
1 Concealed Vert Rod Exit By Aluminum Assembly Manufacturer, Provide actual hardware that was impacted tested with assembly.
OT
1 Exit Device (nightlatch)
By Aluminum Assembly Manufacturer, Provide actual hardware that was impacted tested with assembly - equal to Jackson 2086 CVR panic device tested with the basis of design EFCO D500 series. EL exit with RX switch on both leaves. Coordinate with security to achieve functional requirements.
OT
3 Permanent Core By Aluminum Assembly Manufacturer Medeco X4 26 MC
2 Door Closer By Aluminum Assembly Manufacturer UNI7500 689 NO
2 Door Pulls By Aluminum Assembly Manufacturer RM3732 60” Stainless Steel.
RO
1 Threshold By Aluminum Assembly Manufacturer. Provide actual hardware that was impacted tested with assembly
OT
1 Perimeter Gasketing By Aluminum Assembly Manufacturer. Provide actual hardware that was impacted tested with assembly
OT
1 ElectroLynx Harness - Frame By Aluminum Assembly Manufacturer. Compatible with exit device - equal to QC-C1500P
MK
1 ElectroLynx Harness - Door By Aluminum Assembly Manufacturer. Compatible with exit device - equal to QC-CXXX (Size as required)
MK
1 Electric Power Transfer By Aluminum Assembly Manufacturer EL-CEPT OT
1 Wiring Diagram By Security System Supplier OT
2 Position Switch By Security System Supplier OT
1 Card Reader By Security System Supplier OT
1 Power Supply By Security System Supplier OT
Notes: Door closed & locked at all times. Presenting valid credential outside shunts door position switches & allows for authorized entrance. Operating inside touchpad activates request to exit switch shunting door contact and allowing authorized egress at all times. With loss of power door remains locked. Impact-rated door assembly requires continuous hinge, concealed vertical rod exit, threshold and gasketing to be provided as tested per ASTM E1886 and ASTM A1996 for that assembly.
Set: 1.1
Doors: A105.1
1 Continuous Hinge By Aluminum Assembly Manufacturer. Provide actual hardware that was impacted tested with assembly
OT
1 Exit Device (nightlatch)
By Aluminum Assembly Manufacturer, Provide actual hardware that was impacted tested with assembly - equal to Jackson 2086 CVR panic device tested with the basis of design EFCO D500 series. EL exit with RX switch on both leaves. Coordinate with security to achieve functional requirements.
OT
2 Permanent Core By Aluminum Assembly Manufacturer Medeco X4
630 MC
1 Door Closer By Aluminum Assembly Manufacturer UNI7500 689 NO
Additions and Renovations - Platt Technical High School - Milford, CT
Addendum No.6 –August 21, 2019 DCS Project No. BI-RT-878 CMR | OSCG&R Project No. 900-0013
2 Door Pulls By Aluminum Assembly Manufacturer RM3732 60” Stainless Steel
RO
1 Threshold By Aluminum Assembly Manufacturer OT
1 Perimeter Gasketing By Aluminum Assembly Manufacturer OT
1 ElectroLynx Harness - Frame By Aluminum Assembly Manufacturer. Compatible with exit device - equal to QC-C1500P
MK
1 ElectroLynx Harness - Door By Aluminum Assembly Manufacturer. Compatible with exit device - equal to QC-CXXX (Size as required)
MK
1 Wiring Diagram by Security System Supplier OT
1 Position Switch B OT
1 Card Reader By Security System Supplier OT
1 Power Supply By Security System Supplier OT
Notes: Door closed & locked at all times. Presenting valid credential outside shunts door position switches & allows for authorized entrance. Operating inside touchpad activates request to exit switch shunting door contact and allowing authorized egress at all times. With loss of power door remains locked. . Impact-rated door assembly requires continuous hinge, concealed vertical rod exit, threshold and gasketing to be provided as tested per ASTM E1886 and ASTM A1996 for that assembly.
Set: 2.0
Doors: A133.8, E114, E133, S5.2
2 Continuous Hinge By Aluminum Assembly Manufacturer OT
1 Concealed Vert Rod Exit By Aluminum Assembly Manufacturer, Provide actual hardware that was impacted tested with assembly
OT
1 Exit Device (nightlatch)
By Aluminum Assembly Manufacturer, Provide actual hardware that was impacted tested with assembly - equal to Jackson 2086 CVR panic device tested with the basis of design EFCO D500 series. EL exit with RX switch on both leaves. Coordinate with security to achieve functional requirements.
OT
3 Permanent Core By Aluminum Assembly Manufacturer Medeco X4 26 MC
2 Door Closer By Aluminum Assembly Manufacturer UNI7500 689 NO
2 Door Pulls By Aluminum Assembly Manufacturer RM3732 60” Stainless Steel
RO
1 Threshold By Aluminum Assembly Manufacturer OT
1 Perimeter Gasketing By Aluminum Assembly Manufacturer OT
1 ElectroLynx Harness - Frame By Aluminum Assembly Manufacturer. Compatible with exit device - equal to QC-C1500P
MK
1 ElectroLynx Harness - Door By Aluminum Assembly Manufacturer. Compatible with exit device- equal to QC-CXXX (Size as required)
MK
1 Wiring Diagram By Security System Supplier OT
1 Position Switch By Security System Supplier OT
1 Card Reader By Security System Supplier OT
1 Power Supply By Security System Supplier OT
Notes: Door closed & locked at all times. Presenting valid credential outside shunts door position switches & allows for authorized entrance. Operating inside touchpad activates request to exit switch shunting door contact and allowing authorized egress at all times. With loss of power door remains locked. Impact-rated door assembly requires continuous hinge, concealed vertical rod exit, threshold and gasketing to be provided as tested per ASTM E1886 and ASTM A1996 for that assembly.
Additions and Renovations - Platt Technical High School - Milford, CT
Addendum No.6 –August 21, 2019 DCS Project No. BI-RT-878 CMR | OSCG&R Project No. 900-0013
Set: 2.1 Doors: B157.1, B162.1
2 Continuous Hinge By Aluminum Assembly Manufacturer, Provide actual hardware that was impacted tested with assembly
OT
1 Concealed Vert Rod Exit By Aluminum Assembly Manufacturer, Provide actual hardware that was impacted tested with assembly
OT
1 Exit Device (nightlatch)
By Aluminum Assembly Manufacturer, Provide actual hardware that was impacted tested with assembly - equal to Jackson 2086 CVR panic device tested with the basis of design EFCO D500 series. EL exit with RX switch on both leaves. Coordinate with security to achieve functional requirements.
OT
3 Permanent Core By Aluminum Assembly Manufacturer Medeco X4 26 MC
1 Door Closer By Aluminum Assembly Manufacturer UNI7500 689 NO
2 Door Pulls By Aluminum Assembly Manufacturer RM3732 60” Stainless Steel
RO
1 Door Operator By Aluminum Assembly Manufacturer 6060 / 6070 689 NO
1 Threshold By Aluminum Assembly Manufacturer OT
1 Mullion Gasketing By Aluminum Assembly Manufacturer 5110BL OT
1 Perimeter Gasketing By Aluminum Assembly Manufacturer OT
2 ElectroLynx Harness - Frame By Aluminum Assembly Manufacturer. Compatible with exit device - equal to QC-C1500P
MK
2 ElectroLynx Harness - Door By Aluminum Assembly Manufacturer. Compatible with exit device - equal to QC-CXXX (Size as required)
MK
1 Wiring Diagram By Security System Supplier OT
2 Position Switch By Security System Supplier OT
2 Door Switch By Aluminum Assembly Manufacturer 501 OT
1 Card Reader By Security System Supplier OT
1 Power Supply By Security System Supplier OT
Notes: .Door closed & locked at all times. Presenting valid credential outside shunts door position switches, activates outside operator paddle & allows for authorized entrance. Operating inside touchpad or inside operator paddle shunts door contact and allows authorized egress at all times. With loss of power door remains locked. Impact-rated door assembly requires continuous hinge, concealed vertical rod exit, threshold and gasketing to be provided as tested per ASTM E1886 and ASTM A1996 for that assembly.
Set: 3.0
Doors: B157.2, B157.3
2 Continuous Hinge By Aluminum Assembly Manufacturer, Provide actual hardware that was impacted tested with assembly
OT
1 Concealed Vert Rod Exit By Aluminum Assembly Manufacturer, Provide actual hardware that was impacted tested with assembly
OT
1 Exit Device (nightlatch)
By Aluminum Assembly Manufacturer, Provide actual hardware that was impacted tested with assembly - equal to Jackson 2086 CVR panic device tested with the basis of design EFCO D500 series. EL exit with RX switch on both leaves. Coordinate with security to achieve functional requirements.
OT
3 Permanent Core Medeco X4 by Aluminum Assembly Manufacturer
26 MC
2 Door Closer UNI7500 by Aluminum Assembly Manufacturer
689 NO
Additions and Renovations - Platt Technical High School - Milford, CT
Addendum No.6 –August 21, 2019 DCS Project No. BI-RT-878 CMR | OSCG&R Project No. 900-0013
2 Door Pulls By Aluminum Assembly Manufacturer RM3732 60” Stainless Steel
RO
1 Threshold By Aluminum Assembly Manufacturer OT
1 Perimeter Gasketing By Aluminum Assembly Manufacturer OT
1 ElectroLynx Harness - Frame By Aluminum Assembly Manufacturer. Compatible with exit device - equal to QC-C1500P
MK
1 ElectroLynx Harness - Door By Aluminum Assembly Manufacturer. Compatible with exit device - equal to QC-CXXX (Size as required)
MK
1 Wiring Diagram By Security System Supplier OT
1 Position Switch By Security System Supplier OT
1 Power Supply By Security System Supplier OT
Set: 4.0
Doors: B159.1, S1.2, S2.1
2 Continuous Hinge By Aluminum Assembly Manufacturer, Provide actual hardware that was impacted tested with assembly
OT
1 Concealed Vert Rod Exit By Aluminum Assembly Manufacturer, Provide actual hardware that was impacted tested with assembly
OT
1 Exit Device (nightlatch)
By Aluminum Assembly Manufacturer, Provide actual hardware that was impacted tested with assembly - equal to Jackson 2086 CVR panic device tested with the basis of design EFCO D500 series. EL exit with RX switch on both leaves. Coordinate with security to achieve functional requirements.
OT
3 Permanent Core By Aluminum Assembly Manufacturer Medeco
X4 26 MC
2 Door Closer By Aluminum Assembly Manufacturer UNI7500 689
NO
2 Door Pulls By Aluminum Assembly Manufacturer RM3732 60” Stainless Steel
RO
1 Threshold By Aluminum Assembly Manufacturer OT
1 Perimeter Gasketing By Aluminum Assembly Manufacturer OT
1 ElectroLynx Harness - Frame
By Aluminum Assembly Manufacturer. Compatible with exit device - equal to QC-C1500P
MK
1 ElectroLynx Harness - Door
By Aluminum Assembly Manufacturer. Compatible with exit device - equal to QC-CXXX (Size as required)
MK
1 Wiring Diagram by Security System Supplier OT
1 Position Switch By Security System Supplier OT
Notes: Impact-rated door assembly requires continuous hinge, concealed vertical rod exit, threshold and gasketing to be provided as tested per ASTM E1886 and ASTM A1996 for that assembly.
Additions and Renovations - Platt Technical High School - Milford, CT
Addendum No.6 –August 21, 2019 DCS Project No. BI-RT-878 CMR | OSCG&R Project No. 900-0013
Set: 5.0
Doors: A101.1, C156
1 Continuous Hinge By Aluminum Assembly Manufacturer, Provide actual hardware that was impacted tested with assembly
OT
1 Exit Device (nightlatch)
By Aluminum Assembly Manufacturer, Provide actual hardware that was impacted tested with assembly - equal to Jackson 2086 CVR panic device tested with the basis of design EFCO D500 series. EL exit with RX switch on both leaves. Coordinate with security to achieve functional requirements.
OT
2 Permanent Core By Aluminum Assembly Manufacturer Medeco X4 26 MC
1 Door Closer By Aluminum Assembly Manufacturer UNI7500 689 NO
2 Door Pulls By Aluminum Assembly Manufacturer RM3732 60” Stainless Steel
RO
1 Threshold By Aluminum Assembly Manufacturer OT
1 Perimeter Gasketing By Aluminum Assembly Manufacturer OT
1 ElectroLynx Harness - Frame By Aluminum Assembly Manufacturer. Compatible with exit device - equal to QC-C1500P
MK
1 ElectroLynx Harness - Door By Aluminum Assembly Manufacturer. Compatible with exit device - equal to QC-CXXX (Size as required)
MK
1 Position Switch by Security System Supplier OT
Notes: Impact-rated door assembly requires continuous hinge, concealed vertical rod exit, threshold and gasketing to be provided as tested per ASTM E1886 and ASTM A1996 for that assembly.
DIVISION 10 – SPECIALTIES
ADD 6-015 SECTION 10 14 00 – SIGNAGE
ADD an additional two (2) “Safety Sign, Wall Mount, Carbon Monoxide, Type 38 Signs.” Location
to be determined by Architect.
ADD 6-016 SECTION 10 41 00 – AED CABINETS
Page 2, REVISE heading of Article 2.1 to READ “AUTOMATED EXTERNAL DEFIBRILLATOR CABINET”
Page 2, Article 2.1, ADD the following sentence after the heading: “Provide one (1) cabinet in the
following rooms: Yoga/Aerobics A102, Gymnasium A133, Restaurant B126, Cafeteria Seating
B159, Nurse Suite C127, Multipurpose Room D111, Learning Commons C218, and Faculty Break
Room E238. Architect to provide exact location for cabinet. Cabinet size to be coordinated with
AED.”
Additions and Renovations - Platt Technical High School - Milford, CT
Addendum No.6 –August 21, 2019 DCS Project No. BI-RT-878 CMR | OSCG&R Project No. 900-0013
ADD 6-017 SECTION 10 41 00 – AED CABINETS
Page 3, ADD Article 2.2 per the following:
“2.2 AUTOMATED EXTERNAL DEFIBRILLATOR (AED)
Provide one (1) defibrillator per cabinet.
A. Manufacture:
Subject to Architect's review for conformance with Contract Documents and
the requirements specified herein, provide products from one of the following
listed manufacturers:
1. Philips Medical Systems, Andover, MA.
2. Medtronic, Minneapolis, MN.
3. Cardiac Science, Bothell, WA.
4. Or equal.
B. Basis of Design: Automated External Defibrillator shall be model “HeartStart
FRx Ready Pack” as manufactured by Philips Medical Systems, Andover, MA.
C. Components:
1. Ready Pack shall have automated external defibrillator, battery, carry case,
SMART Pads II (1 pre-connected set, 1 spare set), Training Pads II, Setup
and Maintenance Guides, Owner’s Manual, Quick Reference Guide, Date
Sticker.
2. Waveform: Truncated Exponential Biphasic. Waveform parameters
adjusted as a function of each patient’s impedance.
3. Therapy: Adult defibrillation: Peak current 32A (150 J nominal into a 50-
ohm load). Pediatric defibrillation with optional FRx Infant/Child key
installed: Peak current 19A (50 J nominal into 50-ohm load).
4. Protocol: Device follows preconfigured settings. Defibrillation and CPR
protocol can be customized using HeartStart Event Review software.
5. Capacity: Minimum 200 shocks or 4 hours of operating time (EN 60601-2-
4:2003).”
6. CPR/AED Responder Kit: Kit shall contain CPR mask, eye shield, 2 pr nitrile
gloves, antiseptic wipes, towel, razor, shears, and a bio-hazard bag in a
nylon carry case.
7. AED inspection tag.
8. Two-way AED wall sign.”
DIVISION 11 – EQUIPMENT
ADD 6-018 SECTION 11 52 14 - LARGE VENUE TENSIONED FRONT PROJECTION SCREEN
ADD this Section, attached, in its Entirety.
Additions and Renovations - Platt Technical High School - Milford, CT
Addendum No.6 –August 21, 2019 DCS Project No. BI-RT-878 CMR | OSCG&R Project No. 900-0013
AMENDMENTS TO DRAWINGS
ARCHITECTURAL
ADD 6-019 DRAWING A1-1-2C – SECOND FLOOR PLAN – AREA C
Room C221: ADD “Similar” Interior Wall Section Tag 3/A2-2-9 to the East Wall.
ADD 6-020 DRAWING A2-2-11 – INTERIOR ELEVATIONS
Interior Elevation 1: REVISE note and graphics regarding Motorized Projection Screen
per Sketch RA6-04.
ADD 6-021 DRAWING A3-2-15 – WALL SECTIONS
Wall Section 1: ADDED detailing for recessed, ceiling mounted, Motorized Large Venue
Tensioned Projection Screen per Sketch RA6-03. ADD 6-022 DRAWING A6-3-2 – CURTAIN WALL TYPES
Curtain Wall Type CW15: ADD the following note to CW15:
“At South Building Facade Provide Double Roller Shade with Room Darkening.”
ADD 6-023 DRAWING A6-3-3 – CURTAIN WALL TYPES
Curtain Wall Type CW16: REVISE note regarding Double Roller Shade to READ:
“Provide Double Roller Shade w/ Darkening at Rooms D129 & D212.
Provide Roller Shade at Rooms D105 & D204.”
ADD 6-024 DRAWING A6-3-7 – STOREFRONT AND INTERIOR STOREFRONT TYPES
Interior Storefront Type ISF16: Provide Vertical Louver Blinds from Floor to 12’-0” AFF.
ADD 6-025 DRAWING A6-3-21 – CURTAIN WALL DETAILS (Drawing added to the set in Addendum No.3)
Detail 6: ADD Detail 6, Typical Sunshade Detail, per Sketch RA6-05.
ADD 6-026 DRAWING A8-1-2D – SECOND FLOOR REFLECTED CEILING PLAN – AREA D
RELOCATED wall mounted Motorized Projection Screen to a recessed, ceiling mounted,
Motorized Large Venue Tensioned Projection Screen per Sketch RA6-02.
STRUCTURAL
ADD 6-027 DRAWING S1-1-2 – SECOND FLOOR FRAMING PLAN – OVERALL
REVISE concrete strength for slabs “S-1” and “S-2” to be 4,000 PSI in the Concrete Slab Table.
ADD 6-028 DRAWING S1-1-3D – ROOF FRAMING PLAN – AREA D
ADD Supports for projector screen per Revision RS6-3.
ADD 6-029 DRAWING S2-3-1 – PRECAST WALL ELEVATIONS
ADD “Typical Exterior Wall Girt Elevation – Area E and Area F” per Revision RS6-1.
ADD 6-030 DRAWING S4-2-21– STRUCTURAL SECTIONS
ADD sections “S12” – refer to Sketch RS6-001.
ADD 6-031 DRAWING S5-1-1 – STRUCTURAL SECTIONS ROOF
ADD Section “R8” – refer to Sketch RS6-002.
Additions and Renovations - Platt Technical High School - Milford, CT
Addendum No.6 –August 21, 2019 DCS Project No. BI-RT-878 CMR | OSCG&R Project No. 900-0013
ELECTRICAL
ADD 6-032 DRAWING E2-1-1D – FIRST FLOOR ELECTRICAL POWER PLAN AREA D
In Multi-Purpose Room D111 provide a backbox, 3/4” conduit, and low voltage control wiring for
the projection screen controls. Locate controls adjacent to the motorized shade switch at the
entry door adjacent to Corridor D106. Route conduit and control wiring to the ceiling mount
projection screen control interface location. Coordinate wiring requirements with the projection
screen provider. Controls provided with the projection screen.
ADD 6-033 DRAWING E2-1-2D – SECOND FLOOR ELECTRICAL POWER PLAN AREA D
In Multi-Purpose Room D111 provide 2#12, #12G, ¾”C from a spare 20A-1P circuit breaker in
Panel “PP7-2” to the wall mounted projection screen motor located on the front wall of the room
adjacent to IDF closet 220. Coordinate wiring requirements with the projection screen provider.
Connect power and controls wiring and test.
E N D O F A D D E N D U M N O . 6
Activity ID Calendar Activity Name OD Start Finish
Platt TechniPlatt Technical High ScPlatt Technical High School GMP Schedule w 12.2.19 EOD NTP DatePlatt Technical High School GMP Schedule w 12.2.19 EOD NTP DatePlatt Technical High School GMP Schedule w 12.2.19 EOD NTP DatePlatt Technical High School GMP Schedule w 12.2.19 EOD NTP DateSummarySummarySummarySummarySummarySummaryMilestonesMilestonesMilestonesMilestonesMilestonesMilestonesM101 5x8 w H (p) Complete Prep Bid Packages 5 01-Jul-19 A 08-Jul-19 AM100 5x8 w H (p) Start Bid Phase 0 09-Jul-19 AM105 5x8 w H (p) Bid Period - All Packages 33 09-Jul-19 A 29-Aug-19M102 5x8 w H (p) Bid Packages Put Out to Trades 0 09-Jul-19 AM106 5x8 w H (p) Prebid Meeting 0 22-Jul-19 AM107 5x8 w H (p) Last Day for RFI's 0 08-Aug-19 AM110 5x8 w H (p) Open Bids 1 29-Aug-19 29-Aug-19M108 5x8 w H (p) Bids Due 0 29-Aug-19*M115 5x8 w H (p) Scope Reviews w BP Subcontractors 16 30-Aug-19 23-Sep-19M120 5x8 w H (p) Review Scopes w Major Trades/Confirm Ability to Meet Schedule Requirements 5 17-Sep-19 23-Sep-19M125 5x8 w H (p) Prepare Final GMP Estimate/Submit GMP to State for Review & Approval 5 19-Sep-19 25-Sep-19M130 5x8 w H (p) GMP Submitted for Approval 0 25-Sep-19M135 5x8 w H (p) State Reviews & Approves GMP 46 26-Sep-19 02-Dec-19M140 5x8 w H (p) GMP Approved / Notice to Proceed Issued 0 02-Dec-19*M145 5x8 w H (p) Execute Subcontractor Bid Packages (27) 10 03-Dec-19 16-Dec-19M150 5x8 w H (p) Start Phase 1 Submittals for Construction of New Building 0 05-Dec-19M155 5x8 w H (p) Start Construction: Site Prep/Site Utilities 0 30-Dec-19M160 5x8 w H (p) Start Foundations 0 02-Mar-20*M165 5x8 w H (p) Start Structural Steel w Crane #2 0 28-Apr-20M170 5x8 w H (p) Start Structural Steel w Crane #1 0 07-May-20M175 5x8 w H (p) Complete Foundations 0 11-Jun-20M190 5x8 w H (p) Structural Steel Complete (Includes Detailing) 0 01-Jul-20M180 5x8 w H (p) Start Roofing 0 07-Jul-20M185 5x8 w H (p) Start Structural Precast w Crane #3 0 07-Jul-20M195 5x8 w H (p) Start Interior Rough Construction 0 14-Aug-20M200 5x8 w H (p) Slabs-On-Grade Complete 0 17-Aug-20M215 5x8 w H (p) Area A Building Envelope Complete (Weather Tight) 0 26-Aug-20M205 5x8 w H (p) Structural Precast Complete (Includes Detailing/Topping Slabs) 0 17-Sep-20M210 5x8 w H (p) Elevated/Topping Slabs Complete 0 17-Sep-20M220 5x8 w H (p) Entire Building Roof Tight 0 13-Oct-20M225 5x8 w H (p) Area F Building Envelope Complete (Weather Tight) 0 22-Oct-20M230 5x8 w H (p) Area E Building Envelope Complete (Weather Tight) 0 02-Nov-20M235 5x8 w H (p) Area B Building Envelope Complete (Weather Tight) 0 01-Dec-20M240 5x8 w H (p) Area C Building Envelope Complete (Weather Tight) 0 01-Dec-20M255 5x8 w H (p) Area D Building Envelope Complete (Weather Tight) 0 10-Dec-20M250 5x8 w H (p) Entire Building Envelope Complete (Weather Tight) 0 15-Dec-20M245 5x8 w H (p) Start Interior Finishes (Not Including Early Gym Painting) 0 17-Dec-20M260 5x8 w H (p) Permanent Power (All Areas) 0 06-Apr-21M265 5x8 w H (p) Interior Rough Construction Complete 0 21-Jul-21M270 5x8 w H (p) Permanent Heat/Conditioned Air (All Areas) 0 21-Jul-21X5000 7x8 (p) Required Weather Days Allowance (Spec Section 01 32 16 Paragraph 1.6.6) 14 19-Nov-21 02-Dec-21Z910M 5x8 w H (p) Phase 1 Substantial Completion 0 03-Dec-21*X200M 5x8 w H (p) Phase 2 Construction Start 0 06-Dec-21X925M 5x8 w H (p) Phase 2 Start Demolition 0 14-Feb-22Z920M 5x8 w H (p) Phase 2 Substantial Completion/Project Complete 0 24-Oct-22Z930 5x8 w H (p) Post Construction 61 25-Oct-22 23-Jan-23
Phase 1 Site Phase 1 Site Summary ActivPhase 1 Site Summary ActivitiesPhase 1 Site Summary ActivitiesPhase 1 Site Summary ActivitiesPhase 1 Site Summary ActivitiesX1000 5x8 w H (p) CM & Owner Trailer and temp services to same 18 17-Dec-19 13-Jan-20X1010 5x8 w H (p) Temp Fencing, Site demo, entrance road & Erosion controls 10 30-Dec-19 13-Jan-20X1020 5x8 w H (p) Clear & Grub & install Storm drain from STMH# 35 to MH# 101 western & northern main run - site 29 03-Jan-20 12-Feb-20X1030 5x8 w H (p) Clear & Grub & install Storm drain from STMH# 35 to MH# 125 southern run 22 07-Jan-20 05-Feb-20X1050 5x8 w H (p) Site Prep - strip frost disturb soils Areas A & B (incl sedimentation basin) 19 10-Feb-20 06-Mar-20X1070 5x8 w H (p) Site Prep - Strip Frost Disturb Soils & Cuts/Rock Areas C & D (inlc sedimentation basin) 12 09-Mar-20 24-Mar-20X1040 5x8 w H (p) Sanitary Main install from street to bldg site 20 16-Mar-20 13-Apr-20X1060 5x8 w H (p) Remove existing storm run within new bldg footprint 0 09-Apr-20 09-Apr-20X1080 5x8 w H (p) Site Prep - strip frost disturb soils Areas E&F (incl sedimentation basin) 17 16-Apr-20 08-May-20X1090 5x8 w H & WS
(p)West side of new bldg - install galley system on west side of new bldg 14 03-Jun-20 22-Jun-20
X1100 5x8 w H & WS( )
West side of bldg - complete all storm work & fills to subgrade 20 18-Aug-20 15-Sep-20X1130 5x8 w H & WS
(p)Water & fire main - install from street to building 22 26-Aug-20 25-Sep-20
X1110 5x8 w H & WS(p)
South of New bldg Area F -complete all storm work and fills to subgrade 15 16-Sep-20 06-Oct-20X1120 5x8 w H & WS
(p)SE Corner of site - complete fills over balance of new utilities to street to subgrade 38 16-Sep-20 06-Nov-20
X1140 5x8 w H & WS( )
Install Tele & electric conduits from poles to bldg 15 28-Sep-20 16-Oct-20
Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q12020 2021 2022 2023
mplete Prep Bid Packagest Bid Phase
Bid Period - All PackagesPackages Put Out to Trades
Prebid MeetingLast Day for RFI's
Open BidsBids Due
Scope Reviews w BP SubcontractorsReview Scopes w Major Trades/Confirm Ability to Meet Schedule RequirementsPrepare Final GMP Estimate/Submit GMP to State for Review & ApprovalGMP Submitted for Approval
State Reviews & Approves GMPGMP Approved / Notice to Proceed Issued
Execute Subcontractor Bid Packages (27)Start Phase 1 Submittals for Construction of New Building
Start Construction: Site Prep/Site UtilitiesStart Foundations
Start Structural Steel w Crane #2Start Structural Steel w Crane #1
Complete FoundationsStructural Steel Complete (Includes Detailing)Start RoofingStart Structural Precast w Crane #3
Start Interior Rough ConstructionSlabs-On-Grade Complete
Area A Building Envelope Complete (Weather Tight)Structural Precast Complete (Includes Detailing/Topping Slabs)Elevated/Topping Slabs Complete
Entire Building Roof TightArea F Building Envelope Complete (Weather Tight)
Area E Building Envelope Complete (Weather Tight)Area B Building Envelope Complete (Weather Tight)Area C Building Envelope Complete (Weather Tight)
Area D Building Envelope Complete (Weather Tight)Entire Building Envelope Complete (Weather Tight)Start Interior Finishes (Not Including Early Gym Painting)
Permanent Power (All Areas)Interior Rough Construction CompletePermanent Heat/Conditioned Air (All Areas)
Required Weather Days Allowance (Spec Section 01 32 16 Paragraph 1.6.6)Phase 1 Substantial CompletionPhase 2 Construction Start
Phase 2 Start DemolitionPhase 2 Substantial Complet
Post Con
CM & Owner Trailer and temp services to sameTemp Fencing, Site demo, entrance road & Erosion controls
Clear & Grub & install Storm drain from STMH# 35 to MH# 101 western & northern main run - siteClear & Grub & install Storm drain from STMH# 35 to MH# 125 southern run
Site Prep - strip frost disturb soils Areas A & B (incl sedimentation basin)Site Prep - Strip Frost Disturb Soils & Cuts/Rock Areas C & D (inlc sedimentation basin)
Sanitary Main install from street to bldg siteRemove existing storm run within new bldg footprint
Site Prep - strip frost disturb soils Areas E&F (incl sedimentation basin)West side of new bldg - install galley system on west side of new bldg
West side of bldg - complete all storm work & fills to subgradeWater & fire main - install from street to building
South of New bldg Area F -complete all storm work and fills to subgradeSE Corner of site - complete fills over balance of new utilities to street to subgrade
Install Tele & electric conduits from poles to bldg
Platt Technical High School GMP Schedule w 12.2.19 EOD NTPDate
Project SchedulePrepared by Project Technologies Group
GMP Submission SchedulePrinted on: 21-Aug-19 11:17
Remaining Level of EffortActual Level of EffortActual WorkRemaining WorkCritical Remaining Work
Milestone Prepared for The Morganti GroupPlatt BP-1 All Activities (dr)
Page 1 of 44
SECTION 11 52 14
ADDENDUM NO.6 08-21-19 LARGE VENUE TENSIONED FRONT PROJECTION SCREEN
PAGE 1 OF 5
CT DAS 5200 (Rev. 02.01.18) DCS PROJECT NO: BI-RT-878-CMR
OSCG&R PROJECT NO: 900-0013
PART 1 - GENERAL 1.1 GENERAL PROVISIONS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section. B. Carefully review and examine all other Contract Documents for requirements therein
affecting the work of this Section. Furthermore, coordinate and sequence the work of this Section with all other trades affected.
1.2 SUMMARY
A. Furnish and install ceiling recessed, electrically operated, large venue tensioned front projection screens and all pertinent accessories as required, as indicated on Drawings, and/or as specified in this Section.
1.3 RELATED WOK
A. Examine Contract Documents for requirements that affect work of this section. Other
Specification sections that relate directly to work of this section include, but not limited to: 1. Division 06 Section “Misc. Rough Carpentry”: for above ceiling wood blocking,
nailers. 2. Division 09 Section "Non-Structural Metal Framing": for secondary metal stud
framing support of recessed projection screen box and mounting accessories. 3. Division 09 Section “Gypsum Boards”: for abutting drywall soffits, openings, and
edge trims. 4. Division 26 Section "Electrical": for electrical power supply and wiring connection
to projection screen control.
1.4 DEFINITIONS A. Gain: Indication of screen’s luminance or brightness, measured perpendicular to screen
center and relative to magnesium carbonate block, which serves as standard for 1.0 gain. Higher numbers indicate greater brightness.
B. Viewing Angle: Horizontal angle from perpendicular center of screen at which gain or
brightness decreases by 50%. C. Format: Proportion of projection screen viewing area expressed as a ratio of height to
width. 1. NTSC or Video Format: 1.00 to 1.33. 2. HDTV Format: 1.00 to 1.78. 3. Wide Format: 1.00 to 1.6. 4. Square: 1.0 to 1.0. 5. Cinemascope or Anamorphic Format: 1.00 to 2.35. 6. Widescreen (Letterbox) Format: 1.00 to 1.85.
1.5 SUBMITTALS
A. Make submittals in accordance with Contract Conditions and Division 01 Section “Submittal Procedures”.
SECTION 11 52 14
ADDENDUM NO.6 08-21-19 LARGE VENUE TENSIONED FRONT PROJECTION SCREEN
PAGE 2 OF 5
CT DAS 5200 (Rev. 02.01.18) DCS PROJECT NO: BI-RT-878-CMR
OSCG&R PROJECT NO: 900-0013
1. Product data: Manufacturer’s technical specifications, installation instructions, and warranty information. a. Test Reports: Certified test reports showing compliance with specified
performance characteristics and physical properties. b. Certificates: Product certificates signed by manufacturer certifying that
materials comply with specified performance characteristics, criteria and physical requirements.
2. Shop drawings: Provide shop drawings for fabrication, and installation of all parts of the work. Provide details of anchorage, connections and accessory items. Provide installation templates for work installed by others. Show all interfaces and relationships to work of other trades. Provide wiring diagrams for electrically operated units.
3. Samples: Submit two 6 inches × 6 inches samples of screen finish material.
B. Sustainable Design Intent: Comply with project requirements intended to achieve sustainable design, measured and documented according to the Connecticut Building Standard Guidelines Compliance Manual for High Performance Buildings. Refer to Section 018113, SUSTAINABLE DESIGN REQUIREMENTS for these conditions.
1.6 REFERENCES A. Society of Motion Picture and Television Engineers (SMPTE):
SMPTE RP 94-2000, Gain Determination of Front Projection Screens. B. Underwriters Laboratories Inc. (UL). C. Connecticut State Building Code.
1.7 QUALITY ASSURANCE A. Qualifications: Worker experienced in performing work of this section who has
specialized in work similar to that required of this project. B. Regulatory Requirements: Comply with Connecticut State Building Code.
1.8 DELIVERY, STORAGE & HANDLING A. Storage and Protection: Store electric projection screens in a dry, ventilated area,
protected from exposure to harmful weather conditions, at a temperature less than 80 degrees F (27 degrees C).
B. Handling: Handle electrically operated projection screen materials with care in order to
prevent damage. C. Deliver materials in manufacturer’s original, unopened, undamaged containers with
identification labels intact.
1.9 WARRANTY A. Manufacturer’s Warranty: Submit, for Owner’s acceptance, manufacturer’s standard
warranty document executed by authorized company official. Manufacturer’s warranty is in addition to, and does not limit, other rights Owner may have under Contract Documents.
SECTION 11 52 14
ADDENDUM NO.6 08-21-19 LARGE VENUE TENSIONED FRONT PROJECTION SCREEN
PAGE 3 OF 5
CT DAS 5200 (Rev. 02.01.18) DCS PROJECT NO: BI-RT-878-CMR
OSCG&R PROJECT NO: 900-0013
B. Provide manufacturer's warranties against manufacturing defects in material and workmanship for a period no less than five (5) years commencing from date of Substantial Completion.
PART 2 - PRODUCTS 2.1 MANUFACTURERS
A. Provide products from one of the following manufacturers, or Architect approved equal:
1 Da-Lite Screen Co., Inc., Warsaw IN. 2 Draper Shade and Screen Co., Inc., Spiceland, IN. 3 Bretford Manufacturing Co., Schiller Park, IL. 4. Or equal.
B. Basis of Design: “Tensioned Large Advantage Deluxe Electrol” as manufactured by Da-Lite Screen Co., Inc.
2.2 ELECTRICALLY OPERATED LARGE VENUE TENSIONED PROJECTION SCREENS
A. Type : Tensioned System. B. Screen Operation: Electrically operated, UL listed, plenum rated, retractable, heavy duty,
with rigid metal roller and motor housed within the roller. Tab guide cable tensioning system to maintain even, lateral tension and hold viewing surface flat. Bottom end of fabric to be inserted into a custom aluminum slat bar with added weight to provide vertical tension on the screen surface. 1. Motor:
a. 2 UL Certified 120 V, 60 Hz, 3-wire permanently lubricated reversal-type, attached to header.
b. Amperage: not more than 2.4 amps. c. Include automatic thermal overload protection, integral gears, capacitor
and electric brake to prevent coasting. d. Preset, adjustable limit switches to automatically stop viewing surface in
UP or DOWN position.
C. Screen Mounting: Ceiling recessed. Include all necessary mounting hardware. D. Screen Case: Extruded aluminum with self-trimming flange. Case is designed to receive
mounting hardware and is sized to suit projection screen. 1. Case Finish: Powder coated black or white as determined by Architect. 2. Case Closure Door: Include automatically operated, hinged powder coated
aluminum finish screen closure door on case bottom. 3. Case Access Door: Hinged, powder coated aluminum finish screen access door
on case bottom for maintenance access.
E. Screen Size: 1. Viewing Area: 146 inches H × 260 inches W.
F. Screen Viewing Surface: 1. High resolution, flexible projection fabric capable of both front and rear projection,
flame retardant, mildew-resistant seamless vinyl, with standard black borders, easily cleaned with mild soap and water solution.
2. Gain: 0.9.
SECTION 11 52 14
ADDENDUM NO.6 08-21-19 LARGE VENUE TENSIONED FRONT PROJECTION SCREEN
PAGE 4 OF 5
CT DAS 5200 (Rev. 02.01.18) DCS PROJECT NO: BI-RT-878-CMR
OSCG&R PROJECT NO: 900-0013
5. Viewing angle: 65. 6. Format: HDTV 16:10. 7. Viewing Surface: “Dual Vision” as manufactured by Da-Lite Screen Company,
Inc.
G. Accessories: 1. Screen Drop: Extra drop of 7'-0" in black fabric at top of the viewing area. 2. Single Motor Low Voltage Control: Built-In Standard. 3. Key Locking Cover Plate: Hinged cover plate with brushed stainless steel finish
provides keyed access to low voltage control wall switch. 4. 3/8" threaded steel mounting rod and mounting brackets. 5. All other pertinent accessories necessary for complete and functional installation.
PART 3 - EXECUTION 3.1 COORDINATION
A. Coordinate electric projection screen placement with other ceiling and wall mounted
components.
3.2 EXAMINATION A. Site Verification of Conditions:
1. Verify that conditions of substrates previously installed under other sections or
contracts are acceptable with electrically operated projection screen installation. 2. Ensure secondary support framing for screen has been properly installed. 3. Ensure electrical power supply is installed to meet electrically operated large
venue projection screen requirements. a. Verify type and location of power supply.
4. Inform General Contractor of unacceptable conditions immediately upon discovery.
5. Proceed with installation only after unacceptable conditions have been corrected.
3.3 INSTALLATION A. General: Install projection screens at locations indicated and in compliance with
manufacturer’s printed instructions. B. Install screen housing and make electrical connections prior to installation of drywall
soffit. C. Securely install screens plumb and level to supporting substrate. Install projection
screens with screen case in position and relationship to adjoining work as indicated on approved shop drawings. Securely anchor work to supporting substrate.
D. Permanently attach screen fabric to roller.
1. Install viewing surface and drive assembly in housing only after interior construction is substantially complete.
3.4 FIELD QULITY CONTROL
A. Testing and Inspection: Operate each screen 3 times to ensure viewing surfaces extend
and retract through full range of motion. 1. Verify controls, limit switches, automatic doors and other components function as
SECTION 11 52 14
ADDENDUM NO.6 08-21-19 LARGE VENUE TENSIONED FRONT PROJECTION SCREEN
PAGE 5 OF 5
CT DAS 5200 (Rev. 02.01.18) DCS PROJECT NO: BI-RT-878-CMR
OSCG&R PROJECT NO: 900-0013
designed and meet project requirements. 2. Ensure that viewing surface raising operation fully engages and moves screen
and closure door into closed position. 3. Adjust motors, controls and components to allow for smooth, unobstructed
screen operation.
3.5 FINAL CLEANING AND PROTECTION A. Upon completion, remove surplus materials, rubbish, tools and equipment. Perform final
cleaning of all exposed surfaces and lubricate all moving parts in accordance with manufacturer's instructions.
B. Protect projection screens from damage during construction. C. Repair damage to adjacent construction caused by electrically operated projection screen
work.
END OF SECTION ***
TR
AN
SLU
CE
NT
WA
LL
PA
NE
L S
YS
TE
M
SE
ALA
NT
AN
D R
OD
B
Y
WIN
DO
W IN
ST
ALLE
R
INS
ULA
TIN
G G
LA
SS
IN
A
LU
MIN
UM
WIN
DO
W
SY
ST
EM
PA
INT
ED
ST
EE
L G
IRT
-S
EE
ST
RU
CT
UR
AL
PA
INT
ED
ST
EE
L A
NG
LE
-S
EE
ST
RU
CT
UR
AL
TH
ER
MA
L B
RE
AK
B
ET
WE
EN
GIR
T A
ND
A
NG
LE
-S
EE
ST
RU
CT
UR
AL
INT
ER
IOR
FA
CE
OF
P
RE
CA
ST
CO
NC
RE
TE
P
AN
EL B
EY
ON
D
1/2"
SH
IM
DA
SH
ED
LIN
ES
SH
OW
A
PP
RO
XIM
AT
E L
OC
AT
ION
O
F S
TE
EL E
MB
ED
PLA
TE
S
AT
JA
MB
S O
F P
RE
CA
ST
P
AN
EL F
OR
GIR
T
AN
CH
OR
AG
E -
BY
PR
EC
AS
T
PA
NE
L M
AN
UF
AC
TU
RE
R
ME
TA
L H
EA
D F
LA
SH
ING
A
TT
AC
HE
D T
O W
OO
D
BLO
CK
ING
BY
WIN
DO
W
INS
TA
LLE
R
(2)
2x W
OO
D B
LO
CK
ING
T
HR
OU
GH
-BO
LT
ED
TO
S
TE
EL A
NG
LE
-A
LU
MIN
UM
C
LA
DD
ED
TO
MA
TC
H
WIN
DO
W S
YS
TE
M
ALUMINUM WINDOW SYSTEM R.O.
R.O. INCLUDES THICKNESS OF 2x WOOD BLOCKING
TRANSLUCENT WALL PANEL R.O.
R.O. INCLUDES THICKNESS OF 2x WOOD BLOCKING
RA
6
1
1"1
1/2"
PR
OV
IDE
CH
AM
FE
R A
T
BLO
CK
ING
ME
TA
L S
ILL F
LA
SH
ING
W/
BA
CK
AN
D E
ND
DA
MS
BY
T
RA
NS
LU
CE
NT
WA
LL P
AN
EL
INS
TA
LLE
R
3 5/8" ±
TU
RN
FLA
SH
ING
UP
AT
BA
CK
S
IDE
OF
BLO
CK
ING
AN
D
PR
OV
IDE
SE
ALA
NT
& R
OD
SE
ALA
NT
& R
OD
BY
W
IND
OW
IN
ST
ALLE
R
SE
T T
RA
NS
LU
CE
NT
WA
LL
PA
NE
L IN
CO
NT
INU
OU
S
BE
D O
F S
EA
LA
NT
AT
FU
LL
PE
RIM
ET
ER
-
TY
P.
2 1/
2"S
HIM
© 2018 Drummey Rosane Anderson, Inc.
Drummey
Rosane
Anderson, Inc.
225 Oakland Road
South Windsor
Connecticut 06074
860-644-8300
REF. DWG No.
Date:
Scale:
DCS Project No.
OSCGR Project No.
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
PL
AT
T T
EC
HN
ICA
L H
IGH
SC
HO
OL
08/21/2019
3" = 1'-0"
Addendum
No. 6
Author
BI-RT-878 CM-R
Re
vis
ion
Tra
nsl
uce
nt
Wa
ll P
an
el
Sil
l/W
ind
ow
He
ad
De
tail
10
/A6
-3-2
0
60
0 O
ran
ge
Av
en
ue
,
Mil
ford
, C
T 0
64
61
RA6-01
900-0013
S
23.4
24.6
8' - 0"MRGWB 9' - 4"
ACT-1
8' - 0"ACT-1
8' - 0"ACT-1
8' - 7"GWB
D221
D220
D217
D218
D216
9' - 4"GWB
THEATRICAL PIPE GRID; SEE ELECTRICAL DRAWINGS
9' - 4"GWB
8' - 0"ACT-1
8' - 0"ACT-1
8' - 0"ACT-1
8' - 0"ACT-1
D216A
CJC
J
CENTER LIGHT
IN TOILET ROOM
RECESSED, CEILING MOUNTED, MOTORIZED LARGE VENUE TENSIONED PROJECTION SCREEN
6' - 5 5/8"
23' - 8 3/4"
6' - 5 5/8"
RA6
2
© 2018 Drummey Rosane Anderson, Inc.
Drummey
Rosane
Anderson, Inc.
225 Oakland Road
South Windsor
Connecticut 06074
860-644-8300
REF. DWG No.
Date:
Scale:
DCS Project No.
OSCGR Project No.
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
PL
AT
T T
EC
HN
ICA
L H
IGH
SC
HO
OL
08/21/2019
1/8" = 1'-0"
Addendum
No. 6
Author
BI-RT-878 CM-R
Re
vis
ion
s to
Se
con
d F
loo
r R
CP
- A
rea
D
60
0 O
ran
ge
Av
en
ue
,
Mil
ford
, C
T 0
64
61
RA6-02
900-0013
B.O. METAL DECK @ MAIN ROOF
ELEV. 131' - 0"
WW
FINISHED CEILING -SEE RCP
FINISHED CEILING -SEE RCP
5 1/2"
RA6
3
RECESSED, CEILING MOUNTED, MOTORIZED LARGE VENUE TENSIONED PROJECTION SCREEN
3 5/8" METAL STUDS @ 16" O.C.
3 5/8" METAL STUD BRACING @ 4'-0" O.C.
STEEL ANGLE HANGERS AND TEE -SEE STRUCTURAL
STEEL BEAM - SEE STRUCTURAL
6" METAL STUD FRAMING @ 16" O.C. BEHIND SCREEN HOUSING
© 2018 Drummey Rosane Anderson, Inc.
Drummey
Rosane
Anderson, Inc.
225 Oakland Road
South Windsor
Connecticut 06074
860-644-8300
REF. DWG No.
Date:
Scale:
DCS Project No.
OSCGR Project No.
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
PL
AT
T T
EC
HN
ICA
L H
IGH
SC
HO
OL
08/21/2019
3/4" = 1'-0"
Addendum
No. 6
Author
BI-RT-878 CM-R
Re
vis
ion
to
Wa
ll S
ect
ion
1/A
3-2
-15
60
0 O
ran
ge
Av
en
ue
,
Mil
ford
, C
T 0
64
61
RA6-03
900-0013
C.J
.C
.J.
RE
CE
SS
ED
, C
EIL
ING
M
OU
NT
ED
, M
OT
OR
IZE
D
LA
RG
E V
EN
UE
TE
NS
ION
ED
P
RO
JE
CT
ION
SC
RE
EN
RA
6
4
© 2018 Drummey Rosane Anderson, Inc.
Drummey
Rosane
Anderson, Inc.
225 Oakland Road
South Windsor
Connecticut 06074
860-644-8300
REF. DWG No.
Date:
Scale:
DCS Project No.
OSCGR Project No.
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
PL
AT
T T
EC
HN
ICA
L H
IGH
SC
HO
OL
08/21/2019
1/4" = 1'-0"
Addendum
No. 6
Author
BI-RT-878 CM-R
Re
vis
ion
s to
Mu
ltip
urp
ose
Ro
om
- W
est
1/A
2-2
-11
60
0 O
ran
ge
Av
en
ue
,
Mil
ford
, C
T 0
64
61
RA6-04
900-0013
ALU
MIN
UM
SU
NS
HA
DE
-S
EE
ELE
VA
TIO
NS
/ T
YP
ES
F
OR
LO
CA
TIO
NS
BY
C
UR
TA
IN W
ALL
MA
NU
FA
CT
UR
ER
(5) H
OR
IZO
NTA
L BL
ADES
2' -
4" INS
ULA
TIN
G G
LA
SS
IN
A
LU
MIN
UM
FR
AM
E
© 2018 Drummey Rosane Anderson, Inc.
Drummey
Rosane
Anderson, Inc.
225 Oakland Road
South Windsor
Connecticut 06074
860-644-8300
REF. DWG No.
Date:
Scale:
DCS Project No.
OSCGR Project No.
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
PL
AT
T T
EC
HN
ICA
L H
IGH
SC
HO
OL
3" = 1'-0"
Author
BI-RT-878 CM-R
Ty
pic
al
Su
nsh
ad
e D
eta
il 6
/A6
-3-2
1
60
0 O
ran
ge
Av
en
ue
,
Mil
ford
, C
T 0
64
61
RA6-05
900-0013
3"
= 1
'-0"
TY
PIC
AL S
UN
SH
AD
E D
ET
AIL
6
Addendum
No. 6
T/SHOP GIRT105' - 7"
WALL BEYOND
11" PRECAST
CONT. 1/4"
STRUCTURAL
THERMAL PAD
8 1/2" 1' - 3 1/2" C OF COLUMN
BEYOND
TUBE GIRT - FOR
SIZE SEE PLAN
SECTION AT INTERMEDIATE SUPPORT POST
NOTE: ALL STEEL TO BE AESS 3
PRIMED WITH A ZINC RICH
PRIMER
VERT. POST -
FOR SIZE SEE
PLAN
1/4"GROUND
SMOOTH TYP.PROVIDE 1/2" Ø THRU-
BOLTS @ 24" O.C. - SEE
ARCH'L DWGS FOR
BLOCKING REQM'TS TYP.
CONT. L4x3x5/16 BOLTED TO
TUBE BEAM W/ 5/8"Ø
EXPANSION BOLTS @ 4'-0" O.C.
TYP.
2 1
/4"
T/SHOP GIRT105' - 7"
WALL BEYOND
11" PRECAST
CONT. 1/4"
STRUCTURAL
THERMAL PAD
8 1/2" 1' - 3 1/2" C OF COLUMN
BEYOND
TUBE GIRT - FOR
SIZE SEE PLAN
SECTION AT EXTERIOR WINDOW GIRT
NOTE: ALL STEEL TO BE AESS 3
PRIMED WITH A ZINC RICH
PRIMER
PROVIDE 1/2" Ø THRU-
BOLTS @ 24" O.C. - SEE
ARCH'L DWGS FOR
BLOCKING REQM'TS TYP.
CONT. L4x3x5/16 BOLTED TO
TUBE BEAM W/ 5/8"Ø
EXPANSION BOLTS @ 4'-0" O.C.
TYP.
2 3
/8"
EMBED PL 1"x7"x0'-10"
W/ (4)-1/2"Øx6" LONG
HEADED STUDS
PRECAST CONCRETE
PANEL - SEE ARCH'L
DWGS. TYP.
1/4"GROUND
SMOOTH TYP.
1/2" THICK WELDED
END PL GROUND
SMOOTH TYP.
STEEL TUBE - FOR
SIZE SEE PLAN TYP.
TYPICAL GIRT TO PANEL CONN.
EMBED PL 1"x6"x0'-8"
W/ (4)-1/2"Øx6" LONG
HEADED STUDS
PRECAST CONCRETE
PANEL - SEE ARCH'L
DWGS. TYP.
1/4"GROUND
SMOOTH TYP.
1/2" THICK WELDED
END PL GROUND
SMOOTH TYP.
STEEL TUBE POST-
FOR SIZE SEE PLAN
TYP.
TYPICAL POST TO PANEL CONN.
© 2018 Drummey Rosane Anderson, Inc.
Drummey
Rosane
Anderson, Inc.
225 Oakland Road
South Windsor
Connecticut 06074
860-644-8300
REF. DWG No.
Date:
Scale:
DCS Project No.
OSCGR Project No.
08/21/2019
3/4" = 1'-0"
ADDENDUM
#6
S4-2-2
BI-RT-878 CM-R
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
PLA
TT
TE
CH
NIC
AL
HIG
H S
CH
OO
L
AD
DE
D S
EC
TIO
N A
T T
UB
E G
IRT
S I
N A
RE
AS
E A
ND
F
60
0 O
ran
ge A
ven
ue
Milf
ord
, C
T 0
64
61
RS6-001
SECTION S12
S4-2-2SCALE: 3/4" = 1'-0"
6
6
2
MAIN ROOF
Top of Steel
131' - 0"
3' -
0"
+/-
1' -
8"
+/-
5 1/2"
CM COORD.
2' - 3" +/-
PROJECTION SCREEN-COORD.
REQUIREMENTS WITH SUPPLIER
STEEL COLUMN-FOR SIZE
SEE COLUMN SCHEDULE
CONT. WT6x32.5 SCREEN
SUPPORT - COORD. FINAL
LENGHT AND BOLT PATTERN
WITH SCREEN SUPPLIER
L3x3x5/16 HANGER AND DIAGONAL BRACE
(WITH SLOTTED HOLES) FIELD WELD AFTER
FINAL ADJUSTMENTL5x3-1/2x5/16
SPACED AT
4'-0" O.C. MAX.
6
RS6
003
© 2018 Drummey Rosane Anderson, Inc.
Drummey
Rosane
Anderson, Inc.
225 Oakland Road
South Windsor
Connecticut 06074
860-644-8300
REF. DWG No.
Date:
Scale:
DCS Project No.
OSCGR Project No.
08/21/2019
3/4" = 1'-0"
ADDENDUM
#6
S5-1-1
BI-RT-878 CM-R
AD
DIT
ION
S A
ND
RE
NO
VA
TIO
NS
PLA
TT
TE
CH
NIC
AL
HIG
H S
CH
OO
L
AD
DE
D S
EC
TIO
N A
T P
RO
JEC
TO
R S
CR
EE
N
60
0 O
ran
ge
Ave
nu
e
Mil
ford
, C
T 0
64
61
RS6-002
SECTION R8
S5-1-1SCALE: 3/4" = 1'-0"
CGCG
CG
CG
CGCG
CGCG
CGCG
CGCG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
(SLOPES)
W14x22
(SLOPES)
W14x22
(SLOPES)
W18x40
(SLOPES)
W18x60
(SLOPES)
W18x60
W24x55
(-1' -
0")
W16x31(-8")
W24x55
(-1' -
0")
W24x55
(-1' -
0")
W18x35(-8")
W24x55
(-1' -
0")
W18x35(-8")
(SLOPES)
W18x35
W24x55
(-1' -
0")
W24x55
(-1' -
0")
W16x26
(-1' -
0")
(SLOPES)
W16x26
W16x26
(-1' -
0")
(SLOPES)
W16x26
W18x35(-8")
W18x35(-8")
(SLOPES)
W18x35
W18x35(-8")
(SLOPES)
W14x22
(SLOPES)
W18x40
(SLOPES)
W14x22
(SLOPES)
W21x44
(SLOPES)
W21x44
DA
DA
DA
DA
R.D.
R.O.F.
[ -8" ]
[ -8" ]
[ -1' -
0" ]
[ -1' -
0" ]
[ -8" ]
R.O.F.
R.D.
R.D.
R.O.F.
R.O.F.
R.D.
[ -1' -
0" ]
"VB-1D"
27
27
26
26
25
25
24
24
21.1
21.1
TT
UU
UU
VV
VV
WW
WW
YY
YY
ZZ
ZZ
AAA
AAA
CCC
CCC
CCC.3
CCC.3
DDD
DDD
EEE
EEE
FFF
FFF
GGG
GGG
21
22
22
22.2
23
23
25.8
27.1
CONT. 1/4
"x8"
BENT PLATE
CONT. 1/4
"x8"
BENT PLATE
R8
S5-1-1
"VB
-2D"
"VB
-4D"
"VB
-3D"
"VB
-5D"
"VB-6D"
"VB-7D"
SS.8
153' - 2"
21' - 0"
30' - 4"
98' - 4"
3' - 6"
26' - 0"
26' - 0"
26' - 0"
20' - 4"
5' - 0"
14' - 8"
10' - 8"
11' - 0"
10' - 0"
154' - 8"
44' - 8"
65' - 4"
28' - 8"
16' - 0"
32' - 8"
32' - 8"
16' - 0"
28' - 8"
98' - 4"
30' - 4"
21' - 0"
10' - 0"
11' - 0"
10' - 8"
14' - 8"
5' - 0"
20' - 4"
26' - 0"
26' - 0"
26' - 0"
14' - 0"
12' - 0"
10' - 0"
16' - 0"
12' - 0"
14' - 0"
161' - 4"
35' - 0"
13' - 0"
65' - 4"
13' - 0"
35' - 0"
3' - 4"
28' - 8"
3' - 0"
13' - 0"
32' - 8"
32' - 8"
13' - 0"
3' - 0"
28' - 8"
3' - 4"
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
R1
S5-1-1
W10x12
W16x26
[ +0" ]
R2
S5-1-1
-4 1/2"
[ -4 1/2
" ]
[ -8 1/4
" ]
[ +0" ]
[ -8 1/4
" ]
[ -1' -
0" ]
[ +0" ]
[ -8" ]
R1C
S5-1-1
[ -1' -
0" ]
[ -6 1/2
" ]
4' - 9 3/8"
4' - 9 3/8"
5' - 6"
5' - 6"
R1
S5-1-1
R3
S5-1-1
CONT. 5/1
6" BENT PLATE
+ CONT. L4x3x1/4
CONT. 5/1
6" BENT PLATE
+ CONT. L4x3x1/4
R6
S5-1-1
R3
S5-1-1
R3
S5-1-1
R6
S5-1-1
R.O.F.
R.O.F.
R.O.F.
R.O.F.
R.O.F.
R.O.F.
R.O.F.
R.O.F.
W18x35
W16x26
(SLOPES)
W16x26
(SLOPES)
W16x26
(SLOPES)
W16x26
(SLOPES)
W16x26
(SLOPES)
W16x26
(SLOPES)
W12x19
(SLOPES)
W12x19
W12x19
(SLOPES)
W12x19
(SLOPES)
W12x26
(SLOPES)
W12x19
(SLOPES)
W12x19
(SLOPES)
W12x19
(SLOPES)
W12x19
(SLOPES)
W12x19
(SLOPES)
W12x19
(SLOPES)
W12x19
W16x26
(SLOPES)
W12x19
W16x26
W16x26
W16x26
(SLOPES)
W12x19
(SLOPES)
W12x26
(SLOPES)
W12x19
(SLOPES)
W12x19
(SLOPES)
W12x19
(SLOPES)
W12x19
(SLOPES)
W12x19
(SLOPES)
W12x19
(SLOPES)
W12x19
(SLOPES)
W10x12
(SLOPES)
W10x12(SLO
PES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W12x50 (SLO
PES)
W12x14
(SLOPES)
W12x50
(SLOPES)
W16x26
(SLOPES)
W16x26
(SLOPES)
W12x50
(SLOPES)
W16x26
(SLOPES)
W12x50
(SLOPES)
W16x31
(SLOPES)
W12x14
(SLOPES)
W12x14
(SLOPES)
W12x14
(SLOPES)
W12x40
(SLOPES)
W12x40
(SLOPES)
W16x26
(SLOPES)
W16x26
(BEN
T)
W30x90
(BEN
T)
W30x90
(BEN
T)
W30x90
(BEN
T)
W30x90
(BEN
T)
W30x90
(BEN
T)
W30x90
(BEN
T)
W30x90
(BEN
T)
W30x90
(BEN
T)
W30x90
(BEN
T)
W30x90
(BEN
T)
W30x90
(BEN
T)
W30x90
(SLOPES)
W12x30
(SLOPES)
W12x30
(SLOPES)
W12x30
(SLOPES)
W12x30
(SLOPES)
W12x30
(SLOPES)
W12x30
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W12x19
(SLOPES)
W12x19
(SLOPES)
W12x19
(SLOPES)
W12x19
(SLOPES)
W12x19
W16x26
W16x26
W16x26
W16x26
(SLOPES)
W12x19
(SLOPES)
W12x19
(SLOPES)
W12x19
(SLOPES)
W12x19
(SLOPES)
W12x19
(SLOPES)
W12x19
(SLOPES)
W12x19
(SLOPES)
W12x19
(SLOPES)
W12x19
(SLOPES)
W12x26(SLO
PES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W12x19
(SLOPES)
W12x19
(SLOPES)
W12x19
(SLOPES)
W12x19
(SLOPES)
W16x26
(SLOPES)
W16x26
(SLOPES)
W16x26
(SLOPES)
W16x26
W18x35
W16x26
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W16x26
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W10x12
(SLOPES)
W12x30
(SLOPES)
W21x50
(SLOPES)
W16x26
(SLOPES)
W16x26
(SLOPES)
W16x26
(SLOPES)
W16x26
(SLOPES)
W16x26
(SLOPES)
W16x26
(SLOPES)
W16x26
(SLOPES)
W16x26
(SLOPES)
W16x26
(SLOPES)
W16x26
(SLOPES)
W16x26
(SLOPES)
W16x26
W16x26
W16x26
MATCHLINE - AREA D
MATCHLINE - AREA C
MATCHLINE - AREA D
MATCHLINE - AREA C
WT6x32.5
(-3'-0
"+/-)
L5x3-1/2x5/16
@ 4'-0
" O.C.
L3x3x5/16 HANGER
& DIAG. BRACE
(TYP. 7 LOC.)
6
RS6
003
A
B
E
F
G
CD
ROOF FRAMING PLAN NOTES:
TOP OF STEEL SHALL BE AT ELEVATION 131'-0" (+14'-0" A.F.F.) UNLESS OTHERWISE
SHOWN THUS (+...) OR (-...) INDICATING THE DISTANCE ABOVE OR BELOW ELEVATION
131'-0" .
[±.....] INICATES TOP OF STEEL GIRDER ELEVATION AT CENTER LINE OF COLUMN. ALL
ELEVATIONS ARE REFERENCED TO TOP OF STEEL ELEVATION 131'-0" (+14'-0" A.F.F.).
INDICATES 1 1/2" DEEP, 20 GAGE, WIDE RIB (TYPE "B"), GALVANIZED METAL
ROOF DECK.
INDICATES 1-1/2" DEEP, 20 GAGE, WIDE RIB (TYPE "BA"), GALVANIZED
ACOUSTICAL METAL ROOF DECK.
PROVIDE ROOF OPENING FRAME (R.O.F.) FOR ALL OPENINGS IN METAL ROOF DECK
LARGER THAN 12" IN ANY DIRECTION PER DETAIL R1 ON DRAWING S1-1-3. REINFORCE
DECK OPENINGS FROM 6" TO 12" IN SIZE W/ L2x2x1/4 STEEL ANGLE. EXTEND A
MINIMUM OF 2 FLUTES EACH SIDE OF OPENING AND WELD TO DECK.
INDICATES MOMENT CONNECTION WHICH SHALL DEVELOP THE FLEXURAL
CAPACITY OF THE MEMBER.
PROVIDE DIAGONAL JOIST BRIDGING WITH BOLTED CONNECTIONS IN ACCORDANCE
WITH SJI REQUIREMENTS. JOIST DESIGNER SHALL PROVIDE BRIDGING AS REQUIRED TO
ADEQUATELY BRACE THE JOISTS AGAINST LATERAL MOVEMENT UNDER FULL LOAD.
PROVIDE BOTTOM CHORD UPLIFT BRIDGING AS REQUIRED.
ALL JOISTS SHALL BE DESIGNED FOR NET MINIMUM WIND UPLIFT OF 15 PSF. JOISTS AND
PERIMETER LOCATED WITHIN 10' OF EXTERIOR WALL SHALL BE DESIGNED FOR NET
UPLIFT OF 25 PSF.
"T.J" INDICATES STEEL TIE JOIST TO HAVE BOTTOM CHORD EXTENSIONS AT STEEL
COLUMN LOCATIONS.
BRACING "VB-*" INDICATES VERTICAL BRACING. SEE BRACING ELEVATIONS ON DRAWING
S2-2-1 FOR REQUIREMENTS.
OPEN WEB STEEL ROOF JOISTS TO BE DESIGNED TO SUPPORT ADDITIONAL POINT LOADS
INDICATED AT LOCATION OF ALL MECHANICAL ROOF TOP UNITS AND EQUIPMENT.
COORD. ACTUAL LOCATION WITH MECHANICAL DRAWINGS AND SUPPLIER.
ADDITIONAL POINT LOADS:
ALL CONDUITS OR PIPING SHALL BE PLACED BELOW THE STRUCTURAL SLAB, NO
CONDUIT OR PIPING SHALL BE PLACED WITHIN THE STRUCTUAL SLAB.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
DA
D
STEEL COLUMNS SHOWN ON THIS DRAWING TO RECEIVE 2-HOUR FIRE RATING BY
CEMENTITIOUS FIREPROOFING UNLESS INDICATED AS A ROUND HSS COLUMN.
EXPOSED TO VIEW PORTION OF ROUND HSS COLUMNS TO RECEIVE 2-HOUR FIRE
RATING BY INTUMESCENT MASTIC FIREPROOFING. CONCEALED FROM VIEW PORTION
OF ROUND HSS COLUMN TO RECEIVE TO RECEIVE 2-HOUR FIRE RATING BY
CEMENTITIOUS FIREPROOFING.
STEEL BEAMS AND KICKERS, ON THIS DRAWING, SUPPORTING ROOF TO RECEIVE 1-
HOUR FIRE RATING BY CEMENTITIOUS FIREPROOFING. METAL ROOF DECK TO RECEIVE
1-HOUR FIRE RATING BY CEMENTITIOUS FIREPROOFING.
FOR ROOF CONSTRUCTION LOCATED MORE THAN 20'-0" ABOVE FINISHED FLOOR, AT
MULTIPURPOSE ROOM (D111), SECONDARY ROOF BEAMS AND DECK SHALL NOT
RECEIVE FIREPROOFING; PRIMARY STEEL BEAMS SUPPORTING ROOF ONLY (BEAMS
CONNECTED TO COLUMNS), TO RECEIVE 1-HOUR FIRE RATING BY CEMENTITIOUS
FIREPROOFING. STEEL AND DECK NOT RECEIVING CEMENTITIOUS FIREPROOFING TO
BE PRIMED TO RECEIVE PAINT.
FIREPROOFING NOTES:
1.
2.
3.
CAD no.
drawing prepared by
DCS project no.
project
drawing no.
approved by
drawn by
scale
date
drawing title
STATE OF CONNECTICUTDEPARTMENT OF ADMINISTRATIVE SERVICES
OSCGR project no.900-0013
descriptiondatemark
REVISIONS
As indicated
ROOF FRAMING PLAN - AREA D
SZEWCZAK ASSOCIATES
ADDITIONS AND RENOVATIONSPLATT TECHNICAL HIGH SCHOOL
BI-RT-878 CM-R
200 Fisher DriveAvon, CT 06001
05/24/2019
JWZ
PGC
S1-1-3D
600 Orange Avenue Milford, CT 06461
100% CONSTRUCTION DOCUMENTS
SCALE: 1/8" = 1'-0"
ROOF FRAMING PLAN - AREA D
6 08/21/2019 ADDENDUM #6
MEZZANINE PLANK
106' - 6"
TOP OF SLAB @
SHOP LEVEL
97' - 0"
J M V W
ROOF PRECAST
DATUM
130' - 11"
Q.4 AA.3
LOW ROOF
PRECAST DATUM
116' - 8"
Y
PW-101
VERTICAL
PANEL
JOINTS TYP.
PRECAST PLANK
MEZZANINE
PW-102
PRECAST
COLUMN
PRECAST
COLUMN
PRECAST
COLUMN
PRECAST
BEAM
PRECAST
BEAM
24' - 0" 36' - 0"36' - 0" 36' - 0" 12' - 4"
PRECAST
BEAM
PRECAST
BEAM PRECAST
COLUMN
PRECAST
COLUMN
PRECAST
COLUMN
PRECAST
COLUMN
28' - 3"
VERTICAL
PANEL
JOINTS TYP.
CONT. CORBEL FOR
PRECAST SUPPORT
CONT. CORBEL FOR
PRECAST SUPPORT
CONT. CORBEL FOR
PRECAST SUPPORT
PW-103PW-104PW-105
CONT. CORBEL FOR
PRECAST SUPPORT
CONT. CORBEL FOR
PRECAST SUPPORT
14
' -
3"
10
' -
2"
9' -
6"
VERTICAL
PANEL
JOINTS TYP.
COORDINATE DUCT
OPENINGS WITH
MECHANICAL
CONTRACTOR TYPICAL
MEZZANINE PLANK
106' - 6"
TOP OF SLAB @
SHOP LEVEL
97' - 0"
9 8 5
ROOF PRECAST
DATUM
130' - 11"
3.6
LOW ROOF
PRECAST DATUM
116' - 8"
PW-107PW-116
PW-120
COORDINATE DUCT
OPENINGS WITH
MECHANICAL
CONTRACTOR TYPICAL
9' -
6"
10
' -
2"
14
' -
3"
A
B
C
D
A
B
C
D
A
B
C
D
12
' -
0"
8' -
5"
9' -
9"4
' -
5"
34
' -
7"
50' - 0" 70' - 0" 48' - 11"
PANEL JOINT
TYPICAL
PANEL JOINTS
TYPICAL
PRECAST
COLUMN
PRECAST
COLUMN PRECAST
COLUMN
PRECAST PLANK
MEZZANINE BEYOND
CORRIDOR ALONG GRID "W"
COORDINATE DUCT
OPENINGS WITH
MECHANICAL
CONTRACTOR TYPICAL
A
B
C
PW-118
D
STACKED PANELS
TYPICAL
COORD. WALL
OPENINGS W/
ARCH'L DWGS
TYPICALMEZZANINE PLANK
106' - 6"
TOP OF SLAB @
SHOP LEVEL
97' - 0"
J M VQ.4
LOW ROOF
PRECAST DATUM
116' - 8"
PW-111
PANEL
JOINTS
TYPICAL
PRECAST PLANK
MEZZANINE B/S
CONT. CORBEL FOR
PRECAST SUPPORT
B/S TYP.
CONT. CORBEL
FOR PRECAST
SUPPORT B/S
TYP.
PANEL
JOINTS
TYPICAL
PW-112PW-113
28' - 3" 36' - 0" 36' - 0"
10
' -
2"
9' -
6"
PRECAST
COLUMN
COORDINATE DUCT
OPENINGS WITH
MECHANICAL
CONTRACTOR TYPICAL
PRECAST
COLUMN
PRECAST
COLUMN
ALONG GRID "5"
MEZZANINE PLANK
106' - 6"
TOP OF SLAB @
SHOP LEVEL
97' - 0"
9.19753
ROOF PRECAST
DATUM
130' - 11"
LOW ROOF
PRECAST DATUM
116' - 8"
PW-119PW-117 PW-106
COORDINATE DUCT
OPENINGS WITH
MECHANICAL
CONTRACTOR TYPICAL
9' -
6"
10
' -
2"
14
' -
3"
A
B
C
D
8' -
5"
9' -
9"4
' -
5"
A
B
12
' -
0"
A
B
C
D
34
' -
7"
PANEL JOINTS TYPICAL
PANEL JOINTS TYPICAL
60' - 0"60' - 0"60' - 0"
PRECAST PLANK
MEZZANINE BEYOND
PRECAST PLANK
MEZZANINE BEYOND
PRECAST COLUMN
TYPICAL
PRECAST COLUMN
TYPICAL
CORRIDOR ALONG GRID "V"
14
' -
3"
COORD. WALL
OPENINGS W/
ARCH'L DWGS
TYPICAL
MEZZANINE PLANK
106' - 6"
TOP OF SLAB @
SHOP LEVEL
97' - 0"
W AA BB
ROOF PRECAST
DATUM
130' - 11"
LOW ROOF
PRECAST DATUM
116' - 8"
Y
VERT. PANEL
JOINTS
TYPICAL
14
' -
3"
10
' -
2"
9' -
6"
24' - 0" 31' - 7" 28' - 7"
PRECAST
COLUMN CONT. CORBEL
FOR PRECAST
SUPPORT B/S
TYP.
CONT. CORBEL FOR
PRECAST SUPPORT
B/S TYP.
COORDINATE DUCT
OPENINGS WITH
MECHANICAL
CONTRACTOR TYPICAL
CONT. PRECAST
CORRIDOR WALL COORDINATE DUCT
OPENINGS WITH
MECHANICAL
CONTRACTOR TYP.
CONT. WOOD FRAMED
MEZZANINE - FAR SIDE
TYP.
T/SHOP GIRT
105' - 7"
MEZZANINE PLANK
106' - 6"
TOP OF SLAB @
SHOP LEVEL
97' - 0"
J M V
ROOF PRECAST
DATUM
130' - 11"
Q.4
LOW ROOF
PRECAST DATUM
116' - 8"
A
C
PANEL
JOINTS
TYPICAL
PRECAST PLANK
MEZZANINE B/S
28' - 3"
CONT. CORBEL FOR
PRECAST SUPPORT
B/S TYP.
CONT. CORBEL
FOR PRECAST
SUPPORT B/S
TYP.
36' - 0" 36' - 0"
PANEL
JOINTS
TYPICAL
PW-109PW-110
MEZZANINE PLANK
106' - 6"
TOP OF SLAB @
SHOP LEVEL
97' - 0"
J M V
AREA F ROOF
PRECAST DATUM
120' - 3"
Q.4
LOW ROOF
PRECAST DATUM
116' - 8"
3' -
7"
10
' -
2"
9' -
6"
PRECAST
COLUMN
COORDINATE DUCT
OPENINGS WITH
MECHANICAL
CONTRACTOR TYPICAL
PRECAST
COLUMN
PRECAST
COLUMN
COORDINATE DUCT
OPENINGS WITH
MECHANICAL
CONTRACTOR TYPICAL
28' - 3" 36' - 0" 36' - 0"
PW-114
PRECAST PLANK
MEZZANINE B/S
CONT. CORBEL FOR
PRECAST SUPPORT
B/S TYP.PW-115
PERP. PRECAST
BEARING WALLS
TYP.
CORRIDOR ALONG GRID "3"
PLAN NOTES
ALL EXPOSED WALL SURFACES SHALL BE SMOOTH AND HOLES
GREATER THAN 1/4" DIAMETER OR GREATER SHALL BE
PATCHED.
PROVIDE SEALED CALCULATIONS FOR THE DESIGN OF WALLS.
WALLS SHALL BE DESIGNED TO RESIST HORIZONTAL SESIMIC
SHEARS SHOWN ON DRAWING S2-5-1.
ALL HARDWARE SHALL BE GALVANIZED WITH FIELD TOUCH-UP.
PROVIDE CONCEALED POCKETS FOR WELD PLATES WHICH
SHALL BE PATCHED TO MATCH THE WALL SURFACE.
COORDINATE WALL PENETRATIONS WITH MECHANICAL AND
PLUMBING CONTRACTORS.
SEE DETAIL "S1/S2-3-2" FOR TYPICAL HORIZONTAL PRECAST
JOINT CONNECTION.
1.
2.
3.
4.
5.
6.
7.
TOP OF SLAB @
SHOP LEVEL
97' - 0"
AREA F ROOF
PRECAST DATUM
120' - 3"
T. O. CONC.
TOPPING
120' - 7"
T/SHOP GIRT
105' - 7"
8' -
5"
5' -
3 1
/2"
8' -
7"
FOR WINDOW OPENING
SEE ARCH'L DWGS
SEE PLAN FOR
GIRT SIZE TYP.
SEE PLAN FOR
POST SIZE
TYP.S12
S4-2-2
NOTES
1.
2.
3.
4.
PROVIDE EMBEDDED PLATE 1"x7"x10" W/ (4)-1/2" DIA. x 6" LONG
HEADED STUDS IN CONCRETE PANELS FOR FIELD WELDED CONN. OF
GIRTS.
PROVIDE EMBEDDED PLATE 1"x6"x8" W/ (4)-1/2" DIA. x 6" LONG
HEADED STUDS IN CONCRETE PANELS FOR FIELD WELDED CONN. OF
POST.
DESIGN ARCHITECTURAL PRECAST CONCRETE PANELS TO SUPPORT
STEEL INFILL AT WINDOW OPENINGS AND OUT OF PLANE WIND
LOADS.
PROVIDE 1/2" WELDED END PLATES AT TUBE ENDS AND FIELD WELD
TO EMBEDDED PLATES WITH SMOOTH WELDS. FIELD VERIFY ALL
LENGTHS TYPICAL
CAD no.
drawing prepared by
DCS project no.
project
drawing no.
approved by
drawn by
scale
date
drawing title STATE OF CONNECTICUT
DEPARTMENT OF ADMINISTRATIVE SERVICES
OSCGR project no.900-0013
descriptiondatemark
REVISIONS
1/8" = 1'-0"
PRECAST WALLELEVATIONS
SZEWCZAK ASSOCIATES
ADDITIONS AND RENOVATIONSPLATT TECHNICAL HIGH SCHOOL
BI-RT-878 CM-R
200 Fisher DriveAvon, CT 06001
05/24/2019
Author
Approver
S2-3-1
600 Orange Avenue Milford, CT 06461
100% CONSTRUCTION DOCUMENTS
SCALE: 1/8" = 1'-0"
WALL ELEVATIONS - "PW-101", "PW-102", "PW-103", "PW-104" & "PW-105"
SCALE: 1/8" = 1'-0"
WALL ELEVATIONS - "PW-107", "PW-116", "PW-118" AND "PW-120"SCALE: 1/8" = 1'-0"
WALL ELEVATIONS - "PW-111", "PW-112" AND "PW-113"
SCALE: 1/8" = 1'-0"
WALL ELEVATIONS - "PW-106", "PW-117" AND "PW-119"
SCALE: 1/8" = 1'-0"
WALL ELEVATION "PW-108"
SCALE: 1/8" = 1'-0"
WALL ELEVATIONS "PW-109" & "PW-110"
SCALE: 1/8" = 1'-0"
WALL ELEVATIONS "PW-114 AND "PW-115"
4 08/09/2019 ADDENDUM #4
6 08/21/2019 ADDENDUM #6
SCALE: 1/8" = 1'-0"
TYPICAL EXTERIOR WALL GIRT ELEVATION - AREA E AND AREA F
6
61